INTRODUCTION
A. Background
 At present , there is no road that directly links
Badikhel - Bandegaun.
 People are compelled to take the long alternative
routes to travel from one village to another.
C. Scope
 To review the existing study reports, standards and
specifications.
 Detailed engineering survey of alignment.
 Preparation of topographical map.
 Study for cross-drainage works and propose suitable drainage
structure.
 Preparation of working drawings.
 Preparation of quantity and cost estimate.
 Preparation of survey and design report
D. Project location
 The proposed road is located in the Lalitpur District,
Bagmati Zone, Central Region. The road starts from
Badikhel and ends at Badegaun.
 The road runs along Karmanasha River corridor.
 The latitude and the longitude of the starting point are
27057’07’’ and 85035’27’’ respectively.
F. Hydrology And Meteorology
 Small temporary streams running only during monsoon crosses
the alignment with small discharge.
 The project area experiences marked seasonal and specific
climate variation with moderately hot summer and relatively
cool winters. Average temperature is 25oC in summer and 10oC
in winter.
 Almost 80% of the rainfall occurs during monsoon which starts
at the middle of the June and continues until the end of August.
METHODOLOGY
DESK STUDY
SOCIAL IMPACT ASSESMENT
FIELD WORK
EQUIPMENT USED FOR SURVEYING
OFFICE WORK
DESK STUDY
 The geographical and the topographical maps
were studied and the relevant information
regarding the alignment selection, cross drainage
structures, gradient of the road were discussed.
 The strategy for the field study was made
accordingly.
 The study team member discussed the related
matters of the project.
SOCIAL IMPACT ASSESMENT
The study identified the following key social issues
for investigation:
 Loss of private property and other assets (land,
houses and trees) and compensation modalities
for these losses.
 Population displacement.
 Construction employment opportunities.
 Potentiality for social development.
 EQUIPMENT USED FOR
SURVEYING
 Total station
 GPS device
 Staff
 Compass
 Measuring tape
 Hammer
 Communicating Device
DESIGN
Road Classification
 As per the NRS 2045, the road project falls on the
category of District Roads.
 A Design speed of 30 km/hr is taken for the
design of geometric parameters of the road.
Design Speed
 The Design values are taken as recommended
by NRS 2045 as far as practicable
 The shoulder width is taken as 1 m considering
the site condition and the utility of the road
 Minimum Gradient recommended by NRS (1%
for better drainage) cannot be incorporated
considering the site condition
Horizontal Alignment
 The most suitable horizontal alignment was
selected considering the following factors:
 Short (S)
 Easy (E)
 Safe (S)
 Economical (E)
 Minimum radius for the horizontal curve as
recommended by NRS is 12 m. The minimum
radius of 12m is provided at the intersection of
existing road and proposed road.
 The extrawidening and transition curves are not
provided owing to low design speed and simplicity
in construction
 A maximum of 5 % super elevation is provided at
each horizontal curve.
 Superelevation is provided by rotation of
pavement about the center line.
 Transition length for super elevation is provided
as 5 m
 Summit curves are designed considering stopping
sight distance.
 Valley curves are designed on the basis of night
visibility
 The radius of vertical curve is adopted as large as
possible so that all the factors are satisfied
 The least vertical radius taken in design is 1000 m
Cross Section Design
 Cross section is designed providing camber of 4%
on carriageway and 5 % on shoulder
 For embankment the side slope of 1.5H: 1V and
for cut the side slope of 1H: 1V is adopted
 Total pavement thickness of 28 cm is adopted as
per CBR method of design
 Gravel is used as the sub-base course
 Otta Seal is used as the surface course
Drainage
 Longitudinal drain is provided on the cut slope side of
the road
 The side slope is 1:1 and longitudinal slope is parallel to
the alignment
 Earthen drain is provided from chainage 0+000 to the
chainage of 1+251.35
 Stoned masonry drain of thickness 20 cm is provided
from the chainage of 1+309.82 to chainage 2+027.24
 Pipe culverts of 60 cm in diameter and total length
of 7.5m are provided at 12 sections of the road
 They are provided at the lowest point of the
vertical alignment
 A minimum depth of 60 cm is provided between
the surface of the pavement and the crown of the
pipe
Plan and Profile
 Ch. 0+000-0+200
 Ch. 0+200-0+480
 Ch. 0+480-0+760
 Ch. 0+760-1+040
 Ch. 1+040-1+360
 Ch. 1+360-1+700
 Ch. 1+700-2+027.24
Cross Section
 Ch. 0+000-0+271.50
 Ch. 0+280-0+500
 Ch. 0+511.92-0+680
 Ch. 0+683.87-0+760
 Ch. 0+780-0+920
 Ch. 0+936.71-1+125.89
 Ch. 1+130.75-1+213.66
 Ch.1+220-1+319.59
 Ch.1+320-1+380
 Ch.1+397.04-1+465.09
 Ch.1+480-1+545.77
 Ch.1+560-1+800
 Ch.1+800.91-1+980
 Ch.1+984.58-2+027.24
Typical Pavement
Cross Drainage Structure
ESTIMATE
Quantity Estimate
Calculation of Earthwork
Necessary Calculations
Rate Analysis
BoQ /Cost Estimate
QUANTITY ESTIMATE
 Earthwork Calculations:
 Calculated at each cross-section
 Separate calculation according to soil type
 Total cut volume = 10283.57 m3
 Total fill volume = 16052.44 m3
 Balance (fill) = 5768.869 m3
 Earthwork for drain = 768.129 m3
All the detailed calculation is shown in the tabular
form in the following slides:
Contd………
 Necessary calculations:
i. For side drain:
Calculations were made taking the following design
considerations:
 Section = trapezoidal
 Depth: 0.3m
 Base width: 0.3m
 Side slope: 1:1
 Unlined earthen canal(Ch. 0+000 to 1251.35)
 Lined canal: (ch.1+309.82 to Ch. 2+027.24)
ii. Sub-grade calculations:
RATE ANALYSIS
 Rate analysis was performed under the
following criteria:
 The quantity of the materials, required labor
force and plants, machinery, tools and
equipments were taken from the work norms
provided by the DoR.
 The rate for the materials, labors, plants and
machinery, tools and equipments was taken
from the district rates provided by the Lalitpur
DDC.
COST ESTIMATE
 The BoQ was prepared on the basis of the
quantity of work calculated and rate analysis
done previously:
 The cost estimate is as below:

design.pptx

  • 1.
    INTRODUCTION A. Background  Atpresent , there is no road that directly links Badikhel - Bandegaun.  People are compelled to take the long alternative routes to travel from one village to another.
  • 2.
    C. Scope  Toreview the existing study reports, standards and specifications.  Detailed engineering survey of alignment.  Preparation of topographical map.  Study for cross-drainage works and propose suitable drainage structure.
  • 3.
     Preparation ofworking drawings.  Preparation of quantity and cost estimate.  Preparation of survey and design report
  • 4.
    D. Project location The proposed road is located in the Lalitpur District, Bagmati Zone, Central Region. The road starts from Badikhel and ends at Badegaun.  The road runs along Karmanasha River corridor.  The latitude and the longitude of the starting point are 27057’07’’ and 85035’27’’ respectively.
  • 5.
    F. Hydrology AndMeteorology  Small temporary streams running only during monsoon crosses the alignment with small discharge.  The project area experiences marked seasonal and specific climate variation with moderately hot summer and relatively cool winters. Average temperature is 25oC in summer and 10oC in winter.  Almost 80% of the rainfall occurs during monsoon which starts at the middle of the June and continues until the end of August.
  • 6.
    METHODOLOGY DESK STUDY SOCIAL IMPACTASSESMENT FIELD WORK EQUIPMENT USED FOR SURVEYING OFFICE WORK
  • 7.
    DESK STUDY  Thegeographical and the topographical maps were studied and the relevant information regarding the alignment selection, cross drainage structures, gradient of the road were discussed.  The strategy for the field study was made accordingly.  The study team member discussed the related matters of the project.
  • 8.
    SOCIAL IMPACT ASSESMENT Thestudy identified the following key social issues for investigation:  Loss of private property and other assets (land, houses and trees) and compensation modalities for these losses.  Population displacement.
  • 9.
     Construction employmentopportunities.  Potentiality for social development.
  • 10.
     EQUIPMENT USEDFOR SURVEYING  Total station  GPS device  Staff  Compass  Measuring tape  Hammer  Communicating Device
  • 11.
  • 12.
    Road Classification  Asper the NRS 2045, the road project falls on the category of District Roads.
  • 13.
     A Designspeed of 30 km/hr is taken for the design of geometric parameters of the road. Design Speed
  • 14.
     The Designvalues are taken as recommended by NRS 2045 as far as practicable  The shoulder width is taken as 1 m considering the site condition and the utility of the road  Minimum Gradient recommended by NRS (1% for better drainage) cannot be incorporated considering the site condition
  • 15.
    Horizontal Alignment  Themost suitable horizontal alignment was selected considering the following factors:  Short (S)  Easy (E)  Safe (S)  Economical (E)  Minimum radius for the horizontal curve as recommended by NRS is 12 m. The minimum radius of 12m is provided at the intersection of existing road and proposed road.
  • 16.
     The extrawideningand transition curves are not provided owing to low design speed and simplicity in construction  A maximum of 5 % super elevation is provided at each horizontal curve.  Superelevation is provided by rotation of pavement about the center line.  Transition length for super elevation is provided as 5 m
  • 17.
     Summit curvesare designed considering stopping sight distance.  Valley curves are designed on the basis of night visibility  The radius of vertical curve is adopted as large as possible so that all the factors are satisfied  The least vertical radius taken in design is 1000 m
  • 18.
    Cross Section Design Cross section is designed providing camber of 4% on carriageway and 5 % on shoulder  For embankment the side slope of 1.5H: 1V and for cut the side slope of 1H: 1V is adopted  Total pavement thickness of 28 cm is adopted as per CBR method of design
  • 19.
     Gravel isused as the sub-base course  Otta Seal is used as the surface course
  • 20.
    Drainage  Longitudinal drainis provided on the cut slope side of the road  The side slope is 1:1 and longitudinal slope is parallel to the alignment  Earthen drain is provided from chainage 0+000 to the chainage of 1+251.35  Stoned masonry drain of thickness 20 cm is provided from the chainage of 1+309.82 to chainage 2+027.24
  • 21.
     Pipe culvertsof 60 cm in diameter and total length of 7.5m are provided at 12 sections of the road  They are provided at the lowest point of the vertical alignment  A minimum depth of 60 cm is provided between the surface of the pavement and the crown of the pipe
  • 22.
    Plan and Profile Ch. 0+000-0+200  Ch. 0+200-0+480  Ch. 0+480-0+760  Ch. 0+760-1+040  Ch. 1+040-1+360  Ch. 1+360-1+700  Ch. 1+700-2+027.24
  • 23.
    Cross Section  Ch.0+000-0+271.50  Ch. 0+280-0+500  Ch. 0+511.92-0+680  Ch. 0+683.87-0+760  Ch. 0+780-0+920  Ch. 0+936.71-1+125.89  Ch. 1+130.75-1+213.66  Ch.1+220-1+319.59  Ch.1+320-1+380  Ch.1+397.04-1+465.09  Ch.1+480-1+545.77  Ch.1+560-1+800  Ch.1+800.91-1+980  Ch.1+984.58-2+027.24
  • 24.
  • 25.
    ESTIMATE Quantity Estimate Calculation ofEarthwork Necessary Calculations Rate Analysis BoQ /Cost Estimate
  • 26.
    QUANTITY ESTIMATE  EarthworkCalculations:  Calculated at each cross-section  Separate calculation according to soil type  Total cut volume = 10283.57 m3  Total fill volume = 16052.44 m3  Balance (fill) = 5768.869 m3  Earthwork for drain = 768.129 m3 All the detailed calculation is shown in the tabular form in the following slides:
  • 27.
    Contd………  Necessary calculations: i.For side drain: Calculations were made taking the following design considerations:  Section = trapezoidal  Depth: 0.3m  Base width: 0.3m  Side slope: 1:1  Unlined earthen canal(Ch. 0+000 to 1251.35)  Lined canal: (ch.1+309.82 to Ch. 2+027.24) ii. Sub-grade calculations:
  • 28.
    RATE ANALYSIS  Rateanalysis was performed under the following criteria:  The quantity of the materials, required labor force and plants, machinery, tools and equipments were taken from the work norms provided by the DoR.  The rate for the materials, labors, plants and machinery, tools and equipments was taken from the district rates provided by the Lalitpur DDC.
  • 29.
    COST ESTIMATE  TheBoQ was prepared on the basis of the quantity of work calculated and rate analysis done previously:  The cost estimate is as below: