RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11
Assessment team: ACPL
Page 1 of 9
Risk Assessment
Risk Matrix
Fatal
Impact
Rating

5 M M H H H
Hospitalization Case 4 L M M H H
Lost Time Case 3 L M M M H
Non-reportable Medical treatment
case 2 L L M M M
First Aid Treatment 1 L L L L M
1 2 3 4 5
Probability Rating 
Risk Level = Probability x
Impact Rating
Most
Unlikely
Unlikely
Likely
Most
Likely
Inevitable
Legend
Risk Level from 1 to 4 Low Risk
Risk Level from 5 to 12 Medium Risk
Risk Level from 15 to 25 High Risk
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11
Assessment team: ACPL
Page 2 of 9
Brick work Activity:
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11
Assessment team: ACPL
Page 3 of 9
S.
No.
Activity Hazard / Risk
Impact
Rating
(I)
Prob.
Rating
(P)
Risk
Level
(IxP)
Risk Controls Required
Residual
Risk
Action
by
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11
Assessment team: ACPL
Page 4 of 9
S.
No.
Activity Hazard / Risk
Impact
Rating
(I)
Prob.
Rating
(P)
Risk
Level
(IxP)
Risk Controls Required
Residual
Risk
Action
by
1 Mobilization of
Manpower
Construction
material&
Equipment
shifting to work
place.
Construction
vehicle engage
at site for
transportation
1-Non competent
personnel.
2-Unaware of site
safety. rule &
regulation.
3-Unauthorized
entry.
4-Slip & Trip
Hazard.
5-Bodily injury
during. shifting
material.
6-Ergonomic
Hazard.
7-Defective
Equipment.
8-Untrained
Operator.
3 3 M 1. TBT & Job specific training conducted before start the activity.
2. Area to be barricaded and caution board display to avoid unauthorized entry.
3. Good housekeeping maintain workplace and access area.
4. Manpower deploy with mandatory and job specific ppe
5. Maintain good body posture while working or manual handling
6. Ensure prior to inspection before use construction vehicle at site.
7. Remove all obstacles from pathway
8. Loose material (Nut, bolt) shifter at location by the help of gunny bag
9. Only allow good Physical condition construction vehicle at site
10. All statutory valid documents of construction vehicle available at site
.
11. Operator have valid driving license
12. Ensure flag man deploy at site.
13. Ensure work permit before start the activity.
Low
Risk
Site
Engineer
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11
Assessment team: ACPL
Page 5 of 9
S.
No.
Activity Hazard / Risk
Impact
Rating
(I)
Prob.
Rating
(P)
Risk
Level
(IxP)
Risk Controls Required
Residual
Risk
Action
by
2 Installation of
Tie rods
(Hanger)
Fixing of
Tees
c. Placing of
hanging tiles
1. Fall from height.
2. Fall of material.
3. Slip, trip and fall
on same surface.
4. Electrical Shock.
5. Cut injury.
6. Eye injury.
4 3 M 1. Obtain Work Permit from Client only after physical verification of work
location.
2. Ensure work specific tool box talk/ training to all the workmen conducted by the
site engineer / supervisor.
3. Work Engineer / supervisor needs to be present at work spot till completion of
work.
4. Engage trained / experience work force on job.
5. Fall protection shall be provided(FBH with adequate anchoring provision.
6. Completely guard rail provided to the height working platform or any surface
opening.
7. Ensue ladder or scaffold stair case with hand railing access provide where
require.
8. Secure the necessary material at height and remove unwanted material from
height.
9. Good housekeeping maintain work place and access area.
10. All electrical connection shall be done by authorised electrician only.
11. Ensure the all power supply through 30 mA. ELCB/ RCCB.
12. All hand & power tools shall be secured on the working platform by using PP
rope to avoid any free fall, barricade the working the area
13. Remove all obstacles from pathway.
14. Stack the materials at designated work location to avoid slip, trip and fall.
15. Provide all mandatory PPE's before start the work.
16. Ensure the all power supply through 30 mA. ELCB/ RCCB.
17. All Power tools must be inspected and valid green inspection tag should be
provided.
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11
Assessment team: ACPL
Page 6 of 9
S.
No.
Activity Hazard / Risk
Impact
Rating
(I)
Prob.
Rating
(P)
Risk
Level
(IxP)
Risk Controls Required
Residual
Risk
Action
by
3 Cutting /
fabrication &
Assembling
of joineries at
site work
location.
1.Damage of
equipments during
handling.
2.Injury due to
rough edge of flat.
3.Eye burn /
irritation due to
burr.
4.Electrical shock
due to not having
proper connection
of drilling
machine.
5.Fall of stacked
materials.
6.Fire hazard.
4 3 M 1. Ensure work permit from client,by job engineer, only after physical verification
of work location
2. Remove all combustible materials from the area before start the work
3. Ensure that all the power tools & hand tools shall be inspected and display the
Green Tag.
4. Cutting machine shall be operated by authorized person only.
5. All electrical connection shall be done by authorized person only.
6. Job engineer / supervisor needs to be present at work spot for continuous
supervision till completion of work
7. Allow only authorized / trained person to work
8. Ensured work specific tool box talk/ training conducted.
9. Ensure the Green tag with valid inspection tag in all the power tools.
10. Ensure the Eye protection devices like Face Shield while cutting & Grinding
operation.
11. All power cable should be over headed & power tool should be double
insulated.
12. Ensure the power cable shall be routed through the insulated hook over.
13. Provide fire extinguisher at work location.
14. Ensure the all power supply through 30mA ELCB/RCCB.
15. Ensure Stacking of material no more then 1 meter.
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11
Assessment team: ACPL
Page 7 of 9
S.
No.
Activity Hazard / Risk
Impact
Rating
(I)
Prob.
Rating
(P)
Risk
Level
(IxP)
Risk Controls Required
Residual
Risk
Action
by
4 Installation of
aluminium
windows,
ventilators, doors
& partitions.
Installation of
frames with
screws.
Installations of
glass & sealing.
Fixing of beading
& gasket.
Cleaning of Glass
and frames.
1. Mis-handling of
fabricated Material
by incompetent
persons.
2. Fall of material
(Glass, Door &
other frames while
fixing).
3. Hitting of glass
with hard / sharp
object.
4. Cut and Eye
Injury.
5. Fall of person
while placing /
fixing of frames.
6. Failure of hand
tools.
7. Electric shock.
4 3 M 1. Ensure work permit before start the activity.
2. Ensure the trained & skilled person shall be allowed to operate.
3. Ensure that no one is allowed to stand beside the frames and glass while
installation.
4. Area shall be barricade to prevent the unauthorized entry.
5. Ensure that all the hand tools shall be secured while working at height.
6. Ensure all the frames has fixed with screw before completion and cross
checked.
7. Inspect the glass before moving to ensure no damage.
8. Use proper material handling technique.
9. Area to be inspected before fixing to avoid hitting of the glass with hard / sharp
objects.
10. Carry one piece of glass at a time
11. Provide cut resistance & googles with side covers.
12. Ensure that Scaffolding shall be used to reach the height for fixing the door /
window frames.
13. Ensure the Scaffolding shall be inspected by competent person.
14. Workmen shall be worn safety harness with double land yard and it shall be
anchored on strong member to avoid fall from height.
15. Ensure use of standard hand tools.
16.Defective hand tools shall not be used. It shall be inspected before used.
17. Right tool for the right job system shall be followed.
18. Electrical connections shall be routed through the ELCB / RCCB 30 mA.
19. All the installations DBs, SDBs at site are to be double earthing.
20. All electrical cables shall be insulated properly.
No electrical cables should be laid over the ground, either cable should be buried
under ground or it should be above the height of obstruction passes through the
Low
Risk
Site
Engineer
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11
Assessment team: ACPL
Page 8 of 9
S.
No.
Activity Hazard / Risk
Impact
Rating
(I)
Prob.
Rating
(P)
Risk
Level
(IxP)
Risk Controls Required
Residual
Risk
Action
by
5 Rolling shutter 1.Electrical shock
2. Contact with
rough edge.
3. Slippage of
materials.
4- Injury due to
sudden arc flash.
5. Eye burn/
Irritation due to
welding Arc.
6- Fall of Man &
Material/Tools
7- Fire
8- Collapse of
scaffold
4 3 M 1. Ensure the all power supply through 30 mA ELCB/RCCB
2. Ensure Work Permit form Client only after physical verification of work
location
3.Job Engineer/supervisor needs to be present at work location for continuous
supervision till completion of work.
4. Allow only authorize /Trained person to work.
5. Ensure work specific tool box/training to all the workmen conducted by the site
manager.
6. Check the access for man and materials movement shifting by manually.
7. Only 25kg/person will be limit for manual material handling.
8. Good housekeeping maintain in work place area.
9. Check the all power tools before start the work and all power tool to be in good
condition.
10. Ensure the double body ear thing of all electrical equipment and all power
cable should be overhead & double insulated.
11. PPE and job specific PPE to be used (Cut resistive hand gloves, Helmet, Safety
Shoes, Reflective jacket, nose mask, Welding face shield leather gloves and
apron..)
12. Double lanyard Fully body harness shall be use for height work.
13. Rope shall be use to lift the material and the same shall be secure or bind with
rope at work location to prevent fall.
14. Fire extinguisher to be kept nearer to the work location.
15. Provide black goggle, lather hand gloves to welder helper.
For scaffolding work kindly follow the safe working methodology as mentioned
above.
16. Tag line has to be provided for all tools and tackles to avoid fall from height.
Low
Risk
Site
Engineer
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11
Assessment team: ACPL
Page 9 of 9
Prepared by: Grant Enterprises Reviewed by: Approved by:

More Related Content

Similar to MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc

JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JESUSBASILIOANTONIO
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
MohammedAliQazi
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
JESUSBASILIOANTONIO
 
Site_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdfSite_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdf
ObijiakuIjeoma
 

Similar to MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc (20)

Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
 
Construction Site Safety - Part II
Construction Site Safety - Part IIConstruction Site Safety - Part II
Construction Site Safety - Part II
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
 
ehs
ehsehs
ehs
 
SITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAININGSITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAINING
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
 
risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdf
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
TRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docxTRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docx
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
 
update 20feb1
update 20feb1update 20feb1
update 20feb1
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docx
 
Plant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffold
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
Site_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdfSite_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdf
 

Recently uploaded

Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
grop material handling.pdf and resarch ethics tth
grop material handling.pdf and resarch ethics tthgrop material handling.pdf and resarch ethics tth
grop material handling.pdf and resarch ethics tth
AmanyaSylus
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
grop material handling.pdf and resarch ethics tth
grop material handling.pdf and resarch ethics tthgrop material handling.pdf and resarch ethics tth
grop material handling.pdf and resarch ethics tth
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Maestro Scripting Language CNC programacion
Maestro Scripting Language CNC programacionMaestro Scripting Language CNC programacion
Maestro Scripting Language CNC programacion
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 

MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc

  • 1. RISK ASSESSMENT MSP- Rev-00 Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date: Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11 Assessment team: ACPL Page 1 of 9 Risk Assessment Risk Matrix Fatal Impact Rating  5 M M H H H Hospitalization Case 4 L M M H H Lost Time Case 3 L M M M H Non-reportable Medical treatment case 2 L L M M M First Aid Treatment 1 L L L L M 1 2 3 4 5 Probability Rating  Risk Level = Probability x Impact Rating Most Unlikely Unlikely Likely Most Likely Inevitable Legend Risk Level from 1 to 4 Low Risk Risk Level from 5 to 12 Medium Risk Risk Level from 15 to 25 High Risk
  • 2. RISK ASSESSMENT MSP- Rev-00 Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date: Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11 Assessment team: ACPL Page 2 of 9 Brick work Activity:
  • 3. RISK ASSESSMENT MSP- Rev-00 Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date: Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11 Assessment team: ACPL Page 3 of 9 S. No. Activity Hazard / Risk Impact Rating (I) Prob. Rating (P) Risk Level (IxP) Risk Controls Required Residual Risk Action by
  • 4. RISK ASSESSMENT MSP- Rev-00 Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date: Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11 Assessment team: ACPL Page 4 of 9 S. No. Activity Hazard / Risk Impact Rating (I) Prob. Rating (P) Risk Level (IxP) Risk Controls Required Residual Risk Action by 1 Mobilization of Manpower Construction material& Equipment shifting to work place. Construction vehicle engage at site for transportation 1-Non competent personnel. 2-Unaware of site safety. rule & regulation. 3-Unauthorized entry. 4-Slip & Trip Hazard. 5-Bodily injury during. shifting material. 6-Ergonomic Hazard. 7-Defective Equipment. 8-Untrained Operator. 3 3 M 1. TBT & Job specific training conducted before start the activity. 2. Area to be barricaded and caution board display to avoid unauthorized entry. 3. Good housekeeping maintain workplace and access area. 4. Manpower deploy with mandatory and job specific ppe 5. Maintain good body posture while working or manual handling 6. Ensure prior to inspection before use construction vehicle at site. 7. Remove all obstacles from pathway 8. Loose material (Nut, bolt) shifter at location by the help of gunny bag 9. Only allow good Physical condition construction vehicle at site 10. All statutory valid documents of construction vehicle available at site . 11. Operator have valid driving license 12. Ensure flag man deploy at site. 13. Ensure work permit before start the activity. Low Risk Site Engineer
  • 5. RISK ASSESSMENT MSP- Rev-00 Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date: Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11 Assessment team: ACPL Page 5 of 9 S. No. Activity Hazard / Risk Impact Rating (I) Prob. Rating (P) Risk Level (IxP) Risk Controls Required Residual Risk Action by 2 Installation of Tie rods (Hanger) Fixing of Tees c. Placing of hanging tiles 1. Fall from height. 2. Fall of material. 3. Slip, trip and fall on same surface. 4. Electrical Shock. 5. Cut injury. 6. Eye injury. 4 3 M 1. Obtain Work Permit from Client only after physical verification of work location. 2. Ensure work specific tool box talk/ training to all the workmen conducted by the site engineer / supervisor. 3. Work Engineer / supervisor needs to be present at work spot till completion of work. 4. Engage trained / experience work force on job. 5. Fall protection shall be provided(FBH with adequate anchoring provision. 6. Completely guard rail provided to the height working platform or any surface opening. 7. Ensue ladder or scaffold stair case with hand railing access provide where require. 8. Secure the necessary material at height and remove unwanted material from height. 9. Good housekeeping maintain work place and access area. 10. All electrical connection shall be done by authorised electrician only. 11. Ensure the all power supply through 30 mA. ELCB/ RCCB. 12. All hand & power tools shall be secured on the working platform by using PP rope to avoid any free fall, barricade the working the area 13. Remove all obstacles from pathway. 14. Stack the materials at designated work location to avoid slip, trip and fall. 15. Provide all mandatory PPE's before start the work. 16. Ensure the all power supply through 30 mA. ELCB/ RCCB. 17. All Power tools must be inspected and valid green inspection tag should be provided.
  • 6. RISK ASSESSMENT MSP- Rev-00 Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date: Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11 Assessment team: ACPL Page 6 of 9 S. No. Activity Hazard / Risk Impact Rating (I) Prob. Rating (P) Risk Level (IxP) Risk Controls Required Residual Risk Action by 3 Cutting / fabrication & Assembling of joineries at site work location. 1.Damage of equipments during handling. 2.Injury due to rough edge of flat. 3.Eye burn / irritation due to burr. 4.Electrical shock due to not having proper connection of drilling machine. 5.Fall of stacked materials. 6.Fire hazard. 4 3 M 1. Ensure work permit from client,by job engineer, only after physical verification of work location 2. Remove all combustible materials from the area before start the work 3. Ensure that all the power tools & hand tools shall be inspected and display the Green Tag. 4. Cutting machine shall be operated by authorized person only. 5. All electrical connection shall be done by authorized person only. 6. Job engineer / supervisor needs to be present at work spot for continuous supervision till completion of work 7. Allow only authorized / trained person to work 8. Ensured work specific tool box talk/ training conducted. 9. Ensure the Green tag with valid inspection tag in all the power tools. 10. Ensure the Eye protection devices like Face Shield while cutting & Grinding operation. 11. All power cable should be over headed & power tool should be double insulated. 12. Ensure the power cable shall be routed through the insulated hook over. 13. Provide fire extinguisher at work location. 14. Ensure the all power supply through 30mA ELCB/RCCB. 15. Ensure Stacking of material no more then 1 meter.
  • 7. RISK ASSESSMENT MSP- Rev-00 Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date: Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11 Assessment team: ACPL Page 7 of 9 S. No. Activity Hazard / Risk Impact Rating (I) Prob. Rating (P) Risk Level (IxP) Risk Controls Required Residual Risk Action by 4 Installation of aluminium windows, ventilators, doors & partitions. Installation of frames with screws. Installations of glass & sealing. Fixing of beading & gasket. Cleaning of Glass and frames. 1. Mis-handling of fabricated Material by incompetent persons. 2. Fall of material (Glass, Door & other frames while fixing). 3. Hitting of glass with hard / sharp object. 4. Cut and Eye Injury. 5. Fall of person while placing / fixing of frames. 6. Failure of hand tools. 7. Electric shock. 4 3 M 1. Ensure work permit before start the activity. 2. Ensure the trained & skilled person shall be allowed to operate. 3. Ensure that no one is allowed to stand beside the frames and glass while installation. 4. Area shall be barricade to prevent the unauthorized entry. 5. Ensure that all the hand tools shall be secured while working at height. 6. Ensure all the frames has fixed with screw before completion and cross checked. 7. Inspect the glass before moving to ensure no damage. 8. Use proper material handling technique. 9. Area to be inspected before fixing to avoid hitting of the glass with hard / sharp objects. 10. Carry one piece of glass at a time 11. Provide cut resistance & googles with side covers. 12. Ensure that Scaffolding shall be used to reach the height for fixing the door / window frames. 13. Ensure the Scaffolding shall be inspected by competent person. 14. Workmen shall be worn safety harness with double land yard and it shall be anchored on strong member to avoid fall from height. 15. Ensure use of standard hand tools. 16.Defective hand tools shall not be used. It shall be inspected before used. 17. Right tool for the right job system shall be followed. 18. Electrical connections shall be routed through the ELCB / RCCB 30 mA. 19. All the installations DBs, SDBs at site are to be double earthing. 20. All electrical cables shall be insulated properly. No electrical cables should be laid over the ground, either cable should be buried under ground or it should be above the height of obstruction passes through the Low Risk Site Engineer
  • 8. RISK ASSESSMENT MSP- Rev-00 Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date: Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11 Assessment team: ACPL Page 8 of 9 S. No. Activity Hazard / Risk Impact Rating (I) Prob. Rating (P) Risk Level (IxP) Risk Controls Required Residual Risk Action by 5 Rolling shutter 1.Electrical shock 2. Contact with rough edge. 3. Slippage of materials. 4- Injury due to sudden arc flash. 5. Eye burn/ Irritation due to welding Arc. 6- Fall of Man & Material/Tools 7- Fire 8- Collapse of scaffold 4 3 M 1. Ensure the all power supply through 30 mA ELCB/RCCB 2. Ensure Work Permit form Client only after physical verification of work location 3.Job Engineer/supervisor needs to be present at work location for continuous supervision till completion of work. 4. Allow only authorize /Trained person to work. 5. Ensure work specific tool box/training to all the workmen conducted by the site manager. 6. Check the access for man and materials movement shifting by manually. 7. Only 25kg/person will be limit for manual material handling. 8. Good housekeeping maintain in work place area. 9. Check the all power tools before start the work and all power tool to be in good condition. 10. Ensure the double body ear thing of all electrical equipment and all power cable should be overhead & double insulated. 11. PPE and job specific PPE to be used (Cut resistive hand gloves, Helmet, Safety Shoes, Reflective jacket, nose mask, Welding face shield leather gloves and apron..) 12. Double lanyard Fully body harness shall be use for height work. 13. Rope shall be use to lift the material and the same shall be secure or bind with rope at work location to prevent fall. 14. Fire extinguisher to be kept nearer to the work location. 15. Provide black goggle, lather hand gloves to welder helper. For scaffolding work kindly follow the safe working methodology as mentioned above. 16. Tag line has to be provided for all tools and tackles to avoid fall from height. Low Risk Site Engineer
  • 9. RISK ASSESSMENT MSP- Rev-00 Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date: Name of the main activity: MS False Ceiling Rolling shutter and Door,Window Fixing. HIRA No: 11 Assessment team: ACPL Page 9 of 9 Prepared by: Grant Enterprises Reviewed by: Approved by: