The views expressed in this presentation are the views of the author/s and do not necessarily reflect the views or policies of the Asian
Development Bank, or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included
in this presentation and accepts no responsibility for any consequence of their use. The countries listed in this presentation do not imply any
view on ADB's part as to sovereignty or independent status or necessarily conform to ADB's terminology.
Working with Logic Models
Olivier Serrat
2014
On Logic Models
In
development
assistance,
most projects
(and
programs) are
planned,
monitored,
and evaluated
using logic
models, the
purpose of
which is to
synthesize "if–
then" (causal)
relationships.
Logic models help to:
• Analyze problems; identify a desired impact;
• Establish a logical hierarchy of means by
which the desired impact will be conduced
by a contributing outcome;
• Identify clusters of outputs toward that;
• Determine how accomplishments might be
monitored and evaluated, and planned and
actual results compared;
• Flag the assumptions on which a project is
based and the associated risks; summarize a
project in a standard format; and
• Build consensus with stakeholders; and
create ownership of the project.
The Results Chain
Inputs
The physical and non-physical resources (personnel,
equipment) and finance necessary to perform planned
activities and manage the project.
Activities
The specific tasks performed, using resources and methods,
in order to achieve intended outputs.
Outputs
The products and services produced or competences and
capacities established directly as a result of project activities.
Outcome
The intended situation at the end of (or soon after) the
project's lifespan in terms of gains in performance (as a result
of changes in knowledge and behavior).
Impact
The improvement of a situation that respond to the
identified development needs of the target population under
a long-term vision.
The Logical Framework
Design Summary Performance Data Sources and
Reporting
Assumptions and Risks
Impact: The broader impact of
the project at a sectoral and
national level
Measures of the extent to
which the project has
contributed to the impact
Sources of information and
ways to gather and report it
Assumptions and risks at the
impact level are beyond the
control of the project but
essential to attainment of the
impact
Outcome: The expected
outcome at the end of the
project
Conditions at the end of the
project indicating that its
outcome has been achieved
Sources of information and
ways to gather and report it
Assumptions and risks at the
outcome level are those that
relate to attainment of
outcome targets
Outputs: The direct results of
the project (works, goods, and
services)
Measures of the quantity and
quality of outputs and the
timing of their delivery
Sources of information and
ways to gather and report it
Assumptions and risks at the
output level are those that are
external and beyond the
control of the project
implementers but essential for
successful attainment of the
outputs
Activities with Milestones: The tasks executed to deliver the outputs identified Inputs: The various resource
categories required to
undertake the project should
be identified
The Results Chain and the OECD-
DAC Evaluation Criteria
Objective Inputs Activities Outputs
Outcome
Impact
Relevance Efficiency
Effectiveness
Sustainability
Needs
Challenges and Limits to
Management
Logic
Degree of
Control
Challenge of
Monitoring
and
Evaluation
Impact
What the
project is
expected to
contribute to
Outcome What the
project can be
expected to
achieve and
be
accountable
for
Outputs What is within
the direct
control of the
project's
management
Activities
Inputs DecreasingControl
IncreasingDifficulty
Working the Logic
It is a rare project that unfolds exactly according to plan: logic models
per se neither guarantee good project design nor replace other
instruments of project management.
During project implementation, one must pay close attention to the
cause-and-effect relationships between inputs, activities with
milestones, outputs, outcome, and impact.
Importantly, outputs (and the activities and related inputs that deliver
these) are what is within the direct control of the project's
management.
Plans are only good intentions unless they
immediately degenerate into hard work.
—Peter Drucker
Working the Logic
Therefore, in relation to outputs, one must during project
implementation make repeatedly certain that inputs for activities are
deployed successfully. (Or, one must adjust the means of attaining
the outcome, including the definition of outputs, the mix of
activities, and the indicators needed to measure accomplishment of
newly-defined performance targets.)
It is possible to deepen and extend the logical framework. For each
output of a project, one can examine methodically whether targets
are being achieved, how activities are being implemented, and how
activities might be improved. One can then itemize individual action
plans, the execution of which should then be monitored. A tool for
output accomplishment and improvement of activities is depicted
overleaf—for the sake of simplicity, it indicates only two targets per
output.
On Output Accomplishment and
Improvement of Activities
Further Reading
• ADB. 2008. Output Accomplishment and the Design and
Monitoring Framework. Manila.
www.adb.org/publications/output-accomplishment-and-
design-and-monitoring-framework
• ——. 2008. Focusing on Project Metrics. Manila.
www.adb.org/publications/focusing-project-metrics
• ——. 2008. Outcome Mapping. Manila.
www.adb.org/publications/outcome-mapping
• ——. 2011. Critical Thinking. Manila.
www.adb.org/publications/critical-thinking
• ——. 2013. Theories of Change. Manila.
digitalcommons.ilr.cornell.edu/intl/269/
Quick Response Codes
@ADB
@ADB Sustainable
Development Timeline
@Academia.edu
@LinkedIn
@ResearchGate
@Scholar
@SlideShare
@Twitter

