The document discusses multiple draft plans for coastal restoration and protection in southeast Louisiana. It includes draft bathymetry maps showing land building and depth changes. Graphs show storm surge envelopes and wave height analyses for selected storms. The document also outlines a proposed wetland vegetation plan and describes a multiple lines of defense base flood elevation conceptual restoration plan for Plaquemines Parish, including details on Reach B-2 which involves constructing an 8 mile long, 500 foot wide, 10 foot high forested ridge requiring 8.5 million cubic yards of fill at an estimated cost of $50 million.