SlideShare a Scribd company logo
INTRODUCTION
A. Background
 At present , there is no road that directly links
Badikhel - Bandegaun.
 People are compelled to take the long alternative
routes to travel from one village to another.
C. Scope
 To review the existing study reports, standards and
specifications.
 Detailed engineering survey of alignment.
 Preparation of topographical map.
 Study for cross-drainage works and propose suitable drainage
structure.
 Preparation of working drawings.
 Preparation of quantity and cost estimate.
 Preparation of survey and design report
D. Project location
 The proposed road is located in the Lalitpur District,
Bagmati Zone, Central Region. The road starts from
Badikhel and ends at Badegaun.
 The road runs along Karmanasha River corridor.
 The latitude and the longitude of the starting point are
27057’07’’ and 85035’27’’ respectively.
F. Hydrology And Meteorology
 Small temporary streams running only during monsoon
crosses the alignment with small discharge.
 The project area experiences marked seasonal and specific
climate variation with moderately hot summer and relatively
cool winters. Average temperature is 25oC in summer and 10oC
in winter.
 Almost 80% of the rainfall occurs during monsoon which
starts at the middle of the June and continues until the end of
August.
METHODOLOGY
DESK STUDY
SOCIAL IMPACT ASSESMENT
FIELD WORK
EQUIPMENT USED FOR SURVEYING
OFFICE WORK
DESK STUDY
The geographical and the topographical maps
were studied and the relevant information
regarding the alignment selection, cross
drainage structures, gradient of the road were
discussed.
The strategy for the field study was made
accordingly.
The study team member discussed the related
matters of the project.
SOCIAL IMPACT ASSESMENT
The study identified the following key social
issues for investigation:
Loss of private property and other assets (land,
houses and trees) and compensation modalities
for these losses.
Population displacement.
Construction employment opportunities.
Potentiality for social development.
FIELD WORK
In field, first of all recce was done and the terrain was
thoroughly observed and possible location of station
was fixed according to sight and leg ratio.
Survey work was done where first Reduced Level
(RL) was transferred for the vertical control and
elevation of the Station was fixed.
Detailed survey was done where details of every
feature of the site like foot trail, electric poles,
buildings, trees, river course, crossing structures etc.
was recorded.
EQUIPMENT USED FOR
SURVEYING
Total station
GPS device
Staff
Compass
Measuring tape
Hammer
Communicating Device
OFFICE WORK
Preparation of Plan, Profile and Cross-section
Quantity estimation
Analysis of the rates
Cost estimation
Report preparation
DESIGN
ROAD CLASSIFICATION
As per the NRS 2045, the road project falls on the category
of District Roads.
 A Design speed of 30 km/hr is taken for the design of
geometric parameters of the road.
DESIGN SPEED
4.3 GEOMETRIC PARAMETERS
Parameters Values Remarks
No. of lane 1 As per NRS
Carriageway Width 3.75 m As per NRS
Shoulder Width 1 m (either side) As per the site condition
Right of way 10 m (either side) As per NRS
Camber 4% As per NRS
Shoulder Slope 5% As per NRS
Minimum Horizontal Curve Radius 12 m As per NRS
Maximum Superelevation 5% As per Design
Maximum Gradient 10.393% As per Design
Minimum Gradient 0.394% As per Design
Average Gradient 1.770% As per Design
The Design values are taken as recommended by NRS
2045 as far as practicable
The shoulder width is taken as 1 m considering the site
condition and the utility of the road
Minimum Gradient recommended by NRS (1% for better
drainage) cannot be incorporated considering the site
condition
Horizontal Alignment
 The most suitable horizontal alignment was selected
considering the following factors:
 Short (S)
 Easy (E)
 Safe (S)
 Economical (E)
 Minimum radius for the horizontal curve as recommended
by NRS is 12 m. The minimum radius of 12m is provided at
the intersection of existing road and proposed road.
The extrawidening and transition curves are not provided
owing to low design speed and simplicity in construction
A maximum of 5 % super elevation is provided at each
horizontal curve.
Superelevation is provided by rotation of pavement about
the center line.
Transition length for super elevation is provided as 5 m
VERTICAL ALIGNMENT
The vertical alignment includes the selection of suitable gradient
and design of summit and valley curves.
The maximum gradient is adopted 10.393% which is permissible
for the hill road as per NRS 2045.
All vertical curves are designed as Simple Parabolas
Summit curves are designed considering stopping sight
distance.
Valley curves are designed on the basis of night visibility
The radius of vertical curve is adopted as large as possible
so that all the factors are satisfied
The least vertical radius taken in design is 1000 m
CROSS SECTION DESIGN
Cross section is designed providing camber of 4% on
carriageway and 5 % on shoulder
For embankment the side slope of 1.5H: 1V and for cut the
side slope of 1H: 1V is adopted
Total pavement thickness of 28 cm is adopted as per CBR
method of design
Gravel is used as the sub-base course
Otta Seal is used as the surface course
DRAINAGE
Longitudinal drain is provided on the cut slope side of the road
The side slope is 1:1 and longitudinal slope is parallel to the
alignment
Earthen drain is provided from chainage 0+000 to the chainage of
1+251.35
Stoned masonry drain of thickness 20 cm is provided from the
chainage of 1+309.82 to chainage 2+027.24
Pipe culverts of 60 cm in diameter and total length of 7.5m
are provided at 12 sections of the road
They are provided at the lowest point of the vertical
alignment
A minimum depth of 60 cm is provided between the surface
of the pavement and the crown of the pipe
RETAINING STRUCTURES
Since the sufficient side slope is available on the
embankment side, no retaining structures are
adopted in the design
Plan and Profile
 Ch. 0+000-0+200
 Ch. 0+200-0+480
 Ch. 0+480-0+760
 Ch. 0+760-1+040
 Ch. 1+040-1+360
 Ch. 1+360-1+700
 Ch. 1+700-2+027.24
Cross Section
 Ch. 0+000-0+271.50
 Ch. 0+280-0+500
 Ch. 0+511.92-0+680
 Ch. 0+683.87-0+760
 Ch. 0+780-0+920
 Ch. 0+936.71-1+125.89
 Ch. 1+130.75-1+213.66
 Ch.1+220-1+319.59
 Ch.1+320-1+380
 Ch.1+397.04-1+465.09
 Ch.1+480-1+545.77
 Ch.1+560-1+800
 Ch.1+800.91-1+980
 Ch.1+984.58-2+027.24
Typical Pavement
Cross Drainage Structure
ESTIMATE
Quantity Estimate
Calculation of Earthwork
Necessary Calculations
Rate Analysis
BoQ /Cost Estimate
QUANTITY ESTIMATE
 Earthwork Calculations:
 Calculated at each cross-section
 Separate calculation according to soil type
 Total cut volume = 10283.57 m3
 Total fill volume = 16052.44 m3
 Balance (fill) = 5768.869 m3
 Earthwork for drain = 768.129 m3
All the detailed calculation is shown in the tabular
form in the following slides:
Contd………
 Necessary calculations:
i. For side drain:
Calculations were made taking the following design
considerations:
 Section = trapezoidal
 Depth: 0.3m
 Base width: 0.3m
 Side slope: 1:1
 Unlined earthen canal(Ch. 0+000 to 1251.35)
 Lined canal: (ch.1+309.82 to Ch. 2+027.24)
ii. Sub-grade calculations:
RATE ANALYSIS
 Rate analysis was performed under the
following criteria:
 The quantity of the materials, required labor
force and plants, machinery, tools and
equipments were taken from the work norms
provided by the DoR.
 The rate for the materials, labors, plants and
machinery, tools and equipments was taken
from the district rates provided by the Lalitpur
DDC.
COST ESTIMATE
 The BoQ was prepared on the basis of the
quantity of work calculated and rate analysis
done previously:
 The cost estimate is as below:

