SlideShare a Scribd company logo
BILLBOARD INSTALLATION AT KM4 KL-SHAH ALAM HIGHWAY (KESAS)
DOC NO: HIRARC/KESAS/091
REV : 0
PAGE : 1 of 4
HIRARC FORM
HIRARC FORM
HIRARC Title: BILLBOARD INSTALLATION AT KM4 KESAS Prepared by:
AHMAD ADNAN
Reviewed by:
ALI
Approved by:
HO SIN YAU
HIRARC Ref. No. HIRARC/KESAS/091 (REV.0)
Date 25 December 2022 SUPERVISOR SAFETY AND HEALTH
OFFICER
PROJECT
DIRECTOR
HAZARD IDENTIFICATION RISK ANALYSIS RISK CONTROL
JOB SEQUENCE HAZARDS EFFECT
EXISTING CONTROL
MEASURE
(if any)
Probability
(P)
Severity
(S)
Risk Rating
P x S
RECOMMENDED CONTROL
MEASURE
RESPONSIBLE
PERSON (PIC)
Score Level
1. Mobilization of worker to
site location
1. Driving onsite Collision with another
vehicle
 Physical Injury
 Property Damage
•Competent Driver
•Schedule Maintenance
3 3 9 M • Adhere to local speed limit
• Mobile phones must not be
used during driving
• Seat belt to be worn by all
including passenger
Driver /
Passenger
2.Install base of billboard Falling from height Fatal/Major Injury • Use safety harness
properly and hook at
anchor point
• Training for working at
height
4 4 16 H • Valid PTW for using skylift
must be applied.
Site Supervisor/
HSE /Worker
Finger Injury Pinch point • Use suitable hand
gloves
2 2 4 L • Hand tools are only to be
used for their intended
purpose.
Site Supervisor/
HSE /Worker
BILLBOARD INSTALLATION AT KM4 KL-SHAH ALAM HIGHWAY (KESAS)
DOC NO: HIRARC/KESAS/091
REV : 0
PAGE : 1 of 4
HIRARC FORM
Trips & Falls Physical injury • Use appropriate PPE.
• Remove unwanted
materials from the
working zone.
2 3 6 M • Warning signs are to be put
in place before work
commences.
Site Supervisor/
HSE /Worker
Improper tools Property damage • Training correct
method of using tools
• Inspection before use
2 3 6 M • When using hand tools,
watch out for
persons working nearby
• using lanyard to secure hand
tool from fall from height
Site Supervisor/
HSE /Worker
Eye Injury Impair eyesight • Use proper eye
protection
2 3 6 M • sufficient lighting Site Supervisor/
HSE /Worker
Electrical Shock Electrocution • Use electrical
resistance tools.
3 3 9 M • Electrical work related PTW
must be applied prior to start
work.
Site Supervisor/
HSE /Worker
3. Installation of billboard
panel
Adverse weather Lightning strike  To provide rest area /
lightning detector.
3 4 12 M • Daily toolbox
•checklist to be done by the
operator prior to start
Site Supervisor/
HSE /Worker
Not competent operator Stop work and
issuance of NOP by
authority
Ensure competent
crane operator / skylift
operator with license
from JKKP / approved
training provider
3 4 12 M • Competent rigger and lifting
supervisor to supervise the
lifting operation
Site Supervisor/
HSE /Worker
Unsafe lifting Fatal/Major Injury  To cordon off the
area.
 To ensure the PMA is
valid.
 Use only inspected
3 4 12 M •Tagline to control movement
of materials
• Valid PTW for lifting activity
must be applied.
• Lifting plan to be provided
Site Supervisor/
HSE /Worker
BILLBOARD INSTALLATION AT KM4 KL-SHAH ALAM HIGHWAY (KESAS)
DOC NO: HIRARC/KESAS/091
REV : 0
PAGE : 1 of 4
HIRARC FORM
lifting gears. • Pre-inspection carried out to
the crane before use
• Lifting gear to be
checked prior to use to ensure
they are in good condition
(certs available and valid)
Uneven/Soft ground
condition
Crane / skylift topple  Use proper steel
crane mats for
outrigger.
3 4 12 M • Pre-inspection carried out to
the crane/skylift before use
Site Supervisor/
HSE /Worker
Sharp edges of billboard
pane
Injury to part of the
body
• Use an appropriate
hand glove
2 3 6 M • Wear full coverage uniform Site Supervisor/
HSE /Worker
Falling from height Fatal/Major Injury • Use safety harness
properly and hook at
anchor point
• Training for working at
height
4 4 16 H • Valid PTW for using skylift
must be applied.
• Pre-inspection carried out to
the crane/skylift before use
• Adhere to SWL of crane /
skylift
Site Supervisor/
HSE /Worker
4. Electrical equipment
installation (cable,
plug,lighting)
Finger Injury Pinch point • Use suitable hand
gloves
2 2 4 L • Hand tools are only to be
used for their intended
purpose.
Site Supervisor/
HSE /Worker
Trips & Falls Physical injury • Use appropriate PPE.
• Remove unwanted
materials from the
working zone.
2 3 6 M • Warning signs are to be put
in place before work
commences.
Site Supervisor/
HSE /Worker
Improper tools Property damage • Training correct
method of using tools
• Inspection before use
2 3 6 M • When using hand tools,
watch out for
persons working nearby
• using lanyard to secure hand
Site Supervisor/
HSE /Worker
BILLBOARD INSTALLATION AT KM4 KL-SHAH ALAM HIGHWAY (KESAS)
DOC NO: HIRARC/KESAS/091
REV : 0
PAGE : 1 of 4
HIRARC FORM
tool from fall from height
Eye Injury Impair eyesight • Use proper eye
protection
2 3 6 M • sufficient lighting Site Supervisor/
HSE /Worker
Electrical Shock Electrocution • Use electrical
resistance tools.
3 3 9 M • Electrical work related PTW
must be applied prior to start
work.
Site Supervisor/
HSE /Worker

More Related Content

What's hot

13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
Dwarika Bhushan Sharma
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
Mohammed Mubasheeruddin
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
Dwarika Bhushan Sharma
 
HIRARC
HIRARCHIRARC
HIRARC
nurulazani1
 
Toolbox Talk
Toolbox TalkToolbox Talk
Toolbox Talk
txheaven
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
Lucy Reimer
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
Dwarika Bhushan Sharma
 
Overhead Crane (Use and Safety) Kegunaan & Keselamatan
Overhead Crane (Use and Safety) Kegunaan & KeselamatanOverhead Crane (Use and Safety) Kegunaan & Keselamatan
Overhead Crane (Use and Safety) Kegunaan & Keselamatan
LWD INDUSTRY SDN BHD
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
Asif Khan
 
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia BerbahayaKeselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Ahmad Aidil Nasir
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
Gaurav Singh Rajput
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
Dwarika Bhushan Sharma
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
soumenmakar
 
Forklift (Use and Safety) Kegunaan & Keselamatanan
Forklift (Use and Safety) Kegunaan & KeselamatananForklift (Use and Safety) Kegunaan & Keselamatanan
Forklift (Use and Safety) Kegunaan & Keselamatanan
LWD INDUSTRY SDN BHD
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdf
RafiullahKhan88
 
HiRARC
HiRARCHiRARC
HiRARC
Ahmad Nazib
 
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah PencegahanAsas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
Norrazman Zaiha Zainol
 
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Malay version
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Malay versionHazard Identification, Risk Assessment and Risk Control (HIRARC) Malay version
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Malay version
Norrazman Zaiha Zainol
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
txsafety1
 

What's hot (20)

13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 
HIRARC
HIRARCHIRARC
HIRARC
 
Toolbox Talk
Toolbox TalkToolbox Talk
Toolbox Talk
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Overhead Crane (Use and Safety) Kegunaan & Keselamatan
Overhead Crane (Use and Safety) Kegunaan & KeselamatanOverhead Crane (Use and Safety) Kegunaan & Keselamatan
Overhead Crane (Use and Safety) Kegunaan & Keselamatan
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia BerbahayaKeselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
Forklift (Use and Safety) Kegunaan & Keselamatanan
Forklift (Use and Safety) Kegunaan & KeselamatananForklift (Use and Safety) Kegunaan & Keselamatanan
Forklift (Use and Safety) Kegunaan & Keselamatanan
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdf
 
HiRARC
HiRARCHiRARC
HiRARC
 
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah PencegahanAsas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
 
Hazard dan risiko
Hazard dan risikoHazard dan risiko
Hazard dan risiko
 
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Malay version
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Malay versionHazard Identification, Risk Assessment and Risk Control (HIRARC) Malay version
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Malay version
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 

Similar to HIRARC FORM (skylift).pdf

HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
Gaurav Singh Rajput
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
almamunmolla96
 
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.docMS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
RajuBiswas41
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
MohammedAliQazi
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdf
IbukunOwolabi4
 
Site Induction
Site InductionSite Induction
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
VasudevaRajuDantulur1
 
Risk Assessments for Airside Construction
Risk Assessments for Airside ConstructionRisk Assessments for Airside Construction
Risk Assessments for Airside Construction
David H Moloney
 
Safety plan
Safety planSafety plan
Safety plan
Shyam Krishna Karki
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3
Saleem Malik
 
Site Induction
Site InductionSite Induction
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
FESTUS RICHARD SIAME
 
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
ARP contractor orientation
ARP contractor orientationARP contractor orientation
ARP contractor orientation
AmcorPackaging
 
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
Darren.w. Halliman Rigging supervisor/loler/APML
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
Aanand Subi
 
AHU.pdf
AHU.pdfAHU.pdf
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
AamirAbbas75
 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
Azmeel Contracting Company
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
Dwarika Bhushan Sharma
 

Similar to HIRARC FORM (skylift).pdf (20)

HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
 
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.docMS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdf
 
Site Induction
Site InductionSite Induction
Site Induction
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Risk Assessments for Airside Construction
Risk Assessments for Airside ConstructionRisk Assessments for Airside Construction
Risk Assessments for Airside Construction
 
Safety plan
Safety planSafety plan
Safety plan
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3
 
Site Induction
Site InductionSite Induction
Site Induction
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
 
ARP contractor orientation
ARP contractor orientationARP contractor orientation
ARP contractor orientation
 
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
AHU.pdf
AHU.pdfAHU.pdf
AHU.pdf
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
 

Recently uploaded

Shallowest Oil Discovery of Turkiye.pptx
Shallowest Oil Discovery of Turkiye.pptxShallowest Oil Discovery of Turkiye.pptx
Shallowest Oil Discovery of Turkiye.pptx
Gokturk Mehmet Dilci
 
Oedema_types_causes_pathophysiology.pptx
Oedema_types_causes_pathophysiology.pptxOedema_types_causes_pathophysiology.pptx
Oedema_types_causes_pathophysiology.pptx
muralinath2
 
bordetella pertussis.................................ppt
bordetella pertussis.................................pptbordetella pertussis.................................ppt
bordetella pertussis.................................ppt
kejapriya1
 
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốtmô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
HongcNguyn6
 
Randomised Optimisation Algorithms in DAPHNE
Randomised Optimisation Algorithms in DAPHNERandomised Optimisation Algorithms in DAPHNE
Randomised Optimisation Algorithms in DAPHNE
University of Maribor
 
SAR of Medicinal Chemistry 1st by dk.pdf
SAR of Medicinal Chemistry 1st by dk.pdfSAR of Medicinal Chemistry 1st by dk.pdf
SAR of Medicinal Chemistry 1st by dk.pdf
KrushnaDarade1
 
aziz sancar nobel prize winner: from mardin to nobel
aziz sancar nobel prize winner: from mardin to nobelaziz sancar nobel prize winner: from mardin to nobel
aziz sancar nobel prize winner: from mardin to nobel
İsa Badur
 
如何办理(uvic毕业证书)维多利亚大学毕业证本科学位证书原版一模一样
如何办理(uvic毕业证书)维多利亚大学毕业证本科学位证书原版一模一样如何办理(uvic毕业证书)维多利亚大学毕业证本科学位证书原版一模一样
如何办理(uvic毕业证书)维多利亚大学毕业证本科学位证书原版一模一样
yqqaatn0
 
NuGOweek 2024 Ghent programme overview flyer
NuGOweek 2024 Ghent programme overview flyerNuGOweek 2024 Ghent programme overview flyer
NuGOweek 2024 Ghent programme overview flyer
pablovgd
 
Thornton ESPP slides UK WW Network 4_6_24.pdf
Thornton ESPP slides UK WW Network 4_6_24.pdfThornton ESPP slides UK WW Network 4_6_24.pdf
Thornton ESPP slides UK WW Network 4_6_24.pdf
European Sustainable Phosphorus Platform
 
3D Hybrid PIC simulation of the plasma expansion (ISSS-14)
3D Hybrid PIC simulation of the plasma expansion (ISSS-14)3D Hybrid PIC simulation of the plasma expansion (ISSS-14)
3D Hybrid PIC simulation of the plasma expansion (ISSS-14)
David Osipyan
 
Cytokines and their role in immune regulation.pptx
Cytokines and their role in immune regulation.pptxCytokines and their role in immune regulation.pptx
Cytokines and their role in immune regulation.pptx
Hitesh Sikarwar
 
20240520 Planning a Circuit Simulator in JavaScript.pptx
20240520 Planning a Circuit Simulator in JavaScript.pptx20240520 Planning a Circuit Simulator in JavaScript.pptx
20240520 Planning a Circuit Simulator in JavaScript.pptx
Sharon Liu
 
EWOCS-I: The catalog of X-ray sources in Westerlund 1 from the Extended Weste...
EWOCS-I: The catalog of X-ray sources in Westerlund 1 from the Extended Weste...EWOCS-I: The catalog of X-ray sources in Westerlund 1 from the Extended Weste...
EWOCS-I: The catalog of X-ray sources in Westerlund 1 from the Extended Weste...
Sérgio Sacani
 
Immersive Learning That Works: Research Grounding and Paths Forward
Immersive Learning That Works: Research Grounding and Paths ForwardImmersive Learning That Works: Research Grounding and Paths Forward
Immersive Learning That Works: Research Grounding and Paths Forward
Leonel Morgado
 
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
vluwdy49
 
Deep Software Variability and Frictionless Reproducibility
Deep Software Variability and Frictionless ReproducibilityDeep Software Variability and Frictionless Reproducibility
Deep Software Variability and Frictionless Reproducibility
University of Rennes, INSA Rennes, Inria/IRISA, CNRS
 
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdfwaterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
LengamoLAppostilic
 
Basics of crystallography, crystal systems, classes and different forms
Basics of crystallography, crystal systems, classes and different formsBasics of crystallography, crystal systems, classes and different forms
Basics of crystallography, crystal systems, classes and different forms
MaheshaNanjegowda
 
ESR spectroscopy in liquid food and beverages.pptx
ESR spectroscopy in liquid food and beverages.pptxESR spectroscopy in liquid food and beverages.pptx
ESR spectroscopy in liquid food and beverages.pptx
PRIYANKA PATEL
 

Recently uploaded (20)

Shallowest Oil Discovery of Turkiye.pptx
Shallowest Oil Discovery of Turkiye.pptxShallowest Oil Discovery of Turkiye.pptx
Shallowest Oil Discovery of Turkiye.pptx
 
Oedema_types_causes_pathophysiology.pptx
Oedema_types_causes_pathophysiology.pptxOedema_types_causes_pathophysiology.pptx
Oedema_types_causes_pathophysiology.pptx
 
bordetella pertussis.................................ppt
bordetella pertussis.................................pptbordetella pertussis.................................ppt
bordetella pertussis.................................ppt
 
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốtmô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
mô tả các thí nghiệm về đánh giá tác động dòng khí hóa sau đốt
 
Randomised Optimisation Algorithms in DAPHNE
Randomised Optimisation Algorithms in DAPHNERandomised Optimisation Algorithms in DAPHNE
Randomised Optimisation Algorithms in DAPHNE
 
SAR of Medicinal Chemistry 1st by dk.pdf
SAR of Medicinal Chemistry 1st by dk.pdfSAR of Medicinal Chemistry 1st by dk.pdf
SAR of Medicinal Chemistry 1st by dk.pdf
 
aziz sancar nobel prize winner: from mardin to nobel
aziz sancar nobel prize winner: from mardin to nobelaziz sancar nobel prize winner: from mardin to nobel
aziz sancar nobel prize winner: from mardin to nobel
 
如何办理(uvic毕业证书)维多利亚大学毕业证本科学位证书原版一模一样
如何办理(uvic毕业证书)维多利亚大学毕业证本科学位证书原版一模一样如何办理(uvic毕业证书)维多利亚大学毕业证本科学位证书原版一模一样
如何办理(uvic毕业证书)维多利亚大学毕业证本科学位证书原版一模一样
 
NuGOweek 2024 Ghent programme overview flyer
NuGOweek 2024 Ghent programme overview flyerNuGOweek 2024 Ghent programme overview flyer
NuGOweek 2024 Ghent programme overview flyer
 
Thornton ESPP slides UK WW Network 4_6_24.pdf
Thornton ESPP slides UK WW Network 4_6_24.pdfThornton ESPP slides UK WW Network 4_6_24.pdf
Thornton ESPP slides UK WW Network 4_6_24.pdf
 
3D Hybrid PIC simulation of the plasma expansion (ISSS-14)
3D Hybrid PIC simulation of the plasma expansion (ISSS-14)3D Hybrid PIC simulation of the plasma expansion (ISSS-14)
3D Hybrid PIC simulation of the plasma expansion (ISSS-14)
 
Cytokines and their role in immune regulation.pptx
Cytokines and their role in immune regulation.pptxCytokines and their role in immune regulation.pptx
Cytokines and their role in immune regulation.pptx
 
20240520 Planning a Circuit Simulator in JavaScript.pptx
20240520 Planning a Circuit Simulator in JavaScript.pptx20240520 Planning a Circuit Simulator in JavaScript.pptx
20240520 Planning a Circuit Simulator in JavaScript.pptx
 
EWOCS-I: The catalog of X-ray sources in Westerlund 1 from the Extended Weste...
EWOCS-I: The catalog of X-ray sources in Westerlund 1 from the Extended Weste...EWOCS-I: The catalog of X-ray sources in Westerlund 1 from the Extended Weste...
EWOCS-I: The catalog of X-ray sources in Westerlund 1 from the Extended Weste...
 
Immersive Learning That Works: Research Grounding and Paths Forward
Immersive Learning That Works: Research Grounding and Paths ForwardImmersive Learning That Works: Research Grounding and Paths Forward
Immersive Learning That Works: Research Grounding and Paths Forward
 
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
在线办理(salfor毕业证书)索尔福德大学毕业证毕业完成信一模一样
 
Deep Software Variability and Frictionless Reproducibility
Deep Software Variability and Frictionless ReproducibilityDeep Software Variability and Frictionless Reproducibility
Deep Software Variability and Frictionless Reproducibility
 
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdfwaterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
waterlessdyeingtechnolgyusing carbon dioxide chemicalspdf
 
Basics of crystallography, crystal systems, classes and different forms
Basics of crystallography, crystal systems, classes and different formsBasics of crystallography, crystal systems, classes and different forms
Basics of crystallography, crystal systems, classes and different forms
 
ESR spectroscopy in liquid food and beverages.pptx
ESR spectroscopy in liquid food and beverages.pptxESR spectroscopy in liquid food and beverages.pptx
ESR spectroscopy in liquid food and beverages.pptx
 

HIRARC FORM (skylift).pdf

  • 1. BILLBOARD INSTALLATION AT KM4 KL-SHAH ALAM HIGHWAY (KESAS) DOC NO: HIRARC/KESAS/091 REV : 0 PAGE : 1 of 4 HIRARC FORM HIRARC FORM HIRARC Title: BILLBOARD INSTALLATION AT KM4 KESAS Prepared by: AHMAD ADNAN Reviewed by: ALI Approved by: HO SIN YAU HIRARC Ref. No. HIRARC/KESAS/091 (REV.0) Date 25 December 2022 SUPERVISOR SAFETY AND HEALTH OFFICER PROJECT DIRECTOR HAZARD IDENTIFICATION RISK ANALYSIS RISK CONTROL JOB SEQUENCE HAZARDS EFFECT EXISTING CONTROL MEASURE (if any) Probability (P) Severity (S) Risk Rating P x S RECOMMENDED CONTROL MEASURE RESPONSIBLE PERSON (PIC) Score Level 1. Mobilization of worker to site location 1. Driving onsite Collision with another vehicle  Physical Injury  Property Damage •Competent Driver •Schedule Maintenance 3 3 9 M • Adhere to local speed limit • Mobile phones must not be used during driving • Seat belt to be worn by all including passenger Driver / Passenger 2.Install base of billboard Falling from height Fatal/Major Injury • Use safety harness properly and hook at anchor point • Training for working at height 4 4 16 H • Valid PTW for using skylift must be applied. Site Supervisor/ HSE /Worker Finger Injury Pinch point • Use suitable hand gloves 2 2 4 L • Hand tools are only to be used for their intended purpose. Site Supervisor/ HSE /Worker
  • 2. BILLBOARD INSTALLATION AT KM4 KL-SHAH ALAM HIGHWAY (KESAS) DOC NO: HIRARC/KESAS/091 REV : 0 PAGE : 1 of 4 HIRARC FORM Trips & Falls Physical injury • Use appropriate PPE. • Remove unwanted materials from the working zone. 2 3 6 M • Warning signs are to be put in place before work commences. Site Supervisor/ HSE /Worker Improper tools Property damage • Training correct method of using tools • Inspection before use 2 3 6 M • When using hand tools, watch out for persons working nearby • using lanyard to secure hand tool from fall from height Site Supervisor/ HSE /Worker Eye Injury Impair eyesight • Use proper eye protection 2 3 6 M • sufficient lighting Site Supervisor/ HSE /Worker Electrical Shock Electrocution • Use electrical resistance tools. 3 3 9 M • Electrical work related PTW must be applied prior to start work. Site Supervisor/ HSE /Worker 3. Installation of billboard panel Adverse weather Lightning strike  To provide rest area / lightning detector. 3 4 12 M • Daily toolbox •checklist to be done by the operator prior to start Site Supervisor/ HSE /Worker Not competent operator Stop work and issuance of NOP by authority Ensure competent crane operator / skylift operator with license from JKKP / approved training provider 3 4 12 M • Competent rigger and lifting supervisor to supervise the lifting operation Site Supervisor/ HSE /Worker Unsafe lifting Fatal/Major Injury  To cordon off the area.  To ensure the PMA is valid.  Use only inspected 3 4 12 M •Tagline to control movement of materials • Valid PTW for lifting activity must be applied. • Lifting plan to be provided Site Supervisor/ HSE /Worker
  • 3. BILLBOARD INSTALLATION AT KM4 KL-SHAH ALAM HIGHWAY (KESAS) DOC NO: HIRARC/KESAS/091 REV : 0 PAGE : 1 of 4 HIRARC FORM lifting gears. • Pre-inspection carried out to the crane before use • Lifting gear to be checked prior to use to ensure they are in good condition (certs available and valid) Uneven/Soft ground condition Crane / skylift topple  Use proper steel crane mats for outrigger. 3 4 12 M • Pre-inspection carried out to the crane/skylift before use Site Supervisor/ HSE /Worker Sharp edges of billboard pane Injury to part of the body • Use an appropriate hand glove 2 3 6 M • Wear full coverage uniform Site Supervisor/ HSE /Worker Falling from height Fatal/Major Injury • Use safety harness properly and hook at anchor point • Training for working at height 4 4 16 H • Valid PTW for using skylift must be applied. • Pre-inspection carried out to the crane/skylift before use • Adhere to SWL of crane / skylift Site Supervisor/ HSE /Worker 4. Electrical equipment installation (cable, plug,lighting) Finger Injury Pinch point • Use suitable hand gloves 2 2 4 L • Hand tools are only to be used for their intended purpose. Site Supervisor/ HSE /Worker Trips & Falls Physical injury • Use appropriate PPE. • Remove unwanted materials from the working zone. 2 3 6 M • Warning signs are to be put in place before work commences. Site Supervisor/ HSE /Worker Improper tools Property damage • Training correct method of using tools • Inspection before use 2 3 6 M • When using hand tools, watch out for persons working nearby • using lanyard to secure hand Site Supervisor/ HSE /Worker
  • 4. BILLBOARD INSTALLATION AT KM4 KL-SHAH ALAM HIGHWAY (KESAS) DOC NO: HIRARC/KESAS/091 REV : 0 PAGE : 1 of 4 HIRARC FORM tool from fall from height Eye Injury Impair eyesight • Use proper eye protection 2 3 6 M • sufficient lighting Site Supervisor/ HSE /Worker Electrical Shock Electrocution • Use electrical resistance tools. 3 3 9 M • Electrical work related PTW must be applied prior to start work. Site Supervisor/ HSE /Worker