1864 Sociedad Minero-Metallurgica Cantabro-Filipino de Mankayan
Septmeber 21, 1936 V. Lednicky & M. Arick copper plant 400 tpd to 1K tpd
(1939-1945 WW2) Mitsui Company 3 yrs
1947 4,500 tpd
1960’s Carlos Palanca Jr. Tubo Shaft, Roasting Plant
1980 FSE gold-rich porphyry copper deposit was discovered
1988 TSF 5-A, Nayak Shaft, Nayak Twin Decline, done pre-feasibility study FSE
September 1995 Victoria & Teresa gold ore deposit was discovered.
1996 cease production enargite: 743K t Cu, 92 t Au, 390 t Ag
November 1996-March 15, 1997 CIL, 10 mo’s 106K oz Au, 71K oz Ag
September 2012 FSGRI inferred mineral resource 19.8M oz Au, 9.921B lbs Cu
October 2015 Discovery of New Porphyry Copper-Gold Mineralization
May 12, 2016 EMS = ISO 14001:2004
June 2019 ISO 14001:2015
VISION & MISSION
To be a global Filipino mining company by attaining world-class capabilities and
becoming a corporate model in the fulfilment of social responsibilities.
We shall turn this vision into reality through the efforts of highly motivated, committed,
and competent employees who:
● continually explore and develop ore reserves
● optimize metal production through cost-efficient operations
● maintain outstanding safety records and ensure responsible env’l stewardship
● foster mutually beneficial partnership with host communities
● exhibit initiative and decisiveness
We in Lepanto are determined to enhance shareholders' investment through the
pursuit of excellence.
CORE VALUES
● Accountability
● Commitment
● Innovation
● Ownership
● Social responsibility
● Operational excellence
LOCATION
N
E
TOPOGRAPHY
Areas that are within the Enargite-QPG and
Teresa/Victoria orebody are the Barangay of
Poblacion, Sapid, Bulalacao, Palasaan and
portion of Tabio. Milling complex is in Sapid.
Mine camp, houses and offices are in Paco
Area. Tailings dam is in the northwest
surrounding barangay Paco, Cabitin and
Colalo.
Topography of barangay within the mining
area are relatively smooth with elevation from
1300 to 1500 masl. Required mining limit
shall be maintained in accordance to the
existing mining laws.
ORE RESERVE OF JAN 1, 2019
MINERAL RESOURCE AS OF JAN 1, 2019
Mine Access
Mine Ventilation
Ventilation Survey
Sling psychrometer is an instrument that
measures the relative humidity and dew point
in an area. A sling psychrometer has two
thermometers: a wet bulb and a dry bulb. The
wet bulb has a cotton wick over the bulb of the
thermometer, which is moistened with room
temperature water.
Vane anemometers are used for measuring
the velocity and volumetric flow rate, airspeed,
volume flow and temperature. Possible in
combination with a measuring cone. The
speed of the rotating vane of the anemometer
is converted into electric power, which is
transferred into air speed.
Prior to the calculation of the system
curve for each fan installation, an
inventory of all ventilation fans was done.
Included in the inventory are the fans’
size, motor rating, blade setting and its
fan curve and location. Considering which
fans are installed in bulkhead and with
ventilation tube.
A survey of the ventilation fans’ location,
the ventilation ductings connected to the
fans and a PQ survey was also done.
The resistance (R) for each fan shall then
be computed.
System Curve Calculation
Fan Installations
Atkinson Resistance
characterise the resistance to airflow of a duct
of irregular size and shape
& Square Law
pressure is proportional to quantity squared
Airflow Velocity Requirements
1. Air velocity in drives in which personnel travels should not
exceed 6 m/s.
2. Air velocity in a shaft in which personnel travels should not
exceed 10 m/s.
3. If the wet bulb temperature exceeds 25°C, an air velocity of not
less than 0.5 m/s must be provided.
4. A minimum air velocity of 0.25 m/s must be maintained in all
underground areas where vehicles or locomotives powered by
electricity are used.
5. A minimum air quantity of 0.05 m³/s per HP rated diesel power,
must be maintained in all underground areas where vehicles or
locomotives powered by diesel are used.
6. The optimum/ideal velocity for upcast raises excavated by
blasting is about 6 m/s.
7. The optimum/ideal velocity for upcast raises excavated by
raise bore machine is about 14.5 m/s.
Air Velocity Limits
Recommended Velocities
The airflow in any workplace
where a diesel unit operates
must not be less than 3.35
m³/s.
Typical airflow requirement
for diesel equipment in a
mine is 0.05 m³/s per kW.
BASIS OF REQUIRED AIRFLOW QUANTITY IN
VENTILATION PLANNING
• 75 CFM OR 0.04 CMS PER PERSON
• 100 CFM OR 0.05 CMS PER KW-DIESEL
• 0.40 ~0.50 CMS PER 1,000 TONS MINED PER YEAR
Secondary ventilation refers to the
provision of ventilation to
development ends, stopes and
services facilities, which constitute
secondary circuits tapped off the
primary circuit or main through flow of
air.
An unbalanced primary and
secondary combination can cause
re-circulation, which is inefficient and
potentially hazardous. These
inefficiencies extend into operational
and other considerations, such as
power.
Considerations in Secondary Ventilation
• As a general rule of thumb air quantity decreases
approximately 10% per 100 meters of
ventilation tubings.
• Ventilation tubings must be installed as straight as
possible.
• Sharp bends of ventilation bags must be avoided.
• Constrictions of any kind must be avoided.
• Leaks and tears must be repaired immediately.
• The correct size of ventilation tubings must be
installed.
• Distance of the last ventilation bag to the working face
must not be less than 15 meters.
• Distance of overlap fans (push and pull) must not be
less than 1.0 meter and pull fan
(exhaust fan) should be 25 meters or more from the
working face.
Ventilation Controls
The control of air
distribution should be
maintained by the use of
doors,stoppings, bulkheads
and regulators. These
should be constructed as
airtight as possible except
where controlled leakage is
desirable.
LeHfun2
STARTER PACK

More Related Content

What's hot

Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
Surya Kant
 
Xlpe insulated cables
Xlpe insulated cablesXlpe insulated cables
Xlpe insulated cables
Piranuj Vithyakomol
 
Api 5 l 44 ed psl 1 & psl 2
Api 5 l 44 ed psl 1 & psl 2Api 5 l 44 ed psl 1 & psl 2
Api 5 l 44 ed psl 1 & psl 2
Henry Hutabarat
 
3
33
TMT bars and its Grades
TMT bars and its GradesTMT bars and its Grades
TMT bars and its Grades
Aman Singh
 
ERSHAD ROUSTABOUT & FLOORMAN
ERSHAD ROUSTABOUT & FLOORMANERSHAD ROUSTABOUT & FLOORMAN
ERSHAD ROUSTABOUT & FLOORMAN
MOHAMMED ERSHAD KHAN
 
I Beam Standard Specifications _Details
I Beam Standard Specifications _DetailsI Beam Standard Specifications _Details
I Beam Standard Specifications _Details
Al-Amin PB
 
Ceramics
CeramicsCeramics
Ceramics
kirbylight
 
Material data sheet piping
Material data sheet pipingMaterial data sheet piping
Material data sheet piping
Mohamad Haris Ahsun
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
Rami Al-Majzoub
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
Mohammad Mahrous
 
Saudi Aramco Engineering Procedures (SAEP) 5
Saudi Aramco Engineering Procedures (SAEP) 5Saudi Aramco Engineering Procedures (SAEP) 5
Saudi Aramco Engineering Procedures (SAEP) 5
ROBERTO BATAHOY GAMALE JR
 
Refractory Materials
Refractory MaterialsRefractory Materials
Refractory Materials
Rahul Mitra
 
Tes p-122.08-r0
Tes p-122.08-r0Tes p-122.08-r0
Tes p-122.08-r0
Ibrahim Ali
 
Aerial cables
Aerial cablesAerial cables
Aerial cables
Sandeep Bhowmick
 
Asme b31.3 interpretation
Asme b31.3 interpretationAsme b31.3 interpretation
Asme b31.3 interpretation
Kathia Espinoza Rojas
 
Welding Procces
Welding ProccesWelding Procces
Welding Procces
Alen Pepa
 
17 4 ph stainless steel
17 4 ph stainless steel17 4 ph stainless steel
17 4 ph stainless steel
RaviTeja JB
 
The Importance of Welding Electrode Flux Coating
The Importance of Welding Electrode Flux CoatingThe Importance of Welding Electrode Flux Coating
The Importance of Welding Electrode Flux Coating
Annamalai Ram
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design training
Sam Jose
 

What's hot (20)

Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Xlpe insulated cables
Xlpe insulated cablesXlpe insulated cables
Xlpe insulated cables
 
Api 5 l 44 ed psl 1 & psl 2
Api 5 l 44 ed psl 1 & psl 2Api 5 l 44 ed psl 1 & psl 2
Api 5 l 44 ed psl 1 & psl 2
 
3
33
3
 
TMT bars and its Grades
TMT bars and its GradesTMT bars and its Grades
TMT bars and its Grades
 
ERSHAD ROUSTABOUT & FLOORMAN
ERSHAD ROUSTABOUT & FLOORMANERSHAD ROUSTABOUT & FLOORMAN
ERSHAD ROUSTABOUT & FLOORMAN
 
I Beam Standard Specifications _Details
I Beam Standard Specifications _DetailsI Beam Standard Specifications _Details
I Beam Standard Specifications _Details
 
Ceramics
CeramicsCeramics
Ceramics
 
Material data sheet piping
Material data sheet pipingMaterial data sheet piping
Material data sheet piping
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
Saudi Aramco Engineering Procedures (SAEP) 5
Saudi Aramco Engineering Procedures (SAEP) 5Saudi Aramco Engineering Procedures (SAEP) 5
Saudi Aramco Engineering Procedures (SAEP) 5
 
Refractory Materials
Refractory MaterialsRefractory Materials
Refractory Materials
 
Tes p-122.08-r0
Tes p-122.08-r0Tes p-122.08-r0
Tes p-122.08-r0
 
Aerial cables
Aerial cablesAerial cables
Aerial cables
 
Asme b31.3 interpretation
Asme b31.3 interpretationAsme b31.3 interpretation
Asme b31.3 interpretation
 
Welding Procces
Welding ProccesWelding Procces
Welding Procces
 
17 4 ph stainless steel
17 4 ph stainless steel17 4 ph stainless steel
17 4 ph stainless steel
 
The Importance of Welding Electrode Flux Coating
The Importance of Welding Electrode Flux CoatingThe Importance of Welding Electrode Flux Coating
The Importance of Welding Electrode Flux Coating
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design training
 

Similar to Lepanto Consolidated Mining Company Introduction

Basic understanding of thermal power generation
Basic understanding of thermal power generationBasic understanding of thermal power generation
Basic understanding of thermal power generation
Sourav Jana
 
Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishan
BHANUKISHAN1
 
Aircooling underground coal mine
 Aircooling underground coal mine Aircooling underground coal mine
Aircooling underground coal mine
Ulimella Siva Sankar
 
Tata steel
Tata steelTata steel
Tata steel
Home
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
Uday Wankar
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
haxxo24
 
1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling
Nani Thirupathi
 
powerplant Engg Unit 1
powerplant Engg Unit 1powerplant Engg Unit 1
powerplant Engg Unit 1
sureshkcet
 
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
PALANIVEL SUBBIAH
 
Marine Boilers and steam engineering .pptx
Marine Boilers and steam engineering .pptxMarine Boilers and steam engineering .pptx
Marine Boilers and steam engineering .pptx
devmarineacademy
 
Irjet v3 i12235
Irjet v3 i12235Irjet v3 i12235
Irjet v3 i12235
btlitm99
 
Wajahat ppt on ac shop
Wajahat ppt on ac shopWajahat ppt on ac shop
Wajahat ppt on ac shop
WajahatHussain68
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
applesam8
 
SIP Presentation
SIP PresentationSIP Presentation
SIP Presentation
Amay Jain
 
Heat Load Calculations and Duct Design for Commercial Building G 2
Heat Load Calculations and Duct Design for Commercial Building G 2Heat Load Calculations and Duct Design for Commercial Building G 2
Heat Load Calculations and Duct Design for Commercial Building G 2
ijtsrd
 
Industrial training
Industrial trainingIndustrial training
Industrial training
Debanksh Mohanty
 
Ocean Thermal Energy Conversion
Ocean Thermal Energy ConversionOcean Thermal Energy Conversion
Ocean Thermal Energy Conversion
ijtsrd
 
Sunil- Thermal Power Plant
Sunil- Thermal Power PlantSunil- Thermal Power Plant
Sunil- Thermal Power Plant
Sunil8889
 
Improvement of ventilation system in a mining site
Improvement of ventilation system in a mining siteImprovement of ventilation system in a mining site
Improvement of ventilation system in a mining site
saadamatola
 
THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING
AFAQAHMED JAMADAR
 

Similar to Lepanto Consolidated Mining Company Introduction (20)

Basic understanding of thermal power generation
Basic understanding of thermal power generationBasic understanding of thermal power generation
Basic understanding of thermal power generation
 
Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishan
 
Aircooling underground coal mine
 Aircooling underground coal mine Aircooling underground coal mine
Aircooling underground coal mine
 
Tata steel
Tata steelTata steel
Tata steel
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
 
1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling
 
powerplant Engg Unit 1
powerplant Engg Unit 1powerplant Engg Unit 1
powerplant Engg Unit 1
 
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
 
Marine Boilers and steam engineering .pptx
Marine Boilers and steam engineering .pptxMarine Boilers and steam engineering .pptx
Marine Boilers and steam engineering .pptx
 
Irjet v3 i12235
Irjet v3 i12235Irjet v3 i12235
Irjet v3 i12235
 
Wajahat ppt on ac shop
Wajahat ppt on ac shopWajahat ppt on ac shop
Wajahat ppt on ac shop
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
SIP Presentation
SIP PresentationSIP Presentation
SIP Presentation
 
Heat Load Calculations and Duct Design for Commercial Building G 2
Heat Load Calculations and Duct Design for Commercial Building G 2Heat Load Calculations and Duct Design for Commercial Building G 2
Heat Load Calculations and Duct Design for Commercial Building G 2
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
Ocean Thermal Energy Conversion
Ocean Thermal Energy ConversionOcean Thermal Energy Conversion
Ocean Thermal Energy Conversion
 
Sunil- Thermal Power Plant
Sunil- Thermal Power PlantSunil- Thermal Power Plant
Sunil- Thermal Power Plant
 
Improvement of ventilation system in a mining site
Improvement of ventilation system in a mining siteImprovement of ventilation system in a mining site
Improvement of ventilation system in a mining site
 
THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING
 

More from Charles Jojo Besitan

Transportation and service equipment
Transportation and service equipmentTransportation and service equipment
Transportation and service equipment
Charles Jojo Besitan
 
Coal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and MachinesCoal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and Machines
Charles Jojo Besitan
 
General shop design & construction
General shop design & constructionGeneral shop design & construction
General shop design & construction
Charles Jojo Besitan
 
Maintenance facilities for surface mine operations
Maintenance facilities for surface mine operationsMaintenance facilities for surface mine operations
Maintenance facilities for surface mine operations
Charles Jojo Besitan
 
General Maintenance Surface Mining
General Maintenance Surface MiningGeneral Maintenance Surface Mining
General Maintenance Surface Mining
Charles Jojo Besitan
 
Extraction and Recovery of Gold Using Pyrometallurgy
Extraction and Recovery of Gold Using PyrometallurgyExtraction and Recovery of Gold Using Pyrometallurgy
Extraction and Recovery of Gold Using Pyrometallurgy
Charles Jojo Besitan
 
Air Blast Mine Safety
Air Blast Mine SafetyAir Blast Mine Safety
Air Blast Mine Safety
Charles Jojo Besitan
 
Rock mass plasticity
Rock mass plasticityRock mass plasticity
Rock mass plasticity
Charles Jojo Besitan
 
Fire assaying
Fire assayingFire assaying
Fire assaying
Charles Jojo Besitan
 
APPLICATIONS OF MAGNETIC SEPARATOR ON CALCINING LIMESTONE PRODUCTION
APPLICATIONS  OF MAGNETIC SEPARATOR  ON CALCINING  LIMESTONE PRODUCTIONAPPLICATIONS  OF MAGNETIC SEPARATOR  ON CALCINING  LIMESTONE PRODUCTION
APPLICATIONS OF MAGNETIC SEPARATOR ON CALCINING LIMESTONE PRODUCTION
Charles Jojo Besitan
 
Magnetic Separator
Magnetic SeparatorMagnetic Separator
Magnetic Separator
Charles Jojo Besitan
 
DAO 2000-98 Section 47
DAO 2000-98 Section 47DAO 2000-98 Section 47
DAO 2000-98 Section 47
Charles Jojo Besitan
 
DAO 2000-98 Section 46
DAO 2000-98 Section 46DAO 2000-98 Section 46
DAO 2000-98 Section 46
Charles Jojo Besitan
 
DAO 2000-98 Section 45
DAO 2000-98 Section 45DAO 2000-98 Section 45
DAO 2000-98 Section 45
Charles Jojo Besitan
 
Automotive Repair Facilities for Surface Mining
Automotive Repair Facilities for Surface MiningAutomotive Repair Facilities for Surface Mining
Automotive Repair Facilities for Surface Mining
Charles Jojo Besitan
 
The Occurrence of Sedimentary Rock Part 2
The Occurrence of Sedimentary Rock Part 2The Occurrence of Sedimentary Rock Part 2
The Occurrence of Sedimentary Rock Part 2
Charles Jojo Besitan
 
The Occurrence of Sedimentary Rock
The Occurrence of Sedimentary RockThe Occurrence of Sedimentary Rock
The Occurrence of Sedimentary Rock
Charles Jojo Besitan
 
Square set stoping
Square set stopingSquare set stoping
Square set stoping
Charles Jojo Besitan
 
Behavioral Views of Management
Behavioral Views  of ManagementBehavioral Views  of Management
Behavioral Views of Management
Charles Jojo Besitan
 
Economic Role of Small Scale Mining
Economic Role of Small Scale MiningEconomic Role of Small Scale Mining
Economic Role of Small Scale Mining
Charles Jojo Besitan
 

More from Charles Jojo Besitan (20)

Transportation and service equipment
Transportation and service equipmentTransportation and service equipment
Transportation and service equipment
 
Coal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and MachinesCoal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and Machines
 
General shop design & construction
General shop design & constructionGeneral shop design & construction
General shop design & construction
 
Maintenance facilities for surface mine operations
Maintenance facilities for surface mine operationsMaintenance facilities for surface mine operations
Maintenance facilities for surface mine operations
 
General Maintenance Surface Mining
General Maintenance Surface MiningGeneral Maintenance Surface Mining
General Maintenance Surface Mining
 
Extraction and Recovery of Gold Using Pyrometallurgy
Extraction and Recovery of Gold Using PyrometallurgyExtraction and Recovery of Gold Using Pyrometallurgy
Extraction and Recovery of Gold Using Pyrometallurgy
 
Air Blast Mine Safety
Air Blast Mine SafetyAir Blast Mine Safety
Air Blast Mine Safety
 
Rock mass plasticity
Rock mass plasticityRock mass plasticity
Rock mass plasticity
 
Fire assaying
Fire assayingFire assaying
Fire assaying
 
APPLICATIONS OF MAGNETIC SEPARATOR ON CALCINING LIMESTONE PRODUCTION
APPLICATIONS  OF MAGNETIC SEPARATOR  ON CALCINING  LIMESTONE PRODUCTIONAPPLICATIONS  OF MAGNETIC SEPARATOR  ON CALCINING  LIMESTONE PRODUCTION
APPLICATIONS OF MAGNETIC SEPARATOR ON CALCINING LIMESTONE PRODUCTION
 
Magnetic Separator
Magnetic SeparatorMagnetic Separator
Magnetic Separator
 
DAO 2000-98 Section 47
DAO 2000-98 Section 47DAO 2000-98 Section 47
DAO 2000-98 Section 47
 
DAO 2000-98 Section 46
DAO 2000-98 Section 46DAO 2000-98 Section 46
DAO 2000-98 Section 46
 
DAO 2000-98 Section 45
DAO 2000-98 Section 45DAO 2000-98 Section 45
DAO 2000-98 Section 45
 
Automotive Repair Facilities for Surface Mining
Automotive Repair Facilities for Surface MiningAutomotive Repair Facilities for Surface Mining
Automotive Repair Facilities for Surface Mining
 
The Occurrence of Sedimentary Rock Part 2
The Occurrence of Sedimentary Rock Part 2The Occurrence of Sedimentary Rock Part 2
The Occurrence of Sedimentary Rock Part 2
 
The Occurrence of Sedimentary Rock
The Occurrence of Sedimentary RockThe Occurrence of Sedimentary Rock
The Occurrence of Sedimentary Rock
 
Square set stoping
Square set stopingSquare set stoping
Square set stoping
 
Behavioral Views of Management
Behavioral Views  of ManagementBehavioral Views  of Management
Behavioral Views of Management
 
Economic Role of Small Scale Mining
Economic Role of Small Scale MiningEconomic Role of Small Scale Mining
Economic Role of Small Scale Mining
 

Recently uploaded

Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
sayalidalavi006
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 

Recently uploaded (20)

Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 

Lepanto Consolidated Mining Company Introduction

  • 2. HISTORY 1864 Sociedad Minero-Metallurgica Cantabro-Filipino de Mankayan Septmeber 21, 1936 V. Lednicky & M. Arick copper plant 400 tpd to 1K tpd (1939-1945 WW2) Mitsui Company 3 yrs 1947 4,500 tpd 1960’s Carlos Palanca Jr. Tubo Shaft, Roasting Plant 1980 FSE gold-rich porphyry copper deposit was discovered 1988 TSF 5-A, Nayak Shaft, Nayak Twin Decline, done pre-feasibility study FSE September 1995 Victoria & Teresa gold ore deposit was discovered. 1996 cease production enargite: 743K t Cu, 92 t Au, 390 t Ag November 1996-March 15, 1997 CIL, 10 mo’s 106K oz Au, 71K oz Ag September 2012 FSGRI inferred mineral resource 19.8M oz Au, 9.921B lbs Cu October 2015 Discovery of New Porphyry Copper-Gold Mineralization May 12, 2016 EMS = ISO 14001:2004 June 2019 ISO 14001:2015
  • 3.
  • 4. VISION & MISSION To be a global Filipino mining company by attaining world-class capabilities and becoming a corporate model in the fulfilment of social responsibilities. We shall turn this vision into reality through the efforts of highly motivated, committed, and competent employees who: ● continually explore and develop ore reserves ● optimize metal production through cost-efficient operations ● maintain outstanding safety records and ensure responsible env’l stewardship ● foster mutually beneficial partnership with host communities ● exhibit initiative and decisiveness We in Lepanto are determined to enhance shareholders' investment through the pursuit of excellence.
  • 5. CORE VALUES ● Accountability ● Commitment ● Innovation ● Ownership ● Social responsibility ● Operational excellence
  • 7. TOPOGRAPHY Areas that are within the Enargite-QPG and Teresa/Victoria orebody are the Barangay of Poblacion, Sapid, Bulalacao, Palasaan and portion of Tabio. Milling complex is in Sapid. Mine camp, houses and offices are in Paco Area. Tailings dam is in the northwest surrounding barangay Paco, Cabitin and Colalo. Topography of barangay within the mining area are relatively smooth with elevation from 1300 to 1500 masl. Required mining limit shall be maintained in accordance to the existing mining laws.
  • 8. ORE RESERVE OF JAN 1, 2019 MINERAL RESOURCE AS OF JAN 1, 2019
  • 10.
  • 12. Ventilation Survey Sling psychrometer is an instrument that measures the relative humidity and dew point in an area. A sling psychrometer has two thermometers: a wet bulb and a dry bulb. The wet bulb has a cotton wick over the bulb of the thermometer, which is moistened with room temperature water. Vane anemometers are used for measuring the velocity and volumetric flow rate, airspeed, volume flow and temperature. Possible in combination with a measuring cone. The speed of the rotating vane of the anemometer is converted into electric power, which is transferred into air speed.
  • 13. Prior to the calculation of the system curve for each fan installation, an inventory of all ventilation fans was done. Included in the inventory are the fans’ size, motor rating, blade setting and its fan curve and location. Considering which fans are installed in bulkhead and with ventilation tube. A survey of the ventilation fans’ location, the ventilation ductings connected to the fans and a PQ survey was also done. The resistance (R) for each fan shall then be computed. System Curve Calculation Fan Installations
  • 14. Atkinson Resistance characterise the resistance to airflow of a duct of irregular size and shape & Square Law pressure is proportional to quantity squared
  • 15. Airflow Velocity Requirements 1. Air velocity in drives in which personnel travels should not exceed 6 m/s. 2. Air velocity in a shaft in which personnel travels should not exceed 10 m/s. 3. If the wet bulb temperature exceeds 25°C, an air velocity of not less than 0.5 m/s must be provided. 4. A minimum air velocity of 0.25 m/s must be maintained in all underground areas where vehicles or locomotives powered by electricity are used. 5. A minimum air quantity of 0.05 m³/s per HP rated diesel power, must be maintained in all underground areas where vehicles or locomotives powered by diesel are used. 6. The optimum/ideal velocity for upcast raises excavated by blasting is about 6 m/s. 7. The optimum/ideal velocity for upcast raises excavated by raise bore machine is about 14.5 m/s. Air Velocity Limits Recommended Velocities
  • 16. The airflow in any workplace where a diesel unit operates must not be less than 3.35 m³/s. Typical airflow requirement for diesel equipment in a mine is 0.05 m³/s per kW. BASIS OF REQUIRED AIRFLOW QUANTITY IN VENTILATION PLANNING • 75 CFM OR 0.04 CMS PER PERSON • 100 CFM OR 0.05 CMS PER KW-DIESEL • 0.40 ~0.50 CMS PER 1,000 TONS MINED PER YEAR
  • 17. Secondary ventilation refers to the provision of ventilation to development ends, stopes and services facilities, which constitute secondary circuits tapped off the primary circuit or main through flow of air. An unbalanced primary and secondary combination can cause re-circulation, which is inefficient and potentially hazardous. These inefficiencies extend into operational and other considerations, such as power. Considerations in Secondary Ventilation • As a general rule of thumb air quantity decreases approximately 10% per 100 meters of ventilation tubings. • Ventilation tubings must be installed as straight as possible. • Sharp bends of ventilation bags must be avoided. • Constrictions of any kind must be avoided. • Leaks and tears must be repaired immediately. • The correct size of ventilation tubings must be installed. • Distance of the last ventilation bag to the working face must not be less than 15 meters. • Distance of overlap fans (push and pull) must not be less than 1.0 meter and pull fan (exhaust fan) should be 25 meters or more from the working face.
  • 18. Ventilation Controls The control of air distribution should be maintained by the use of doors,stoppings, bulkheads and regulators. These should be constructed as airtight as possible except where controlled leakage is desirable.