More Related Content

Similar to PPT Estimate.pptx

HIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).docHIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).doc
sydneyaugust1
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
Gaurav Baviskar
 
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
Er. Bam Bhandari
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
AkshathaBhandary
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
IRJET Journal
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
DhananjayM13
 
Geological investigations for highways
Geological investigations for highwaysGeological investigations for highways
Geological investigations for highways
Prof. A.Balasubramanian
 
Engineering surveys and construction of new lines
Engineering surveys and construction of new linesEngineering surveys and construction of new lines
Engineering surveys and construction of new lines
Nasir Uddin
 
Geometric design
Geometric designGeometric design
Geometric design
ayishairshad
 
Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution . Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution .
gunjatetm
 
Minor project ppt1.pdf
Minor project ppt1.pdfMinor project ppt1.pdf
Minor project ppt1.pdf
AnshuRaj51911
 
Vertical Curves_Presentation_NR.pptx
Vertical Curves_Presentation_NR.pptxVertical Curves_Presentation_NR.pptx
Vertical Curves_Presentation_NR.pptx
NaniRoy9
 
transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.
ayudge
 
Highway Project
Highway ProjectHighway Project
Highway Project
Pavan Nimbal
 
Design of expressways
Design of expresswaysDesign of expressways
Design of expressways
Vijai Krishnan V
 
hillroads-200131051526.pptx
hillroads-200131051526.pptxhillroads-200131051526.pptx
hillroads-200131051526.pptx
DESHANTAGGARWAL1
 
Transportation Systems Design Project
Transportation Systems Design ProjectTransportation Systems Design Project
Transportation Systems Design Project
Megan Hanrahan
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
IJSRD
 
Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)
lltdayar
 
Hill roads
Hill roadsHill roads
Hill roads
akshaydesai76
 

Similar to PPT Estimate.pptx (20)

HIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).docHIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).doc
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
 
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
 
Geological investigations for highways
Geological investigations for highwaysGeological investigations for highways
Geological investigations for highways
 
Engineering surveys and construction of new lines
Engineering surveys and construction of new linesEngineering surveys and construction of new lines
Engineering surveys and construction of new lines
 
Geometric design
Geometric designGeometric design
Geometric design
 
Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution . Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution .
 
Minor project ppt1.pdf
Minor project ppt1.pdfMinor project ppt1.pdf
Minor project ppt1.pdf
 
Vertical Curves_Presentation_NR.pptx
Vertical Curves_Presentation_NR.pptxVertical Curves_Presentation_NR.pptx
Vertical Curves_Presentation_NR.pptx
 
transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.
 
Highway Project
Highway ProjectHighway Project
Highway Project
 
Design of expressways
Design of expresswaysDesign of expressways
Design of expressways
 
hillroads-200131051526.pptx
hillroads-200131051526.pptxhillroads-200131051526.pptx
hillroads-200131051526.pptx
 
Transportation Systems Design Project
Transportation Systems Design ProjectTransportation Systems Design Project
Transportation Systems Design Project
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
 
Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)
 
Hill roads
Hill roadsHill roads
Hill roads
 

Recently uploaded

Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 

Recently uploaded (20)

Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 

PPT Estimate.pptx

  • 1. INTRODUCTION A. Background  At present , there is no road that directly links Badikhel - Bandegaun.  People are compelled to take the long alternative routes to travel from one village to another.
  • 2. C. Scope  To review the existing study reports, standards and specifications.  Detailed engineering survey of alignment.  Preparation of topographical map.  Study for cross-drainage works and propose suitable drainage structure.
  • 3.  Preparation of working drawings.  Preparation of quantity and cost estimate.  Preparation of survey and design report
  • 4. D. Project location  The proposed road is located in the Lalitpur District, Bagmati Zone, Central Region. The road starts from Badikhel and ends at Badegaun.  The road runs along Karmanasha River corridor.  The latitude and the longitude of the starting point are 27057’07’’ and 85035’27’’ respectively.
  • 5. F. Hydrology And Meteorology  Small temporary streams running only during monsoon crosses the alignment with small discharge.  The project area experiences marked seasonal and specific climate variation with moderately hot summer and relatively cool winters. Average temperature is 25oC in summer and 10oC in winter.  Almost 80% of the rainfall occurs during monsoon which starts at the middle of the June and continues until the end of August.
  • 6. METHODOLOGY DESK STUDY SOCIAL IMPACT ASSESMENT FIELD WORK EQUIPMENT USED FOR SURVEYING OFFICE WORK
  • 7. DESK STUDY The geographical and the topographical maps were studied and the relevant information regarding the alignment selection, cross drainage structures, gradient of the road were discussed. The strategy for the field study was made accordingly. The study team member discussed the related matters of the project.
  • 8. SOCIAL IMPACT ASSESMENT The study identified the following key social issues for investigation: Loss of private property and other assets (land, houses and trees) and compensation modalities for these losses. Population displacement.
  • 10. FIELD WORK In field, first of all recce was done and the terrain was thoroughly observed and possible location of station was fixed according to sight and leg ratio. Survey work was done where first Reduced Level (RL) was transferred for the vertical control and elevation of the Station was fixed. Detailed survey was done where details of every feature of the site like foot trail, electric poles, buildings, trees, river course, crossing structures etc. was recorded.
  • 11. EQUIPMENT USED FOR SURVEYING Total station GPS device Staff Compass Measuring tape Hammer Communicating Device
  • 12. OFFICE WORK Preparation of Plan, Profile and Cross-section Quantity estimation Analysis of the rates Cost estimation Report preparation
  • 14. ROAD CLASSIFICATION As per the NRS 2045, the road project falls on the category of District Roads.
  • 15.  A Design speed of 30 km/hr is taken for the design of geometric parameters of the road. DESIGN SPEED
  • 16. 4.3 GEOMETRIC PARAMETERS Parameters Values Remarks No. of lane 1 As per NRS Carriageway Width 3.75 m As per NRS Shoulder Width 1 m (either side) As per the site condition Right of way 10 m (either side) As per NRS Camber 4% As per NRS Shoulder Slope 5% As per NRS Minimum Horizontal Curve Radius 12 m As per NRS Maximum Superelevation 5% As per Design Maximum Gradient 10.393% As per Design Minimum Gradient 0.394% As per Design Average Gradient 1.770% As per Design
  • 17. The Design values are taken as recommended by NRS 2045 as far as practicable The shoulder width is taken as 1 m considering the site condition and the utility of the road Minimum Gradient recommended by NRS (1% for better drainage) cannot be incorporated considering the site condition
  • 18. Horizontal Alignment  The most suitable horizontal alignment was selected considering the following factors:  Short (S)  Easy (E)  Safe (S)  Economical (E)  Minimum radius for the horizontal curve as recommended by NRS is 12 m. The minimum radius of 12m is provided at the intersection of existing road and proposed road.
  • 19. The extrawidening and transition curves are not provided owing to low design speed and simplicity in construction A maximum of 5 % super elevation is provided at each horizontal curve. Superelevation is provided by rotation of pavement about the center line. Transition length for super elevation is provided as 5 m
  • 20. VERTICAL ALIGNMENT The vertical alignment includes the selection of suitable gradient and design of summit and valley curves. The maximum gradient is adopted 10.393% which is permissible for the hill road as per NRS 2045. All vertical curves are designed as Simple Parabolas
  • 21. Summit curves are designed considering stopping sight distance. Valley curves are designed on the basis of night visibility The radius of vertical curve is adopted as large as possible so that all the factors are satisfied The least vertical radius taken in design is 1000 m
  • 22. CROSS SECTION DESIGN Cross section is designed providing camber of 4% on carriageway and 5 % on shoulder For embankment the side slope of 1.5H: 1V and for cut the side slope of 1H: 1V is adopted Total pavement thickness of 28 cm is adopted as per CBR method of design
  • 23. Gravel is used as the sub-base course Otta Seal is used as the surface course
  • 24. DRAINAGE Longitudinal drain is provided on the cut slope side of the road The side slope is 1:1 and longitudinal slope is parallel to the alignment Earthen drain is provided from chainage 0+000 to the chainage of 1+251.35 Stoned masonry drain of thickness 20 cm is provided from the chainage of 1+309.82 to chainage 2+027.24
  • 25. Pipe culverts of 60 cm in diameter and total length of 7.5m are provided at 12 sections of the road They are provided at the lowest point of the vertical alignment A minimum depth of 60 cm is provided between the surface of the pavement and the crown of the pipe
  • 26. RETAINING STRUCTURES Since the sufficient side slope is available on the embankment side, no retaining structures are adopted in the design
  • 27. Plan and Profile  Ch. 0+000-0+200  Ch. 0+200-0+480  Ch. 0+480-0+760  Ch. 0+760-1+040  Ch. 1+040-1+360  Ch. 1+360-1+700  Ch. 1+700-2+027.24
  • 28. Cross Section  Ch. 0+000-0+271.50  Ch. 0+280-0+500  Ch. 0+511.92-0+680  Ch. 0+683.87-0+760  Ch. 0+780-0+920  Ch. 0+936.71-1+125.89  Ch. 1+130.75-1+213.66  Ch.1+220-1+319.59  Ch.1+320-1+380  Ch.1+397.04-1+465.09  Ch.1+480-1+545.77  Ch.1+560-1+800  Ch.1+800.91-1+980  Ch.1+984.58-2+027.24
  • 30. ESTIMATE Quantity Estimate Calculation of Earthwork Necessary Calculations Rate Analysis BoQ /Cost Estimate
  • 31. QUANTITY ESTIMATE  Earthwork Calculations:  Calculated at each cross-section  Separate calculation according to soil type  Total cut volume = 10283.57 m3  Total fill volume = 16052.44 m3  Balance (fill) = 5768.869 m3  Earthwork for drain = 768.129 m3 All the detailed calculation is shown in the tabular form in the following slides:
  • 32. Contd………  Necessary calculations: i. For side drain: Calculations were made taking the following design considerations:  Section = trapezoidal  Depth: 0.3m  Base width: 0.3m  Side slope: 1:1  Unlined earthen canal(Ch. 0+000 to 1251.35)  Lined canal: (ch.1+309.82 to Ch. 2+027.24) ii. Sub-grade calculations:
  • 33. RATE ANALYSIS  Rate analysis was performed under the following criteria:  The quantity of the materials, required labor force and plants, machinery, tools and equipments were taken from the work norms provided by the DoR.  The rate for the materials, labors, plants and machinery, tools and equipments was taken from the district rates provided by the Lalitpur DDC.
  • 34. COST ESTIMATE  The BoQ was prepared on the basis of the quantity of work calculated and rate analysis done previously:  The cost estimate is as below: