One of the challenges of explaining project management to people who are unfamiliar with the
approach, is that descriptions are often either so high-level as to be meaningless, or so detailed that
they are overwhelming. Over the years, I have come to use a model as a framework for introducing
and discussing project management tools and techniques. It can be used as the basis for a five-
minute explanation of what is involved in project management, but also as an outline for more detailed
discussions. (The actual model can be found on the Key Consulting website under free templates and
info.)
A brief description of each step follows:
Assemble Team
The project planning team will be assembled, including appropriate representation from
customers/clients, and sometimes subcontractors and vendors. Initial roles and responsibilities will be
defined.
Deliverables: Initial project setup documentation.
Define Project Objective
With the project team in place, the overall project purpose will be verified and detailed project
objectives developed. A phase-exit review will be conducted to ensure that the project is ready to
move into the next phase, which is planning.
2/29/2016 The Simplified Project Management Process - IT-Toolkits.org
http://it-toolkits.org/blog/?p=398 2/4
Deliverables: project charter, phase-exit review checklist.
Define Project Scope
An appropriately detailed Work Breakdown Structure (WBS) will be developed to ensure the project
scope is properly agreed to and understood by all stakeholders. This also allows the complete project
to be split into appropriate sub-projects and/or phases.
Deliverables: Project work breakdown structure.
Construct an Initial Plan
Once tasks of an appropriate level have been identified in the WBS, they will be organised by the
project team into logical network diagrams, with estimated durations. This allows the project manager
to predict when activities will be complete, assess the feasibility of target dates, and identify the critical
path for the project.
Deliverables: Initial work plan.
Add Resources, Costs, Risks, etc.
Certain project resources may be defined as critical resources. In particular, the project manager may
suspect that key project staff may be faced with too much work. If so, estimated resource usage
information can be added to the project plan to allow resource forecasting. Cost is obviously also
critically important, and expenditures can be added to the plan to create estimated cash-flow
requirements. Risk management can also be utilised on projects to provide a framework to better
manage events that occur beyond the control of the project team.
Deliverables: Resource availability and commitment profiles, risk identification and control
strategies, cash-flow forecasts.
Obtain Stakeholder Buy-in
To ensure the project is implemented as smoothly as possible, with the support of the involved
parties, it will be necessary to review the initial plans with all the major project stakeholders and to
solicit buy-in from each one. A phase-exit review will be conducted to ensure that the project is ready
to move into the next phase, which is control.
Deliverables: Approved final plan, phase-exit review checklist.
Publish the Plan
Once the plans are agreed to, they must be effectively communicated to all stakeholders. This can be
2/29/2016 The Simplified Project Management Process - IT-Toolkits.org
http://it-toolkits.org/blog/?p=398 3/4
done in hard copy or via electronic media, depending on the resources available. On most projects, a
communications plan will be developed, and distribution of the plans will follow the guidelines laid out
in the communications plan.
Deliverables: Plan published to all stakeholders.
Collect Progress Information
On a regular basis, the project manager will collect progress information that has been reported by
the project team. This will allow the compilation of progress reports, such as:
Activities completed within the past two weeks
Activities forecast for the next two weeks with a focus on activities on the critical path
Funds expended vs. fund expenditure forecast
Prioritised issues report
Metrics can also be developed to measure project progress in other ways, such as earned value, or
activity float statistics. If the project manager reviews the progress data and concludes that the project
is complete, a phase-exit review will be completed to confirm that all the objectives have been met
before moving into the final closure phase.
Deliverables: Set of progress reports, set of exception reports, metrics report, (phase-exit review
checklist).
Analyse Current Status
By analysing the progress information received, the project manager will be able to augment the
above reports with information about which areas of the project are of concern and where problems
are likely to occur in the future. This allows managers to focus on the important/critical areas of the
project.
Deliverables: Project evaluation report(s).
Adjust the Plan, and Manage Project Change
Based on the analysis, and with the support of the project team, the project manager will make plan
adjustments to help reduce risks, accommodate scope changes, or to compensate for activities that
have not occurred on schedule. Once this has happened, the plan will re-published and the cycle
repeated until the project is complete.
Deliverables: Change request forms, updated plan.
Close Project
2/29/2016 The Simplified Project Management Process - IT-Toolkits.org
http://it-toolkits.org/blog/?p=398 4/4
When the objectives of the project have been achieved, the project manager will close down the
project. This will involve some financial closure tasks, as well as archiving of the project materials. A
lessons-learned document will be developed to benefit future projects, and if possible a project team
celebration will be held.
You may also like

More Related Content

What's hot

Master schedule and milestone schedule
Master schedule and milestone scheduleMaster schedule and milestone schedule
Master schedule and milestone schedule
Mudassir Iqbal
 
Project Planning
Project PlanningProject Planning
Project Planning
Srinivasan Rengasamy
 
Project management part 1
Project management part 1Project management part 1
Project management part 1
hkbhadraa
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentationNithin Dev
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
Susitra Anandan
 
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
Indra Pandu Prasetyo
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cm
Prasad Reddy
 
Project Time Management
Project Time ManagementProject Time Management
Project Time ManagementSerdar Temiz
 
3-0 PROJECT PLANNING
3-0 PROJECT PLANNING3-0 PROJECT PLANNING
3-0 PROJECT PLANNING
pmSPECFramework
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
eklaksh
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
Akash Prasanna
 
Building a-project-schedule
Building a-project-scheduleBuilding a-project-schedule
Building a-project-schedule
Raaz Karkee
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementation
Dr. Saima Baig
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
Vîñõđ Kůmåř
 
Monitoring of project implementation
Monitoring of project implementationMonitoring of project implementation
Monitoring of project implementation
Dejened
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Charlie Jackson
 
Training pm jan 11 part b
Training pm jan 11 part bTraining pm jan 11 part b
Training pm jan 11 part b
Siep Littooij
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2
Mazhar Poohlah
 
Benefits of implementing primavera p6 r8.1 and integration to oracle ppt
Benefits of implementing primavera p6 r8.1 and integration to oracle pptBenefits of implementing primavera p6 r8.1 and integration to oracle ppt
Benefits of implementing primavera p6 r8.1 and integration to oracle pptp6academy
 

What's hot (20)

Master schedule and milestone schedule
Master schedule and milestone scheduleMaster schedule and milestone schedule
Master schedule and milestone schedule
 
PRIMEVERA
PRIMEVERAPRIMEVERA
PRIMEVERA
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project management part 1
Project management part 1Project management part 1
Project management part 1
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentation
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
Project Schedule Planning and Development - A Guide to Develop Reliable Proje...
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cm
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
3-0 PROJECT PLANNING
3-0 PROJECT PLANNING3-0 PROJECT PLANNING
3-0 PROJECT PLANNING
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Building a-project-schedule
Building a-project-scheduleBuilding a-project-schedule
Building a-project-schedule
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementation
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Monitoring of project implementation
Monitoring of project implementationMonitoring of project implementation
Monitoring of project implementation
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
 
Training pm jan 11 part b
Training pm jan 11 part bTraining pm jan 11 part b
Training pm jan 11 part b
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2
 
Benefits of implementing primavera p6 r8.1 and integration to oracle ppt
Benefits of implementing primavera p6 r8.1 and integration to oracle pptBenefits of implementing primavera p6 r8.1 and integration to oracle ppt
Benefits of implementing primavera p6 r8.1 and integration to oracle ppt
 

Viewers also liked

What it managers need to know about working capital it-toolkits.org
What it managers need to know about working capital   it-toolkits.orgWhat it managers need to know about working capital   it-toolkits.org
What it managers need to know about working capital it-toolkits.org
IT-Toolkits.org
 
The 4 groups important for a help desk manager it-toolkits
The 4 groups important for a help desk manager   it-toolkitsThe 4 groups important for a help desk manager   it-toolkits
The 4 groups important for a help desk manager it-toolkits
IT-Toolkits.org
 
Relevant it – it solutions to bridge the gap between business and it it man...
Relevant it – it solutions to bridge the gap between business and it   it man...Relevant it – it solutions to bridge the gap between business and it   it man...
Relevant it – it solutions to bridge the gap between business and it it man...
IT-Toolkits.org
 
How to write your company's it security policy it-toolkits
How to write your company's it security policy   it-toolkitsHow to write your company's it security policy   it-toolkits
How to write your company's it security policy it-toolkits
IT-Toolkits.org
 
4 ways to manage your it budget it-toolkits
4 ways to manage your it budget   it-toolkits4 ways to manage your it budget   it-toolkits
4 ways to manage your it budget it-toolkits
IT-Toolkits.org
 
Finding a common ground between finance and it it management templates
Finding a common ground between finance and it   it management templatesFinding a common ground between finance and it   it management templates
Finding a common ground between finance and it it management templates
IT-Toolkits.org
 
The basics of managing i.t
The basics of managing i.tThe basics of managing i.t
The basics of managing i.t
IT-Toolkits.org
 
It help desk what is a help desk - it-toolkits
It help desk  what is a help desk  - it-toolkitsIt help desk  what is a help desk  - it-toolkits
It help desk what is a help desk - it-toolkits
IT-Toolkits.org
 
The benefits of technology standards it-toolkits
The benefits of technology standards   it-toolkitsThe benefits of technology standards   it-toolkits
The benefits of technology standards it-toolkits
IT-Toolkits.org
 
7 components of a successful it budget it-toolkits.org
7 components of a successful it budget   it-toolkits.org7 components of a successful it budget   it-toolkits.org
7 components of a successful it budget it-toolkits.org
IT-Toolkits.org
 
Email policies tools to govern usage, access and etiquette it-toolkits
Email policies  tools to govern usage, access and etiquette   it-toolkitsEmail policies  tools to govern usage, access and etiquette   it-toolkits
Email policies tools to govern usage, access and etiquette it-toolkits
IT-Toolkits.org
 
Five techniques to defend the it budget and demonstrate the value of it it-...
Five techniques to defend the it budget and demonstrate the value of it   it-...Five techniques to defend the it budget and demonstrate the value of it   it-...
Five techniques to defend the it budget and demonstrate the value of it it-...
IT-Toolkits.org
 
Help desk mission and vision statements. it-toolkits
Help desk mission and vision statements.   it-toolkitsHelp desk mission and vision statements.   it-toolkits
Help desk mission and vision statements. it-toolkits
IT-Toolkits.org
 

Viewers also liked (13)

What it managers need to know about working capital it-toolkits.org
What it managers need to know about working capital   it-toolkits.orgWhat it managers need to know about working capital   it-toolkits.org
What it managers need to know about working capital it-toolkits.org
 
The 4 groups important for a help desk manager it-toolkits
The 4 groups important for a help desk manager   it-toolkitsThe 4 groups important for a help desk manager   it-toolkits
The 4 groups important for a help desk manager it-toolkits
 
Relevant it – it solutions to bridge the gap between business and it it man...
Relevant it – it solutions to bridge the gap between business and it   it man...Relevant it – it solutions to bridge the gap between business and it   it man...
Relevant it – it solutions to bridge the gap between business and it it man...
 
How to write your company's it security policy it-toolkits
How to write your company's it security policy   it-toolkitsHow to write your company's it security policy   it-toolkits
How to write your company's it security policy it-toolkits
 
4 ways to manage your it budget it-toolkits
4 ways to manage your it budget   it-toolkits4 ways to manage your it budget   it-toolkits
4 ways to manage your it budget it-toolkits
 
Finding a common ground between finance and it it management templates
Finding a common ground between finance and it   it management templatesFinding a common ground between finance and it   it management templates
Finding a common ground between finance and it it management templates
 
The basics of managing i.t
The basics of managing i.tThe basics of managing i.t
The basics of managing i.t
 
It help desk what is a help desk - it-toolkits
It help desk  what is a help desk  - it-toolkitsIt help desk  what is a help desk  - it-toolkits
It help desk what is a help desk - it-toolkits
 
The benefits of technology standards it-toolkits
The benefits of technology standards   it-toolkitsThe benefits of technology standards   it-toolkits
The benefits of technology standards it-toolkits
 
7 components of a successful it budget it-toolkits.org
7 components of a successful it budget   it-toolkits.org7 components of a successful it budget   it-toolkits.org
7 components of a successful it budget it-toolkits.org
 
Email policies tools to govern usage, access and etiquette it-toolkits
Email policies  tools to govern usage, access and etiquette   it-toolkitsEmail policies  tools to govern usage, access and etiquette   it-toolkits
Email policies tools to govern usage, access and etiquette it-toolkits
 
Five techniques to defend the it budget and demonstrate the value of it it-...
Five techniques to defend the it budget and demonstrate the value of it   it-...Five techniques to defend the it budget and demonstrate the value of it   it-...
Five techniques to defend the it budget and demonstrate the value of it it-...
 
Help desk mission and vision statements. it-toolkits
Help desk mission and vision statements.   it-toolkitsHelp desk mission and vision statements.   it-toolkits
Help desk mission and vision statements. it-toolkits
 

Similar to The simplified project management process it-toolkits

Project planning
Project planningProject planning
Project planningShaikh Zain
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
Reema
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practice
krunalchem
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3
POOJA UDAYAN
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
SabrinaScott22
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdf
TanzeelShahid5
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
RISHABHSIINGH
 
NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2
Future Managers
 
Project controls outlined
Project controls outlinedProject controls outlined
Project controls outlined
Faisal Jasim Parokot
 
project management plan.pptx
project management plan.pptxproject management plan.pptx
project management plan.pptx
Nimra zaman
 
System Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptSystem Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).ppt
AynetuTerefe2
 
Planning And Managing The Project
Planning And Managing The ProjectPlanning And Managing The Project
Planning And Managing The Project
Laguna State Polytechnic University
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
rielaantonio
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
SHAZEBALIKHAN1
 
Software Project Management: Budget
Software Project Management: BudgetSoftware Project Management: Budget
Software Project Management: Budget
Minhas Kamal
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business planfarouq umar
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
wkyra78
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
Mary Stevenson
 

Similar to The simplified project management process it-toolkits (20)

Communication 1
Communication 1Communication 1
Communication 1
 
Project planning
Project planningProject planning
Project planning
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practice
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3
 
Aaqib
AaqibAaqib
Aaqib
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdf
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2
 
Project controls outlined
Project controls outlinedProject controls outlined
Project controls outlined
 
project management plan.pptx
project management plan.pptxproject management plan.pptx
project management plan.pptx
 
System Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptSystem Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).ppt
 
Planning And Managing The Project
Planning And Managing The ProjectPlanning And Managing The Project
Planning And Managing The Project
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Software Project Management: Budget
Software Project Management: BudgetSoftware Project Management: Budget
Software Project Management: Budget
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business plan
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
 

More from IT-Toolkits.org

Risk Management & Information Security Management Systems
Risk Management & Information Security Management SystemsRisk Management & Information Security Management Systems
Risk Management & Information Security Management Systems
IT-Toolkits.org
 
Information Technology & Its Role in the Modern Organization
Information Technology & Its Role in the  Modern OrganizationInformation Technology & Its Role in the  Modern Organization
Information Technology & Its Role in the Modern Organization
IT-Toolkits.org
 
It Organization Management : Revisiting Centralization
It Organization Management : Revisiting CentralizationIt Organization Management : Revisiting Centralization
It Organization Management : Revisiting Centralization
IT-Toolkits.org
 
It change management
It change managementIt change management
It change management
IT-Toolkits.org
 
P2 how to develop an it change management program
P2 how to develop an it change management programP2 how to develop an it change management program
P2 how to develop an it change management program
IT-Toolkits.org
 
25 important considerations for selecting new customer support tools
25 important considerations for selecting new customer support tools25 important considerations for selecting new customer support tools
25 important considerations for selecting new customer support tools
IT-Toolkits.org
 
10 security problems unique to it
10 security problems unique to it10 security problems unique to it
10 security problems unique to it
IT-Toolkits.org
 
10 security problems unique to it
10 security problems unique to it10 security problems unique to it
10 security problems unique to it
IT-Toolkits.org
 
It management audits it management templates
It management audits   it management templatesIt management audits   it management templates
It management audits it management templates
IT-Toolkits.org
 
What is value added- it management_ - it management templates
What is  value added- it management_ - it management templatesWhat is  value added- it management_ - it management templates
What is value added- it management_ - it management templates
IT-Toolkits.org
 
7 steps to business and it alignment it management templates
7 steps to business and it alignment   it management templates7 steps to business and it alignment   it management templates
7 steps to business and it alignment it management templates
IT-Toolkits.org
 
Protecting business interests with policies for it asset management it-tool...
Protecting business interests with policies for it asset management   it-tool...Protecting business interests with policies for it asset management   it-tool...
Protecting business interests with policies for it asset management it-tool...
IT-Toolkits.org
 
Fundamentals of data security policy in i.t. management it-toolkits
Fundamentals of data security policy in i.t. management   it-toolkitsFundamentals of data security policy in i.t. management   it-toolkits
Fundamentals of data security policy in i.t. management it-toolkits
IT-Toolkits.org
 
Why do you need an it policy it-toolkits
Why do you need an it policy     it-toolkitsWhy do you need an it policy     it-toolkits
Why do you need an it policy it-toolkits
IT-Toolkits.org
 
Help desk ticket categories create help desk ticket classification it-tool...
Help desk ticket categories  create help desk ticket classification   it-tool...Help desk ticket categories  create help desk ticket classification   it-tool...
Help desk ticket categories create help desk ticket classification it-tool...
IT-Toolkits.org
 
Help desk problem management it-toolkits
Help desk problem management   it-toolkitsHelp desk problem management   it-toolkits
Help desk problem management it-toolkits
IT-Toolkits.org
 
Help desk kpi it-toolkits
Help desk kpi   it-toolkitsHelp desk kpi   it-toolkits
Help desk kpi it-toolkits
IT-Toolkits.org
 
It helpdesk communication plan it-toolkits
It helpdesk communication plan   it-toolkitsIt helpdesk communication plan   it-toolkits
It helpdesk communication plan it-toolkits
IT-Toolkits.org
 
How to recruit an it project manager it-toolkits
How to recruit an it project manager   it-toolkitsHow to recruit an it project manager   it-toolkits
How to recruit an it project manager it-toolkits
IT-Toolkits.org
 
Project managers the value of understanding technology it-toolkits
Project managers  the value of understanding technology   it-toolkitsProject managers  the value of understanding technology   it-toolkits
Project managers the value of understanding technology it-toolkits
IT-Toolkits.org
 

More from IT-Toolkits.org (20)

Risk Management & Information Security Management Systems
Risk Management & Information Security Management SystemsRisk Management & Information Security Management Systems
Risk Management & Information Security Management Systems
 
Information Technology & Its Role in the Modern Organization
Information Technology & Its Role in the  Modern OrganizationInformation Technology & Its Role in the  Modern Organization
Information Technology & Its Role in the Modern Organization
 
It Organization Management : Revisiting Centralization
It Organization Management : Revisiting CentralizationIt Organization Management : Revisiting Centralization
It Organization Management : Revisiting Centralization
 
It change management
It change managementIt change management
It change management
 
P2 how to develop an it change management program
P2 how to develop an it change management programP2 how to develop an it change management program
P2 how to develop an it change management program
 
25 important considerations for selecting new customer support tools
25 important considerations for selecting new customer support tools25 important considerations for selecting new customer support tools
25 important considerations for selecting new customer support tools
 
10 security problems unique to it
10 security problems unique to it10 security problems unique to it
10 security problems unique to it
 
10 security problems unique to it
10 security problems unique to it10 security problems unique to it
10 security problems unique to it
 
It management audits it management templates
It management audits   it management templatesIt management audits   it management templates
It management audits it management templates
 
What is value added- it management_ - it management templates
What is  value added- it management_ - it management templatesWhat is  value added- it management_ - it management templates
What is value added- it management_ - it management templates
 
7 steps to business and it alignment it management templates
7 steps to business and it alignment   it management templates7 steps to business and it alignment   it management templates
7 steps to business and it alignment it management templates
 
Protecting business interests with policies for it asset management it-tool...
Protecting business interests with policies for it asset management   it-tool...Protecting business interests with policies for it asset management   it-tool...
Protecting business interests with policies for it asset management it-tool...
 
Fundamentals of data security policy in i.t. management it-toolkits
Fundamentals of data security policy in i.t. management   it-toolkitsFundamentals of data security policy in i.t. management   it-toolkits
Fundamentals of data security policy in i.t. management it-toolkits
 
Why do you need an it policy it-toolkits
Why do you need an it policy     it-toolkitsWhy do you need an it policy     it-toolkits
Why do you need an it policy it-toolkits
 
Help desk ticket categories create help desk ticket classification it-tool...
Help desk ticket categories  create help desk ticket classification   it-tool...Help desk ticket categories  create help desk ticket classification   it-tool...
Help desk ticket categories create help desk ticket classification it-tool...
 
Help desk problem management it-toolkits
Help desk problem management   it-toolkitsHelp desk problem management   it-toolkits
Help desk problem management it-toolkits
 
Help desk kpi it-toolkits
Help desk kpi   it-toolkitsHelp desk kpi   it-toolkits
Help desk kpi it-toolkits
 
It helpdesk communication plan it-toolkits
It helpdesk communication plan   it-toolkitsIt helpdesk communication plan   it-toolkits
It helpdesk communication plan it-toolkits
 
How to recruit an it project manager it-toolkits
How to recruit an it project manager   it-toolkitsHow to recruit an it project manager   it-toolkits
How to recruit an it project manager it-toolkits
 
Project managers the value of understanding technology it-toolkits
Project managers  the value of understanding technology   it-toolkitsProject managers  the value of understanding technology   it-toolkits
Project managers the value of understanding technology it-toolkits
 

Recently uploaded

FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
Abida Shariff
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 

Recently uploaded (20)

FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 

The simplified project management process it-toolkits

  • 1. 2/29/2016 The Simplified Project Management Process - IT-Toolkits.org http://it-toolkits.org/blog/?p=398 1/4 The Simplified Project Management Process - IT- Toolkits.org One of the challenges of explaining project management to people who are unfamiliar with the approach, is that descriptions are often either so high-level as to be meaningless, or so detailed that they are overwhelming. Over the years, I have come to use a model as a framework for introducing and discussing project management tools and techniques. It can be used as the basis for a five- minute explanation of what is involved in project management, but also as an outline for more detailed discussions. (The actual model can be found on the Key Consulting website under free templates and info.) A brief description of each step follows: Assemble Team The project planning team will be assembled, including appropriate representation from customers/clients, and sometimes subcontractors and vendors. Initial roles and responsibilities will be defined. Deliverables: Initial project setup documentation. Define Project Objective With the project team in place, the overall project purpose will be verified and detailed project objectives developed. A phase-exit review will be conducted to ensure that the project is ready to move into the next phase, which is planning.
  • 2. 2/29/2016 The Simplified Project Management Process - IT-Toolkits.org http://it-toolkits.org/blog/?p=398 2/4 Deliverables: project charter, phase-exit review checklist. Define Project Scope An appropriately detailed Work Breakdown Structure (WBS) will be developed to ensure the project scope is properly agreed to and understood by all stakeholders. This also allows the complete project to be split into appropriate sub-projects and/or phases. Deliverables: Project work breakdown structure. Construct an Initial Plan Once tasks of an appropriate level have been identified in the WBS, they will be organised by the project team into logical network diagrams, with estimated durations. This allows the project manager to predict when activities will be complete, assess the feasibility of target dates, and identify the critical path for the project. Deliverables: Initial work plan. Add Resources, Costs, Risks, etc. Certain project resources may be defined as critical resources. In particular, the project manager may suspect that key project staff may be faced with too much work. If so, estimated resource usage information can be added to the project plan to allow resource forecasting. Cost is obviously also critically important, and expenditures can be added to the plan to create estimated cash-flow requirements. Risk management can also be utilised on projects to provide a framework to better manage events that occur beyond the control of the project team. Deliverables: Resource availability and commitment profiles, risk identification and control strategies, cash-flow forecasts. Obtain Stakeholder Buy-in To ensure the project is implemented as smoothly as possible, with the support of the involved parties, it will be necessary to review the initial plans with all the major project stakeholders and to solicit buy-in from each one. A phase-exit review will be conducted to ensure that the project is ready to move into the next phase, which is control. Deliverables: Approved final plan, phase-exit review checklist. Publish the Plan Once the plans are agreed to, they must be effectively communicated to all stakeholders. This can be
  • 3. 2/29/2016 The Simplified Project Management Process - IT-Toolkits.org http://it-toolkits.org/blog/?p=398 3/4 done in hard copy or via electronic media, depending on the resources available. On most projects, a communications plan will be developed, and distribution of the plans will follow the guidelines laid out in the communications plan. Deliverables: Plan published to all stakeholders. Collect Progress Information On a regular basis, the project manager will collect progress information that has been reported by the project team. This will allow the compilation of progress reports, such as: Activities completed within the past two weeks Activities forecast for the next two weeks with a focus on activities on the critical path Funds expended vs. fund expenditure forecast Prioritised issues report Metrics can also be developed to measure project progress in other ways, such as earned value, or activity float statistics. If the project manager reviews the progress data and concludes that the project is complete, a phase-exit review will be completed to confirm that all the objectives have been met before moving into the final closure phase. Deliverables: Set of progress reports, set of exception reports, metrics report, (phase-exit review checklist). Analyse Current Status By analysing the progress information received, the project manager will be able to augment the above reports with information about which areas of the project are of concern and where problems are likely to occur in the future. This allows managers to focus on the important/critical areas of the project. Deliverables: Project evaluation report(s). Adjust the Plan, and Manage Project Change Based on the analysis, and with the support of the project team, the project manager will make plan adjustments to help reduce risks, accommodate scope changes, or to compensate for activities that have not occurred on schedule. Once this has happened, the plan will re-published and the cycle repeated until the project is complete. Deliverables: Change request forms, updated plan. Close Project
  • 4. 2/29/2016 The Simplified Project Management Process - IT-Toolkits.org http://it-toolkits.org/blog/?p=398 4/4 When the objectives of the project have been achieved, the project manager will close down the project. This will involve some financial closure tasks, as well as archiving of the project materials. A lessons-learned document will be developed to benefit future projects, and if possible a project team celebration will be held. You may also like