INTRODUCTION
A. Background
 At present , there is no road that directly links
Badikhel - Bandegaun.
 People are compelled to take the long alternative
routes to travel from one village to another.
C. Scope
 To review the existing study reports, standards and
specifications.
 Detailed engineering survey of alignment.
 Preparation of topographical map.
 Study for cross-drainage works and propose suitable drainage
structure.
 Preparation of working drawings.
 Preparation of quantity and cost estimate.
 Preparation of survey and design report
D. Project location
 The proposed road is located in the Lalitpur District,
Bagmati Zone, Central Region. The road starts from
Badikhel and ends at Badegaun.
 The road runs along Karmanasha River corridor.
 The latitude and the longitude of the starting point are
27057’07’’ and 85035’27’’ respectively.
F. Hydrology And Meteorology
 Small temporary streams running only during monsoon crosses
the alignment with small discharge.
 The project area experiences marked seasonal and specific
climate variation with moderately hot summer and relatively
cool winters. Average temperature is 25oC in summer and 10oC
in winter.
 Almost 80% of the rainfall occurs during monsoon which starts
at the middle of the June and continues until the end of August.
METHODOLOGY
DESK STUDY
SOCIAL IMPACT ASSESMENT
FIELD WORK
EQUIPMENT USED FOR SURVEYING
OFFICE WORK
DESK STUDY
 The geographical and the topographical maps
were studied and the relevant information
regarding the alignment selection, cross drainage
structures, gradient of the road were discussed.
 The strategy for the field study was made
accordingly.
 The study team member discussed the related
matters of the project.
SOCIAL IMPACT ASSESMENT
The study identified the following key social issues
for investigation:
 Loss of private property and other assets (land,
houses and trees) and compensation modalities
for these losses.
 Population displacement.
 Construction employment opportunities.
 Potentiality for social development.
 EQUIPMENT USED FOR
SURVEYING
 Total station
 GPS device
 Staff
 Compass
 Measuring tape
 Hammer
 Communicating Device
DESIGN
Road Classification
 As per the NRS 2045, the road project falls on the
category of District Roads.
 A Design speed of 30 km/hr is taken for the
design of geometric parameters of the road.
Design Speed
 The Design values are taken as recommended
by NRS 2045 as far as practicable
 The shoulder width is taken as 1 m considering
the site condition and the utility of the road
 Minimum Gradient recommended by NRS (1%
for better drainage) cannot be incorporated
considering the site condition
Horizontal Alignment
 The most suitable horizontal alignment was
selected considering the following factors:
 Short (S)
 Easy (E)
 Safe (S)
 Economical (E)
 Minimum radius for the horizontal curve as
recommended by NRS is 12 m. The minimum
radius of 12m is provided at the intersection of
existing road and proposed road.
 The extrawidening and transition curves are not
provided owing to low design speed and simplicity
in construction
 A maximum of 5 % super elevation is provided at
each horizontal curve.
 Superelevation is provided by rotation of
pavement about the center line.
 Transition length for super elevation is provided
as 5 m
 Summit curves are designed considering stopping
sight distance.
 Valley curves are designed on the basis of night
visibility
 The radius of vertical curve is adopted as large as
possible so that all the factors are satisfied
 The least vertical radius taken in design is 1000 m
Cross Section Design
 Cross section is designed providing camber of 4%
on carriageway and 5 % on shoulder
 For embankment the side slope of 1.5H: 1V and
for cut the side slope of 1H: 1V is adopted
 Total pavement thickness of 28 cm is adopted as
per CBR method of design
 Gravel is used as the sub-base course
 Otta Seal is used as the surface course
Drainage
 Longitudinal drain is provided on the cut slope side of
the road
 The side slope is 1:1 and longitudinal slope is parallel to
the alignment
 Earthen drain is provided from chainage 0+000 to the
chainage of 1+251.35
 Stoned masonry drain of thickness 20 cm is provided
from the chainage of 1+309.82 to chainage 2+027.24
 Pipe culverts of 60 cm in diameter and total length
of 7.5m are provided at 12 sections of the road
 They are provided at the lowest point of the
vertical alignment
 A minimum depth of 60 cm is provided between
the surface of the pavement and the crown of the
pipe
Plan and Profile
 Ch. 0+000-0+200
 Ch. 0+200-0+480
 Ch. 0+480-0+760
 Ch. 0+760-1+040
 Ch. 1+040-1+360
 Ch. 1+360-1+700
 Ch. 1+700-2+027.24
Cross Section
 Ch. 0+000-0+271.50
 Ch. 0+280-0+500
 Ch. 0+511.92-0+680
 Ch. 0+683.87-0+760
 Ch. 0+780-0+920
 Ch. 0+936.71-1+125.89
 Ch. 1+130.75-1+213.66
 Ch.1+220-1+319.59
 Ch.1+320-1+380
 Ch.1+397.04-1+465.09
 Ch.1+480-1+545.77
 Ch.1+560-1+800
 Ch.1+800.91-1+980
 Ch.1+984.58-2+027.24
Typical Pavement
Cross Drainage Structure
ESTIMATE
Quantity Estimate
Calculation of Earthwork
Necessary Calculations
Rate Analysis
BoQ /Cost Estimate
QUANTITY ESTIMATE
 Earthwork Calculations:
 Calculated at each cross-section
 Separate calculation according to soil type
 Total cut volume = 10283.57 m3
 Total fill volume = 16052.44 m3
 Balance (fill) = 5768.869 m3
 Earthwork for drain = 768.129 m3
All the detailed calculation is shown in the tabular
form in the following slides:
Contd………
 Necessary calculations:
i. For side drain:
Calculations were made taking the following design
considerations:
 Section = trapezoidal
 Depth: 0.3m
 Base width: 0.3m
 Side slope: 1:1
 Unlined earthen canal(Ch. 0+000 to 1251.35)
 Lined canal: (ch.1+309.82 to Ch. 2+027.24)
ii. Sub-grade calculations:
RATE ANALYSIS
 Rate analysis was performed under the
following criteria:
 The quantity of the materials, required labor
force and plants, machinery, tools and
equipments were taken from the work norms
provided by the DoR.
 The rate for the materials, labors, plants and
machinery, tools and equipments was taken
from the district rates provided by the Lalitpur
DDC.
COST ESTIMATE
 The BoQ was prepared on the basis of the
quantity of work calculated and rate analysis
done previously:
 The cost estimate is as below:

More Related Content

Similar to design.pptx

03 Highway Alignment.pdf
03 Highway Alignment.pdf03 Highway Alignment.pdf
03 Highway Alignment.pdf
Gaurav606406
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
IJSRD
 
Engineering surveys and construction of new lines
Engineering surveys and construction of new linesEngineering surveys and construction of new lines
Engineering surveys and construction of new lines
Nasir Uddin
 

Similar to design.pptx (20)

Hill_Roads
Hill_RoadsHill_Roads
Hill_Roads
 
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
 
Minor project ppt1.pdf
Minor project ppt1.pdfMinor project ppt1.pdf
Minor project ppt1.pdf
 
transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.
 
Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution . Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution .
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
 
Case Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane HighwayCase Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane Highway
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
 
WB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCPWB funded Rural Road Projects MPRCP
WB funded Rural Road Projects MPRCP
 
Geological investigations for highways
Geological investigations for highwaysGeological investigations for highways
Geological investigations for highways
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
 
03 Highway Alignment.pdf
03 Highway Alignment.pdf03 Highway Alignment.pdf
03 Highway Alignment.pdf
 
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali PathirajaSite Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali Pathiraja
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
hillroads-200131051526.pptx
hillroads-200131051526.pptxhillroads-200131051526.pptx
hillroads-200131051526.pptx
 
Hill roads
Hill roadsHill roads
Hill roads
 
Road-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptxRoad-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptx
 
Engineering surveys and construction of new lines
Engineering surveys and construction of new linesEngineering surveys and construction of new lines
Engineering surveys and construction of new lines
 

Recently uploaded

➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
amitlee9823
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
amitlee9823
 
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
amitlee9823
 
➥🔝 7737669865 🔝▻ dharamshala Call-girls in Women Seeking Men 🔝dharamshala🔝 ...
➥🔝 7737669865 🔝▻ dharamshala Call-girls in Women Seeking Men  🔝dharamshala🔝  ...➥🔝 7737669865 🔝▻ dharamshala Call-girls in Women Seeking Men  🔝dharamshala🔝  ...
➥🔝 7737669865 🔝▻ dharamshala Call-girls in Women Seeking Men 🔝dharamshala🔝 ...
amitlee9823
 
Just Call Vip call girls Etawah Escorts ☎️9352988975 Two shot with one girl (...
Just Call Vip call girls Etawah Escorts ☎️9352988975 Two shot with one girl (...Just Call Vip call girls Etawah Escorts ☎️9352988975 Two shot with one girl (...
Just Call Vip call girls Etawah Escorts ☎️9352988975 Two shot with one girl (...
gajnagarg
 
Just Call Vip call girls dharamshala Escorts ☎️9352988975 Two shot with one g...
Just Call Vip call girls dharamshala Escorts ☎️9352988975 Two shot with one g...Just Call Vip call girls dharamshala Escorts ☎️9352988975 Two shot with one g...
Just Call Vip call girls dharamshala Escorts ☎️9352988975 Two shot with one g...
gajnagarg
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
mark11275
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion pills in Kuwait Cytotec pills in Kuwait
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
saipriyacoool
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men 🔝jhansi🔝 Escorts S...
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men  🔝jhansi🔝   Escorts S...➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men  🔝jhansi🔝   Escorts S...
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men 🔝jhansi🔝 Escorts S...
amitlee9823
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
amitlee9823
 

Recently uploaded (20)

call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
 
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
Vip Mumbai Call Girls Bandra West Call On 9920725232 With Body to body massag...
 
➥🔝 7737669865 🔝▻ dharamshala Call-girls in Women Seeking Men 🔝dharamshala🔝 ...
➥🔝 7737669865 🔝▻ dharamshala Call-girls in Women Seeking Men  🔝dharamshala🔝  ...➥🔝 7737669865 🔝▻ dharamshala Call-girls in Women Seeking Men  🔝dharamshala🔝  ...
➥🔝 7737669865 🔝▻ dharamshala Call-girls in Women Seeking Men 🔝dharamshala🔝 ...
 
Just Call Vip call girls Etawah Escorts ☎️9352988975 Two shot with one girl (...
Just Call Vip call girls Etawah Escorts ☎️9352988975 Two shot with one girl (...Just Call Vip call girls Etawah Escorts ☎️9352988975 Two shot with one girl (...
Just Call Vip call girls Etawah Escorts ☎️9352988975 Two shot with one girl (...
 
Just Call Vip call girls dharamshala Escorts ☎️9352988975 Two shot with one g...
Just Call Vip call girls dharamshala Escorts ☎️9352988975 Two shot with one g...Just Call Vip call girls dharamshala Escorts ☎️9352988975 Two shot with one g...
Just Call Vip call girls dharamshala Escorts ☎️9352988975 Two shot with one g...
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Sector 104, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 104, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 104, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 104, Noida Call girls :8448380779 Model Escorts | 100% verified
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
 
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men 🔝jhansi🔝 Escorts S...
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men  🔝jhansi🔝   Escorts S...➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men  🔝jhansi🔝   Escorts S...
➥🔝 7737669865 🔝▻ jhansi Call-girls in Women Seeking Men 🔝jhansi🔝 Escorts S...
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service AvailableCall Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
 

design.pptx

  • 1. INTRODUCTION A. Background  At present , there is no road that directly links Badikhel - Bandegaun.  People are compelled to take the long alternative routes to travel from one village to another.
  • 2. C. Scope  To review the existing study reports, standards and specifications.  Detailed engineering survey of alignment.  Preparation of topographical map.  Study for cross-drainage works and propose suitable drainage structure.
  • 3.  Preparation of working drawings.  Preparation of quantity and cost estimate.  Preparation of survey and design report
  • 4. D. Project location  The proposed road is located in the Lalitpur District, Bagmati Zone, Central Region. The road starts from Badikhel and ends at Badegaun.  The road runs along Karmanasha River corridor.  The latitude and the longitude of the starting point are 27057’07’’ and 85035’27’’ respectively.
  • 5. F. Hydrology And Meteorology  Small temporary streams running only during monsoon crosses the alignment with small discharge.  The project area experiences marked seasonal and specific climate variation with moderately hot summer and relatively cool winters. Average temperature is 25oC in summer and 10oC in winter.  Almost 80% of the rainfall occurs during monsoon which starts at the middle of the June and continues until the end of August.
  • 6. METHODOLOGY DESK STUDY SOCIAL IMPACT ASSESMENT FIELD WORK EQUIPMENT USED FOR SURVEYING OFFICE WORK
  • 7. DESK STUDY  The geographical and the topographical maps were studied and the relevant information regarding the alignment selection, cross drainage structures, gradient of the road were discussed.  The strategy for the field study was made accordingly.  The study team member discussed the related matters of the project.
  • 8. SOCIAL IMPACT ASSESMENT The study identified the following key social issues for investigation:  Loss of private property and other assets (land, houses and trees) and compensation modalities for these losses.  Population displacement.
  • 9.  Construction employment opportunities.  Potentiality for social development.
  • 10.  EQUIPMENT USED FOR SURVEYING  Total station  GPS device  Staff  Compass  Measuring tape  Hammer  Communicating Device
  • 12. Road Classification  As per the NRS 2045, the road project falls on the category of District Roads.
  • 13.  A Design speed of 30 km/hr is taken for the design of geometric parameters of the road. Design Speed
  • 14.  The Design values are taken as recommended by NRS 2045 as far as practicable  The shoulder width is taken as 1 m considering the site condition and the utility of the road  Minimum Gradient recommended by NRS (1% for better drainage) cannot be incorporated considering the site condition
  • 15. Horizontal Alignment  The most suitable horizontal alignment was selected considering the following factors:  Short (S)  Easy (E)  Safe (S)  Economical (E)  Minimum radius for the horizontal curve as recommended by NRS is 12 m. The minimum radius of 12m is provided at the intersection of existing road and proposed road.
  • 16.  The extrawidening and transition curves are not provided owing to low design speed and simplicity in construction  A maximum of 5 % super elevation is provided at each horizontal curve.  Superelevation is provided by rotation of pavement about the center line.  Transition length for super elevation is provided as 5 m
  • 17.  Summit curves are designed considering stopping sight distance.  Valley curves are designed on the basis of night visibility  The radius of vertical curve is adopted as large as possible so that all the factors are satisfied  The least vertical radius taken in design is 1000 m
  • 18. Cross Section Design  Cross section is designed providing camber of 4% on carriageway and 5 % on shoulder  For embankment the side slope of 1.5H: 1V and for cut the side slope of 1H: 1V is adopted  Total pavement thickness of 28 cm is adopted as per CBR method of design
  • 19.  Gravel is used as the sub-base course  Otta Seal is used as the surface course
  • 20. Drainage  Longitudinal drain is provided on the cut slope side of the road  The side slope is 1:1 and longitudinal slope is parallel to the alignment  Earthen drain is provided from chainage 0+000 to the chainage of 1+251.35  Stoned masonry drain of thickness 20 cm is provided from the chainage of 1+309.82 to chainage 2+027.24
  • 21.  Pipe culverts of 60 cm in diameter and total length of 7.5m are provided at 12 sections of the road  They are provided at the lowest point of the vertical alignment  A minimum depth of 60 cm is provided between the surface of the pavement and the crown of the pipe
  • 22. Plan and Profile  Ch. 0+000-0+200  Ch. 0+200-0+480  Ch. 0+480-0+760  Ch. 0+760-1+040  Ch. 1+040-1+360  Ch. 1+360-1+700  Ch. 1+700-2+027.24
  • 23. Cross Section  Ch. 0+000-0+271.50  Ch. 0+280-0+500  Ch. 0+511.92-0+680  Ch. 0+683.87-0+760  Ch. 0+780-0+920  Ch. 0+936.71-1+125.89  Ch. 1+130.75-1+213.66  Ch.1+220-1+319.59  Ch.1+320-1+380  Ch.1+397.04-1+465.09  Ch.1+480-1+545.77  Ch.1+560-1+800  Ch.1+800.91-1+980  Ch.1+984.58-2+027.24
  • 25. ESTIMATE Quantity Estimate Calculation of Earthwork Necessary Calculations Rate Analysis BoQ /Cost Estimate
  • 26. QUANTITY ESTIMATE  Earthwork Calculations:  Calculated at each cross-section  Separate calculation according to soil type  Total cut volume = 10283.57 m3  Total fill volume = 16052.44 m3  Balance (fill) = 5768.869 m3  Earthwork for drain = 768.129 m3 All the detailed calculation is shown in the tabular form in the following slides:
  • 27. Contd………  Necessary calculations: i. For side drain: Calculations were made taking the following design considerations:  Section = trapezoidal  Depth: 0.3m  Base width: 0.3m  Side slope: 1:1  Unlined earthen canal(Ch. 0+000 to 1251.35)  Lined canal: (ch.1+309.82 to Ch. 2+027.24) ii. Sub-grade calculations:
  • 28. RATE ANALYSIS  Rate analysis was performed under the following criteria:  The quantity of the materials, required labor force and plants, machinery, tools and equipments were taken from the work norms provided by the DoR.  The rate for the materials, labors, plants and machinery, tools and equipments was taken from the district rates provided by the Lalitpur DDC.
  • 29. COST ESTIMATE  The BoQ was prepared on the basis of the quantity of work calculated and rate analysis done previously:  The cost estimate is as below: