Background 
The SGP-India views monitoring and evaluation as a participatory process, which 
enables capacity building and understanding and applying lessons learned from the 
projects’ experiences. 
Project monitoring and evaluation serves several purposes, facilitates the identification 
and resolution of problems enhances project performances and ensures congruence 
with the GEF criteria, provides the basis for technical and financial accountability builds 
local capacity to implement and manage projects successfully and promote the 
identification and dissemination of lessons learned by participants themselves. 
SGP-India has, from the beginning, insisted on clearly defined indicators of performance 
in all projects. No SGP-India project can be approved without explicit statement of how it 
will be monitored and evaluated, including where possible quantifiable indicators and 
targets. All project proposals will also be required to present a “Risk Analysis” stating the 
critical assumptions and external factors upon which the achievement of project objective 
depends. 
This practice will be reinforced and further refined on the basis of feedback from ongoing 
projects. In due course, group meetings bringing together managers from different 
projects will be used in formulating, monitoring and evaluating new projects. These peer-based 
workshops will evolve monitoring strategies that are best suited for the types of 
field projects being funded by SGP-India. 
Each field project partner is required to submit Quarterly Progress Report and the NHI to 
ensure this will follow a systematic follow up procedure. These QPRs will also identify 
any assistance needed by project partners in the form of technical, social, financial or 
other inputs that were not foreseen at the time of preparing the project report. The NC 
and RCs will, to the extent possible, arrange for provision of these inputs and provide 
advice on any mid-course corrections needed. 
The multidisciplinary expertise available with NHI, NSC members and the RCm 
members will be available to SGP-India for identifying, monitoring and evaluating 
projects. The NHI will undertake a mid-term review and project end evaluation of each 
project with help from NSC/RCm members or independent consultants to track progress 
and verify results. 
The NC and the RCs will maintain systematic information on every project proposal 
received and from inception to sanction to completion of all project approved. SGP-India 
will document case studies arising out of this project, reflecting both successes and 
failures, and disseminate these widely. 
Formats 
The formats given in the SGP Monitoring and Evaluation Framework Document will be 
used with necessary adaptations (if required). The formats will incorporate indicators for 
measuring the progress towards the objectives set out; the effectiveness of processes; 
gender and participatory aspects of the project and the impact of the project.
Ongoing monitoring 
Monitoring involves the collection and analysis of data about project activities. The data 
should be easy to understand. It allows project participants to keep track of project 
activities to determine whether project objectives are being achieved and to make 
whatever changes are necessary to improve the project performance. 
The CEE Regional Cells shall be in communication with the NGOs in their areas, during 
the course of the projects. Organizations will submit quarterly reports, giving details of 
activities and progress, measured against targets, as also statement of income and 
expenditure. 
 The Regional Cells will analyze these reports and keep track of the projects and 
give feedback to the organizations to make online corrections where necessary. 
They shall also inform the NC, Regional Committee and the NSC about the 
progress of the projects, problems faced, etc. 
 Each project will be visited preferably once in six months, or definitely before the 
release of the second and third installments. Where possible, the visit will be 
undertaken by a team of two persons, one from CEE, and another person who 
may be an expert, a staff member of an NGO or institution working in a similar 
field, or a member of the Regional Committee. The visiting team will interact 
extensively with the implementing organization and stakeholders, and will also 
see the physical progress. A report, in a pre-decided format, shall be made of the 
visit. Feedback, comments and suggestions will be given in writing to the 
organization and reported to NC, RCm and NSC. 
 The release of the second and third installments shall be dependent on 
satisfactory reports from the organization and the visiting team, and utilization 
certificates from the organization. 
Project Evaluation systems 
(i) Mid Term Evaluation (MTR): 
Evaluation considers the results and effects of a project in terms of the local and global 
environment and the quality of life of the participants. It should include an explicit 
appraisal of whether the project has its stated objectives in terms of the GEF focal area 
and operational programme, if not analyze the reasons. 
While the project proposal is being developed, care shall be taken to ensure that 
measurable outputs and outcomes are detailed therein. All reporting will be done against 
these. 
 It will be ensured that each approved GEF/SGP project should include an M&E 
plan with appropriate indicators. The NGOs will guided to include M&E costs in 
their project budgets to ensure that the grantees are able to carry out their M&E 
plans. 
 The reporting formats will have sections for feedback from various stakeholders 
involved. 
 The reporting formats will encourage introspection and reflections on learnings 
by the implementing NGOs.
Evaluation of projects is generally done towards the end of the project implementation 
and should be included along with monitoring in project design. 
(ii) Online and Mid-course Corrections 
- Each time a release of grant installment is to take place, a team would be visiting the 
project and making a report. This report would clearly specify whether the next 
installment is to be released, released conditionally, or the project terminated. In 
case the installment is to be released, this will be done routinely and reported to 
RCm and NSC. In case there are conditionality, the case shall be discussed at the 
RCm and the release made with their concurrence to the conditions; in case 
termination of the project is recommended, the case shall be discussed at the RCm, 
and be put up to the NSC, with the recommendations of the visiting team and the 
comments of the RCm. The NSC will take the final decision about the termination of 
the project. 
- If the visiting team recommends major changes in the project as proposed, these 
recommendations will be discussed at the RC and put up to the NSC for final 
decisions. Ordinarily, such changes should not involve changes in overall budget. 
- Where there is need for extension of time of the project, RC will give its 
recommendations, RCm will discuss this and give its comments, and the final 
decision will be taken by the NSC. 
(iii) Final Evaluation 
 The NGO shall prepare a report on completion of the project. 
 The projects will be evaluated in terms of impact. 
 NHI, the organization and the stakeholders will together reflect on and evaluate 
the project, its outcomes and learning and prepare a report on this. The reflection 
may be done in a workshop mode. 
 NHI’s report will evaluate the impact of the project and will also reflect on issues 
like reliability, scaling up; sustainability, etc. 
SGP project evaluations should include a participatory component. Participatory 
monitoring and assessment involves early consultation with the community members 
and stakeholders about project design, the problems to be addressed, potential courses 
of action community resources which can be brought to bear and the role of external 
support, participatory research to complete baseline information, participatory definition 
and agreement on project concept, consensus about the project objectives and 
activities. 
Both Monitoring and Evaluation require information about the current state of relevant 
features of the community or locality usually focussing on the environmental problem in 
the GEF focal areas and corresponding operational programme before the project 
activity begins. This is called baseline data. This information is normally used to identify 
and construct the indicators of the project progress and accomplishments can then be 
compared to the baseline and hence evaluated. 
While a monitoring and evaluation framework should be systematic, it should also allow 
for unexpected occurrences and results.

More Related Content

What's hot

Project proposal
Project proposalProject proposal
Project proposal
Pradeep Panda
 
Logical framework
Logical  frameworkLogical  framework
Logical framework
Vaidehi Malvi
 
Participatory Monitoring and Evlaution
Participatory Monitoring and EvlautionParticipatory Monitoring and Evlaution
Participatory Monitoring and Evlaution
Iwl Pcu
 
Logframework and swort thursday
Logframework and swort thursdayLogframework and swort thursday
Logframework and swort thursday
David mbwiga
 
Factors Affecting the Efectiveness of Monitoring and Evaluation of Constituen...
Factors Affecting the Efectiveness of Monitoring and Evaluation of Constituen...Factors Affecting the Efectiveness of Monitoring and Evaluation of Constituen...
Factors Affecting the Efectiveness of Monitoring and Evaluation of Constituen...
IOSR Journals
 
5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too
SHAZEBALIKHAN1
 
C8 logical framework approach (lfa)
C8 logical framework approach (lfa)C8 logical framework approach (lfa)
C8 logical framework approach (lfa)
ocasiconference
 
The Logical Framework Matrix Approach
The Logical Framework Matrix ApproachThe Logical Framework Matrix Approach
The Logical Framework Matrix Approach
PhDSofiaUniversity
 
Project management
Project managementProject management
Project management
Ashok Pandey
 
Stages of Project Development
Stages of Project Development Stages of Project Development
Stages of Project Development
Jo Balucanag - Bitonio
 
Project development new1
Project development new1Project development new1
Project development new1
David mbwiga
 
Napolcom SWOT Matrix
Napolcom SWOT MatrixNapolcom SWOT Matrix
Napolcom SWOT Matrix
Jo Balucanag - Bitonio
 
Logical framework
Logical frameworkLogical framework
Logical framework
Md. Ayatullah Khan
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
rexcris
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Erik Kijne
 
Working with Logic Models
Working with Logic ModelsWorking with Logic Models
Working with Logic Models
Olivier Serrat
 
2. The Logical Framework
2. The Logical Framework2. The Logical Framework
2. The Logical Framework
Vilimaka Foliaki
 
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan PerezAPR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
IFAD International Fund for Agricultural Development
 
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan PerezAPR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
IFAD International Fund for Agricultural Development
 
Lfa approach on project planning
Lfa approach on project planningLfa approach on project planning
Lfa approach on project planning
Fida Karim 🇵🇰
 

What's hot (20)

Project proposal
Project proposalProject proposal
Project proposal
 
Logical framework
Logical  frameworkLogical  framework
Logical framework
 
Participatory Monitoring and Evlaution
Participatory Monitoring and EvlautionParticipatory Monitoring and Evlaution
Participatory Monitoring and Evlaution
 
Logframework and swort thursday
Logframework and swort thursdayLogframework and swort thursday
Logframework and swort thursday
 
Factors Affecting the Efectiveness of Monitoring and Evaluation of Constituen...
Factors Affecting the Efectiveness of Monitoring and Evaluation of Constituen...Factors Affecting the Efectiveness of Monitoring and Evaluation of Constituen...
Factors Affecting the Efectiveness of Monitoring and Evaluation of Constituen...
 
5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too
 
C8 logical framework approach (lfa)
C8 logical framework approach (lfa)C8 logical framework approach (lfa)
C8 logical framework approach (lfa)
 
The Logical Framework Matrix Approach
The Logical Framework Matrix ApproachThe Logical Framework Matrix Approach
The Logical Framework Matrix Approach
 
Project management
Project managementProject management
Project management
 
Stages of Project Development
Stages of Project Development Stages of Project Development
Stages of Project Development
 
Project development new1
Project development new1Project development new1
Project development new1
 
Napolcom SWOT Matrix
Napolcom SWOT MatrixNapolcom SWOT Matrix
Napolcom SWOT Matrix
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
 
Working with Logic Models
Working with Logic ModelsWorking with Logic Models
Working with Logic Models
 
2. The Logical Framework
2. The Logical Framework2. The Logical Framework
2. The Logical Framework
 
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan PerezAPR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
 
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan PerezAPR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
 
Lfa approach on project planning
Lfa approach on project planningLfa approach on project planning
Lfa approach on project planning
 

Viewers also liked

Outlaw Poster
Outlaw PosterOutlaw Poster
Outlaw Poster
hugojarvis
 
Greek fire
Greek fireGreek fire
Greek fire
Edward Reich
 
Outillage pour raccords à sertir inox stainless steel press fittings tools ...
Outillage pour raccords à sertir inox   stainless steel press fittings tools ...Outillage pour raccords à sertir inox   stainless steel press fittings tools ...
Outillage pour raccords à sertir inox stainless steel press fittings tools ...
jeremy marcelino
 
Just the facts transport oct 2011
Just the facts transport oct 2011Just the facts transport oct 2011
Just the facts transport oct 2011
Ramon Arratia
 
Proyecto Residentes
Proyecto  ResidentesProyecto  Residentes
Proyecto Residentes
angelitux
 
Voter Ed2
Voter Ed2Voter Ed2
Voter Ed2
Avie Olarte
 
Izrael Agnes
Izrael AgnesIzrael Agnes
Izrael Agnes
PLETZ.com -
 
WTTIL-QUIPPO-EB
WTTIL-QUIPPO-EBWTTIL-QUIPPO-EB
WTTIL-QUIPPO-EB
pratyushray
 
Trabajo recuerdos1
Trabajo recuerdos1Trabajo recuerdos1
Trabajo recuerdos1
Grafite Libanio Batista Muñoz
 
Trabajoo master 1
Trabajoo master 1Trabajoo master 1
Trabajoo master 1
ciraroger
 
Icewave Booklet
Icewave BookletIcewave Booklet
Icewave Booklet
Hockeyman4life
 
移动营销前线Vol.14
移动营销前线Vol.14移动营销前线Vol.14
移动营销前线Vol.14LOOCON
 
Voting in iraq
Voting in iraqVoting in iraq
Voting in iraq
nikki
 
Don Coqui Exhibit Brochure 2009
Don Coqui Exhibit Brochure   2009Don Coqui Exhibit Brochure   2009
Don Coqui Exhibit Brochure 2009
prsun
 
Money&manure
Money&manureMoney&manure
Money&manure
Keith Barklage
 
Vostu
VostuVostu
Ax2012 eses sma
Ax2012 eses smaAx2012 eses sma
Ax2012 eses sma
Alex Torres
 
NR 18 .02
NR 18 .02NR 18 .02
NR 18 .02
shasha00
 
Frans Halsstraat 65 B
Frans Halsstraat 65 BFrans Halsstraat 65 B
Frans Halsstraat 65 Bguest97bf763
 
Παρουσίαση Αστέρης Χουλιάρας στην Έκθεση "ΚΟΡΙΝΘΙΑ 2014"
Παρουσίαση Αστέρης Χουλιάρας στην Έκθεση "ΚΟΡΙΝΘΙΑ 2014"Παρουσίαση Αστέρης Χουλιάρας στην Έκθεση "ΚΟΡΙΝΘΙΑ 2014"
Παρουσίαση Αστέρης Χουλιάρας στην Έκθεση "ΚΟΡΙΝΘΙΑ 2014"
Vasileios Balafas
 

Viewers also liked (20)

Outlaw Poster
Outlaw PosterOutlaw Poster
Outlaw Poster
 
Greek fire
Greek fireGreek fire
Greek fire
 
Outillage pour raccords à sertir inox stainless steel press fittings tools ...
Outillage pour raccords à sertir inox   stainless steel press fittings tools ...Outillage pour raccords à sertir inox   stainless steel press fittings tools ...
Outillage pour raccords à sertir inox stainless steel press fittings tools ...
 
Just the facts transport oct 2011
Just the facts transport oct 2011Just the facts transport oct 2011
Just the facts transport oct 2011
 
Proyecto Residentes
Proyecto  ResidentesProyecto  Residentes
Proyecto Residentes
 
Voter Ed2
Voter Ed2Voter Ed2
Voter Ed2
 
Izrael Agnes
Izrael AgnesIzrael Agnes
Izrael Agnes
 
WTTIL-QUIPPO-EB
WTTIL-QUIPPO-EBWTTIL-QUIPPO-EB
WTTIL-QUIPPO-EB
 
Trabajo recuerdos1
Trabajo recuerdos1Trabajo recuerdos1
Trabajo recuerdos1
 
Trabajoo master 1
Trabajoo master 1Trabajoo master 1
Trabajoo master 1
 
Icewave Booklet
Icewave BookletIcewave Booklet
Icewave Booklet
 
移动营销前线Vol.14
移动营销前线Vol.14移动营销前线Vol.14
移动营销前线Vol.14
 
Voting in iraq
Voting in iraqVoting in iraq
Voting in iraq
 
Don Coqui Exhibit Brochure 2009
Don Coqui Exhibit Brochure   2009Don Coqui Exhibit Brochure   2009
Don Coqui Exhibit Brochure 2009
 
Money&manure
Money&manureMoney&manure
Money&manure
 
Vostu
VostuVostu
Vostu
 
Ax2012 eses sma
Ax2012 eses smaAx2012 eses sma
Ax2012 eses sma
 
NR 18 .02
NR 18 .02NR 18 .02
NR 18 .02
 
Frans Halsstraat 65 B
Frans Halsstraat 65 BFrans Halsstraat 65 B
Frans Halsstraat 65 B
 
Παρουσίαση Αστέρης Χουλιάρας στην Έκθεση "ΚΟΡΙΝΘΙΑ 2014"
Παρουσίαση Αστέρης Χουλιάρας στην Έκθεση "ΚΟΡΙΝΘΙΑ 2014"Παρουσίαση Αστέρης Χουλιάρας στην Έκθεση "ΚΟΡΙΝΘΙΑ 2014"
Παρουσίαση Αστέρης Χουλιάρας στην Έκθεση "ΚΟΡΙΝΘΙΑ 2014"
 

Similar to Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)

Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
AmandaBvera
 
Experiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in IndiaExperiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in India
Yinhongsun
 
Campong
CampongCampong
Campong
eye
 
Monitioring and evaluation
Monitioring and  evaluationMonitioring and  evaluation
Monitioring and evaluation
zahidss2
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report
Danes Ganancial
 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoring
Sandeep Kumar
 
M&e strategy 'reach vulnerable' annex 13.
M&e strategy 'reach vulnerable' annex 13.M&e strategy 'reach vulnerable' annex 13.
M&e strategy 'reach vulnerable' annex 13.
World Without Borders Movement
 
MPPC.ppt
MPPC.pptMPPC.ppt
MPPC.ppt
KuberBhusal1
 
CIB8942.pdf
CIB8942.pdfCIB8942.pdf
CIB8942.pdf
ssusere0ee1d
 
Monitoring & Evaluation
Monitoring & EvaluationMonitoring & Evaluation
Monitoring & Evaluation
Devegowda S R
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
Iktimed Med project - Marche Regional Authority
 
The simplified project management process it-toolkits
The simplified project management process   it-toolkitsThe simplified project management process   it-toolkits
The simplified project management process it-toolkits
IT-Toolkits.org
 
TOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdfTOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdf
PoisonBeAware
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business plan
farouq umar
 
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptxPUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
kipkorirkoech5
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
EPC Group
 
Group Presentation MSMS
Group Presentation MSMSGroup Presentation MSMS
Group Presentation MSMS
Carmichael Ellis
 
E-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and OversightE-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and Oversight
epass2015
 
Writing evaluation report of a project
Writing evaluation report of a projectWriting evaluation report of a project
Writing evaluation report of a project
03363635718
 

Similar to Monitoring evaluation-and-reporting-1299571066-phpapp02 (1) (20)

Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
 
Experiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in IndiaExperiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in India
 
Campong
CampongCampong
Campong
 
Monitioring and evaluation
Monitioring and  evaluationMonitioring and  evaluation
Monitioring and evaluation
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report
 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoring
 
M&e strategy 'reach vulnerable' annex 13.
M&e strategy 'reach vulnerable' annex 13.M&e strategy 'reach vulnerable' annex 13.
M&e strategy 'reach vulnerable' annex 13.
 
MPPC.ppt
MPPC.pptMPPC.ppt
MPPC.ppt
 
CIB8942.pdf
CIB8942.pdfCIB8942.pdf
CIB8942.pdf
 
Monitoring & Evaluation
Monitoring & EvaluationMonitoring & Evaluation
Monitoring & Evaluation
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
 
The simplified project management process it-toolkits
The simplified project management process   it-toolkitsThe simplified project management process   it-toolkits
The simplified project management process it-toolkits
 
TOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdfTOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdf
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business plan
 
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptxPUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
 
Group Presentation MSMS
Group Presentation MSMSGroup Presentation MSMS
Group Presentation MSMS
 
E-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and OversightE-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and Oversight
 
Writing evaluation report of a project
Writing evaluation report of a projectWriting evaluation report of a project
Writing evaluation report of a project
 

More from V-cool Ndayak

Monev
MonevMonev
Kapitalisasi
KapitalisasiKapitalisasi
Kapitalisasi
V-cool Ndayak
 
Kapitalisasi
KapitalisasiKapitalisasi
Kapitalisasi
V-cool Ndayak
 
Kapitalisasi
KapitalisasiKapitalisasi
Kapitalisasi
V-cool Ndayak
 
Kapitalisasi
KapitalisasiKapitalisasi
Kapitalisasi
V-cool Ndayak
 
Kapitalis
KapitalisKapitalis
Kapitalis
V-cool Ndayak
 
Logo bpbd mentawai
Logo bpbd mentawaiLogo bpbd mentawai
Logo bpbd mentawai
V-cool Ndayak
 
Tabel angka romawai
Tabel angka romawaiTabel angka romawai
Tabel angka romawai
V-cool Ndayak
 
Statuta forum-prb-diy
Statuta forum-prb-diyStatuta forum-prb-diy
Statuta forum-prb-diy
V-cool Ndayak
 
Penyusunan hvca dengan pra
Penyusunan hvca dengan praPenyusunan hvca dengan pra
Penyusunan hvca dengan pra
V-cool Ndayak
 
Tata cara berkomunikasi menggunakan radio komunikasi
Tata cara berkomunikasi menggunakan radio komunikasiTata cara berkomunikasi menggunakan radio komunikasi
Tata cara berkomunikasi menggunakan radio komunikasi
V-cool Ndayak
 
Tsunami dari bnpb
Tsunami dari bnpbTsunami dari bnpb
Tsunami dari bnpb
V-cool Ndayak
 
Peran dan tugas kodam dalam penanggulangan bencana sebagai perwujudan operasi...
Peran dan tugas kodam dalam penanggulangan bencana sebagai perwujudan operasi...Peran dan tugas kodam dalam penanggulangan bencana sebagai perwujudan operasi...
Peran dan tugas kodam dalam penanggulangan bencana sebagai perwujudan operasi...V-cool Ndayak
 

More from V-cool Ndayak (13)

Monev
MonevMonev
Monev
 
Kapitalisasi
KapitalisasiKapitalisasi
Kapitalisasi
 
Kapitalisasi
KapitalisasiKapitalisasi
Kapitalisasi
 
Kapitalisasi
KapitalisasiKapitalisasi
Kapitalisasi
 
Kapitalisasi
KapitalisasiKapitalisasi
Kapitalisasi
 
Kapitalis
KapitalisKapitalis
Kapitalis
 
Logo bpbd mentawai
Logo bpbd mentawaiLogo bpbd mentawai
Logo bpbd mentawai
 
Tabel angka romawai
Tabel angka romawaiTabel angka romawai
Tabel angka romawai
 
Statuta forum-prb-diy
Statuta forum-prb-diyStatuta forum-prb-diy
Statuta forum-prb-diy
 
Penyusunan hvca dengan pra
Penyusunan hvca dengan praPenyusunan hvca dengan pra
Penyusunan hvca dengan pra
 
Tata cara berkomunikasi menggunakan radio komunikasi
Tata cara berkomunikasi menggunakan radio komunikasiTata cara berkomunikasi menggunakan radio komunikasi
Tata cara berkomunikasi menggunakan radio komunikasi
 
Tsunami dari bnpb
Tsunami dari bnpbTsunami dari bnpb
Tsunami dari bnpb
 
Peran dan tugas kodam dalam penanggulangan bencana sebagai perwujudan operasi...
Peran dan tugas kodam dalam penanggulangan bencana sebagai perwujudan operasi...Peran dan tugas kodam dalam penanggulangan bencana sebagai perwujudan operasi...
Peran dan tugas kodam dalam penanggulangan bencana sebagai perwujudan operasi...
 

Recently uploaded

在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
yemqpj
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
JSchaus & Associates
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
Christina Parmionova
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Christina Parmionova
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
Cheong Man Keong
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
yemqpj
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
ssuser05e8f3
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
Christina Parmionova
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
Christina Parmionova
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
Scalabrini Institute for Human Mobility in Africa
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
ajatjamwal123
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 

Recently uploaded (20)

在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 

Monitoring evaluation-and-reporting-1299571066-phpapp02 (1)

  • 1. Monitoring Evaluation and Reporting Strategy Background The SGP-India views monitoring and evaluation as a participatory process, which enables capacity building and understanding and applying lessons learned from the projects’ experiences. Project monitoring and evaluation serves several purposes, facilitates the identification and resolution of problems enhances project performances and ensures congruence with the GEF criteria, provides the basis for technical and financial accountability builds local capacity to implement and manage projects successfully and promote the identification and dissemination of lessons learned by participants themselves. SGP-India has, from the beginning, insisted on clearly defined indicators of performance in all projects. No SGP-India project can be approved without explicit statement of how it will be monitored and evaluated, including where possible quantifiable indicators and targets. All project proposals will also be required to present a “Risk Analysis” stating the critical assumptions and external factors upon which the achievement of project objective depends. This practice will be reinforced and further refined on the basis of feedback from ongoing projects. In due course, group meetings bringing together managers from different projects will be used in formulating, monitoring and evaluating new projects. These peer-based workshops will evolve monitoring strategies that are best suited for the types of field projects being funded by SGP-India. Each field project partner is required to submit Quarterly Progress Report and the NHI to ensure this will follow a systematic follow up procedure. These QPRs will also identify any assistance needed by project partners in the form of technical, social, financial or other inputs that were not foreseen at the time of preparing the project report. The NC and RCs will, to the extent possible, arrange for provision of these inputs and provide advice on any mid-course corrections needed. The multidisciplinary expertise available with NHI, NSC members and the RCm members will be available to SGP-India for identifying, monitoring and evaluating projects. The NHI will undertake a mid-term review and project end evaluation of each project with help from NSC/RCm members or independent consultants to track progress and verify results. The NC and the RCs will maintain systematic information on every project proposal received and from inception to sanction to completion of all project approved. SGP-India will document case studies arising out of this project, reflecting both successes and failures, and disseminate these widely. Formats The formats given in the SGP Monitoring and Evaluation Framework Document will be used with necessary adaptations (if required). The formats will incorporate indicators for measuring the progress towards the objectives set out; the effectiveness of processes; gender and participatory aspects of the project and the impact of the project.
  • 2. Ongoing monitoring Monitoring involves the collection and analysis of data about project activities. The data should be easy to understand. It allows project participants to keep track of project activities to determine whether project objectives are being achieved and to make whatever changes are necessary to improve the project performance. The CEE Regional Cells shall be in communication with the NGOs in their areas, during the course of the projects. Organizations will submit quarterly reports, giving details of activities and progress, measured against targets, as also statement of income and expenditure.  The Regional Cells will analyze these reports and keep track of the projects and give feedback to the organizations to make online corrections where necessary. They shall also inform the NC, Regional Committee and the NSC about the progress of the projects, problems faced, etc.  Each project will be visited preferably once in six months, or definitely before the release of the second and third installments. Where possible, the visit will be undertaken by a team of two persons, one from CEE, and another person who may be an expert, a staff member of an NGO or institution working in a similar field, or a member of the Regional Committee. The visiting team will interact extensively with the implementing organization and stakeholders, and will also see the physical progress. A report, in a pre-decided format, shall be made of the visit. Feedback, comments and suggestions will be given in writing to the organization and reported to NC, RCm and NSC.  The release of the second and third installments shall be dependent on satisfactory reports from the organization and the visiting team, and utilization certificates from the organization. Project Evaluation systems (i) Mid Term Evaluation (MTR): Evaluation considers the results and effects of a project in terms of the local and global environment and the quality of life of the participants. It should include an explicit appraisal of whether the project has its stated objectives in terms of the GEF focal area and operational programme, if not analyze the reasons. While the project proposal is being developed, care shall be taken to ensure that measurable outputs and outcomes are detailed therein. All reporting will be done against these.  It will be ensured that each approved GEF/SGP project should include an M&E plan with appropriate indicators. The NGOs will guided to include M&E costs in their project budgets to ensure that the grantees are able to carry out their M&E plans.  The reporting formats will have sections for feedback from various stakeholders involved.  The reporting formats will encourage introspection and reflections on learnings by the implementing NGOs.
  • 3. Evaluation of projects is generally done towards the end of the project implementation and should be included along with monitoring in project design. (ii) Online and Mid-course Corrections - Each time a release of grant installment is to take place, a team would be visiting the project and making a report. This report would clearly specify whether the next installment is to be released, released conditionally, or the project terminated. In case the installment is to be released, this will be done routinely and reported to RCm and NSC. In case there are conditionality, the case shall be discussed at the RCm and the release made with their concurrence to the conditions; in case termination of the project is recommended, the case shall be discussed at the RCm, and be put up to the NSC, with the recommendations of the visiting team and the comments of the RCm. The NSC will take the final decision about the termination of the project. - If the visiting team recommends major changes in the project as proposed, these recommendations will be discussed at the RC and put up to the NSC for final decisions. Ordinarily, such changes should not involve changes in overall budget. - Where there is need for extension of time of the project, RC will give its recommendations, RCm will discuss this and give its comments, and the final decision will be taken by the NSC. (iii) Final Evaluation  The NGO shall prepare a report on completion of the project.  The projects will be evaluated in terms of impact.  NHI, the organization and the stakeholders will together reflect on and evaluate the project, its outcomes and learning and prepare a report on this. The reflection may be done in a workshop mode.  NHI’s report will evaluate the impact of the project and will also reflect on issues like reliability, scaling up; sustainability, etc. SGP project evaluations should include a participatory component. Participatory monitoring and assessment involves early consultation with the community members and stakeholders about project design, the problems to be addressed, potential courses of action community resources which can be brought to bear and the role of external support, participatory research to complete baseline information, participatory definition and agreement on project concept, consensus about the project objectives and activities. Both Monitoring and Evaluation require information about the current state of relevant features of the community or locality usually focussing on the environmental problem in the GEF focal areas and corresponding operational programme before the project activity begins. This is called baseline data. This information is normally used to identify and construct the indicators of the project progress and accomplishments can then be compared to the baseline and hence evaluated. While a monitoring and evaluation framework should be systematic, it should also allow for unexpected occurrences and results.