ManageMent
InforMatIon SySteM
What IS ManageMent
 Management
 the process of coordinating work activities
so that they are completed efficiently and
effectively with and through other people
Process - represents ongoing functions or
primary activities engaged in by managers
Coordinating - distinguishes a managerial
position from a non-managerial one
What IS ManageMent
 Management (cont.)
 Efficiency - getting the most output from the least
amount of inputs
 “doing things right” (not wasting resources)
 concerned with means
 Examples: cutting inventory levels
 Decreasing the amount of time to manufacture
products
 Effectiveness - completing activities so that
organizational goals are attained
 “doing the right things”
 concerned with ends
effIcIency and effectIveneSS In
ManageMent
Management Strives For:
Low resource waste (high efficiency)
High goal attainment (high effectiveness)
Resource
Usage
Efficiency (Means)
Goal
Attainment
Effectiveness (Ends)
Low Waste High Attainment
Key reSourceS of MIS
InforMatIon
 Data
Are raw facts that describe a particular phenomenon
e.g Current Temperature, Price of property, Age of a person etc.
A message which source wants to communicate to the receiver
e.g Text, Voice, Image, movies, Music etc
 Information: Data that is organized, meaningful, and
useful
 data with context
 processed data
 value-added to data
 summarized
 organized
 analyzed
data and InforMatIondata and InforMatIon
changIng data Into InforMatIon
• data
– Raw facts stored in databases
– Need additional processing to become useful
• InforMatIon
– Required by decision maker
– Data processed and presented in a meaningful form
– Transformation (any process that changes data into information).
Program
instructions
data collected WIthIn an
organISatIon
Data collected Where from? Used for?
Order details, customer
details complaints
customers
Financial data bank
Cost of goods, new
products
suppliers
Sales data Sales Dept
data collected WIthIn an organISatIon
Data collected Where from? Used for?
Order details, customer
details complaints
customers Supplying goods, creating
invoices and statements
Improved performance
Financial data bank Planning strategic decisions
Cost of goods, new
products
suppliers Selling to customers
Sales data Sales Dept Monitor sales against
forecasts, re-order of stock
characterIStIcS of valuable
InforMatIon
1. Accuracy.
2. Verifiable.
3. Timeliness.
4. Organized.
5. Meaningful.
6. Cost effective.
1.accuracy
• The information a user receives
has been processed correctly
• Correct information
• Free from errors
• Inaccurate information can lead to
incorrect decisions
2. verIfIable
User can confirm and verify
the information.
Identify source of information
Having information when users
need it.
Right information must be produced
to users at right time.
3.tIMely InforMatIon
4. organIzed
 Information is arranged to
suit the needs and
requirements of the users.
5. MeanIngful
 Relevant to the user who
receives or uses it.
 Unnecessary information must
be eliminated.
6.coSt-effectIve
 The cost to produce the information
should be less than the actual cost
of the information.
What IS a SySteM?
 A system is…
 A set of interrelated components
 With a clearly defined boundary
 Working together
 To achieve a common set of objectives
 By accepting inputs and producing
outputs
 In an organized transformation process
baSIc functIonS of a
SySteM
 Input:
 Capturing and assembling elements that enter the system to be
processed
 Processing:
 Transformation process that converts input into output
 Output:
 Transferring transformed elements to their ultimate destination
It and IS
• What is Information Technology?
Any form of technology used by people to handle
information.
• What are Information Systems?
“A collection of hardware, software, data, people, and
procedures that are designed to generate
information that support day-to-day activities of
users in an organization”
 The branch of Engineering that deals with the use of
Computers and Telecommunications to retrieve, store
and transmit information
 Any computer based tool that people use to work with
information & support the information & information
processing needs of an organization
InforMatIon technology (It)
defInItIon of InforMatIon
SySteMS
“A collection of hardware, software, data,
people, and procedures that are
designed to generate information that
support day-to-day activities of users in
an organization”
coMponentS of InforMatIon
SySteMS
• Data
• Software
• Hardware
• People
• Procedures
InforMatIon SySteM
actIvItIeS
 Input of data resources
 Data entry activities
 Processing of data into information
 Calculations, comparisons, sorting, and so on
 Output of information products
 Messages, reports, forms, graphic images
 Storage of data resources
 Data elements and databases
 Control of system performance
 Monitoring and evaluating feedback
typeS of InforMatIon SySteMS
 operatIonS Support SySteMS:
 TPS( Sales, Inventory, and accounting systems)
 PCS( Monitor and control industrial processes ( Petroleum refining,
power generation and steel production systems.
 Enterprise collaboration systems, such as e-mail, chat and
videoconferencing systems.
 ManageMent Support SySteMS:
 MIS( Provide information as reports and displays)
 DSS(such as products pricing, profitability forecasting, and risk
analysis.
 EIS( Provides critical information from MIS, DSS such as system for
easy access to analysis of business performance, action of competitors,
and strategic planning
typeS of operatIonS Support
SySteMS
 Transaction Processing Systems
 Record and process business transactions
 Examples: sales processing, inventory systems,
accounting systems
 Process Control Systems
 Monitor and control physical processes
 Example: using sensors to monitor chemical processes
in a petroleum refinery
 Enterprise Collaboration Systems
 Enhance team and workgroup communication
 Examples: email, video conferencing
tranSactIon proceSSIng SySteMS
 TPS is the important examples of Operations
support systems that record and process data
resulting from business transactions.
 Computerized systems that perform and record
the daily routine transactions necessary to
conduct the business; they serve the
organization’s operational level
 Examples
 Accounting information systems
 TCS, DHL, all have systems that are TPS
tWo WayS to proceSS
tranSactIonS
 Batch Processing:
 Accumulate transactions over time and process
periodically
 Example: a bank processes all checks received in a
batch at night
 Online Processing:
 Process transactions immediately
 Example: a bank processes an ATM withdrawal
immediately
exaMple of tpS
1. An inventory control system keeps a file of records about the
stock of goods that a business has on hand (the inventory)
which is one aspect of the state of the business.
2. When items are shipped or received, the state of the business
is affected, and the inventory control system makes
changes about the inventory in the stored records.
 4. It also prints a report giving the quantity
on hand for each item in inventory, which is a
characteristic of the state of the business.
 Finally, when inventory is low, the system
produces output that causes more inventory
to be ordered, which is another type of
business transaction.
exaMple of tpS
typeS of tpS SySteMS
tranSactIon proceSSIng
SySteM functIonS
Input function
• Capture input data
• Enter input data
• Validate input data
Processing function:
• perform computation
• make decision
Output function:
• produce screen output
• print output
Storage function:
• stored data
• Access data
• Update data
 Transaction processing systems perform input, output,
storage, and processing functions.
 Input functions include capturing data on a source
document, entering the input data into the system, and
checking input data for errors, a process called data
validation
 Output functions include producing screen or paper reports,
such as detail reports, summary reports, and exception
reports.
tranSactIon proceSSIng SySteM
 Storage functions include storing data in files and
databases, accessing stored data, sorting stored data,
and updating stored data.
 Processing functions involve the manipulation of
data, including computation and decision making
tranSactIon proceSSIng SySteM
tranSactIon proceSSIng SySteMS
ManageMent InforMatIon
SySteMS
• MIS provides information in the form of reports
and displays to managers and many business
professionals. Such as sales analysis, production
performance.
• Provides information to business professionals in
a variety of easy-to-use formats.
• Examples
– Systems that provide managers with reports and online
real-time access to company performance and historical
records.
ManageMent InforMatIon SySteM
(MIS)
decISIon Support SySteMS
 Decision Support Systems are concerned with providing
useful information to support the decision process.
 A Production Manager may use a DSS to decides how
much product to manufacture based on the expected sales
associated with a future promotion and the location and
availability of the raw materials necessary to manufacture
the product.
• Examples
– May take data from both internal sources (TPS, MIS) but also from external
sources (Stock prices or product prices of competitors)
– Shipping companies use voyage-estimating systems that take various shipping
information into account and give advice on costs, freight rates for various types
of cargo and port expenses etc
Voyage-estimating Decision Support
System
 Needs voyage-estimating system to calculate
 financial details
 Ship/time costs (fuel, labour, capital)
 Freight rates for various types of cargo
 Port expenses
 technical details
 Ship cargo capacity
 Speed
 Port distances
 Fuel and water consumption
 Cargo loading patterns
decISIon Support SySteMS
decISIon Support SySteM
(dSS)
executIve InforMatIon SySteMS
• Information Systems at the organizations
strategic level designed to address unstructured
decision making through advanced graphics and
communications.
• Examples:
– Incorporate data about external events such as tax laws or competitors, but also
draw summarized information from internal MIS and DSS.
– Filter, compress and track critical data, emphasizing the reduction of time and
effort required to obtain information useful to executives.
executIve Support SySteM (eSS)
What is a human resources information system
(HRIS)?
 Manages human resources functions
 Employee relationship management (ERM) system
facilitates communication with employees
Human Resource Systems
2-47
 A strategic information system is
any information system that uses IT to
help an organization…
StrategIc It
2-48
 Cost Leadership
 Become low-cost producers
 Help suppliers or customers reduce costs
 Differentiation Strategy
 Differentiate a firm’s products from its competitors’
 Focus on a particular segment or niche of market
fIve coMpetItIve StrategIeS
2-49
 Innovation Strategy
 Unique products, services, or markets
 Radical changes to business processes
 Growth Strategy
 Expand company’s capacity to produce
 Expand into global markets
coMpetItIve StrategIeS
2-50
 Alliance Strategy
 Establish linkages and alliances with customers, suppliers, competitors,
consultants, and other companies
coMpetItIve StrategIeS
hoW IS a coMputer defIned?
Produces and stores results
 Electronic device operating under the control of
instructions stored in its own memory
Processes data into informationinformation
Data that is organized,
meaningful, and useful
Accepts datadata
Raw facts, figures, and
symbols
What IS hardWare
 Hardware is the general term that
is used to describe physical
artifacts of technology.
What IS an Input devIce?
 Hardware used
to enter data
and instructions
Input devIceS
Input devIceS
What IS an output devIce?
 Hardware that
conveys
information
to one or more
people
What IS Storage?
Storage mediaStorage media
Physical material on which data, instructions,
and information are stored
Storage mediaStorage media
Physical material on which data, instructions,
and information are stored
Storage deviceStorage device
Records and retrieves items to and from
a storage medium
Storage deviceStorage device
Records and retrieves items to and from
a storage medium
 Holds data, instructions, and information
for future use
coMputer for IndIvIdual uSerS
 Desktop computers
 The most common type of computer
 Sits on the desk or floor
 Performs a variety of tasks
 Workstations
 Specialized computers
 Optimized for science or graphics
 More powerful than a desktop
Mainframe Very powerful,
expensive computer that supports
thousands of connected users
[Also called an Enterprise Server]
Supercomputer The fastest, most
powerful, most expensive
computer. Used for applications
requiring complex mathematical
calculations
Server Controls access to network
resources and provides centralized
storage
What is a notebook computer?
 Portable, small enough
to fit on your lap
 Also called a laptop
computer
 Generally more
expensive than desktop
computers with equal
capabilities
What is a Tablet PC?
 Especially useful for taking
notes
 Resembles a letter-sized slate
 Allows you to write on the
screen using a digital pen
Consists of a series
of instructions that
tells the computer
what to do and
how to do it
Consists of a series
of instructions that
tells the computer
what to do and
how to do it
What IS SoftWare?
Also called a
program
Also called a
program
coMputer SoftWare
 Definition:
 Key to productive use of computers.
 A computer program that tells the computer how to
perform particular tasks.
 Information that the computer uses to get the job done.
 Types of Software
 Software can be categorized into two types:
 System Software
 Application Software.
What IS SySteM SoftWare?
Operating System (OS)Operating System (OS)
is a set of programs
that coordinates all
activities among
computer hardware
devices
Operating System (OS)Operating System (OS)
is a set of programs
that coordinates all
activities among
computer hardware
devices
Utility ProgramsUtility Programs allow the user to
perform maintenance-type tasks
usually related to managing a
computer, its devices or its programs
Utility ProgramsUtility Programs allow the user to
perform maintenance-type tasks
usually related to managing a
computer, its devices or its programs
 Programs that control or maintain the operations of
the computer and its devices
What IS applIcatIon SoftWare?
Presentation
Graphics
Spreadsheet
Database
Word
Processing
 Programs designed to make
users more productive
 Create/Produce useful data
Word proceSSIng
 Word Processing software is used to create and print documents. A key
advantage of word processing software is that users easily can make
changes in documents.
electronIc SpreadSheetS
 Electronic spreadsheet software allows the user to add, subtract, and
perform user-defined calculations on rows and columns of numbers. These
numbers can be changed and the spreadsheet quickly recalculates the new
results.
databaSe SoftWaredatabaSe SoftWare
 Allows the user to enter, retrieve, and update data in an organized and efficient
manner, with flexible inquiry and reporting capabilities.
coMputer SoftWare
What is a programmer?
 Someone who develops
application or system
software
 Programmer writes
the instructions to
direct the computer to
process data into
information
What IS a graphIcal uSer Interface
(guI)?
 Allows you to interact with the software using
graphics and visual images such as icons
 Controls how you enter data and instructions and
how the screen displays information
3-71
bIt and byte
 Bit
 Short for binary digit
 Smallest element of data
 Either zero or one
 Byte
 Group of eight bits, which operate as a single
unit
 Represents one character or number
3-72
repreSentIng characterS In byteS
3-73
uSIng bInary code to calculate
3-74
Storage capacIty MeaSureMent
 Kilobyte (KB): one thousand bytes
 Megabyte (MB): one million bytes
 Gigabyte (GB): one billions bytes
 Terabyte (TB): one trillion bytes
 Petabyte (PB): one quadrillion bytes
coMMon nuMber SySteMS
System Base Symbols
Used by
humans?
Used in
computers?
Decimal 10 0, 1, … 9 Yes No
Binary 2 0, 1 No Yes
Octal 8 0, 1, … 7 No No
Hexa-
decimal
16 0, 1, … 9,
A, B, … F
No No
75
Quantities/Counting (1 of 3)
Decimal Binary Octal
Hexa-
decimal
0 0 0 0
1 1 1 1
2 10 2 2
3 11 3 3
4 100 4 4
5 101 5 5
6 110 6 6
7 111 7 7
76
Quantities/Counting (2 of 3)
Decimal Binary Octal
Hexa-
decimal
8 1000 10 8
9 1001 11 9
10 1010 12 A
11 1011 13 B
12 1100 14 C
13 1101 15 D
14 1110 16 E
15 1111 17 F
77
Quantities/Counting (3
of 3)
Decimal Binary Octal
Hexa-
decimal
16 10000 20 10
17 10001 21 11
18 10010 22 12
19 10011 23 13
20 10100 24 14
21 10101 25 15
22 10110 26 16
23 10111 27 17 Etc.
78
Quick
Example
2510 = 110012 = 318 = 1916
Base
79
Decimal to Decimal (just
for fun)
Hexadecimal
Decimal Octal
Binary
80
12510 => 5 x 100
= 5
2 x 101
= 20
1 x 102
= 100
125
Base
Weight
81
Decimal to Decimal (just for fun)
Weight “0”
Binary to
Decimal
Hexadecimal
Decimal Octal
Binary
82
Binary to
Decimal
 Technique
 Multiply each bit by 2
n
, where n is the “weight” of the bit
 The weight is the position of the bit, starting from 0 on the right
 Add the results
83
Examp
le
1010112 => 1 x 20
= 1
1 x 21
= 2
0 x 22
= 0
1 x 23
= 8
0 x 24
= 0
1 x 25
= 32
4310
Bit “0”
84
Octal to
Decimal
Hexadecimal
Decimal Octal
Binary
85
Octal to
Decimal
 Technique
 Multiply each bit by 8
n
, where n is the “weight” of the bit
 The weight is the position of the bit, starting from 0 on the right
 Add the results
86
Examp
le
7248 => 4 x 80
= 4
2 x 81
= 16
7 x 82
= 448
46810
87
Hexadecimal to
Decimal
Hexadecimal
Decimal Octal
Binary
88
Hexadecimal to
Decimal
 Technique
 Multiply each bit by 16
n
, where n is the “weight” of the bit
 The weight is the position of the bit, starting from 0 on the right
 Add the results
89
Examp
le
ABC16 => C x 160
= 12 x 1 = 12
B x 161
= 11 x 16 = 176
A x 162
= 10 x 256 = 2560
274810
90
Decimal to
Binary
Hexadecimal
Decimal Octal
Binary
91
Decimal to
Binary
 Technique
 Divide by two, keep track of the remainder
 First remainder is bit 0 (LSB, least-significant bit)
 Second remainder is bit 1
 Etc.
92
Examp
le
12510 = ?2
2 125
62 12
31 02
15 12
7 12
3 12
1 12
0 1
12510 = 11111012
93
Decimal to
Octal
Hexadecimal
Decimal Octal
Binary
94
Decimal to
Octal
 Technique
 Divide by 8
 Keep track of the remainder
95
Examp
le
123410 = ?8
8 1234
154 28
19 28
2 38
0 2
123410 = 23228
96
Decimal to
Hexadecimal
Hexadecimal
Decimal Octal
Binary
97
Decimal to
Hexadecimal
 Technique
 Divide by 16
 Keep track of the remainder
98
Examp
le
123410 = ?16
123410 = 4D216
16 1234
77 216
4 13 = D16
0 4
99
Octal to
Binary
Hexadecimal
Decimal Octal
Binary
100
Octal to
Binary
 Technique
 Convert each octal digit to a 3-bit equivalent binary representation
101
Examp
le
7058 = ?2
7 0 5
111 000 101
7058 = 1110001012
102
Hexadecimal to
Binary
Hexadecimal
Decimal Octal
Binary
103
Hexadecimal to
Binary
 Technique
 Convert each hexadecimal digit to a 4-bit equivalent binary representation
104
Examp
le
10AF16 = ?2
1 0 A F
0001 0000 1010 1111
10AF16 = 00010000101011112
105
Binary to
Octal
Hexadecimal
Decimal Octal
Binary
106
Binary to
Octal
 Technique
 Group bits in threes, starting on right
 Convert to octal digits
107
Examp
le
10110101112 = ?8
1 011 010 111
1 3 2 7
10110101112 = 13278
108
Binary to
Hexadecimal
Hexadecimal
Decimal Octal
Binary
109
Binary to
Hexadecimal
 Technique
 Group bits in fours, starting on right
 Convert to hexadecimal digits
110
Examp
le
10101110112 = ?16
10 1011 1011
2 B B
10101110112 = 2BB16
111
Octal to
Hexadecimal
Hexadecimal
Decimal Octal
Binary
112
Octal to
Hexadecimal
 Technique
 Use binary as an intermediary
113
Examp
le
10768 = ?16
1 0 7 6
001 000 111 110
2 3 E
10768 = 23E16
114
Hexadecimal to
Octal
Hexadecimal
Decimal Octal
Binary
115
Hexadecimal to
Octal
 Technique
 Use binary as an intermediary
116
Examp
le
1F0C16 = ?8
1 F 0 C
0001 1111 0000 1100
1 7 4 1 4
1F0C16 = 174148
117
Exercise –
Convert ...
Don’t use a calculator!
Decimal Binary Octal
Hexa-
decimal
33
1110101
703
1AF
118
Exercise –
Convert …
Decimal Binary Octal
Hexa-
decimal
33 100001 41 21
117 1110101 165 75
451 111000011 703 1C3
431 110101111 657 1AF
Answer
119
WEB BROWSERS
WORD PROCESSING & DESKTOP
PUBLISHING
ELECTRONIC SPREADSHEETS &
PRESENTATION GRAPHICS
Electronic Spreadsheets
 Worksheet of rows and columns
 Used for calculations and charts
 E.g., Lotus 1-2-3, Microsoft Excel, Corel QuattroPro, BO XI
Presentation Graphics
 Convert numeric data into graphics displays
 Prepare multimedia presentations including graphics, photos, animation, and video clips
 E.g., Microsoft PowerPoint, Lotus Freelance, Corel Presentations
ELECTRONIC SPREADSHEETS &
PRESENTATION GRAPHICS
PERSONAL INFORMATION MANAGER &
GROUPWARE
Personal Information Manager (PIM)
 Software for end user productivity and collaboration
 Store information about clients, schedules, manage
appointments, manage tasks
 E.g., Lotus Organizer, Microsoft Outlook
Groupware
 Software that helps workgroups collaborate on group
assignments
 E-mail, discussion groups, databases, videoconferencing
 E.g., Lotus Notes, Novell GroupWise, Microsoft
Exchange
PERSONAL INFORMATION MANAGER &
GROUPWARE
SOFTWARE ALTERNATIVES
 Outsourcing development and maintenance of
software
 Application service providers (ASPs)
 Companies that own, operate and maintain
application software and computer system
resources
 Use the application for a fee over the Internet
 Pay-as-you-go
SOFTWARE ALTERNATIVES
SOFTWARE LICENSING
 All software (COTS, ASP) is licensed
 You don’t buy software: you buy a license to use
the software under the terms of the licensing
agreement
 Licensed to protect the vendor’s property rights
SYSTEM SOFWARE
Software that manages and supports a computer
system
System management programs
 Programs that manage hardware, software, network, and data resources
 E.g., operating systems, network management programs, database management systems,
systems utilities
Systems development programs
 Programs that help users develop information system programs
SYSTEM MANAGEMENT
PROGRAMS
OPERATING SYSTEM
 Integrated system of programs that
 Manages the operations of the CPU
 Controls the input/output and storage resources and activities of the computer system
 Provides support services as computer executes applications programs
OS BASIC FUNCTIONS
USER INTERFACE
 Part of the operating system that allows you to
communicate with it
 Three main types:
 Command-driven
 Menu-driven
 Graphical user interfaces (GUI)
USER INTERFACE
RESOURCE MANAGEMENT
 Part of operating system that manages the hardware
and networking resources of a computer system
 Includes CPU, memory, secondary storage device, telecommunications, and input/output
peripherals
FILE MANAAGEMENT
 Part of the operating system that controls the
creation, deletion, and access of files of data and
programs
FILE MANAGEMENT
TASK MANAGEMENT
 Part of the operating system that manages the
accomplishment of computing tasks of the end
users
 Multitasking
 Task management approach that allows for several tasks to be performed in a seemingly
simultaneous fashion
 Also called multiprogramming or time-sharing
TASK MANAGEMENT
POPULAR OS
 Windows
 GUI, multitasking, networking, multimedia
 Microsoft’s operating system
 Different versions manage servers
 Unix
 Multitasking, multiuser, network-managing
 Portable – can run on mainframes, midrange and PCs
 Linux
 Low-cost, powerful reliable Unix-like operating system
 Open-source
 MAC OS X
 Apple operating system for the iMac
 GUI, multitasking, multimedia
OTHER SYSTEM SOFTWARE
Utilities
 Miscellaneous housekeeping functions
 Example, Norton utilities includes data backup, virus protection, data compression, etc.
Performance monitors
 Programs that monitor and adjust computer system to keep them running efficiently
Security monitors
 Programs that monitor and control use of computer systems to prevent unauthorized use of
resources
WEB LANGUAGES
 HTML
 A page description language that creates hypertext documents for the Web
 XML
 Describes the contents of Web pages by applying identifying tags or contextual
labels to the data in Web documents
 Java
 Object-oriented programming language that is simple, secure and platform
independent
 Java applets can be executed on any computer
WEB LANGUAGES
Data ResouRce ManageMent
Foundation Data Concepts
Data Organization Structure is logically organized into:-Data Organization Structure is logically organized into:-
 Character
 Field
 Record
 File
 Database
Like writing can be organized into letters, word, paragraph &
sentences
CHARACTER
 Consists of a single alphabets, numeric or other
symbol.
 It is a byte used to represent a particular character.
field
 Consists of a grouping of related characters.
 E.g., person names represent the name field. i.e., last name, first name, state, city, telephone
#
RECORD
 Fields when grouped together make a record.
 An allocation of attributes to describe any entity.
 E.g.,
 Person payroll records
 Employee claims record
 Student academic records
FILE
 Group of related records is a data file or table.
 A single table may be referred to as a flat file.
 E.g.,
 Employee file
 Student file
 Inventory file
 Payroll file etc
DATABASE
 An integrated collection of logically related data
elements.
 It contains all the records
Foundation Data Concepts
Employee
Record 1
Employee
Record 2
Employee
Record 3
Employee
Record 4
Name
Field
SS No.
Field
Salary
Field
Name
Field
SS No.
Field
Salary
Field
Name
Field
SS No.
Field
Salary
Field
Name
Field
SS No.
Field
Salary
Field
Jones T.A. 275-32-3874 20,000 Klugman J.L. 349-88-7913 28,000 Alverez, J.S. 542-40-3718 100,000 Porter, M.L. 617-87-7915 50,000
Human Resource
Database
Payroll File Benefit File
Data Organization StructureData Organization Structure
Foundation Data Concepts
Electric Utility Database
Entities:
Customers, Meters, Bills,
Payments, Meter Readings
Relationships:
Bills Sent to Customers
Customers Make Payments
Customers Use Meters
Billing
Meter
Reading
Payment
Processing
Service
Start/Stop
Example: An Electric Utility DatabaseExample: An Electric Utility Database
DATABASE STRUCTURES
 DBMS packages are designed to use specific data
structures to provide end users with quick; easy
access to information stored in the databases.
DATABASE STRUCTURES
 Five Major Database StructuresFive Major Database Structures
•Hierarchical Structure
•Network Structure
•Relational Model
•Object-Oriented
•Multidimensional Structure
HIERARCHICAL STRUCTURE
 One-to-many relationship
 Relationship b/w records from a hierarchy structure
all of them are dependent.
 Root element
NETWORK STRUCTURE
 Allow many-to-many relationships among records.
 E.g., employee records can be related to more than
one project record & vice versa.
RELATIONAL STRUCTURE
 It is used by most microcomputers
DBMS packages as well as by both
midrange & mainframes systems.
 In this, all data elements within the
database are viewed as being stored in
the form of simple two dimensional
tables sometimes referred to as
relations .
Department Table Employee Table
Deptno Dname Dloc Dmgr Empno Ename Etitle Esalary Deptno
Emp 1
Emp 2
Emp 3
Emp 4
Emp 5
Emp 6
Dept A
Dept B
Dept C
Dept A
Dept B
Dept A
Dept B
Dept C
Dept B
MULTIDIMENSIONAL
STRUCTURE
Object-oriented structure
Attributes
•Customer
•Balance
•Interest
Operations
•Deposit (Amount)
•Withdraw (Amount)
•Get Owner
Attributes
•Credit Line
•Monthly Statements
Operations
•Calculate Interest
•Print Monthly Statement
Attributes
•Number of Withdrawals
•Quarterly Statement
Operations
•Calculate Interest Paid
•Print Quarterly Statement
Bank Account Object
Checking Account Object Savings Account Object
Inheritance Inheritance
Web basedWeb based
applicationsapplications
Describing theDescribing the
attributes of anattributes of an
entity, plus theentity, plus the
operations that canoperations that can
be performs upon thebe performs upon the
datadata
SupportsSupports
inheritanceinheritance
Object-oriented structure
Database Development
Database management packages like Microsoft Access or Lotus
Approach allow end users to easily develop the database they
need.
Database Development
•Database Administrators (DBAs)
•Data Definition Language (DDL)
•Oracle 10g or IBM DB2
•Data Dictionary or Metadata Repository
•Database management catalog or directory that
contain metadata.
•Relies on specialized database software component to
manage a database.
•Metadata
•Data on data
Data Mining
 Identify New Product Bundles
 Find Root Causes to Quality or Manufacturing Problems
 Prevent Customer Attrition
 Cross-Sell to Existing Customers
 Profile Customers with More Accuracy
Types of Databases
 Operational Databases
 Distributed Databases
 External Databases
 Hypermedia Databases
Distributed Database ModelDistributed Database Model
Client PC
Distributed
Databases
on Intranets
and Other
Networks
End User
Databases
Data
Warehouse
Data
Marts
Operational
Databases
of the
Organization
Network
Server
External
Databases
on the
Internet and
Online
Services
Operational DatabasesOperational Databases
Types of Databases
Web-Based Information SystemWeb-Based Information System
Web
Browser
The Internet
Intranets
Extranets Web
Server
Software
HTML
XML
Web Pages
Image Files
Video Files
Audio Files
Network
Server
Client PCs
Hypermedia
Database
Types of Databases
Data Warehouses
Applications Data Marts
Finance
Marketing
Sales
Accounting
Management
Reporting
ERP
Purchasing
CRM
Inveentory
Control
Shipping
Logistics
5-170
Data Warehouse Components
5-171
Applications and Data Marts
5-172
Database Management System
 In mainframe and server computer systems, a
software package that is used to…
 Create new databases and database applications
 Maintain the quality of the data in an organization’s databases
 Use the databases of an organization to provide the information needed by end users
5-173
Common DBMS Software Components
 Database definition
 Language and graphical tools to define entities, relationships, integrity constraints, and
authorization rights
 Nonprocedural access
 Language and graphical tools to access data without complicated coding
 Application development
 Graphical tools to develop menus, data entry forms, and reports
5-174
Common DBMS Software Components
 Procedural language interface
 Language that combines nonprocedural access with full capabilities of a programming
language
 Transaction processing
 Control mechanism prevents interference from simultaneous users and recovers lost data
after
a failure
 Database tuning
 Tools to monitor, improve database performance
5-175
Database Management System
 Database Development
 Defining and organizing the content, relationships, and structure of the data needed
to build a database
 Database Application Development
 Using DBMS to create prototypes of queries, forms, reports, Web pages
 Database Maintenance
 Using transaction processing systems and other tools to add, delete, update, and correct data
5-176
DBMS Major Functions
5-177
Database Interrogation
 End users use a DBMS query feature or report
generator
 Response is video display or printed report
 No programming is required
 Query language
 Immediate response to ad hoc data requests
 Report generator
 Quickly specify a format for information you want to present as a report
5-178
Database Interrogation
 SQL Queries
 Structured, international standard query language found in many DBMS packages
 Query form is SELECT…FROM…WHERE…
5-179
Database Interrogation
 Boolean Logic
 Developed by George Boole in the mid-1800s
 Used to refine searches to specific information
 Has three logical operators: AND, OR, NOT
 Example
 Cats OR felines AND NOT dogs OR Broadway
5-180
Database Interrogation
 Graphical and Natural Queries
 It is difficult to correctly phrase SQL and other database language search queries
 Most DBMS packages offer easier-to-use,
point-and-click methods
 Translates queries into SQL commands
 Natural language query statements are similar
to conversational English
5-181
Graphical Query Wizard
5-182
Database Maintenance
 Accomplished by transaction processing systems
and other applications, with the support of the
DBMS
 Done to reflect new business transactions and other events
 Updating and correcting data, such as customer addresses
5-183
Application Development
 Use DBMS software development tools to develop
custom application programs
 Not necessary to develop detailed data-handling procedures using conventional
programming languages
 Can include data manipulation language (DML) statements that call on the DBMS to
perform necessary data handling
Telecommunications
and Networks
6-185
Types of Communications Networks
 Primary types of communications networks
 Wide Area
 Local Area
 Virtual Private
 Client/Server
 Peer-to-peer
6-186
Wide Area Network (WAN)
 Telecommunication network that covers a large
geographic area
6-187
Local Area Network (LAN)
 Connects computers within a limited physical area,
such as an office, classroom, or building
6-188
Virtual Private Networks (VPN)
 Used to establish secure intranets and extranets
 The Internet is the main backbone network
 Relies on network firewalls, encryption, and
other security features to build a “pipe” through the Internet
 Creates a private network without the high
cost of a separate proprietary connection
6-189
Virtual Private Network
6-190
Client/Server Networks
 Clients
 End user personal computers or networked computers
 Servers
 Used to manage the networks
 Processing
 Shared between the clients and servers
 Sometimes called a two-tier architecture
 Larger computer systems are being replaced
with multiple client/server networks
6-191
Client/Server Network
6-192
Network Computing
 Networks are the central computing resource
of the organization
 Thin clients provide a browser-based user interface for processing applets
 Thin clients include
 Network computers
 Net PCs
 Other low-cost network devices or
information appliances
6-193
Network Computing
 Application and database servers provide
 The operating system
 Application software
 Applets
 Databases
 Database management software
 Sometimes called a three-tier client/server
model because it consists of
 Thin clients
 Application servers
 Database servers
6-194
Network Computing
6-195
Peer-to-Peer Networks
 Central Server Architecture
 P2P file-sharing software connects all PCs
to a central server
 When a PC requests a file, the server searches
all active peers on the network
 The server sends the requesting PC a list of
links to all active peers who have the file
 Clicking a link connects the two PCs and automatically transfers the file to the
requesting PC
6-196
Peer-to-Peer Networks
 Pure Peer-to-Peer Architecture
 No central directory or server
 File-sharing software connects one PC to
another online user
 When you request a file, the software searches every online user and sends you a list of
active file names
 Clicking a link automatically transfers the file from that user’s hard drive to yours
6-197
Central Server Peer-to-Peer Networks
 Advantages
 Can better protect the integrity and security
of the content and users of the network
 Disadvantages
 Directory server can be slowed or overwhelmed by too many users or technical problems
6-198
Peer-to-Peer Network Diagrams
6-199
Digital and Analog Signals
 Analog or digital refers to the method used to
convert information into an electrical signal
 Analog: an electrical current is generated that
is proportional to the quantity being observed
 Digital: the quantity being observed is expressed as a number
 Analog: if the temperature is 83 degrees, a measuring device would generate 8.3 volts
 Digital: a measurement of 83 degrees would be displayed as the number 83
6-200
Telecommunications Media
 Twisted-Pair Wire
 Ordinary telephone wire
 Copper wire is twisted
into pairs
6-201
Telecommunications Media
 Coaxial Cable
 Sturdy copper or
aluminum wire wrapped
with spacers to insulate
and protect it
6-202
Telecommunications Media
 Fiber-Optic Cable
 One or more hair-thin
filaments of glass
fiber wrapped in a
protective jacket
6-203
The Problem of “The Last Mile”
 Network providers use fiber optic cable as a
communications backbone
 Houses connected to the backbone are wired
with twisted pair
 Users don’t benefit from the faster, better technology
6-204
Wireless Technologies
 Terrestrial Microwave
 Earthbound microwave systems transmit
high-speed radio signals
 Follows a line-of-sight path between relay systems spaced about 30 miles apart
 Communications Satellites
 Serve as relay stations
 Use microwave radio signals
 Earth stations beam signals to the satellites
 Not suitable for interactive, real-time processing
6-205
Wireless Technologies
 Cellular and PCS Telephone and Pager Systems
 Geographic areas are divided into cells
 Each cell has a low-power transmitter or radio relay antenna
 Computers and other communications processors coordinate and control the transmissions to
and from mobile users
6-206
Wireless Technologies
 Wireless LANS
 Uses wireless radio-wave technology to
connect PCs within an office or a building
 Can be high-frequency, similar to digital
cellular, or low frequency (spread spectrum)
 Bluetooth
 Short-range wireless technology
 Connects PCs to devices, such as a printer
 Fairly low cost to implement
6-207
Wireless Technologies
 Other Wireless Systems
 Cellular phones
 Mobile radio
 PDAs
 Telecommunications networks now play vital and
pervasive roles in
 Web-enabled e-business processes
 Electronic commerce
 Enterprise collaboration
 Other applications that support business operations, management, and strategic objectives
6-208
The Wireless Web
 Wireless Internet access is growing as Web-enabled
information appliances proliferate
 Smart telephones, pagers, PDAs
 All are very thin clients in wireless networks
6-209
Telecommunications Processors
 Modems
 The most common type of communications processor
 Converts a digital signal to an analog frequency that can be transmitted over phone lines,
then back into a digital signal
 Modulation and demodulation
6-210
Comparing Technologies
6-211
Inter-Network Processors
 Switch… makes connections between
telecommunications circuits in a network
 Router… intelligent communications processor
that interconnects networks based on different
protocols
 Hub… a port-switching communications processor
 Gateway… connects networks with different
6-212
Communications Processors
6-213
Communications Processors
 Multiplexer… allows a single communications
channel to carry simultaneous data transmissions
from many terminals
 In time division multiplexing (TDM), the multiplexer divides the time each terminal can use
the high-speed into short time slots
 Multiplexers increase the number of transmissions
possible
 Does not increase the number of physical data channels
6-214
Telecommunications Software
 May reside in PCs, servers, mainframes, and
communications processors
 Vital part of all telecommunications networks
 Used to manage network performance
 WANs often use telecommunications monitors or teleprocessing monitors
 Other networks use operating system software
 Middleware helps diverse networks communicate with each other
6-215
Network Management Functions
 Traffic Management
 Manage network resources and traffic to
avoid congestion and optimize service levels
 Security
 Provide authentication, encryption, firewall, auditing, and enforcement
 Network Monitoring
 Troubleshoot and watch over the network, alerting administrators of potential problems
6-216
Network Management Functions
 Capacity Planning
 Survey network resources, traffic patterns, and users’ needs
 Determine the best way to accommodate the needs of the network as it grows and changes
6-217
Network Topologies
 Topology
 The structure of a network
 Star Network
 Ties end user computers to a central computer
 Ring Network
 Ties local computer processors together in a ring on a relatively equal basis
 Bus Network
 Local processors share the same communications channel
6-218
Network Topologies
 Mesh Network
 Uses direct communications lines to connect some or all of the computers in the ring to
each other
 Switch
 A message-switching computer that handles
data communication between autonomous
local computers
6-219
Network Topologies
6-220
Network Architectures and Protocols
 Protocol
 A standard set of rules and procedures for the control of communications in a network
 Handshaking
 The process of exchanging predetermined
signals and characters
 Establishes a telecommunications session between terminals and computers
6-221
Network Architectures and Protocols
 Network Architecture
 Master plan of standard protocols, hardware, software, and interfaces between end users
and computer systems
 Goal is to promote an open, simple, flexible,
and efficient telecommunications environment
6-222
OSI and TCP/IP Models
 Open Systems Interconnection (OSI) Model
 A seven-layer model that serves as a standard model for network architectures
 Model for how messages should be transmitted between two points in a network
 Each layer adds functions
 Transmission Control Protocol/Internet Protocol
(TCP/IP)
 A five-layer telecommunications protocol used by the Internet
6-223
OSI and TCP/IP Models
6-224
Voice Over IP
 Internet Telephony
 Using an Internet connection to pass voice
data using IP instead of a telephone network
 Often referred to as voice over IP or VoIP
 Works like a regular phone, but skips long-distance charges
 Runs over standard network infrastructure
 Requires a well-configured network to work smoothly
6-225
Bandwidth
 Bandwidth
 The frequency range of a telecommunications channel that determines the maximum
transmission rate
 Speed and capacity typically measured in bits
per second (bps)
 Sometimes call baud rate
 Transmission Rates
 Narrow-band = low speed
 Broadband = high speed
6-226
Transmission Speeds
6-227
Switching Alternatives
 Circuit Switching
 Switch opens a circuit to establish a link
between a sender and a receiver
 It remains open until the communication
session is completed
 Packet Switching
 Breaks messages into groups called packets
 Transmits packets separately
6-228
Network Interoperability
 Ensures that anyone anywhere on one network can
communicate with anyone anywhere on another
network
 From a telecommunications perspective, no
need to speak a common language
 Telecommunications would be possible without
 Complete accessibility
 Transparency
 Seamless interoperability across all networks
ElEctronic BusinEss systEms
7-230
Enterprise Business Systems
 E-business means using the Internet, other
networks, and IT to support
 Electronic commerce
 Enterprise communications and collaboration
 Web-enabled business processes
 E-commerce is the buying, selling, and marketing
of products, services, and information over the
Internet and other networks
7-231
Cross-Functional Systems
 Cross the boundaries of traditional business
functions
 Used to reengineer and improve vital business processes all across the enterprise
7-232
Enterprise Application Architecture
7-233
Enterprise Application Architecture
 Provides a conceptual framework
 Helps visualize the basic components, processes, and interfaces of major e-business
applications
 Focuses on accomplishing fundamental
business processes in concert with
 Customers
 Suppliers
 Partners
 Employees
7-234
Enterprise Application Architecture
 Enterprise Resource Planning (ERP)
 Concentrates on the efficiency of internal production, distribution, and financial processes
 Customer Relationship Management (CRM)
 Focuses on acquiring and retaining profitable customers via marketing, sales, and services
 Partner Relationship Management (PRM)
 Aims at acquiring and retaining partners who
can enhance the selling and distribution of products and services
7-235
Enterprise Application Architecture
 Supply Chain Management (SCM)
 Focuses on developing the most efficient and effective sourcing and procurement processes
 Knowledge Management (KM)
 Focuses on facilitating internal group collaboration and decision support
7-236
Enterprise Application Integration
 EAI software connects cross-functional systems
 Serves as middleware to provide
 Data conversion
 Communication between systems
 Access to system interfaces
7-237
Transaction Processing Systems
 Cross-functional information systems that process
data resulting from the occurrence of business
transactions
 Transactions include sales, purchases, deposits, withdrawals, refunds, and payments
 Online transaction processing (OLTP) is a real-time system that captures transactions
immediately
7-238
Transaction Processing Systems
7-239
The Transaction Processing Cycle
7-240
Enterprise Collaboration Systems
(ECS)
 EC systems are cross-functional information
systems that enhance team and workgroup
 Communication
 Coordination
 Collaboration
 Systems may include
 Networked PC workstations
 Servers
 Databases
 Groupware and application packages
7-241
ECS Tools
7-242
Functional Business Systems
 A variety of types of information systems
that support the business functions of
 Accounting
 Finance
 Marketing
 Operations management
 Human resource management
7-243
IT in Business
7-244
Marketing Systems
 Marketing systems are concerned with
 Planning, promotion, and sale of existing products in existing markets
 Development of new products and new markets
 Better attracting and serving present and
potential customers
7-245
Marketing Information Systems
7-246
Interactive Marketing
 Interactive Marketing
 A customer-focused marketing process
 Uses the Internet, intranets, and extranets
 Establishes two-way transactions between a business and its customers or potential
customers
 Goal
 Profitably use networks to attract and keep customers
 Get customers to help create, purchase, and improve products and services
7-247
Targeted Marketing
 An advertising and promotion management concept
with five targeting components
7-248
Targeted Marketing Components
 Community: customized ads to appeal to specific
virtual communities
 Content: ads placed on a variety of selected
websites, aimed at a specific audience
 Context: ads placed on web pages that are relevant
to a product or service
 Demographic/Psychographic: web marketing
7-249
Sales Force Automation
 Outfit sales force with notebook computers,
web browsers, and sales contact software
 Connect them to marketing websites and the company intranet
 Goals
 Increase personal productivity
 Speed up capture and analysis of sales data
 Gain strategic advantage
7-250
Manufacturing Information Systems
 Supports the production/operations functions
 Includes all activities concerned with planning and control of the processes producing goods
or services
7-251
Computer-Integrated Manufacturing
7-252
CIM Objectives
 Simplify production processes, product designs,
and factory organization
 Automate production processes and the
business functions that support them
 Integrate all production and support
processes using
 Networks
 Cross-functional business software
7-253
CIM Systems
 Computer-aided manufacturing (CAM)
 Automate the production process
 Manufacturing execution systems (MES)
 Performance monitoring information systems
for factory floor operations
 Process control
 Control ongoing physical processes
 Machine control
 Controls the actions of machines
7-254
Human Resource Management (HRM)
 Information systems designed to support
 Planning to meet personnel needs
 Development of employees to their full potential
 Control of all personnel policies and programs
7-255
HRM Systems
7-256
HRM and the Internet
 Recruiting employees using the corporate website
and commercial recruiting services
 Posting messages in selected Internet newsgroups
 Communicating with job applicants via e-mail
7-257
HRM and Corporate Intranets
 Corporate intranet uses
 Process common HRM transactions
 Allow around-the-clock HRM services
 Disseminate information faster than through previous company channels
 Collect information from employees online
 Allow HRM tasks to be performed with little HRM department intervention
 Training
7-258
Employee Self-Service
 Intranet applications can allow employees to
 View benefits
 Enter travel and expense reports
 Verify employment and salary information
 Access and update personal information
 Enter time-sensitive data
7-259
Accounting Information Systems
 The oldest and most widely used information
system in business
 Records and reports business transactions and economic events
 Produces financial statements
 Forecasts future conditions
7-260
Accounting Information Systems
 Typically consists of
 Order processing
 Inventory control
 Accounts receivable
 Accounts payable
 Payroll
 General ledger systems
7-261
Accounting Information Systems
7-262
Financial Management Systems
 Supports business managers and professionals
making decisions concerning
 The financing of a business
 The allocation and control of financial
resources within a business
7-263
Financial Management System
Example
EntErprisE BusinEss systEms
8-265
What is CRM?
 Managing the full range of the customer
relationship involves
 Providing customer-facing employees with a single, complete view of every customer at
every touch point and across all channels
 Providing the customer with a single, complete view of the company and its extended
channels
 CRM uses IT to create a cross-functional enterprise
system that integrates and automates many of the
customer-serving processes
8-266
Application Clusters in CRM
8-267
Contact and Account Management
 CRM helps sales, marketing, and service
professionals capture and track relevant
data about
 Every past and planned contact with prospects and customers
 Other business and life cycle events of customers
 Data are captured through customer touchpoints
 Telephone, fax, e-mail
 Websites, retail stores, kiosks
 Personal contact
8-268
Sales
 A CRM system provides sales reps with the
tools and data resources they need to
 Support and manage their sales activities
 Optimize cross- and up-selling
 CRM also provides the means to check on a
customer’s account status and history before
scheduling a sales call
8-269
Marketing and Fulfillment
 CRM systems help with direct marketing
campaigns by automatic such tasks as
 Qualifying leads for targeted marketing
 Scheduling and tracking mailings
 Capturing and managing responses
 Analyzing the business value of the campaign
 Fulfilling responses and requests
8-270
Customer Service and Support
 A CRM system gives service reps real-time access
to the same database used by sales
and marketing
 Requests for service are created, assigned,
and managed
 Call center software routes calls to agents
 Help desk software provides service data
and suggestions for solving problems
 Web-based self-service enables customers
8-271
Retention and Loyalty Programs
 It costs 6 times more to sell to a new customer
 An unhappy customer will tell 8-10 others
 Boosting customer retention by 5 percent can boost
profits by 85 percent
 The odds of selling to an existing customer are 50
percent; a new one 15 percent
 About 70 percent of customers will do business
8-272
Retention and Loyalty Programs
 Enhancing and optimizing customer retention
and loyalty is a primary objective of CRM
 Identify, reward, and market to the most loyal
and profitable customers
 Evaluate targeted marketing and relationship programs
8-273
The Three Phases of CRM
8-274
Benefits of CRM
 Benefits of CRM
 Identify and target the best customers
 Real-time customization and personalization
of products and services
 Track when and how a customer contacts
the company
 Provide a consistent customer experience
 Provide superior service and support across
all customer contact points
8-275
CRM Failures
 Business benefits of CRM are not guaranteed
 50 percent of CRM projects did not produce promised results
 20 percent damaged customer relationships
 Reasons for failure
 Lack of understanding and preparation
 Not solving business process problems first
 No participation on part of business stakeholders involved
8-276
Trends in CRM
 Operational CRM
 Supports customer interaction with greater convenience through a variety of channels
 Synchronizes customer interactions consistently across all channels
 Makes the company easier to do business with
8-277
Trends in CRM
 Analytical CRM
 Extracts in-depth customer history, preferences, and profitability from databases
 Allows prediction of customer value
and behavior
 Allows forecast of demand
 Helps tailor information and offers to
customer needs
8-278
Trends in CRM
 Collaborative CRM
 Easy collaboration with customers,
suppliers, and partners
 Improves efficiency and integration
throughout supply chain
 Greater responsiveness to customer needs through outside sourcing of products
and services
8-279
Trends in CRM
 Portal-based CRM
 Provides users with tools and information
that fit their needs
 Empowers employees to respond to
customer demands more quickly
 Helps reps become truly customer-faced
 Provides instant access to all internal and
external customer information
8-280
ERP: The Business Backbone
 ERP is a cross-functional enterprise backbone that
integrates and automates processes within
 Manufacturing
 Logistics
 Distribution
 Accounting
 Finance
 Human resources
8-281
What is ERP?
 Enterprise resource planning is a cross-functional
enterprise system
 An integrated suite of software modules
 Supports basic internal business processes
 Facilitates business, supplier, and customer information flows
8-282
ERP Application Components
8-283
ERP Process and Information Flows
8-284
Benefits and Challenges of ERP
 ERP Business Benefits
 Quality and efficiency
 Decreased costs
 Decision support
 Enterprise agility
 ERP Costs
 Risks and costs are considerable
 Hardware and software are a small part
of total costs
 Failure can cripple or kill a business
8-285
Costs of Implementing a New ERP
8-286
Causes of ERP Failures
 Most common causes of ERP failure
 Under-estimating the complexity of planning, development, training
 Failure to involve affected employees in
planning and development
 Trying to do too much too fast
 Insufficient training
 Insufficient data conversion and testing
 Over-reliance on ERP vendor or consultants
8-287
Trends in ERP
8-288
Supply Chain Management (SCM)
 Fundamentally, supply chain management
helps a company
 Get the right products
 To the right place
 At the right time
 In the proper quantity
 At an acceptable cost
8-289
Goals of SCM
 The goal of SCM is to efficiently
 Forecast demand
 Control inventory
 Enhance relationships with customers, suppliers, distributors, and others
 Receive feedback on the status of every link in the supply chain
8-290
What is a Supply Chain?
 The interrelationships
 With suppliers, customers, distributors, and
other businesses
 Needed to design, build, and sell a product
 Each supply chain process should add value to the
products or services a company produces
 Frequently called a value chain
8-291
Supply Chain Life Cycle
8-292
Electronic Data Interchange
 EDI
 One of the earliest uses of information technology for supply chain management
 The electronic exchange of business transaction documents between supply chain trading
partners
 The almost complete automation of an e-commerce supply chain process
 Many transactions occur over the Internet, using secure virtual private networks
8-293
Typical EDI Activities
8-294
Roles and Activities of SCM in
Business
8-295
Planning & Execution Functions of SCM
 Planning
 Supply chain design
 Collaborative demand and supply planning
 Execution
 Materials management
 Collaborative manufacturing
 Collaborative fulfillment
 Supply chain event management
 Supply chain performance management
8-296
Benefits and Challenges of SCM
 Key Benefits
 Faster, more accurate order processing
 Reductions in inventory levels
 Quicker times to market
 Lower transaction and materials costs
 Strategic relationships with supplier
8-297
Goals and Objectives of SCM
8-298
Benefits and Challenges of SCM
 Key Challenges
 Lack of demand planning knowledge, tools,
and guidelines
 Inaccurate data provided by other information systems
 Lack of collaboration among marketing, production, and inventory management
 SCM tools are immature, incomplete, and
hard to implement
8-299
Trends in SCM
ElEctronic commErcE SyStEmS
9-301
The Scope of e-Commerce
9-302
E-Commerce Technologies
9-303
Categories of e-Commerce
 Business-to-Consumer
 Virtual storefronts, multimedia catalogs, interactive order processing, electronic payment,
online customer support
 Business-to-Business
 Electronic business marketplaces, direct links between businesses, auctions and exchanges
 Consumer-to-Consumer
 Online auctions, posting to newspaper sites, personal websites, e-commerce portals
9-304
Essential e-Commerce Architecture
9-305
Access Control and Security
 E-commerce processes must establish mutual trust
and secure access between parties
 User names and passwords
 Encryption key
 Digital certificates and signatures
 Restricted access areas
 Other people’s accounts
 Restricted company data
 Webmaster administration areas
9-306
Profiling and Personalizing
 Profiling gathers data on you and your website
behavior and choices
 User registration
 Cookie files and tracking software
 User feedback
 Profiling is used for
 Personalized (one-to-one) marketing
 Authenticating identity
 Customer relationship management
 Marketing planning
9-307
Search Management
 Search processes help customers find the specific
product or service they want
 E-commerce software packages often include
a website search engine
 A customized search engine may be acquired from companies like Google or Requisite
Technology
 Searches are often on content or by parameters
9-308
Content and Catalog Management
 Content Management Software
 Helps develop, generate, deliver, update, and archive text and multimedia information at
e-commerce websites
 Catalog Management Software
 Helps generate and manage catalog content
 Catalog and content management software works
with profiling tools to personalize content
 Includes product configuration and
mass customization
9-309
Workflow Management
 E-business and e-commerce workflow manage-
ment depends on a workflow software engine
 Contains software model of business processes
 Workflow models express predefined
 Sets of business rules
 Roles of stakeholders
 Authorization requirements
 Routing alternative
 Databases used

9-310
Example of Workflow Management
9-311
Event Notification
 Most e-commerce applications are event driven
 Responds to such things as customer’s first website visit and payments
 Monitors all e-commerce processes
 Records all relevant events, including problem situations
 Notifies all involved stakeholders
 Works in conjunction with user-profiling software
9-312
Collaboration and Trading
 Processes that support vital collaboration
arrangements and trading services
 Needed by customers, suppliers, and other stakeholders
 Online communities of interest
 E-mail, chat, discussion groups
 Enhances customer service
 Builds loyalty
9-313
Electronic Payment Processes
 Complex processes
 Near-anonymous and electronic nature
of transactions
 Many security issues
 Wide variety of debit and credit alternatives
 Financial institutions may be part of the process
9-314
Electronic Payment Processes
 Web Payment Processes
 Shopping cart process
 Credit card payment process
 Debit and other more complex processes
 Electronic Funds Transfer (EFT)
 Major payment system in banking, retail
 Variety of information technologies capture
and process money and credit card transfers
 Most point-of-sale terminals in retail stores
are networked to bank EFT systems
9-315
Electronic Payment Example
9-316
Securing Electronic Payments
 Network sniffers easily recognize credit card
formats
 Encrypt data between customer and merchant
 Encrypt data between customer and financial institution
 Take sensitive information off-line
9-317
E-Commerce Application Trends
9-318
E-Commerce Success Factors
 Some of the success factors in e-commerce
 Selection and value
 Performance and service
 Look and feel
 Advertising and incentives
 Personal attention (one-to-one marketing)
 Community relationships
 Security and reliability
9-319
Differences in Marketing
9-320
Web Store Requirements
9-321
Developing a Web Store
 Build a website
 Choose or set up web hosting
 Use simple design tools and templates
 Include a shopping cart and payment support
 Market the website
 Include Web page and e-mail advertising
and promotions
 Exchange advertising with other Web stores
 Register with search engines and directories
 Sign up for affiliate programs
9-322
Serving Your Customers
 Convert visitors into loyal customers
 Develop one-to-one relationship with customers
 Create incentives to encourage registration
 Use Web cookies to identify visitors
 Use tracking services to record and analyze website behavior and customer preferences
 Create an attractive, friendly, efficient store
 Offer fast order processing and payment
 Notify when orders are processed and shipped
 Provide links to related websites
9-323
Managing a Web Store
 Manage both the business and the website
 Record and analyze traffic, inventory, sales
 Use CRM features to help retain customers
 Link sales, inventory data to accounting systems
 Operate 24 hours a day, seven day a week
 Protect transactions and customer records
 Use security monitors and firewalls
 Use redundant systems and power sources
 Employ passwords and encryption
9-324
B2B E-Commerce
 B2B is the wholesale and supply side of
the commercial process
 Businesses buy, sell, or trade with other businesses
 Relies on multiple electronic information
technologies
 Catalog systems
 Trading systems
 Data interchange
 Electronic funds transfers
9-325
E-Commerce Marketplaces
 One to Many
 Sell-side marketplaces
 One supplier dictates product offerings and prices
 Many to One
 Buy-side marketplaces
 Many suppliers bid for the business of a buyer
 Some to Many
 Distribution marketplaces
 Unites suppliers who combine their product catalogs to attract a larger audience
9-326
E-Commerce Marketplaces
 Many to Some
 Procurement marketplaces
 Unites major buyers who combine purchasing catalogs
 Attracts more competition and thus lower prices
 Many to Many
 Auction marketplaces
 Dynamically optimizes prices
9-327
E-Commerce Portals
 B2B e-commerce portals offer multiple
marketplaces
 Catalogs
 Exchanges
 Auctions
 Often developed and hosted by third-party market-
maker companies
 Infomediaries serve as intermediaries in
e-business and e-commerce transactions
9-328
B2B E-Commerce Web Portal
9-329
Clicks and Bricks
 Success will go to those who can integrate Internet
initiatives with traditional operations
 Merging operations has trade-offs
9-330
E-Commerce Integration
 The business case for merging e-commerce
with traditional business operations
 Move strategic capabilities in traditional operations to the e-commerce business
 Integrate e-commerce into the traditional business
 Sharing of established brands
 Sharing of key business information
 Joint buying power and distribution efficiencies
9-331
Other Clicks and Bricks Strategies
 Partial e-commerce integration
 Joint ventures and strategic partnerships
 Complete separation
 Spin-off of an independent e-commerce company
 Barnes and Noble’s experience
 Spun off independent e-commerce company
 Gained venture capital, entrepreneurial culture, and flexibility
 Attracted quality management
 Accelerated decision making
 Failed to gain market share
9-332
E-Commerce Channel Choices
 An e-commerce channel is the marketing or sales
channel created by a company for its
e-commerce activities
 There is no universal strategy or e-commerce channel choice
 Both e-commerce integration and separation
have major business benefits and shortcoming
 Most businesses are implementing some
measure of clicks and bricks integration
9-333
E-Commerce Strategy Checklist
 Questions to ask and answer
 What audiences are we attempting to reach?
 What action do we want those audiences to take?
 Who owns the e-commerce channel within the organization?
 Is the e-commerce channel planned alongside other channels?
 Is there a process for generating, approving, releasing, and withdrawing content?
 Will our brand translate to the new channel?
 How will we market the channel itself?
DEciSion Support SyStEmS
10-335
Levels of Managerial Decision Making
10-336
Decision Structure
 Structured (operational)
 The procedures to follow when decision
is needed can be specified in advance
 Unstructured (strategic)
 It is not possible to specify in advance
most of the decision procedures to follow
 Semi-structured (tactical)
 Decision procedures can be pre-specified,
but not enough to lead to the correct decision
10-337
Decision Support Systems
Management Information
Systems
Decision Support
Systems
Decision
support
provided
Provide information about
the performance of the
organization
Provide information and
techniques to analyze
specific problems
Information
form and
frequency
Periodic, exception,
demand, and push reports
and responses
Interactive inquiries and
responses
Information
format
Prespecified, fixed format Ad hoc, flexible, and
adaptable format
Information
processing
methodology
Information produced by
extraction and manipulation
of business data
Information produced by
analytical modeling of
business data
10-338
Decision Support Trends
 The emerging class of applications focuses on
 Personalized decision support
 Modeling
 Information retrieval
 Data warehousing
 What-if scenarios
 Reporting
10-339
Business Intelligence Applications
10-340
Decision Support Systems
 Decision support systems use the following to
support the making of semi-structured business
decisions
 Analytical models
 Specialized databases
 A decision-maker’s own insights and judgments
 An interactive, computer-based modeling process
 DSS systems are designed to be ad hoc,
quick-response systems that are initiated and
controlled by decision makers
10-341
DSS Components
10-342
DSS Model Base
 Model Base
 A software component that consists of
models used in computational and analytical routines that mathematically express relations
among variables
 Spreadsheet Examples
 Linear programming
 Multiple regression forecasting
 Capital budgeting present value
10-343
Applications of Statistics and
Modeling
 Supply Chain: simulate and optimize supply
chain flows, reduce inventory, reduce stock-outs
 Pricing: identify the price that maximizes
yield or profit
 Product and Service Quality: detect quality problems early in order to minimize them
 Research and Development: improve quality, efficacy, and safety of products and services
10-344
Management Information Systems
 The original type of information system
that supported managerial decision making
 Produces information products that support
many day-to-day decision-making needs
 Produces reports, display, and responses
 Satisfies needs of operational and tactical decision makers who face structured decisions
10-345
Management Reporting Alternatives
 Periodic Scheduled Reports
 Prespecified format on a regular basis
 Exception Reports
 Reports about exceptional conditions
 May be produced regularly or when an
exception occurs
 Demand Reports and Responses
 Information is available on demand
 Push Reporting
10-346
Example of Push Reporting
10-347
Online Analytical Processing
 OLAP
 Enables managers and analysts to examine
and manipulate large amounts of detailed and consolidated data from many perspectives
 Done interactively, in real time, with rapid response to queries
10-348
Online Analytical Operations
 Consolidation
 Aggregation of data
 Example: data about sales offices rolled up
to the district level
 Drill-Down
 Display underlying detail data
 Example: sales figures by individual product
 Slicing and Dicing
 Viewing database from different viewpoints
10-349
OLAP Configuration
10-350
Geographic Information Systems
 GIS
 DSS uses geographic databases to construct
and display maps and other graphic displays
 Supports decisions affecting the geographic distribution of people and other resources
 Often used with Global Positioning Systems (GPS) devices
10-351
Data Visualization Systems
 DVS
 Represents complex data using interactive,
three-dimensional graphical forms
(charts, graphs, maps)
 Helps users interactively sort, subdivide, combine, and organize data while it is in its
graphical form
10-352
DVS Example
10-353
Using Decision Support Systems
 Using a decision support system involves
an interactive analytical modeling process
 Decision makers are not demanding
pre-specified information
 They are exploring possible alternatives
 What-If Analysis
 Observing how changes to selected variables affect other variables
10-354
Using Decision Support Systems
 Sensitivity Analysis
 Observing how repeated changes to a single variable affect other variables
 Goal-seeking Analysis
 Making repeated changes to selected variables until a chosen variable reaches a target value
 Optimization Analysis
 Finding an optimum value for selected variables, given certain constraints
10-355
Data Mining
 Provides decision support through knowledge
discovery
 Analyzes vast stores of historical business data
 Looks for patterns, trends, and correlations
 Goal is to improve business performance
 Types of analysis
 Regression
 Decision tree
 Neural network
 Cluster detection
 Market basket analysis
10-356
Analysis of Customer Demographics
10-357
Market Basket Analysis
 One of the most common uses for data mining
 Determines what products customers purchase together with other products
 Results affect how companies
 Market products
 Place merchandise in the store
 Lay out catalogs and order forms
 Determine what new products to offer
 Customize solicitation phone calls
10-358
Executive Information Systems
 EIS
 Combines many features of MIS and DSS
 Provide top executives with immediate and
easy access to information
 Identify factors that are critical to accomplishing strategic objectives (critical success factors)
 So popular that it has been expanded to managers, analysis, and other knowledge workers
10-359
Features of an EIS
 Information presented in forms tailored to the
preferences of the executives using the system
 Customizable graphical user interfaces
 Exception reports
 Trend analysis
 Drill down capability
10-360
Enterprise Information Portals
 An EIP is a Web-based interface and integration of
MIS, DSS, EIS, and other technologies
 Available to all intranet users and select
extranet users
 Provides access to a variety of internal and external business applications and services
 Typically tailored or personalized to the user
or groups of users
 Often has a digital dashboard
 Also called enterprise knowledge portals
10-361
Dashboard Example
10-362
Enterprise Information Portal
Components
10-363
Enterprise Knowledge Portal
10-364
Artificial Intelligence (AI)
 AI is a field of science and technology based on
 Computer science
 Biology
 Psychology
 Linguistics
 Mathematics
 Engineering
 The goal is to develop computers than can simulate
the ability to think
 And see, hear, walk, talk, and feel as well
10-365
Attributes of Intelligent Behavior
 Some of the attributes of intelligent behavior
 Think and reason
 Use reason to solve problems
 Learn or understand from experience
 Acquire and apply knowledge
 Exhibit creativity and imagination
 Deal with complex or perplexing situations
10-366
Attributes of Intelligent Behavior
 Attributes of intelligent behavior (continued)
 Respond quickly and successfully to new situations
 Recognize the relative importance of
elements in a situation
 Handle ambiguous, incomplete, or
erroneous information
10-367
Domains of Artificial Intelligence
10-368
Cognitive Science
 Applications in the cognitive science of AI
 Expert systems
 Knowledge-based systems
 Adaptive learning systems
 Fuzzy logic systems
 Neural networks
 Genetic algorithm software
 Intelligent agents
 Focuses on how the human brain works
and how humans think and learn
10-369
Robotics
 AI, engineering, and physiology are the basic
disciplines of robotics
 Produces robot machines with computer intelligence and humanlike physical capabilities
 This area include applications designed to
give robots the powers of
 Sight or visual perception
 Touch
 Dexterity
 Locomotion
 Navigation
10-370
Natural Interfaces
 Major thrusts in the area of AI and the development
of natural interfaces
 Natural languages
 Speech recognition
 Virtual reality
 Involves research and development in
 Linguistics
 Psychology
 Computer science
 Other disciplines
10-371
Latest Commercial Applications of AI
 Decision Support
 Helps capture the why as well as the what of engineered design and decision making
 Information Retrieval
 Distills tidal waves of information into simple presentations
 Natural language technology
 Database mining
10-372
Latest Commercial Applications of AI
 Virtual Reality
 X-ray-like vision enabled by enhanced-reality visualization helps surgeons
 Automated animation and haptic interfaces
allow users to interact with virtual objects
 Robotics
 Machine-vision inspections systems
 Cutting-edge robotics systems
 From micro robots and hands and legs, to cognitive and trainable modular vision systems
10-373
Expert Systems
 An Expert System (ES)
 A knowledge-based information system
 Contain knowledge about a specific, complex application area
 Acts as an expert consultant to end users
10-374
Components of an Expert System
 Knowledge Base
 Facts about a specific subject area
 Heuristics that express the reasoning procedures of an expert (rules of thumb)
 Software Resources
 An inference engine processes the knowledge
and recommends a course of action
 User interface programs communicate with
the end user
 Explanation programs explain the reasoning process to the end user
10-375
Components of an Expert System
10-376
Methods of Knowledge Representation
 Case-Based
 Knowledge organized in the form of cases
 Cases are examples of past performance, occurrences, and experiences
 Frame-Based
 Knowledge organized in a hierarchy or
network of frames
 A frame is a collection of knowledge about
an entity, consisting of a complex package
of data values describing its attributes
10-377
Methods of Knowledge Representation
 Object-Based
 Knowledge represented as a network of objects
 An object is a data element that includes both data and the methods or processes that act on
those data
 Rule-Based
 Knowledge represented in the form of rules
and statements of fact
 Rules are statements that typically take the
form of a premise and a conclusion (If, Then)
10-378
Expert System Application Categories
 Decision Management
 Loan portfolio analysis
 Employee performance evaluation
 Insurance underwriting
 Diagnostic/Troubleshooting
 Equipment calibration
 Help desk operations
 Medical diagnosis
 Software debugging
10-379
Expert System Application Categories
 Design/Configuration
 Computer option installation
 Manufacturability studies
 Communications networks
 Selection/Classification
 Material selection
 Delinquent account identification
 Information classification
 Suspect identification
 Process Monitoring/Control
10-380
Expert System Application Categories
 Process Monitoring/Control
 Machine control (including robotics)
 Inventory control
 Production monitoring
 Chemical testing
10-381
Benefits of Expert Systems
 Captures the expertise of an expert or group of
experts in a computer-based information system
 Faster and more consistent than an expert
 Can contain knowledge of multiple experts
 Does not get tired or distracted
 Cannot be overworked or stressed
 Helps preserve and reproduce the knowledge
of human experts
10-382
Limitations of Expert Systems
 The major limitations of expert systems
 Limited focus
 Inability to learn
 Maintenance problems
 Development cost
 Can only solve specific types of problems
in a limited domain of knowledge
10-383
Developing Expert Systems
 Suitability Criteria for Expert Systems
 Domain: the domain or subject area of
the problem is small and well-defined
 Expertise: a body of knowledge, techniques,
and intuition is needed that only a few people possess
 Complexity: solving the problem is a complex task that requires logical inference
processing
10-384
Developing Expert Systems
 Suitability Criteria for Expert Systems
 Structure: the solution process must be able
to cope with ill-structured, uncertain, missing, and conflicting data and a changing problem
situation
 Availability: an expert exists who is articulate, cooperative, and supported by the
management and end users involved in the development process
10-385
Development Tool
 Expert System Shell
 The easiest way to develop an expert system
 A software package consisting of an expert system without its knowledge base
 Has an inference engine and user interface programs
10-386
Knowledge Engineering
 A knowledge engineer
 Works with experts to capture the knowledge (facts and rules of thumb) they possess
 Builds the knowledge base, and if necessary,
the rest of the expert system
 Performs a role similar to that of systems
analysts in conventional information systems development
10-387
Neural Networks
 Computing systems modeled after the brain’s
mesh-like network of interconnected processing
elements (neurons)
 Interconnected processors operate in parallel
and interact with each other
 Allows the network to learn from the data it processes
10-388
Fuzzy Logic
 Fuzzy logic
 Resembles human reasoning
 Allows for approximate values and
inferences and incomplete or ambiguous data
 Uses terms such as “very high” instead of
precise measures
 Used more often in Japan than in the U.S.
 Used in fuzzy process controllers used in
subway trains, elevators, and cars
10-389
Example of Fuzzy Logic Rules and
Query
10-390
Genetic Algorithms
 Genetic algorithm software
 Uses Darwinian, randomizing, and other mathematical functions
 Simulates an evolutionary process, yielding increasingly better solutions to a problem
 Being uses to model a variety of scientific, technical, and business processes
 Especially useful for situations in which thousands of solutions are possible
10-391
Virtual Reality (VR)
 Virtual reality is a computer-simulated reality
 Fast-growing area of artificial intelligence
 Originated from efforts to build natural, realistic, multi-sensory human-computer interfaces
 Relies on multi-sensory input/output devices
 Creates a three-dimensional world through
sight, sound, and touch
 Also called telepresence
10-392
Typical VR Applications
 Current applications of virtual reality
 Computer-aided design
 Medical diagnostics and treatment
 Scientific experimentation
 Flight simulation
 Product demonstrations
 Employee training
 Entertainment
10-393
Intelligent Agents
 A software surrogate for an end user or a
process that fulfills a stated need or activity
 Uses built-in and learned knowledge base
to make decisions and accomplish tasks in
a way that fulfills the intentions of a user
 Also call software robots or bots
10-394
User Interface Agents
 Interface Tutors – observe user computer operations, correct user mistakes, provide
hints/advice on efficient software use
 Presentation Agents – show information in a variety of forms/media based on user
preferences
 Network Navigation Agents – discover paths
to information, provide ways to view it based
on user preferences
 Role-Playing – play what-if games and other roles to help users understand information and
make better decisions
10-395
Information Management Agents
 Search Agents – help users find files and databases, search for information, and suggest and
find new types of information products, media, resources
 Information Brokers – provide commercial services to discover and develop information
resources that fit business or personal needs
 Information Filters – Receive, find, filter, discard, save, forward, and notify users about
products received or desired, including e-mail, voice mail, and other information media

Management information system-MIS

  • 1.
  • 2.
    What IS ManageMent Management  the process of coordinating work activities so that they are completed efficiently and effectively with and through other people Process - represents ongoing functions or primary activities engaged in by managers Coordinating - distinguishes a managerial position from a non-managerial one
  • 3.
    What IS ManageMent Management (cont.)  Efficiency - getting the most output from the least amount of inputs  “doing things right” (not wasting resources)  concerned with means  Examples: cutting inventory levels  Decreasing the amount of time to manufacture products  Effectiveness - completing activities so that organizational goals are attained  “doing the right things”  concerned with ends
  • 4.
    effIcIency and effectIveneSSIn ManageMent Management Strives For: Low resource waste (high efficiency) High goal attainment (high effectiveness) Resource Usage Efficiency (Means) Goal Attainment Effectiveness (Ends) Low Waste High Attainment
  • 5.
    Key reSourceS ofMIS InforMatIon  Data Are raw facts that describe a particular phenomenon e.g Current Temperature, Price of property, Age of a person etc. A message which source wants to communicate to the receiver e.g Text, Voice, Image, movies, Music etc  Information: Data that is organized, meaningful, and useful  data with context  processed data  value-added to data  summarized  organized  analyzed
  • 6.
    data and InforMatIondataand InforMatIon
  • 7.
    changIng data IntoInforMatIon • data – Raw facts stored in databases – Need additional processing to become useful • InforMatIon – Required by decision maker – Data processed and presented in a meaningful form – Transformation (any process that changes data into information). Program instructions
  • 8.
    data collected WIthInan organISatIon Data collected Where from? Used for? Order details, customer details complaints customers Financial data bank Cost of goods, new products suppliers Sales data Sales Dept
  • 9.
    data collected WIthInan organISatIon Data collected Where from? Used for? Order details, customer details complaints customers Supplying goods, creating invoices and statements Improved performance Financial data bank Planning strategic decisions Cost of goods, new products suppliers Selling to customers Sales data Sales Dept Monitor sales against forecasts, re-order of stock
  • 10.
    characterIStIcS of valuable InforMatIon 1.Accuracy. 2. Verifiable. 3. Timeliness. 4. Organized. 5. Meaningful. 6. Cost effective.
  • 11.
    1.accuracy • The informationa user receives has been processed correctly • Correct information • Free from errors • Inaccurate information can lead to incorrect decisions
  • 12.
    2. verIfIable User canconfirm and verify the information. Identify source of information
  • 13.
    Having information whenusers need it. Right information must be produced to users at right time. 3.tIMely InforMatIon
  • 14.
    4. organIzed  Informationis arranged to suit the needs and requirements of the users.
  • 15.
    5. MeanIngful  Relevantto the user who receives or uses it.  Unnecessary information must be eliminated.
  • 16.
    6.coSt-effectIve  The costto produce the information should be less than the actual cost of the information.
  • 17.
    What IS aSySteM?  A system is…  A set of interrelated components  With a clearly defined boundary  Working together  To achieve a common set of objectives  By accepting inputs and producing outputs  In an organized transformation process
  • 18.
    baSIc functIonS ofa SySteM  Input:  Capturing and assembling elements that enter the system to be processed  Processing:  Transformation process that converts input into output  Output:  Transferring transformed elements to their ultimate destination
  • 19.
    It and IS •What is Information Technology? Any form of technology used by people to handle information. • What are Information Systems? “A collection of hardware, software, data, people, and procedures that are designed to generate information that support day-to-day activities of users in an organization”
  • 20.
     The branchof Engineering that deals with the use of Computers and Telecommunications to retrieve, store and transmit information  Any computer based tool that people use to work with information & support the information & information processing needs of an organization InforMatIon technology (It)
  • 21.
    defInItIon of InforMatIon SySteMS “Acollection of hardware, software, data, people, and procedures that are designed to generate information that support day-to-day activities of users in an organization”
  • 22.
    coMponentS of InforMatIon SySteMS •Data • Software • Hardware • People • Procedures
  • 23.
    InforMatIon SySteM actIvItIeS  Inputof data resources  Data entry activities  Processing of data into information  Calculations, comparisons, sorting, and so on  Output of information products  Messages, reports, forms, graphic images  Storage of data resources  Data elements and databases  Control of system performance  Monitoring and evaluating feedback
  • 24.
    typeS of InforMatIonSySteMS  operatIonS Support SySteMS:  TPS( Sales, Inventory, and accounting systems)  PCS( Monitor and control industrial processes ( Petroleum refining, power generation and steel production systems.  Enterprise collaboration systems, such as e-mail, chat and videoconferencing systems.  ManageMent Support SySteMS:  MIS( Provide information as reports and displays)  DSS(such as products pricing, profitability forecasting, and risk analysis.  EIS( Provides critical information from MIS, DSS such as system for easy access to analysis of business performance, action of competitors, and strategic planning
  • 25.
    typeS of operatIonSSupport SySteMS  Transaction Processing Systems  Record and process business transactions  Examples: sales processing, inventory systems, accounting systems  Process Control Systems  Monitor and control physical processes  Example: using sensors to monitor chemical processes in a petroleum refinery  Enterprise Collaboration Systems  Enhance team and workgroup communication  Examples: email, video conferencing
  • 26.
    tranSactIon proceSSIng SySteMS TPS is the important examples of Operations support systems that record and process data resulting from business transactions.  Computerized systems that perform and record the daily routine transactions necessary to conduct the business; they serve the organization’s operational level  Examples  Accounting information systems  TCS, DHL, all have systems that are TPS
  • 27.
    tWo WayS toproceSS tranSactIonS  Batch Processing:  Accumulate transactions over time and process periodically  Example: a bank processes all checks received in a batch at night  Online Processing:  Process transactions immediately  Example: a bank processes an ATM withdrawal immediately
  • 28.
    exaMple of tpS 1.An inventory control system keeps a file of records about the stock of goods that a business has on hand (the inventory) which is one aspect of the state of the business. 2. When items are shipped or received, the state of the business is affected, and the inventory control system makes changes about the inventory in the stored records.
  • 29.
     4. Italso prints a report giving the quantity on hand for each item in inventory, which is a characteristic of the state of the business.  Finally, when inventory is low, the system produces output that causes more inventory to be ordered, which is another type of business transaction. exaMple of tpS
  • 30.
    typeS of tpSSySteMS
  • 31.
    tranSactIon proceSSIng SySteM functIonS Inputfunction • Capture input data • Enter input data • Validate input data Processing function: • perform computation • make decision Output function: • produce screen output • print output Storage function: • stored data • Access data • Update data
  • 32.
     Transaction processingsystems perform input, output, storage, and processing functions.  Input functions include capturing data on a source document, entering the input data into the system, and checking input data for errors, a process called data validation  Output functions include producing screen or paper reports, such as detail reports, summary reports, and exception reports. tranSactIon proceSSIng SySteM
  • 33.
     Storage functionsinclude storing data in files and databases, accessing stored data, sorting stored data, and updating stored data.  Processing functions involve the manipulation of data, including computation and decision making tranSactIon proceSSIng SySteM
  • 34.
  • 35.
    ManageMent InforMatIon SySteMS • MISprovides information in the form of reports and displays to managers and many business professionals. Such as sales analysis, production performance. • Provides information to business professionals in a variety of easy-to-use formats. • Examples – Systems that provide managers with reports and online real-time access to company performance and historical records.
  • 36.
  • 37.
    decISIon Support SySteMS Decision Support Systems are concerned with providing useful information to support the decision process.  A Production Manager may use a DSS to decides how much product to manufacture based on the expected sales associated with a future promotion and the location and availability of the raw materials necessary to manufacture the product. • Examples – May take data from both internal sources (TPS, MIS) but also from external sources (Stock prices or product prices of competitors) – Shipping companies use voyage-estimating systems that take various shipping information into account and give advice on costs, freight rates for various types of cargo and port expenses etc
  • 38.
    Voyage-estimating Decision Support System Needs voyage-estimating system to calculate  financial details  Ship/time costs (fuel, labour, capital)  Freight rates for various types of cargo  Port expenses  technical details  Ship cargo capacity  Speed  Port distances  Fuel and water consumption  Cargo loading patterns
  • 39.
  • 40.
  • 41.
    executIve InforMatIon SySteMS •Information Systems at the organizations strategic level designed to address unstructured decision making through advanced graphics and communications. • Examples: – Incorporate data about external events such as tax laws or competitors, but also draw summarized information from internal MIS and DSS. – Filter, compress and track critical data, emphasizing the reduction of time and effort required to obtain information useful to executives.
  • 42.
  • 43.
    What is ahuman resources information system (HRIS)?  Manages human resources functions  Employee relationship management (ERM) system facilitates communication with employees
  • 44.
  • 45.
    2-47  A strategicinformation system is any information system that uses IT to help an organization… StrategIc It
  • 46.
    2-48  Cost Leadership Become low-cost producers  Help suppliers or customers reduce costs  Differentiation Strategy  Differentiate a firm’s products from its competitors’  Focus on a particular segment or niche of market fIve coMpetItIve StrategIeS
  • 47.
    2-49  Innovation Strategy Unique products, services, or markets  Radical changes to business processes  Growth Strategy  Expand company’s capacity to produce  Expand into global markets coMpetItIve StrategIeS
  • 48.
    2-50  Alliance Strategy Establish linkages and alliances with customers, suppliers, competitors, consultants, and other companies coMpetItIve StrategIeS
  • 49.
    hoW IS acoMputer defIned? Produces and stores results  Electronic device operating under the control of instructions stored in its own memory Processes data into informationinformation Data that is organized, meaningful, and useful Accepts datadata Raw facts, figures, and symbols
  • 50.
    What IS hardWare Hardware is the general term that is used to describe physical artifacts of technology.
  • 51.
    What IS anInput devIce?  Hardware used to enter data and instructions
  • 52.
  • 53.
  • 54.
    What IS anoutput devIce?  Hardware that conveys information to one or more people
  • 55.
    What IS Storage? StoragemediaStorage media Physical material on which data, instructions, and information are stored Storage mediaStorage media Physical material on which data, instructions, and information are stored Storage deviceStorage device Records and retrieves items to and from a storage medium Storage deviceStorage device Records and retrieves items to and from a storage medium  Holds data, instructions, and information for future use
  • 56.
    coMputer for IndIvIdualuSerS  Desktop computers  The most common type of computer  Sits on the desk or floor  Performs a variety of tasks  Workstations  Specialized computers  Optimized for science or graphics  More powerful than a desktop
  • 57.
    Mainframe Very powerful, expensivecomputer that supports thousands of connected users [Also called an Enterprise Server] Supercomputer The fastest, most powerful, most expensive computer. Used for applications requiring complex mathematical calculations Server Controls access to network resources and provides centralized storage
  • 58.
    What is anotebook computer?  Portable, small enough to fit on your lap  Also called a laptop computer  Generally more expensive than desktop computers with equal capabilities
  • 59.
    What is aTablet PC?  Especially useful for taking notes  Resembles a letter-sized slate  Allows you to write on the screen using a digital pen
  • 60.
    Consists of aseries of instructions that tells the computer what to do and how to do it Consists of a series of instructions that tells the computer what to do and how to do it What IS SoftWare? Also called a program Also called a program
  • 61.
    coMputer SoftWare  Definition: Key to productive use of computers.  A computer program that tells the computer how to perform particular tasks.  Information that the computer uses to get the job done.  Types of Software  Software can be categorized into two types:  System Software  Application Software.
  • 62.
    What IS SySteMSoftWare? Operating System (OS)Operating System (OS) is a set of programs that coordinates all activities among computer hardware devices Operating System (OS)Operating System (OS) is a set of programs that coordinates all activities among computer hardware devices Utility ProgramsUtility Programs allow the user to perform maintenance-type tasks usually related to managing a computer, its devices or its programs Utility ProgramsUtility Programs allow the user to perform maintenance-type tasks usually related to managing a computer, its devices or its programs  Programs that control or maintain the operations of the computer and its devices
  • 63.
    What IS applIcatIonSoftWare? Presentation Graphics Spreadsheet Database Word Processing  Programs designed to make users more productive  Create/Produce useful data
  • 64.
    Word proceSSIng  WordProcessing software is used to create and print documents. A key advantage of word processing software is that users easily can make changes in documents.
  • 65.
    electronIc SpreadSheetS  Electronicspreadsheet software allows the user to add, subtract, and perform user-defined calculations on rows and columns of numbers. These numbers can be changed and the spreadsheet quickly recalculates the new results.
  • 66.
    databaSe SoftWaredatabaSe SoftWare Allows the user to enter, retrieve, and update data in an organized and efficient manner, with flexible inquiry and reporting capabilities.
  • 67.
    coMputer SoftWare What isa programmer?  Someone who develops application or system software  Programmer writes the instructions to direct the computer to process data into information
  • 68.
    What IS agraphIcal uSer Interface (guI)?  Allows you to interact with the software using graphics and visual images such as icons  Controls how you enter data and instructions and how the screen displays information
  • 69.
    3-71 bIt and byte Bit  Short for binary digit  Smallest element of data  Either zero or one  Byte  Group of eight bits, which operate as a single unit  Represents one character or number
  • 70.
  • 71.
  • 72.
    3-74 Storage capacIty MeaSureMent Kilobyte (KB): one thousand bytes  Megabyte (MB): one million bytes  Gigabyte (GB): one billions bytes  Terabyte (TB): one trillion bytes  Petabyte (PB): one quadrillion bytes
  • 73.
    coMMon nuMber SySteMS SystemBase Symbols Used by humans? Used in computers? Decimal 10 0, 1, … 9 Yes No Binary 2 0, 1 No Yes Octal 8 0, 1, … 7 No No Hexa- decimal 16 0, 1, … 9, A, B, … F No No 75
  • 74.
    Quantities/Counting (1 of3) Decimal Binary Octal Hexa- decimal 0 0 0 0 1 1 1 1 2 10 2 2 3 11 3 3 4 100 4 4 5 101 5 5 6 110 6 6 7 111 7 7 76
  • 75.
    Quantities/Counting (2 of3) Decimal Binary Octal Hexa- decimal 8 1000 10 8 9 1001 11 9 10 1010 12 A 11 1011 13 B 12 1100 14 C 13 1101 15 D 14 1110 16 E 15 1111 17 F 77
  • 76.
    Quantities/Counting (3 of 3) DecimalBinary Octal Hexa- decimal 16 10000 20 10 17 10001 21 11 18 10010 22 12 19 10011 23 13 20 10100 24 14 21 10101 25 15 22 10110 26 16 23 10111 27 17 Etc. 78
  • 77.
    Quick Example 2510 = 110012= 318 = 1916 Base 79
  • 78.
    Decimal to Decimal(just for fun) Hexadecimal Decimal Octal Binary 80
  • 79.
    12510 => 5x 100 = 5 2 x 101 = 20 1 x 102 = 100 125 Base Weight 81 Decimal to Decimal (just for fun) Weight “0”
  • 80.
  • 81.
    Binary to Decimal  Technique Multiply each bit by 2 n , where n is the “weight” of the bit  The weight is the position of the bit, starting from 0 on the right  Add the results 83
  • 82.
    Examp le 1010112 => 1x 20 = 1 1 x 21 = 2 0 x 22 = 0 1 x 23 = 8 0 x 24 = 0 1 x 25 = 32 4310 Bit “0” 84
  • 83.
  • 84.
    Octal to Decimal  Technique Multiply each bit by 8 n , where n is the “weight” of the bit  The weight is the position of the bit, starting from 0 on the right  Add the results 86
  • 85.
    Examp le 7248 => 4x 80 = 4 2 x 81 = 16 7 x 82 = 448 46810 87
  • 86.
  • 87.
    Hexadecimal to Decimal  Technique Multiply each bit by 16 n , where n is the “weight” of the bit  The weight is the position of the bit, starting from 0 on the right  Add the results 89
  • 88.
    Examp le ABC16 => Cx 160 = 12 x 1 = 12 B x 161 = 11 x 16 = 176 A x 162 = 10 x 256 = 2560 274810 90
  • 89.
  • 90.
    Decimal to Binary  Technique Divide by two, keep track of the remainder  First remainder is bit 0 (LSB, least-significant bit)  Second remainder is bit 1  Etc. 92
  • 91.
    Examp le 12510 = ?2 2125 62 12 31 02 15 12 7 12 3 12 1 12 0 1 12510 = 11111012 93
  • 92.
  • 93.
    Decimal to Octal  Technique Divide by 8  Keep track of the remainder 95
  • 94.
    Examp le 123410 = ?8 81234 154 28 19 28 2 38 0 2 123410 = 23228 96
  • 95.
  • 96.
    Decimal to Hexadecimal  Technique Divide by 16  Keep track of the remainder 98
  • 97.
    Examp le 123410 = ?16 123410= 4D216 16 1234 77 216 4 13 = D16 0 4 99
  • 98.
  • 99.
    Octal to Binary  Technique Convert each octal digit to a 3-bit equivalent binary representation 101
  • 100.
    Examp le 7058 = ?2 70 5 111 000 101 7058 = 1110001012 102
  • 101.
  • 102.
    Hexadecimal to Binary  Technique Convert each hexadecimal digit to a 4-bit equivalent binary representation 104
  • 103.
    Examp le 10AF16 = ?2 10 A F 0001 0000 1010 1111 10AF16 = 00010000101011112 105
  • 104.
  • 105.
    Binary to Octal  Technique Group bits in threes, starting on right  Convert to octal digits 107
  • 106.
    Examp le 10110101112 = ?8 1011 010 111 1 3 2 7 10110101112 = 13278 108
  • 107.
  • 108.
    Binary to Hexadecimal  Technique Group bits in fours, starting on right  Convert to hexadecimal digits 110
  • 109.
    Examp le 10101110112 = ?16 101011 1011 2 B B 10101110112 = 2BB16 111
  • 110.
  • 111.
    Octal to Hexadecimal  Technique Use binary as an intermediary 113
  • 112.
    Examp le 10768 = ?16 10 7 6 001 000 111 110 2 3 E 10768 = 23E16 114
  • 113.
  • 114.
    Hexadecimal to Octal  Technique Use binary as an intermediary 116
  • 115.
    Examp le 1F0C16 = ?8 1F 0 C 0001 1111 0000 1100 1 7 4 1 4 1F0C16 = 174148 117
  • 116.
    Exercise – Convert ... Don’tuse a calculator! Decimal Binary Octal Hexa- decimal 33 1110101 703 1AF 118
  • 117.
    Exercise – Convert … DecimalBinary Octal Hexa- decimal 33 100001 41 21 117 1110101 165 75 451 111000011 703 1C3 431 110101111 657 1AF Answer 119
  • 118.
  • 119.
    WORD PROCESSING &DESKTOP PUBLISHING
  • 120.
    ELECTRONIC SPREADSHEETS & PRESENTATIONGRAPHICS Electronic Spreadsheets  Worksheet of rows and columns  Used for calculations and charts  E.g., Lotus 1-2-3, Microsoft Excel, Corel QuattroPro, BO XI Presentation Graphics  Convert numeric data into graphics displays  Prepare multimedia presentations including graphics, photos, animation, and video clips  E.g., Microsoft PowerPoint, Lotus Freelance, Corel Presentations
  • 121.
  • 122.
    PERSONAL INFORMATION MANAGER& GROUPWARE Personal Information Manager (PIM)  Software for end user productivity and collaboration  Store information about clients, schedules, manage appointments, manage tasks  E.g., Lotus Organizer, Microsoft Outlook Groupware  Software that helps workgroups collaborate on group assignments  E-mail, discussion groups, databases, videoconferencing  E.g., Lotus Notes, Novell GroupWise, Microsoft Exchange
  • 123.
  • 124.
    SOFTWARE ALTERNATIVES  Outsourcingdevelopment and maintenance of software  Application service providers (ASPs)  Companies that own, operate and maintain application software and computer system resources  Use the application for a fee over the Internet  Pay-as-you-go
  • 125.
  • 126.
    SOFTWARE LICENSING  Allsoftware (COTS, ASP) is licensed  You don’t buy software: you buy a license to use the software under the terms of the licensing agreement  Licensed to protect the vendor’s property rights
  • 127.
    SYSTEM SOFWARE Software thatmanages and supports a computer system System management programs  Programs that manage hardware, software, network, and data resources  E.g., operating systems, network management programs, database management systems, systems utilities Systems development programs  Programs that help users develop information system programs
  • 128.
  • 129.
    OPERATING SYSTEM  Integratedsystem of programs that  Manages the operations of the CPU  Controls the input/output and storage resources and activities of the computer system  Provides support services as computer executes applications programs
  • 130.
  • 131.
    USER INTERFACE  Partof the operating system that allows you to communicate with it  Three main types:  Command-driven  Menu-driven  Graphical user interfaces (GUI)
  • 132.
  • 133.
    RESOURCE MANAGEMENT  Partof operating system that manages the hardware and networking resources of a computer system  Includes CPU, memory, secondary storage device, telecommunications, and input/output peripherals
  • 134.
    FILE MANAAGEMENT  Partof the operating system that controls the creation, deletion, and access of files of data and programs
  • 135.
  • 136.
    TASK MANAGEMENT  Partof the operating system that manages the accomplishment of computing tasks of the end users  Multitasking  Task management approach that allows for several tasks to be performed in a seemingly simultaneous fashion  Also called multiprogramming or time-sharing
  • 137.
  • 138.
    POPULAR OS  Windows GUI, multitasking, networking, multimedia  Microsoft’s operating system  Different versions manage servers  Unix  Multitasking, multiuser, network-managing  Portable – can run on mainframes, midrange and PCs  Linux  Low-cost, powerful reliable Unix-like operating system  Open-source  MAC OS X  Apple operating system for the iMac  GUI, multitasking, multimedia
  • 139.
    OTHER SYSTEM SOFTWARE Utilities Miscellaneous housekeeping functions  Example, Norton utilities includes data backup, virus protection, data compression, etc. Performance monitors  Programs that monitor and adjust computer system to keep them running efficiently Security monitors  Programs that monitor and control use of computer systems to prevent unauthorized use of resources
  • 140.
    WEB LANGUAGES  HTML A page description language that creates hypertext documents for the Web  XML  Describes the contents of Web pages by applying identifying tags or contextual labels to the data in Web documents  Java  Object-oriented programming language that is simple, secure and platform independent  Java applets can be executed on any computer
  • 141.
  • 142.
  • 143.
    Foundation Data Concepts DataOrganization Structure is logically organized into:-Data Organization Structure is logically organized into:-  Character  Field  Record  File  Database Like writing can be organized into letters, word, paragraph & sentences
  • 144.
    CHARACTER  Consists ofa single alphabets, numeric or other symbol.  It is a byte used to represent a particular character.
  • 145.
    field  Consists ofa grouping of related characters.  E.g., person names represent the name field. i.e., last name, first name, state, city, telephone #
  • 146.
    RECORD  Fields whengrouped together make a record.  An allocation of attributes to describe any entity.  E.g.,  Person payroll records  Employee claims record  Student academic records
  • 147.
    FILE  Group ofrelated records is a data file or table.  A single table may be referred to as a flat file.  E.g.,  Employee file  Student file  Inventory file  Payroll file etc
  • 148.
    DATABASE  An integratedcollection of logically related data elements.  It contains all the records
  • 149.
    Foundation Data Concepts Employee Record1 Employee Record 2 Employee Record 3 Employee Record 4 Name Field SS No. Field Salary Field Name Field SS No. Field Salary Field Name Field SS No. Field Salary Field Name Field SS No. Field Salary Field Jones T.A. 275-32-3874 20,000 Klugman J.L. 349-88-7913 28,000 Alverez, J.S. 542-40-3718 100,000 Porter, M.L. 617-87-7915 50,000 Human Resource Database Payroll File Benefit File Data Organization StructureData Organization Structure
  • 150.
    Foundation Data Concepts ElectricUtility Database Entities: Customers, Meters, Bills, Payments, Meter Readings Relationships: Bills Sent to Customers Customers Make Payments Customers Use Meters Billing Meter Reading Payment Processing Service Start/Stop Example: An Electric Utility DatabaseExample: An Electric Utility Database
  • 151.
    DATABASE STRUCTURES  DBMSpackages are designed to use specific data structures to provide end users with quick; easy access to information stored in the databases.
  • 152.
    DATABASE STRUCTURES  FiveMajor Database StructuresFive Major Database Structures •Hierarchical Structure •Network Structure •Relational Model •Object-Oriented •Multidimensional Structure
  • 153.
    HIERARCHICAL STRUCTURE  One-to-manyrelationship  Relationship b/w records from a hierarchy structure all of them are dependent.  Root element
  • 154.
    NETWORK STRUCTURE  Allowmany-to-many relationships among records.  E.g., employee records can be related to more than one project record & vice versa.
  • 155.
    RELATIONAL STRUCTURE  Itis used by most microcomputers DBMS packages as well as by both midrange & mainframes systems.  In this, all data elements within the database are viewed as being stored in the form of simple two dimensional tables sometimes referred to as relations . Department Table Employee Table Deptno Dname Dloc Dmgr Empno Ename Etitle Esalary Deptno Emp 1 Emp 2 Emp 3 Emp 4 Emp 5 Emp 6 Dept A Dept B Dept C Dept A Dept B Dept A Dept B Dept C Dept B
  • 157.
  • 158.
    Object-oriented structure Attributes •Customer •Balance •Interest Operations •Deposit (Amount) •Withdraw(Amount) •Get Owner Attributes •Credit Line •Monthly Statements Operations •Calculate Interest •Print Monthly Statement Attributes •Number of Withdrawals •Quarterly Statement Operations •Calculate Interest Paid •Print Quarterly Statement Bank Account Object Checking Account Object Savings Account Object Inheritance Inheritance Web basedWeb based applicationsapplications Describing theDescribing the attributes of anattributes of an entity, plus theentity, plus the operations that canoperations that can be performs upon thebe performs upon the datadata SupportsSupports inheritanceinheritance
  • 159.
  • 160.
    Database Development Database managementpackages like Microsoft Access or Lotus Approach allow end users to easily develop the database they need.
  • 161.
    Database Development •Database Administrators(DBAs) •Data Definition Language (DDL) •Oracle 10g or IBM DB2 •Data Dictionary or Metadata Repository •Database management catalog or directory that contain metadata. •Relies on specialized database software component to manage a database. •Metadata •Data on data
  • 162.
    Data Mining  IdentifyNew Product Bundles  Find Root Causes to Quality or Manufacturing Problems  Prevent Customer Attrition  Cross-Sell to Existing Customers  Profile Customers with More Accuracy
  • 163.
    Types of Databases Operational Databases  Distributed Databases  External Databases  Hypermedia Databases
  • 164.
    Distributed Database ModelDistributedDatabase Model Client PC Distributed Databases on Intranets and Other Networks End User Databases Data Warehouse Data Marts Operational Databases of the Organization Network Server External Databases on the Internet and Online Services
  • 165.
  • 166.
    Web-Based Information SystemWeb-BasedInformation System Web Browser The Internet Intranets Extranets Web Server Software HTML XML Web Pages Image Files Video Files Audio Files Network Server Client PCs Hypermedia Database Types of Databases
  • 167.
    Data Warehouses Applications DataMarts Finance Marketing Sales Accounting Management Reporting ERP Purchasing CRM Inveentory Control Shipping Logistics
  • 168.
  • 169.
  • 170.
    5-172 Database Management System In mainframe and server computer systems, a software package that is used to…  Create new databases and database applications  Maintain the quality of the data in an organization’s databases  Use the databases of an organization to provide the information needed by end users
  • 171.
    5-173 Common DBMS SoftwareComponents  Database definition  Language and graphical tools to define entities, relationships, integrity constraints, and authorization rights  Nonprocedural access  Language and graphical tools to access data without complicated coding  Application development  Graphical tools to develop menus, data entry forms, and reports
  • 172.
    5-174 Common DBMS SoftwareComponents  Procedural language interface  Language that combines nonprocedural access with full capabilities of a programming language  Transaction processing  Control mechanism prevents interference from simultaneous users and recovers lost data after a failure  Database tuning  Tools to monitor, improve database performance
  • 173.
    5-175 Database Management System Database Development  Defining and organizing the content, relationships, and structure of the data needed to build a database  Database Application Development  Using DBMS to create prototypes of queries, forms, reports, Web pages  Database Maintenance  Using transaction processing systems and other tools to add, delete, update, and correct data
  • 174.
  • 175.
    5-177 Database Interrogation  Endusers use a DBMS query feature or report generator  Response is video display or printed report  No programming is required  Query language  Immediate response to ad hoc data requests  Report generator  Quickly specify a format for information you want to present as a report
  • 176.
    5-178 Database Interrogation  SQLQueries  Structured, international standard query language found in many DBMS packages  Query form is SELECT…FROM…WHERE…
  • 177.
    5-179 Database Interrogation  BooleanLogic  Developed by George Boole in the mid-1800s  Used to refine searches to specific information  Has three logical operators: AND, OR, NOT  Example  Cats OR felines AND NOT dogs OR Broadway
  • 178.
    5-180 Database Interrogation  Graphicaland Natural Queries  It is difficult to correctly phrase SQL and other database language search queries  Most DBMS packages offer easier-to-use, point-and-click methods  Translates queries into SQL commands  Natural language query statements are similar to conversational English
  • 179.
  • 180.
    5-182 Database Maintenance  Accomplishedby transaction processing systems and other applications, with the support of the DBMS  Done to reflect new business transactions and other events  Updating and correcting data, such as customer addresses
  • 181.
    5-183 Application Development  UseDBMS software development tools to develop custom application programs  Not necessary to develop detailed data-handling procedures using conventional programming languages  Can include data manipulation language (DML) statements that call on the DBMS to perform necessary data handling
  • 182.
  • 183.
    6-185 Types of CommunicationsNetworks  Primary types of communications networks  Wide Area  Local Area  Virtual Private  Client/Server  Peer-to-peer
  • 184.
    6-186 Wide Area Network(WAN)  Telecommunication network that covers a large geographic area
  • 185.
    6-187 Local Area Network(LAN)  Connects computers within a limited physical area, such as an office, classroom, or building
  • 186.
    6-188 Virtual Private Networks(VPN)  Used to establish secure intranets and extranets  The Internet is the main backbone network  Relies on network firewalls, encryption, and other security features to build a “pipe” through the Internet  Creates a private network without the high cost of a separate proprietary connection
  • 187.
  • 188.
    6-190 Client/Server Networks  Clients End user personal computers or networked computers  Servers  Used to manage the networks  Processing  Shared between the clients and servers  Sometimes called a two-tier architecture  Larger computer systems are being replaced with multiple client/server networks
  • 189.
  • 190.
    6-192 Network Computing  Networksare the central computing resource of the organization  Thin clients provide a browser-based user interface for processing applets  Thin clients include  Network computers  Net PCs  Other low-cost network devices or information appliances
  • 191.
    6-193 Network Computing  Applicationand database servers provide  The operating system  Application software  Applets  Databases  Database management software  Sometimes called a three-tier client/server model because it consists of  Thin clients  Application servers  Database servers
  • 192.
  • 193.
    6-195 Peer-to-Peer Networks  CentralServer Architecture  P2P file-sharing software connects all PCs to a central server  When a PC requests a file, the server searches all active peers on the network  The server sends the requesting PC a list of links to all active peers who have the file  Clicking a link connects the two PCs and automatically transfers the file to the requesting PC
  • 194.
    6-196 Peer-to-Peer Networks  PurePeer-to-Peer Architecture  No central directory or server  File-sharing software connects one PC to another online user  When you request a file, the software searches every online user and sends you a list of active file names  Clicking a link automatically transfers the file from that user’s hard drive to yours
  • 195.
    6-197 Central Server Peer-to-PeerNetworks  Advantages  Can better protect the integrity and security of the content and users of the network  Disadvantages  Directory server can be slowed or overwhelmed by too many users or technical problems
  • 196.
  • 197.
    6-199 Digital and AnalogSignals  Analog or digital refers to the method used to convert information into an electrical signal  Analog: an electrical current is generated that is proportional to the quantity being observed  Digital: the quantity being observed is expressed as a number  Analog: if the temperature is 83 degrees, a measuring device would generate 8.3 volts  Digital: a measurement of 83 degrees would be displayed as the number 83
  • 198.
    6-200 Telecommunications Media  Twisted-PairWire  Ordinary telephone wire  Copper wire is twisted into pairs
  • 199.
    6-201 Telecommunications Media  CoaxialCable  Sturdy copper or aluminum wire wrapped with spacers to insulate and protect it
  • 200.
    6-202 Telecommunications Media  Fiber-OpticCable  One or more hair-thin filaments of glass fiber wrapped in a protective jacket
  • 201.
    6-203 The Problem of“The Last Mile”  Network providers use fiber optic cable as a communications backbone  Houses connected to the backbone are wired with twisted pair  Users don’t benefit from the faster, better technology
  • 202.
    6-204 Wireless Technologies  TerrestrialMicrowave  Earthbound microwave systems transmit high-speed radio signals  Follows a line-of-sight path between relay systems spaced about 30 miles apart  Communications Satellites  Serve as relay stations  Use microwave radio signals  Earth stations beam signals to the satellites  Not suitable for interactive, real-time processing
  • 203.
    6-205 Wireless Technologies  Cellularand PCS Telephone and Pager Systems  Geographic areas are divided into cells  Each cell has a low-power transmitter or radio relay antenna  Computers and other communications processors coordinate and control the transmissions to and from mobile users
  • 204.
    6-206 Wireless Technologies  WirelessLANS  Uses wireless radio-wave technology to connect PCs within an office or a building  Can be high-frequency, similar to digital cellular, or low frequency (spread spectrum)  Bluetooth  Short-range wireless technology  Connects PCs to devices, such as a printer  Fairly low cost to implement
  • 205.
    6-207 Wireless Technologies  OtherWireless Systems  Cellular phones  Mobile radio  PDAs  Telecommunications networks now play vital and pervasive roles in  Web-enabled e-business processes  Electronic commerce  Enterprise collaboration  Other applications that support business operations, management, and strategic objectives
  • 206.
    6-208 The Wireless Web Wireless Internet access is growing as Web-enabled information appliances proliferate  Smart telephones, pagers, PDAs  All are very thin clients in wireless networks
  • 207.
    6-209 Telecommunications Processors  Modems The most common type of communications processor  Converts a digital signal to an analog frequency that can be transmitted over phone lines, then back into a digital signal  Modulation and demodulation
  • 208.
  • 209.
    6-211 Inter-Network Processors  Switch…makes connections between telecommunications circuits in a network  Router… intelligent communications processor that interconnects networks based on different protocols  Hub… a port-switching communications processor  Gateway… connects networks with different
  • 210.
  • 211.
    6-213 Communications Processors  Multiplexer…allows a single communications channel to carry simultaneous data transmissions from many terminals  In time division multiplexing (TDM), the multiplexer divides the time each terminal can use the high-speed into short time slots  Multiplexers increase the number of transmissions possible  Does not increase the number of physical data channels
  • 212.
    6-214 Telecommunications Software  Mayreside in PCs, servers, mainframes, and communications processors  Vital part of all telecommunications networks  Used to manage network performance  WANs often use telecommunications monitors or teleprocessing monitors  Other networks use operating system software  Middleware helps diverse networks communicate with each other
  • 213.
    6-215 Network Management Functions Traffic Management  Manage network resources and traffic to avoid congestion and optimize service levels  Security  Provide authentication, encryption, firewall, auditing, and enforcement  Network Monitoring  Troubleshoot and watch over the network, alerting administrators of potential problems
  • 214.
    6-216 Network Management Functions Capacity Planning  Survey network resources, traffic patterns, and users’ needs  Determine the best way to accommodate the needs of the network as it grows and changes
  • 215.
    6-217 Network Topologies  Topology The structure of a network  Star Network  Ties end user computers to a central computer  Ring Network  Ties local computer processors together in a ring on a relatively equal basis  Bus Network  Local processors share the same communications channel
  • 216.
    6-218 Network Topologies  MeshNetwork  Uses direct communications lines to connect some or all of the computers in the ring to each other  Switch  A message-switching computer that handles data communication between autonomous local computers
  • 217.
  • 218.
    6-220 Network Architectures andProtocols  Protocol  A standard set of rules and procedures for the control of communications in a network  Handshaking  The process of exchanging predetermined signals and characters  Establishes a telecommunications session between terminals and computers
  • 219.
    6-221 Network Architectures andProtocols  Network Architecture  Master plan of standard protocols, hardware, software, and interfaces between end users and computer systems  Goal is to promote an open, simple, flexible, and efficient telecommunications environment
  • 220.
    6-222 OSI and TCP/IPModels  Open Systems Interconnection (OSI) Model  A seven-layer model that serves as a standard model for network architectures  Model for how messages should be transmitted between two points in a network  Each layer adds functions  Transmission Control Protocol/Internet Protocol (TCP/IP)  A five-layer telecommunications protocol used by the Internet
  • 221.
  • 222.
    6-224 Voice Over IP Internet Telephony  Using an Internet connection to pass voice data using IP instead of a telephone network  Often referred to as voice over IP or VoIP  Works like a regular phone, but skips long-distance charges  Runs over standard network infrastructure  Requires a well-configured network to work smoothly
  • 223.
    6-225 Bandwidth  Bandwidth  Thefrequency range of a telecommunications channel that determines the maximum transmission rate  Speed and capacity typically measured in bits per second (bps)  Sometimes call baud rate  Transmission Rates  Narrow-band = low speed  Broadband = high speed
  • 224.
  • 225.
    6-227 Switching Alternatives  CircuitSwitching  Switch opens a circuit to establish a link between a sender and a receiver  It remains open until the communication session is completed  Packet Switching  Breaks messages into groups called packets  Transmits packets separately
  • 226.
    6-228 Network Interoperability  Ensuresthat anyone anywhere on one network can communicate with anyone anywhere on another network  From a telecommunications perspective, no need to speak a common language  Telecommunications would be possible without  Complete accessibility  Transparency  Seamless interoperability across all networks
  • 227.
  • 228.
    7-230 Enterprise Business Systems E-business means using the Internet, other networks, and IT to support  Electronic commerce  Enterprise communications and collaboration  Web-enabled business processes  E-commerce is the buying, selling, and marketing of products, services, and information over the Internet and other networks
  • 229.
    7-231 Cross-Functional Systems  Crossthe boundaries of traditional business functions  Used to reengineer and improve vital business processes all across the enterprise
  • 230.
  • 231.
    7-233 Enterprise Application Architecture Provides a conceptual framework  Helps visualize the basic components, processes, and interfaces of major e-business applications  Focuses on accomplishing fundamental business processes in concert with  Customers  Suppliers  Partners  Employees
  • 232.
    7-234 Enterprise Application Architecture Enterprise Resource Planning (ERP)  Concentrates on the efficiency of internal production, distribution, and financial processes  Customer Relationship Management (CRM)  Focuses on acquiring and retaining profitable customers via marketing, sales, and services  Partner Relationship Management (PRM)  Aims at acquiring and retaining partners who can enhance the selling and distribution of products and services
  • 233.
    7-235 Enterprise Application Architecture Supply Chain Management (SCM)  Focuses on developing the most efficient and effective sourcing and procurement processes  Knowledge Management (KM)  Focuses on facilitating internal group collaboration and decision support
  • 234.
    7-236 Enterprise Application Integration EAI software connects cross-functional systems  Serves as middleware to provide  Data conversion  Communication between systems  Access to system interfaces
  • 235.
    7-237 Transaction Processing Systems Cross-functional information systems that process data resulting from the occurrence of business transactions  Transactions include sales, purchases, deposits, withdrawals, refunds, and payments  Online transaction processing (OLTP) is a real-time system that captures transactions immediately
  • 236.
  • 237.
  • 238.
    7-240 Enterprise Collaboration Systems (ECS) EC systems are cross-functional information systems that enhance team and workgroup  Communication  Coordination  Collaboration  Systems may include  Networked PC workstations  Servers  Databases  Groupware and application packages
  • 239.
  • 240.
    7-242 Functional Business Systems A variety of types of information systems that support the business functions of  Accounting  Finance  Marketing  Operations management  Human resource management
  • 241.
  • 242.
    7-244 Marketing Systems  Marketingsystems are concerned with  Planning, promotion, and sale of existing products in existing markets  Development of new products and new markets  Better attracting and serving present and potential customers
  • 243.
  • 244.
    7-246 Interactive Marketing  InteractiveMarketing  A customer-focused marketing process  Uses the Internet, intranets, and extranets  Establishes two-way transactions between a business and its customers or potential customers  Goal  Profitably use networks to attract and keep customers  Get customers to help create, purchase, and improve products and services
  • 245.
    7-247 Targeted Marketing  Anadvertising and promotion management concept with five targeting components
  • 246.
    7-248 Targeted Marketing Components Community: customized ads to appeal to specific virtual communities  Content: ads placed on a variety of selected websites, aimed at a specific audience  Context: ads placed on web pages that are relevant to a product or service  Demographic/Psychographic: web marketing
  • 247.
    7-249 Sales Force Automation Outfit sales force with notebook computers, web browsers, and sales contact software  Connect them to marketing websites and the company intranet  Goals  Increase personal productivity  Speed up capture and analysis of sales data  Gain strategic advantage
  • 248.
    7-250 Manufacturing Information Systems Supports the production/operations functions  Includes all activities concerned with planning and control of the processes producing goods or services
  • 249.
  • 250.
    7-252 CIM Objectives  Simplifyproduction processes, product designs, and factory organization  Automate production processes and the business functions that support them  Integrate all production and support processes using  Networks  Cross-functional business software
  • 251.
    7-253 CIM Systems  Computer-aidedmanufacturing (CAM)  Automate the production process  Manufacturing execution systems (MES)  Performance monitoring information systems for factory floor operations  Process control  Control ongoing physical processes  Machine control  Controls the actions of machines
  • 252.
    7-254 Human Resource Management(HRM)  Information systems designed to support  Planning to meet personnel needs  Development of employees to their full potential  Control of all personnel policies and programs
  • 253.
  • 254.
    7-256 HRM and theInternet  Recruiting employees using the corporate website and commercial recruiting services  Posting messages in selected Internet newsgroups  Communicating with job applicants via e-mail
  • 255.
    7-257 HRM and CorporateIntranets  Corporate intranet uses  Process common HRM transactions  Allow around-the-clock HRM services  Disseminate information faster than through previous company channels  Collect information from employees online  Allow HRM tasks to be performed with little HRM department intervention  Training
  • 256.
    7-258 Employee Self-Service  Intranetapplications can allow employees to  View benefits  Enter travel and expense reports  Verify employment and salary information  Access and update personal information  Enter time-sensitive data
  • 257.
    7-259 Accounting Information Systems The oldest and most widely used information system in business  Records and reports business transactions and economic events  Produces financial statements  Forecasts future conditions
  • 258.
    7-260 Accounting Information Systems Typically consists of  Order processing  Inventory control  Accounts receivable  Accounts payable  Payroll  General ledger systems
  • 259.
  • 260.
    7-262 Financial Management Systems Supports business managers and professionals making decisions concerning  The financing of a business  The allocation and control of financial resources within a business
  • 261.
  • 262.
  • 263.
    8-265 What is CRM? Managing the full range of the customer relationship involves  Providing customer-facing employees with a single, complete view of every customer at every touch point and across all channels  Providing the customer with a single, complete view of the company and its extended channels  CRM uses IT to create a cross-functional enterprise system that integrates and automates many of the customer-serving processes
  • 264.
  • 265.
    8-267 Contact and AccountManagement  CRM helps sales, marketing, and service professionals capture and track relevant data about  Every past and planned contact with prospects and customers  Other business and life cycle events of customers  Data are captured through customer touchpoints  Telephone, fax, e-mail  Websites, retail stores, kiosks  Personal contact
  • 266.
    8-268 Sales  A CRMsystem provides sales reps with the tools and data resources they need to  Support and manage their sales activities  Optimize cross- and up-selling  CRM also provides the means to check on a customer’s account status and history before scheduling a sales call
  • 267.
    8-269 Marketing and Fulfillment CRM systems help with direct marketing campaigns by automatic such tasks as  Qualifying leads for targeted marketing  Scheduling and tracking mailings  Capturing and managing responses  Analyzing the business value of the campaign  Fulfilling responses and requests
  • 268.
    8-270 Customer Service andSupport  A CRM system gives service reps real-time access to the same database used by sales and marketing  Requests for service are created, assigned, and managed  Call center software routes calls to agents  Help desk software provides service data and suggestions for solving problems  Web-based self-service enables customers
  • 269.
    8-271 Retention and LoyaltyPrograms  It costs 6 times more to sell to a new customer  An unhappy customer will tell 8-10 others  Boosting customer retention by 5 percent can boost profits by 85 percent  The odds of selling to an existing customer are 50 percent; a new one 15 percent  About 70 percent of customers will do business
  • 270.
    8-272 Retention and LoyaltyPrograms  Enhancing and optimizing customer retention and loyalty is a primary objective of CRM  Identify, reward, and market to the most loyal and profitable customers  Evaluate targeted marketing and relationship programs
  • 271.
  • 272.
    8-274 Benefits of CRM Benefits of CRM  Identify and target the best customers  Real-time customization and personalization of products and services  Track when and how a customer contacts the company  Provide a consistent customer experience  Provide superior service and support across all customer contact points
  • 273.
    8-275 CRM Failures  Businessbenefits of CRM are not guaranteed  50 percent of CRM projects did not produce promised results  20 percent damaged customer relationships  Reasons for failure  Lack of understanding and preparation  Not solving business process problems first  No participation on part of business stakeholders involved
  • 274.
    8-276 Trends in CRM Operational CRM  Supports customer interaction with greater convenience through a variety of channels  Synchronizes customer interactions consistently across all channels  Makes the company easier to do business with
  • 275.
    8-277 Trends in CRM Analytical CRM  Extracts in-depth customer history, preferences, and profitability from databases  Allows prediction of customer value and behavior  Allows forecast of demand  Helps tailor information and offers to customer needs
  • 276.
    8-278 Trends in CRM Collaborative CRM  Easy collaboration with customers, suppliers, and partners  Improves efficiency and integration throughout supply chain  Greater responsiveness to customer needs through outside sourcing of products and services
  • 277.
    8-279 Trends in CRM Portal-based CRM  Provides users with tools and information that fit their needs  Empowers employees to respond to customer demands more quickly  Helps reps become truly customer-faced  Provides instant access to all internal and external customer information
  • 278.
    8-280 ERP: The BusinessBackbone  ERP is a cross-functional enterprise backbone that integrates and automates processes within  Manufacturing  Logistics  Distribution  Accounting  Finance  Human resources
  • 279.
    8-281 What is ERP? Enterprise resource planning is a cross-functional enterprise system  An integrated suite of software modules  Supports basic internal business processes  Facilitates business, supplier, and customer information flows
  • 280.
  • 281.
    8-283 ERP Process andInformation Flows
  • 282.
    8-284 Benefits and Challengesof ERP  ERP Business Benefits  Quality and efficiency  Decreased costs  Decision support  Enterprise agility  ERP Costs  Risks and costs are considerable  Hardware and software are a small part of total costs  Failure can cripple or kill a business
  • 283.
  • 284.
    8-286 Causes of ERPFailures  Most common causes of ERP failure  Under-estimating the complexity of planning, development, training  Failure to involve affected employees in planning and development  Trying to do too much too fast  Insufficient training  Insufficient data conversion and testing  Over-reliance on ERP vendor or consultants
  • 285.
  • 286.
    8-288 Supply Chain Management(SCM)  Fundamentally, supply chain management helps a company  Get the right products  To the right place  At the right time  In the proper quantity  At an acceptable cost
  • 287.
    8-289 Goals of SCM The goal of SCM is to efficiently  Forecast demand  Control inventory  Enhance relationships with customers, suppliers, distributors, and others  Receive feedback on the status of every link in the supply chain
  • 288.
    8-290 What is aSupply Chain?  The interrelationships  With suppliers, customers, distributors, and other businesses  Needed to design, build, and sell a product  Each supply chain process should add value to the products or services a company produces  Frequently called a value chain
  • 289.
  • 290.
    8-292 Electronic Data Interchange EDI  One of the earliest uses of information technology for supply chain management  The electronic exchange of business transaction documents between supply chain trading partners  The almost complete automation of an e-commerce supply chain process  Many transactions occur over the Internet, using secure virtual private networks
  • 291.
  • 292.
    8-294 Roles and Activitiesof SCM in Business
  • 293.
    8-295 Planning & ExecutionFunctions of SCM  Planning  Supply chain design  Collaborative demand and supply planning  Execution  Materials management  Collaborative manufacturing  Collaborative fulfillment  Supply chain event management  Supply chain performance management
  • 294.
    8-296 Benefits and Challengesof SCM  Key Benefits  Faster, more accurate order processing  Reductions in inventory levels  Quicker times to market  Lower transaction and materials costs  Strategic relationships with supplier
  • 295.
  • 296.
    8-298 Benefits and Challengesof SCM  Key Challenges  Lack of demand planning knowledge, tools, and guidelines  Inaccurate data provided by other information systems  Lack of collaboration among marketing, production, and inventory management  SCM tools are immature, incomplete, and hard to implement
  • 297.
  • 298.
  • 299.
  • 300.
  • 301.
    9-303 Categories of e-Commerce Business-to-Consumer  Virtual storefronts, multimedia catalogs, interactive order processing, electronic payment, online customer support  Business-to-Business  Electronic business marketplaces, direct links between businesses, auctions and exchanges  Consumer-to-Consumer  Online auctions, posting to newspaper sites, personal websites, e-commerce portals
  • 302.
  • 303.
    9-305 Access Control andSecurity  E-commerce processes must establish mutual trust and secure access between parties  User names and passwords  Encryption key  Digital certificates and signatures  Restricted access areas  Other people’s accounts  Restricted company data  Webmaster administration areas
  • 304.
    9-306 Profiling and Personalizing Profiling gathers data on you and your website behavior and choices  User registration  Cookie files and tracking software  User feedback  Profiling is used for  Personalized (one-to-one) marketing  Authenticating identity  Customer relationship management  Marketing planning
  • 305.
    9-307 Search Management  Searchprocesses help customers find the specific product or service they want  E-commerce software packages often include a website search engine  A customized search engine may be acquired from companies like Google or Requisite Technology  Searches are often on content or by parameters
  • 306.
    9-308 Content and CatalogManagement  Content Management Software  Helps develop, generate, deliver, update, and archive text and multimedia information at e-commerce websites  Catalog Management Software  Helps generate and manage catalog content  Catalog and content management software works with profiling tools to personalize content  Includes product configuration and mass customization
  • 307.
    9-309 Workflow Management  E-businessand e-commerce workflow manage- ment depends on a workflow software engine  Contains software model of business processes  Workflow models express predefined  Sets of business rules  Roles of stakeholders  Authorization requirements  Routing alternative  Databases used 
  • 308.
  • 309.
    9-311 Event Notification  Moste-commerce applications are event driven  Responds to such things as customer’s first website visit and payments  Monitors all e-commerce processes  Records all relevant events, including problem situations  Notifies all involved stakeholders  Works in conjunction with user-profiling software
  • 310.
    9-312 Collaboration and Trading Processes that support vital collaboration arrangements and trading services  Needed by customers, suppliers, and other stakeholders  Online communities of interest  E-mail, chat, discussion groups  Enhances customer service  Builds loyalty
  • 311.
    9-313 Electronic Payment Processes Complex processes  Near-anonymous and electronic nature of transactions  Many security issues  Wide variety of debit and credit alternatives  Financial institutions may be part of the process
  • 312.
    9-314 Electronic Payment Processes Web Payment Processes  Shopping cart process  Credit card payment process  Debit and other more complex processes  Electronic Funds Transfer (EFT)  Major payment system in banking, retail  Variety of information technologies capture and process money and credit card transfers  Most point-of-sale terminals in retail stores are networked to bank EFT systems
  • 313.
  • 314.
    9-316 Securing Electronic Payments Network sniffers easily recognize credit card formats  Encrypt data between customer and merchant  Encrypt data between customer and financial institution  Take sensitive information off-line
  • 315.
  • 316.
    9-318 E-Commerce Success Factors Some of the success factors in e-commerce  Selection and value  Performance and service  Look and feel  Advertising and incentives  Personal attention (one-to-one marketing)  Community relationships  Security and reliability
  • 317.
  • 318.
  • 319.
    9-321 Developing a WebStore  Build a website  Choose or set up web hosting  Use simple design tools and templates  Include a shopping cart and payment support  Market the website  Include Web page and e-mail advertising and promotions  Exchange advertising with other Web stores  Register with search engines and directories  Sign up for affiliate programs
  • 320.
    9-322 Serving Your Customers Convert visitors into loyal customers  Develop one-to-one relationship with customers  Create incentives to encourage registration  Use Web cookies to identify visitors  Use tracking services to record and analyze website behavior and customer preferences  Create an attractive, friendly, efficient store  Offer fast order processing and payment  Notify when orders are processed and shipped  Provide links to related websites
  • 321.
    9-323 Managing a WebStore  Manage both the business and the website  Record and analyze traffic, inventory, sales  Use CRM features to help retain customers  Link sales, inventory data to accounting systems  Operate 24 hours a day, seven day a week  Protect transactions and customer records  Use security monitors and firewalls  Use redundant systems and power sources  Employ passwords and encryption
  • 322.
    9-324 B2B E-Commerce  B2Bis the wholesale and supply side of the commercial process  Businesses buy, sell, or trade with other businesses  Relies on multiple electronic information technologies  Catalog systems  Trading systems  Data interchange  Electronic funds transfers
  • 323.
    9-325 E-Commerce Marketplaces  Oneto Many  Sell-side marketplaces  One supplier dictates product offerings and prices  Many to One  Buy-side marketplaces  Many suppliers bid for the business of a buyer  Some to Many  Distribution marketplaces  Unites suppliers who combine their product catalogs to attract a larger audience
  • 324.
    9-326 E-Commerce Marketplaces  Manyto Some  Procurement marketplaces  Unites major buyers who combine purchasing catalogs  Attracts more competition and thus lower prices  Many to Many  Auction marketplaces  Dynamically optimizes prices
  • 325.
    9-327 E-Commerce Portals  B2Be-commerce portals offer multiple marketplaces  Catalogs  Exchanges  Auctions  Often developed and hosted by third-party market- maker companies  Infomediaries serve as intermediaries in e-business and e-commerce transactions
  • 326.
  • 327.
    9-329 Clicks and Bricks Success will go to those who can integrate Internet initiatives with traditional operations  Merging operations has trade-offs
  • 328.
    9-330 E-Commerce Integration  Thebusiness case for merging e-commerce with traditional business operations  Move strategic capabilities in traditional operations to the e-commerce business  Integrate e-commerce into the traditional business  Sharing of established brands  Sharing of key business information  Joint buying power and distribution efficiencies
  • 329.
    9-331 Other Clicks andBricks Strategies  Partial e-commerce integration  Joint ventures and strategic partnerships  Complete separation  Spin-off of an independent e-commerce company  Barnes and Noble’s experience  Spun off independent e-commerce company  Gained venture capital, entrepreneurial culture, and flexibility  Attracted quality management  Accelerated decision making  Failed to gain market share
  • 330.
    9-332 E-Commerce Channel Choices An e-commerce channel is the marketing or sales channel created by a company for its e-commerce activities  There is no universal strategy or e-commerce channel choice  Both e-commerce integration and separation have major business benefits and shortcoming  Most businesses are implementing some measure of clicks and bricks integration
  • 331.
    9-333 E-Commerce Strategy Checklist Questions to ask and answer  What audiences are we attempting to reach?  What action do we want those audiences to take?  Who owns the e-commerce channel within the organization?  Is the e-commerce channel planned alongside other channels?  Is there a process for generating, approving, releasing, and withdrawing content?  Will our brand translate to the new channel?  How will we market the channel itself?
  • 332.
  • 333.
  • 334.
    10-336 Decision Structure  Structured(operational)  The procedures to follow when decision is needed can be specified in advance  Unstructured (strategic)  It is not possible to specify in advance most of the decision procedures to follow  Semi-structured (tactical)  Decision procedures can be pre-specified, but not enough to lead to the correct decision
  • 335.
    10-337 Decision Support Systems ManagementInformation Systems Decision Support Systems Decision support provided Provide information about the performance of the organization Provide information and techniques to analyze specific problems Information form and frequency Periodic, exception, demand, and push reports and responses Interactive inquiries and responses Information format Prespecified, fixed format Ad hoc, flexible, and adaptable format Information processing methodology Information produced by extraction and manipulation of business data Information produced by analytical modeling of business data
  • 336.
    10-338 Decision Support Trends The emerging class of applications focuses on  Personalized decision support  Modeling  Information retrieval  Data warehousing  What-if scenarios  Reporting
  • 337.
  • 338.
    10-340 Decision Support Systems Decision support systems use the following to support the making of semi-structured business decisions  Analytical models  Specialized databases  A decision-maker’s own insights and judgments  An interactive, computer-based modeling process  DSS systems are designed to be ad hoc, quick-response systems that are initiated and controlled by decision makers
  • 339.
  • 340.
    10-342 DSS Model Base Model Base  A software component that consists of models used in computational and analytical routines that mathematically express relations among variables  Spreadsheet Examples  Linear programming  Multiple regression forecasting  Capital budgeting present value
  • 341.
    10-343 Applications of Statisticsand Modeling  Supply Chain: simulate and optimize supply chain flows, reduce inventory, reduce stock-outs  Pricing: identify the price that maximizes yield or profit  Product and Service Quality: detect quality problems early in order to minimize them  Research and Development: improve quality, efficacy, and safety of products and services
  • 342.
    10-344 Management Information Systems The original type of information system that supported managerial decision making  Produces information products that support many day-to-day decision-making needs  Produces reports, display, and responses  Satisfies needs of operational and tactical decision makers who face structured decisions
  • 343.
    10-345 Management Reporting Alternatives Periodic Scheduled Reports  Prespecified format on a regular basis  Exception Reports  Reports about exceptional conditions  May be produced regularly or when an exception occurs  Demand Reports and Responses  Information is available on demand  Push Reporting
  • 344.
  • 345.
    10-347 Online Analytical Processing OLAP  Enables managers and analysts to examine and manipulate large amounts of detailed and consolidated data from many perspectives  Done interactively, in real time, with rapid response to queries
  • 346.
    10-348 Online Analytical Operations Consolidation  Aggregation of data  Example: data about sales offices rolled up to the district level  Drill-Down  Display underlying detail data  Example: sales figures by individual product  Slicing and Dicing  Viewing database from different viewpoints
  • 347.
  • 348.
    10-350 Geographic Information Systems GIS  DSS uses geographic databases to construct and display maps and other graphic displays  Supports decisions affecting the geographic distribution of people and other resources  Often used with Global Positioning Systems (GPS) devices
  • 349.
    10-351 Data Visualization Systems DVS  Represents complex data using interactive, three-dimensional graphical forms (charts, graphs, maps)  Helps users interactively sort, subdivide, combine, and organize data while it is in its graphical form
  • 350.
  • 351.
    10-353 Using Decision SupportSystems  Using a decision support system involves an interactive analytical modeling process  Decision makers are not demanding pre-specified information  They are exploring possible alternatives  What-If Analysis  Observing how changes to selected variables affect other variables
  • 352.
    10-354 Using Decision SupportSystems  Sensitivity Analysis  Observing how repeated changes to a single variable affect other variables  Goal-seeking Analysis  Making repeated changes to selected variables until a chosen variable reaches a target value  Optimization Analysis  Finding an optimum value for selected variables, given certain constraints
  • 353.
    10-355 Data Mining  Providesdecision support through knowledge discovery  Analyzes vast stores of historical business data  Looks for patterns, trends, and correlations  Goal is to improve business performance  Types of analysis  Regression  Decision tree  Neural network  Cluster detection  Market basket analysis
  • 354.
  • 355.
    10-357 Market Basket Analysis One of the most common uses for data mining  Determines what products customers purchase together with other products  Results affect how companies  Market products  Place merchandise in the store  Lay out catalogs and order forms  Determine what new products to offer  Customize solicitation phone calls
  • 356.
    10-358 Executive Information Systems EIS  Combines many features of MIS and DSS  Provide top executives with immediate and easy access to information  Identify factors that are critical to accomplishing strategic objectives (critical success factors)  So popular that it has been expanded to managers, analysis, and other knowledge workers
  • 357.
    10-359 Features of anEIS  Information presented in forms tailored to the preferences of the executives using the system  Customizable graphical user interfaces  Exception reports  Trend analysis  Drill down capability
  • 358.
    10-360 Enterprise Information Portals An EIP is a Web-based interface and integration of MIS, DSS, EIS, and other technologies  Available to all intranet users and select extranet users  Provides access to a variety of internal and external business applications and services  Typically tailored or personalized to the user or groups of users  Often has a digital dashboard  Also called enterprise knowledge portals
  • 359.
  • 360.
  • 361.
  • 362.
    10-364 Artificial Intelligence (AI) AI is a field of science and technology based on  Computer science  Biology  Psychology  Linguistics  Mathematics  Engineering  The goal is to develop computers than can simulate the ability to think  And see, hear, walk, talk, and feel as well
  • 363.
    10-365 Attributes of IntelligentBehavior  Some of the attributes of intelligent behavior  Think and reason  Use reason to solve problems  Learn or understand from experience  Acquire and apply knowledge  Exhibit creativity and imagination  Deal with complex or perplexing situations
  • 364.
    10-366 Attributes of IntelligentBehavior  Attributes of intelligent behavior (continued)  Respond quickly and successfully to new situations  Recognize the relative importance of elements in a situation  Handle ambiguous, incomplete, or erroneous information
  • 365.
  • 366.
    10-368 Cognitive Science  Applicationsin the cognitive science of AI  Expert systems  Knowledge-based systems  Adaptive learning systems  Fuzzy logic systems  Neural networks  Genetic algorithm software  Intelligent agents  Focuses on how the human brain works and how humans think and learn
  • 367.
    10-369 Robotics  AI, engineering,and physiology are the basic disciplines of robotics  Produces robot machines with computer intelligence and humanlike physical capabilities  This area include applications designed to give robots the powers of  Sight or visual perception  Touch  Dexterity  Locomotion  Navigation
  • 368.
    10-370 Natural Interfaces  Majorthrusts in the area of AI and the development of natural interfaces  Natural languages  Speech recognition  Virtual reality  Involves research and development in  Linguistics  Psychology  Computer science  Other disciplines
  • 369.
    10-371 Latest Commercial Applicationsof AI  Decision Support  Helps capture the why as well as the what of engineered design and decision making  Information Retrieval  Distills tidal waves of information into simple presentations  Natural language technology  Database mining
  • 370.
    10-372 Latest Commercial Applicationsof AI  Virtual Reality  X-ray-like vision enabled by enhanced-reality visualization helps surgeons  Automated animation and haptic interfaces allow users to interact with virtual objects  Robotics  Machine-vision inspections systems  Cutting-edge robotics systems  From micro robots and hands and legs, to cognitive and trainable modular vision systems
  • 371.
    10-373 Expert Systems  AnExpert System (ES)  A knowledge-based information system  Contain knowledge about a specific, complex application area  Acts as an expert consultant to end users
  • 372.
    10-374 Components of anExpert System  Knowledge Base  Facts about a specific subject area  Heuristics that express the reasoning procedures of an expert (rules of thumb)  Software Resources  An inference engine processes the knowledge and recommends a course of action  User interface programs communicate with the end user  Explanation programs explain the reasoning process to the end user
  • 373.
  • 374.
    10-376 Methods of KnowledgeRepresentation  Case-Based  Knowledge organized in the form of cases  Cases are examples of past performance, occurrences, and experiences  Frame-Based  Knowledge organized in a hierarchy or network of frames  A frame is a collection of knowledge about an entity, consisting of a complex package of data values describing its attributes
  • 375.
    10-377 Methods of KnowledgeRepresentation  Object-Based  Knowledge represented as a network of objects  An object is a data element that includes both data and the methods or processes that act on those data  Rule-Based  Knowledge represented in the form of rules and statements of fact  Rules are statements that typically take the form of a premise and a conclusion (If, Then)
  • 376.
    10-378 Expert System ApplicationCategories  Decision Management  Loan portfolio analysis  Employee performance evaluation  Insurance underwriting  Diagnostic/Troubleshooting  Equipment calibration  Help desk operations  Medical diagnosis  Software debugging
  • 377.
    10-379 Expert System ApplicationCategories  Design/Configuration  Computer option installation  Manufacturability studies  Communications networks  Selection/Classification  Material selection  Delinquent account identification  Information classification  Suspect identification  Process Monitoring/Control
  • 378.
    10-380 Expert System ApplicationCategories  Process Monitoring/Control  Machine control (including robotics)  Inventory control  Production monitoring  Chemical testing
  • 379.
    10-381 Benefits of ExpertSystems  Captures the expertise of an expert or group of experts in a computer-based information system  Faster and more consistent than an expert  Can contain knowledge of multiple experts  Does not get tired or distracted  Cannot be overworked or stressed  Helps preserve and reproduce the knowledge of human experts
  • 380.
    10-382 Limitations of ExpertSystems  The major limitations of expert systems  Limited focus  Inability to learn  Maintenance problems  Development cost  Can only solve specific types of problems in a limited domain of knowledge
  • 381.
    10-383 Developing Expert Systems Suitability Criteria for Expert Systems  Domain: the domain or subject area of the problem is small and well-defined  Expertise: a body of knowledge, techniques, and intuition is needed that only a few people possess  Complexity: solving the problem is a complex task that requires logical inference processing
  • 382.
    10-384 Developing Expert Systems Suitability Criteria for Expert Systems  Structure: the solution process must be able to cope with ill-structured, uncertain, missing, and conflicting data and a changing problem situation  Availability: an expert exists who is articulate, cooperative, and supported by the management and end users involved in the development process
  • 383.
    10-385 Development Tool  ExpertSystem Shell  The easiest way to develop an expert system  A software package consisting of an expert system without its knowledge base  Has an inference engine and user interface programs
  • 384.
    10-386 Knowledge Engineering  Aknowledge engineer  Works with experts to capture the knowledge (facts and rules of thumb) they possess  Builds the knowledge base, and if necessary, the rest of the expert system  Performs a role similar to that of systems analysts in conventional information systems development
  • 385.
    10-387 Neural Networks  Computingsystems modeled after the brain’s mesh-like network of interconnected processing elements (neurons)  Interconnected processors operate in parallel and interact with each other  Allows the network to learn from the data it processes
  • 386.
    10-388 Fuzzy Logic  Fuzzylogic  Resembles human reasoning  Allows for approximate values and inferences and incomplete or ambiguous data  Uses terms such as “very high” instead of precise measures  Used more often in Japan than in the U.S.  Used in fuzzy process controllers used in subway trains, elevators, and cars
  • 387.
    10-389 Example of FuzzyLogic Rules and Query
  • 388.
    10-390 Genetic Algorithms  Geneticalgorithm software  Uses Darwinian, randomizing, and other mathematical functions  Simulates an evolutionary process, yielding increasingly better solutions to a problem  Being uses to model a variety of scientific, technical, and business processes  Especially useful for situations in which thousands of solutions are possible
  • 389.
    10-391 Virtual Reality (VR) Virtual reality is a computer-simulated reality  Fast-growing area of artificial intelligence  Originated from efforts to build natural, realistic, multi-sensory human-computer interfaces  Relies on multi-sensory input/output devices  Creates a three-dimensional world through sight, sound, and touch  Also called telepresence
  • 390.
    10-392 Typical VR Applications Current applications of virtual reality  Computer-aided design  Medical diagnostics and treatment  Scientific experimentation  Flight simulation  Product demonstrations  Employee training  Entertainment
  • 391.
    10-393 Intelligent Agents  Asoftware surrogate for an end user or a process that fulfills a stated need or activity  Uses built-in and learned knowledge base to make decisions and accomplish tasks in a way that fulfills the intentions of a user  Also call software robots or bots
  • 392.
    10-394 User Interface Agents Interface Tutors – observe user computer operations, correct user mistakes, provide hints/advice on efficient software use  Presentation Agents – show information in a variety of forms/media based on user preferences  Network Navigation Agents – discover paths to information, provide ways to view it based on user preferences  Role-Playing – play what-if games and other roles to help users understand information and make better decisions
  • 393.
    10-395 Information Management Agents Search Agents – help users find files and databases, search for information, and suggest and find new types of information products, media, resources  Information Brokers – provide commercial services to discover and develop information resources that fit business or personal needs  Information Filters – Receive, find, filter, discard, save, forward, and notify users about products received or desired, including e-mail, voice mail, and other information media