More Related Content

What's hot

Misra, D.C.(2009): E-government Monitoring and Evaluation_MDI-12.2.2009
Misra, D.C.(2009): E-government Monitoring and Evaluation_MDI-12.2.2009Misra, D.C.(2009): E-government Monitoring and Evaluation_MDI-12.2.2009
Misra, D.C.(2009): E-government Monitoring and Evaluation_MDI-12.2.2009
Dr D.C. Misra
 
Logical framework
Logical frameworkLogical framework
Logical framework
Md. Ayatullah Khan
 
Participatory project planning
Participatory project planning Participatory project planning
Participatory project planning
foreman
 
Writing evaluation report of a project
Writing evaluation report of a projectWriting evaluation report of a project
Writing evaluation report of a project
03363635718
 
13 project monitoring and evaluation
13 project monitoring and evaluation13 project monitoring and evaluation
13 project monitoring and evaluationrajkpandey2000
 
Logical framework
Logical frameworkLogical framework
Logical framework
Md. Ayatullah Khan
 
Proposal writing resource the logframe approach
Proposal writing  resource   the logframe approachProposal writing  resource   the logframe approach
Proposal writing resource the logframe approachtccafrica
 
The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)
PhDSofiaUniversity
 
Monitoring & Evaluating projects & programs: A stakeholder perspective
Monitoring & Evaluating projects & programs: A stakeholder perspectiveMonitoring & Evaluating projects & programs: A stakeholder perspective
Monitoring & Evaluating projects & programs: A stakeholder perspective
Jacques Myburgh
 
Logical framework-and-project-proposal-119679674017067-2
Logical framework-and-project-proposal-119679674017067-2Logical framework-and-project-proposal-119679674017067-2
Logical framework-and-project-proposal-119679674017067-2
petch phanpha
 
Monitoring and evaluation of human rights projects
Monitoring and evaluation of human rights projectsMonitoring and evaluation of human rights projects
Monitoring and evaluation of human rights projects
Inka Pibilova
 
Project proposal
Project proposalProject proposal
Project proposal
Pradeep Panda
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
Manish Nepal
 
RBM and LFA
RBM and LFARBM and LFA
RBM and LFA
Kimmo Haapea
 
Successful project implementation requires, detailed project planning
Successful project implementation requires, detailed project planningSuccessful project implementation requires, detailed project planning
Successful project implementation requires, detailed project planning
Dhrumil Shah
 
Project monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino MokayaProject monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino Mokaya
Discover JKUAT
 
Chap003
Chap003Chap003
Chap003
maisuradi
 
Almm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acmAlmm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acmAlberto Mico
 

What's hot (20)

Misra, D.C.(2009): E-government Monitoring and Evaluation_MDI-12.2.2009
Misra, D.C.(2009): E-government Monitoring and Evaluation_MDI-12.2.2009Misra, D.C.(2009): E-government Monitoring and Evaluation_MDI-12.2.2009
Misra, D.C.(2009): E-government Monitoring and Evaluation_MDI-12.2.2009
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Participatory project planning
Participatory project planning Participatory project planning
Participatory project planning
 
Writing evaluation report of a project
Writing evaluation report of a projectWriting evaluation report of a project
Writing evaluation report of a project
 
13 project monitoring and evaluation
13 project monitoring and evaluation13 project monitoring and evaluation
13 project monitoring and evaluation
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Proposal writing resource the logframe approach
Proposal writing  resource   the logframe approachProposal writing  resource   the logframe approach
Proposal writing resource the logframe approach
 
The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)
 
Monitoring & Evaluating projects & programs: A stakeholder perspective
Monitoring & Evaluating projects & programs: A stakeholder perspectiveMonitoring & Evaluating projects & programs: A stakeholder perspective
Monitoring & Evaluating projects & programs: A stakeholder perspective
 
Logical framework-and-project-proposal-119679674017067-2
Logical framework-and-project-proposal-119679674017067-2Logical framework-and-project-proposal-119679674017067-2
Logical framework-and-project-proposal-119679674017067-2
 
Monitoring and evaluation of human rights projects
Monitoring and evaluation of human rights projectsMonitoring and evaluation of human rights projects
Monitoring and evaluation of human rights projects
 
Project proposal
Project proposalProject proposal
Project proposal
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
RBM and LFA
RBM and LFARBM and LFA
RBM and LFA
 
Successful project implementation requires, detailed project planning
Successful project implementation requires, detailed project planningSuccessful project implementation requires, detailed project planning
Successful project implementation requires, detailed project planning
 
Project monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino MokayaProject monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino Mokaya
 
Chap003
Chap003Chap003
Chap003
 
Chap004
Chap004Chap004
Chap004
 
Almm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acmAlmm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acm
 

Similar to Working with Logic Models

Assignment
Assignment Assignment
Assignment
BarryAllen147
 
The Logical Framework Approach
The Logical Framework ApproachThe Logical Framework Approach
The Logical Framework Approach
IanNiccoloVizcarraTo
 
Logical Framework Approach lecture -10.pptx
Logical Framework Approach lecture  -10.pptxLogical Framework Approach lecture  -10.pptx
Logical Framework Approach lecture -10.pptx
RezoanaYeasmin
 
Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Harinder Goel
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notes
Tony
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notesTony
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs
Tony
 
Result Base Project Management
Result Base Project ManagementResult Base Project Management
Result Base Project ManagementArifur Rahman
 
using the logic model for program planning.pdf
using the logic model for program planning.pdfusing the logic model for program planning.pdf
using the logic model for program planning.pdf
Ouheb Group
 
Outcome Mapping: Monitoring and Evaluation Tool
Outcome Mapping: Monitoring and Evaluation ToolOutcome Mapping: Monitoring and Evaluation Tool
Outcome Mapping: Monitoring and Evaluation Tool
International Institute of Tropical Agriculture
 
Monitoring & Evaluation Framework - Fiinovation
Monitoring & Evaluation Framework - FiinovationMonitoring & Evaluation Framework - Fiinovation
Monitoring & Evaluation Framework - Fiinovation
Fiinovation | Innovative Financial Advisors Pvt.Ltd
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
selam49
 
Ngo’s project management
Ngo’s project managementNgo’s project management
Ngo’s project management
Mohamed Ahmed Said
 
M3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxM3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptx
bipuait
 
Implementation and Evaluation
Implementation and EvaluationImplementation and Evaluation
Implementation and Evaluation
Jo Balucanag - Bitonio
 
Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]Fahad Mahmud Mirza
 
Monitoring and Evaluation for development and governmental organizations.pdf
Monitoring and Evaluation for development and governmental organizations.pdfMonitoring and Evaluation for development and governmental organizations.pdf
Monitoring and Evaluation for development and governmental organizations.pdf
Guta Mengesha
 

Similar to Working with Logic Models (20)

Lfa
LfaLfa
Lfa
 
Assignment
Assignment Assignment
Assignment
 
The Logical Framework Approach
The Logical Framework ApproachThe Logical Framework Approach
The Logical Framework Approach
 
Logical Framework Approach lecture -10.pptx
Logical Framework Approach lecture  -10.pptxLogical Framework Approach lecture  -10.pptx
Logical Framework Approach lecture -10.pptx
 
Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9
 
Logic models
Logic modelsLogic models
Logic models
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notes
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notes
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs
 
Result Base Project Management
Result Base Project ManagementResult Base Project Management
Result Base Project Management
 
using the logic model for program planning.pdf
using the logic model for program planning.pdfusing the logic model for program planning.pdf
using the logic model for program planning.pdf
 
Outcome Mapping: Monitoring and Evaluation Tool
Outcome Mapping: Monitoring and Evaluation ToolOutcome Mapping: Monitoring and Evaluation Tool
Outcome Mapping: Monitoring and Evaluation Tool
 
Monitoring & Evaluation Framework - Fiinovation
Monitoring & Evaluation Framework - FiinovationMonitoring & Evaluation Framework - Fiinovation
Monitoring & Evaluation Framework - Fiinovation
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
 
Ch04
Ch04Ch04
Ch04
 
Ngo’s project management
Ngo’s project managementNgo’s project management
Ngo’s project management
 
M3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxM3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptx
 
Implementation and Evaluation
Implementation and EvaluationImplementation and Evaluation
Implementation and Evaluation
 
Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]Project Feasibility [DECEMBER 2006]
Project Feasibility [DECEMBER 2006]
 
Monitoring and Evaluation for development and governmental organizations.pdf
Monitoring and Evaluation for development and governmental organizations.pdfMonitoring and Evaluation for development and governmental organizations.pdf
Monitoring and Evaluation for development and governmental organizations.pdf
 

More from Olivier Serrat

Environmental Migration in the Anthropocene: Perspectives on the Relocation o...
Environmental Migration in the Anthropocene: Perspectives on the Relocation o...Environmental Migration in the Anthropocene: Perspectives on the Relocation o...
Environmental Migration in the Anthropocene: Perspectives on the Relocation o...
Olivier Serrat
 
Leading Organizations of the Future: A New Framework.pdf
Leading Organizations of the Future: A New Framework.pdfLeading Organizations of the Future: A New Framework.pdf
Leading Organizations of the Future: A New Framework.pdf
Olivier Serrat
 
Safeguarding Lake Chad
Safeguarding Lake ChadSafeguarding Lake Chad
Safeguarding Lake Chad
Olivier Serrat
 
Gilgamesh: The Prototypical Epic Hero
Gilgamesh: The Prototypical Epic HeroGilgamesh: The Prototypical Epic Hero
Gilgamesh: The Prototypical Epic Hero
Olivier Serrat
 
Leading Organizations of the Future: Oral Defense
Leading Organizations of the Future: Oral DefenseLeading Organizations of the Future: Oral Defense
Leading Organizations of the Future: Oral Defense
Olivier Serrat
 
Leading Organizations of the Future: A Dissertation Proposal
Leading Organizations of the Future: A Dissertation ProposalLeading Organizations of the Future: A Dissertation Proposal
Leading Organizations of the Future: A Dissertation Proposal
Olivier Serrat
 
Digital Solutions: Reframing Leadership
Digital Solutions: Reframing LeadershipDigital Solutions: Reframing Leadership
Digital Solutions: Reframing Leadership
Olivier Serrat
 
Leading Solutions: Essays in Business Psychology
Leading Solutions: Essays in Business PsychologyLeading Solutions: Essays in Business Psychology
Leading Solutions: Essays in Business Psychology
Olivier Serrat
 
The Global Compact, Human Rights, and Nike, Inc.
The Global Compact, Human Rights, and Nike, Inc.The Global Compact, Human Rights, and Nike, Inc.
The Global Compact, Human Rights, and Nike, Inc.
Olivier Serrat
 
Minority Population Analysis: The Aeta of the Philippines
Minority Population Analysis: The Aeta of the PhilippinesMinority Population Analysis: The Aeta of the Philippines
Minority Population Analysis: The Aeta of the Philippines
Olivier Serrat
 
Reflections on a Multifactor Leadership Questionnaire 360 Leader's Report
Reflections on a Multifactor Leadership Questionnaire 360 Leader's ReportReflections on a Multifactor Leadership Questionnaire 360 Leader's Report
Reflections on a Multifactor Leadership Questionnaire 360 Leader's Report
Olivier Serrat
 
Ethics at the Movies: Erin Brockovich (2000)
Ethics at the Movies: Erin Brockovich (2000)Ethics at the Movies: Erin Brockovich (2000)
Ethics at the Movies: Erin Brockovich (2000)
Olivier Serrat
 
The Servant Leadership of Gandhi
The Servant Leadership of GandhiThe Servant Leadership of Gandhi
The Servant Leadership of Gandhi
Olivier Serrat
 
Idealized Design for Virtual Teaming
Idealized Design for Virtual TeamingIdealized Design for Virtual Teaming
Idealized Design for Virtual Teaming
Olivier Serrat
 
Dell Inc.: A 2019 World's Most Ethical Companies Honoree
Dell Inc.: A 2019 World's Most Ethical Companies HonoreeDell Inc.: A 2019 World's Most Ethical Companies Honoree
Dell Inc.: A 2019 World's Most Ethical Companies Honoree
Olivier Serrat
 
Perspectives on Work Teams
Perspectives on Work TeamsPerspectives on Work Teams
Perspectives on Work Teams
Olivier Serrat
 
MediSys Corp.: The IntensCare Product Development Team
MediSys Corp.: The IntensCare Product Development TeamMediSys Corp.: The IntensCare Product Development Team
MediSys Corp.: The IntensCare Product Development Team
Olivier Serrat
 
Independent Evaluation for Learning: Toward Systemic Change
Independent Evaluation for Learning: Toward Systemic ChangeIndependent Evaluation for Learning: Toward Systemic Change
Independent Evaluation for Learning: Toward Systemic Change
Olivier Serrat
 
Evolving Corporate Culture
Evolving Corporate CultureEvolving Corporate Culture
Evolving Corporate Culture
Olivier Serrat
 
Designing an Effective Knowledge Partnership Process
Designing an Effective Knowledge Partnership ProcessDesigning an Effective Knowledge Partnership Process
Designing an Effective Knowledge Partnership Process
Olivier Serrat
 

More from Olivier Serrat (20)

Environmental Migration in the Anthropocene: Perspectives on the Relocation o...
Environmental Migration in the Anthropocene: Perspectives on the Relocation o...Environmental Migration in the Anthropocene: Perspectives on the Relocation o...
Environmental Migration in the Anthropocene: Perspectives on the Relocation o...
 
Leading Organizations of the Future: A New Framework.pdf
Leading Organizations of the Future: A New Framework.pdfLeading Organizations of the Future: A New Framework.pdf
Leading Organizations of the Future: A New Framework.pdf
 
Safeguarding Lake Chad
Safeguarding Lake ChadSafeguarding Lake Chad
Safeguarding Lake Chad
 
Gilgamesh: The Prototypical Epic Hero
Gilgamesh: The Prototypical Epic HeroGilgamesh: The Prototypical Epic Hero
Gilgamesh: The Prototypical Epic Hero
 
Leading Organizations of the Future: Oral Defense
Leading Organizations of the Future: Oral DefenseLeading Organizations of the Future: Oral Defense
Leading Organizations of the Future: Oral Defense
 
Leading Organizations of the Future: A Dissertation Proposal
Leading Organizations of the Future: A Dissertation ProposalLeading Organizations of the Future: A Dissertation Proposal
Leading Organizations of the Future: A Dissertation Proposal
 
Digital Solutions: Reframing Leadership
Digital Solutions: Reframing LeadershipDigital Solutions: Reframing Leadership
Digital Solutions: Reframing Leadership
 
Leading Solutions: Essays in Business Psychology
Leading Solutions: Essays in Business PsychologyLeading Solutions: Essays in Business Psychology
Leading Solutions: Essays in Business Psychology
 
The Global Compact, Human Rights, and Nike, Inc.
The Global Compact, Human Rights, and Nike, Inc.The Global Compact, Human Rights, and Nike, Inc.
The Global Compact, Human Rights, and Nike, Inc.
 
Minority Population Analysis: The Aeta of the Philippines
Minority Population Analysis: The Aeta of the PhilippinesMinority Population Analysis: The Aeta of the Philippines
Minority Population Analysis: The Aeta of the Philippines
 
Reflections on a Multifactor Leadership Questionnaire 360 Leader's Report
Reflections on a Multifactor Leadership Questionnaire 360 Leader's ReportReflections on a Multifactor Leadership Questionnaire 360 Leader's Report
Reflections on a Multifactor Leadership Questionnaire 360 Leader's Report
 
Ethics at the Movies: Erin Brockovich (2000)
Ethics at the Movies: Erin Brockovich (2000)Ethics at the Movies: Erin Brockovich (2000)
Ethics at the Movies: Erin Brockovich (2000)
 
The Servant Leadership of Gandhi
The Servant Leadership of GandhiThe Servant Leadership of Gandhi
The Servant Leadership of Gandhi
 
Idealized Design for Virtual Teaming
Idealized Design for Virtual TeamingIdealized Design for Virtual Teaming
Idealized Design for Virtual Teaming
 
Dell Inc.: A 2019 World's Most Ethical Companies Honoree
Dell Inc.: A 2019 World's Most Ethical Companies HonoreeDell Inc.: A 2019 World's Most Ethical Companies Honoree
Dell Inc.: A 2019 World's Most Ethical Companies Honoree
 
Perspectives on Work Teams
Perspectives on Work TeamsPerspectives on Work Teams
Perspectives on Work Teams
 
MediSys Corp.: The IntensCare Product Development Team
MediSys Corp.: The IntensCare Product Development TeamMediSys Corp.: The IntensCare Product Development Team
MediSys Corp.: The IntensCare Product Development Team
 
Independent Evaluation for Learning: Toward Systemic Change
Independent Evaluation for Learning: Toward Systemic ChangeIndependent Evaluation for Learning: Toward Systemic Change
Independent Evaluation for Learning: Toward Systemic Change
 
Evolving Corporate Culture
Evolving Corporate CultureEvolving Corporate Culture
Evolving Corporate Culture
 
Designing an Effective Knowledge Partnership Process
Designing an Effective Knowledge Partnership ProcessDesigning an Effective Knowledge Partnership Process
Designing an Effective Knowledge Partnership Process
 

Recently uploaded

原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
tdt5v4b
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
Rob Healy
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
bernanbumatay1
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
RoopaTemkar
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
tdt5v4b
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
tdt5v4b
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
Alexey Krivitsky
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
tdt5v4b
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
Ahmed AbdelMoneim
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
Ram V Chary
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
EUS+ Management & Consulting Excellence
 
Public Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdfPublic Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdf
Pinta Partners
 
Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
strikingabalance
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
A. F. M. Rubayat-Ul Jannat
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
Matthew Sinclair
 

Recently uploaded (19)

原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
 
Public Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdfPublic Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdf
 
Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
 

Working with Logic Models

  • 1. The views expressed in this presentation are the views of the author/s and do not necessarily reflect the views or policies of the Asian Development Bank, or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this presentation and accepts no responsibility for any consequence of their use. The countries listed in this presentation do not imply any view on ADB's part as to sovereignty or independent status or necessarily conform to ADB's terminology. Working with Logic Models Olivier Serrat 2014
  • 2. On Logic Models In development assistance, most projects (and programs) are planned, monitored, and evaluated using logic models, the purpose of which is to synthesize "if– then" (causal) relationships. Logic models help to: • Analyze problems; identify a desired impact; • Establish a logical hierarchy of means by which the desired impact will be conduced by a contributing outcome; • Identify clusters of outputs toward that; • Determine how accomplishments might be monitored and evaluated, and planned and actual results compared; • Flag the assumptions on which a project is based and the associated risks; summarize a project in a standard format; and • Build consensus with stakeholders; and create ownership of the project.
  • 3. The Results Chain Inputs The physical and non-physical resources (personnel, equipment) and finance necessary to perform planned activities and manage the project. Activities The specific tasks performed, using resources and methods, in order to achieve intended outputs. Outputs The products and services produced or competences and capacities established directly as a result of project activities. Outcome The intended situation at the end of (or soon after) the project's lifespan in terms of gains in performance (as a result of changes in knowledge and behavior). Impact The improvement of a situation that respond to the identified development needs of the target population under a long-term vision.
  • 4. The Logical Framework Design Summary Performance Data Sources and Reporting Assumptions and Risks Impact: The broader impact of the project at a sectoral and national level Measures of the extent to which the project has contributed to the impact Sources of information and ways to gather and report it Assumptions and risks at the impact level are beyond the control of the project but essential to attainment of the impact Outcome: The expected outcome at the end of the project Conditions at the end of the project indicating that its outcome has been achieved Sources of information and ways to gather and report it Assumptions and risks at the outcome level are those that relate to attainment of outcome targets Outputs: The direct results of the project (works, goods, and services) Measures of the quantity and quality of outputs and the timing of their delivery Sources of information and ways to gather and report it Assumptions and risks at the output level are those that are external and beyond the control of the project implementers but essential for successful attainment of the outputs Activities with Milestones: The tasks executed to deliver the outputs identified Inputs: The various resource categories required to undertake the project should be identified
  • 5. The Results Chain and the OECD- DAC Evaluation Criteria Objective Inputs Activities Outputs Outcome Impact Relevance Efficiency Effectiveness Sustainability Needs
  • 6. Challenges and Limits to Management Logic Degree of Control Challenge of Monitoring and Evaluation Impact What the project is expected to contribute to Outcome What the project can be expected to achieve and be accountable for Outputs What is within the direct control of the project's management Activities Inputs DecreasingControl IncreasingDifficulty
  • 7. Working the Logic It is a rare project that unfolds exactly according to plan: logic models per se neither guarantee good project design nor replace other instruments of project management. During project implementation, one must pay close attention to the cause-and-effect relationships between inputs, activities with milestones, outputs, outcome, and impact. Importantly, outputs (and the activities and related inputs that deliver these) are what is within the direct control of the project's management. Plans are only good intentions unless they immediately degenerate into hard work. —Peter Drucker
  • 8. Working the Logic Therefore, in relation to outputs, one must during project implementation make repeatedly certain that inputs for activities are deployed successfully. (Or, one must adjust the means of attaining the outcome, including the definition of outputs, the mix of activities, and the indicators needed to measure accomplishment of newly-defined performance targets.) It is possible to deepen and extend the logical framework. For each output of a project, one can examine methodically whether targets are being achieved, how activities are being implemented, and how activities might be improved. One can then itemize individual action plans, the execution of which should then be monitored. A tool for output accomplishment and improvement of activities is depicted overleaf—for the sake of simplicity, it indicates only two targets per output.
  • 9. On Output Accomplishment and Improvement of Activities
  • 10. Further Reading • ADB. 2008. Output Accomplishment and the Design and Monitoring Framework. Manila. www.adb.org/publications/output-accomplishment-and- design-and-monitoring-framework • ——. 2008. Focusing on Project Metrics. Manila. www.adb.org/publications/focusing-project-metrics • ——. 2008. Outcome Mapping. Manila. www.adb.org/publications/outcome-mapping • ——. 2011. Critical Thinking. Manila. www.adb.org/publications/critical-thinking • ——. 2013. Theories of Change. Manila. digitalcommons.ilr.cornell.edu/intl/269/
  • 11. Quick Response Codes @ADB @ADB Sustainable Development Timeline @Academia.edu @LinkedIn @ResearchGate @Scholar @SlideShare @Twitter