 A S M E
3
 The American Society of Mechanical
Engineers set up a committee in 1911 for the
purpose of formulating standard rules for the
construction of steam boilers & other
pressure vessels.
 This committee is now called the Boiler &
Pressure Vessel Committee.
4
XI.Rules for inservice
Inspection of nuclear power
Plant components
X. Fiber-Reinforced
Plastic PV
IX. Welding &
Brazing Qualf.
VIII. Rules for
Constn.
Of
Pressure vessels VII. Rec.
Guidelines
for the
Care of
Power
boilers
VI. Rec.
Rules for
Care & Opn.
Of heating
boilers
V. NDE
IV.Rules for cont.
of heating boilers
III.Nuclear plants
II. Materials
Part A:Ferrous
Part B:Non Ferrous
Part C:Welding electrodes
Part D: Properties
I. Rules for
Const. of
Power boilers
ASME
BOILER &
PRESSURE
VESSEL
CODE
5
ASME BOILER &
PRESSURE
VESSEL CODE
SECTION VIII
6
 WORLDWIDE,THERE ARE VARIOUS
PRESSURE VESSELS FABRICATION
CODES IN USE
 THE EARLIEST CODE USED WAS
BS 5500, WHICH IS A BRITISH CODE
AND IS STILL IN USE
 ASME CODE IS THE WIDELY
USED CODE TODAY
7
 THE ASME SECTION VIII IS USED FOR
THE CONSTRUCTION OF NEW UNFIRED
PRESSURE VESSELS.
 IT HAS THREE DIVISIONS:
 DIVISION 1(S8/1)
 DIVISION 2(S8/2)
 DIVISION 3(S8/3)
 SOME IMPORTANT POINTS FOR EACH
DIVISION ARE GIVEN IN THE
FOLLOWING SLIDES.
8
 DIVISION 1 : RULES FOR
CONSTRUCTION OF PRESSURE VESSELS
 DIVISION 2 : ALTERNATIVE RULES FOR
CONSTRUCTION OF PRESSURE VESSELS
 DIVISION 3 : ALTERNATIVE RULES FOR
CONTRUCTION OF HIGH PRESSURE
VESSELS
9
 S8/1 (DESIGN & TEST CRITERIA)
 Pressure = 3000 psi (MAX.)
 Temperature = No limitation
 Factor of safety = 3.5
 Hydro test = 1.3 x Design pressure
 Pneumatic test = 1.1 x Design pressure
 Operating cycles = 100 – 10 6
 Radiography = Spot TO 100%
 STATIC & MOBILE VESSELS
PERMITTED
Note the change,
Earlier 1.5
Note the change,
Earlier 1.25
10
 S8/2 (DESIGN & TEST CRITERIA)
 Pressure = No limitation
 Temperature = No limitation
 Factor of safety = 3
 Hydro test = 1.25 x Design pressure
 Pneumatic test = 1.15 x Design pressure
 Operating cycles = 100 – 10 6
 NDT = 100%
 Fatigue analysis required
 Proximity analysis of nozzles required
 ONLY STATIC.NO MOBILE VESSELS
PERMITTED
11
HOW TO USE THE CODE S8/1
 DIVISION 1 CONSISTS OF THREE
SUBSECTIONS
 SUBSECTION A
 SUBSECTION B
 SUBSECTION C
12
 SUBSECTION A:
GENERAL REQUIREMENTS
(PART-UG)
THIS SECTION COVERS THE SCOPE OF
THE CODE & GENERAL REQUIREMENTS
FOR ALL METHODS OF CONTRUCTION
& ALL MATERIALS
13
 SUBSECTION B:
REQUIREMENTS PERTAINING TO METHODS OF
FABRICATION OF PRESSURE VESSELS
THIS SUBSECTION CONSISTS OF THREE
PARTS:
 PART UW : WELDING
 PART UF : FORGING
 PART UB : BRAZING
14
 SUBSECTION C:
REQUIREMENTS PERTAINING TO
CLASSES OF MATERIALS
THIS SUBSECTION HAS 9 PARTS WHICH
ARE AS FOLLOWS:
15
 PART UCS : CARBON & LOW ALLOY STEELS
 PART UNF : NON FERROUS MATERIALS
 PART UHA : HIGH ALLOY STEEL
 PART UCI : CAST IRON
 PART UCL : CLADDING
 PART UCD : CAST DUCTILE IRON
 PART UHT : HEAT TREATMENT
 PART ULW : LAYERED CONSTRUCTION
 PART ULT : LOW TEMPERATURE
16
SECTION VIII (DIVISION I)
SUBSECTION A
SUBSECTION B SUBSECTION C
Part UG Part
UW
UF
UB
Part
UCS
UNF
UHA
UCI
UCL
UCD
UHT
ULW
ULT
17
 REMAINING PART OF THE CODE
CONTAINS:
 TABLES (For types & grades of CS,NF etc.)
 MANDATORY APPENDICES
 NONMANDATORY APPENDICES
18
 THERE ARE 31 MANDATORY APPENDICES IN ASME
SECTION VIII DIVISION 1
 APPENDICES CONCERNING/RELATED TO NDT ARE:
 APPENDIX 4 (RADIOGRAPHY EXAMINATION)
 APPENDIX 6 (MAGNETIC PARTICLE EXAMINATION)
 APPENDIX 8 (LIQUID PENETRANT EXAMINATION)
 APPENDIX 12 (ULTRASONIC EXAMINATION)
THESE APPENDICES ALSO GIVES THE ACCEPTANCE
CRITERIA
19
 CLAUSES IMPORTANT FOR
INSPECTION & TESTING IN PART-UG
OF SUBSECTION A
ARE:
 UG-93 : Inspection Of Materials
 UG-99 : Hydrostatic Test
 UG-100 : Pneumatic Test
 UG-102 : Test Gages
 UG-103 : NDT
20
 CLAUSES IMPORTANT FOR
INSPECTION & TESTING IN PART-UW
OF SUBSECTION B
ARE:
 UW-47 : Welding Procedure
 UW-48 : Welder & Welding Operator
Qualification
 UW-49 : Post Weld Heat Treatment
21
 Please Note The Pressure Vessel Code
Section-VIII Is Not Complete In Itself.
It Asks Us To Refer :
 Section – IX (Welding & Brazing Qualifications)
&
 Section – V (Non Destructive Examination)
THANK YOU
Facebook https://web.facebook.com/Alexinspectors/
website https://alex-inspectors.site123.me/
Linkedin https://www.linkedin.com/in/alex-inspectors
twitter https://twitter.com/AInspectors
YouTube https://www.youtube.com/channel/Alex inspectors
Email Alexinspectors@gmail.com
Alex Inspectors

More Related Content

What's hot

Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturingphysics101
 
ASME Section viii Div-1 Traing ppt..pdf
ASME Section viii Div-1  Traing ppt..pdfASME Section viii Div-1  Traing ppt..pdf
ASME Section viii Div-1 Traing ppt..pdfBaber6
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Gaurav Singh Rajput
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentationMohamed Gaafar
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixmayank0738
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overviewAshifuddinAli
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Varun Patel
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1Tiago Pereira
 
Summary of pressure vessel 1
Summary of pressure vessel 1Summary of pressure vessel 1
Summary of pressure vessel 1Mohamed Basyoni
 
Methods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksMethods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksRajSamy
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel designMASUKUMARA1
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2Jithu John
 
Hot Tapping Requirement
Hot Tapping RequirementHot Tapping Requirement
Hot Tapping Requirementwael el ariny
 

What's hot (20)

Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturing
 
ASME Section viii Div-1 Traing ppt..pdf
ASME Section viii Div-1  Traing ppt..pdfASME Section viii Div-1  Traing ppt..pdf
ASME Section viii Div-1 Traing ppt..pdf
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
 
Pressure vessel
Pressure vesselPressure vessel
Pressure vessel
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
 
Pressure vessel
Pressure vesselPressure vessel
Pressure vessel
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ix
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
Summary of pressure vessel 1
Summary of pressure vessel 1Summary of pressure vessel 1
Summary of pressure vessel 1
 
Methods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksMethods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 Tanks
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel design
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Piping Fundamentals .pdf
Piping Fundamentals .pdfPiping Fundamentals .pdf
Piping Fundamentals .pdf
 
Introduction to piping design
Introduction to piping designIntroduction to piping design
Introduction to piping design
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
 
Hot Tapping Requirement
Hot Tapping RequirementHot Tapping Requirement
Hot Tapping Requirement
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 

Similar to ASME BOILER & PRESSURE SECTION VIII.ppt

Inspeccion Tanque ASME.pdf
Inspeccion Tanque ASME.pdfInspeccion Tanque ASME.pdf
Inspeccion Tanque ASME.pdfHaugSA
 
A study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendmentsA study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendmentsricha diptisikha
 
Ethylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper chinaEthylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper chinaAbdelhakAbdouKermad
 
115kV Substation Design.ppt
115kV Substation Design.ppt115kV Substation Design.ppt
115kV Substation Design.pptsqhuet1
 
00121606 2110006-eme
00121606 2110006-eme00121606 2110006-eme
00121606 2110006-emeddkundaliya
 
Summer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionSummer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionStudent
 
Effect of Arresters on Erosion in Economizer Zone and its Analysis
Effect of Arresters on Erosion in Economizer Zone and its AnalysisEffect of Arresters on Erosion in Economizer Zone and its Analysis
Effect of Arresters on Erosion in Economizer Zone and its AnalysisIDES Editor
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEEAmit Kumar
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingAbhishek Srivastav
 
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Carlos Filho
 
Directional solidification in GDC dies through cooling and heating Design in ...
Directional solidification in GDC dies through cooling and heating Design in ...Directional solidification in GDC dies through cooling and heating Design in ...
Directional solidification in GDC dies through cooling and heating Design in ...AnirudhKumarprajapat
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 

Similar to ASME BOILER & PRESSURE SECTION VIII.ppt (20)

Inspeccion Tanque ASME.pdf
Inspeccion Tanque ASME.pdfInspeccion Tanque ASME.pdf
Inspeccion Tanque ASME.pdf
 
A study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendmentsA study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendments
 
M0401091096
M0401091096M0401091096
M0401091096
 
pipe-stress-analysis-work.ppt
pipe-stress-analysis-work.pptpipe-stress-analysis-work.ppt
pipe-stress-analysis-work.ppt
 
main
mainmain
main
 
Ethylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper chinaEthylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper china
 
115kV Substation Design.ppt
115kV Substation Design.ppt115kV Substation Design.ppt
115kV Substation Design.ppt
 
00121606 2110006-eme
00121606 2110006-eme00121606 2110006-eme
00121606 2110006-eme
 
Summer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionSummer traning on Power Transformer Construction
Summer traning on Power Transformer Construction
 
API_510_for_Exam.pdf
API_510_for_Exam.pdfAPI_510_for_Exam.pdf
API_510_for_Exam.pdf
 
Standards and protocols instrumentation ( typical)
Standards and protocols   instrumentation ( typical)Standards and protocols   instrumentation ( typical)
Standards and protocols instrumentation ( typical)
 
Effect of Arresters on Erosion in Economizer Zone and its Analysis
Effect of Arresters on Erosion in Economizer Zone and its AnalysisEffect of Arresters on Erosion in Economizer Zone and its Analysis
Effect of Arresters on Erosion in Economizer Zone and its Analysis
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEE
 
Laboratorio no 2 2021
Laboratorio no 2 2021Laboratorio no 2 2021
Laboratorio no 2 2021
 
Heat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and WorkingHeat Exchanger - Design, Construction and Working
Heat Exchanger - Design, Construction and Working
 
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
Basicsofheatexchanger shellandtube-150226051621-conversion-gate02
 
Directional solidification in GDC dies through cooling and heating Design in ...
Directional solidification in GDC dies through cooling and heating Design in ...Directional solidification in GDC dies through cooling and heating Design in ...
Directional solidification in GDC dies through cooling and heating Design in ...
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
Typical Instrument Standards
Typical Instrument StandardsTypical Instrument Standards
Typical Instrument Standards
 
S2011-6.pdf
S2011-6.pdfS2011-6.pdf
S2011-6.pdf
 

Recently uploaded

Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 

Recently uploaded (20)

Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 

ASME BOILER & PRESSURE SECTION VIII.ppt

  • 2. 2  A S M E
  • 3. 3  The American Society of Mechanical Engineers set up a committee in 1911 for the purpose of formulating standard rules for the construction of steam boilers & other pressure vessels.  This committee is now called the Boiler & Pressure Vessel Committee.
  • 4. 4 XI.Rules for inservice Inspection of nuclear power Plant components X. Fiber-Reinforced Plastic PV IX. Welding & Brazing Qualf. VIII. Rules for Constn. Of Pressure vessels VII. Rec. Guidelines for the Care of Power boilers VI. Rec. Rules for Care & Opn. Of heating boilers V. NDE IV.Rules for cont. of heating boilers III.Nuclear plants II. Materials Part A:Ferrous Part B:Non Ferrous Part C:Welding electrodes Part D: Properties I. Rules for Const. of Power boilers ASME BOILER & PRESSURE VESSEL CODE
  • 6. 6  WORLDWIDE,THERE ARE VARIOUS PRESSURE VESSELS FABRICATION CODES IN USE  THE EARLIEST CODE USED WAS BS 5500, WHICH IS A BRITISH CODE AND IS STILL IN USE  ASME CODE IS THE WIDELY USED CODE TODAY
  • 7. 7  THE ASME SECTION VIII IS USED FOR THE CONSTRUCTION OF NEW UNFIRED PRESSURE VESSELS.  IT HAS THREE DIVISIONS:  DIVISION 1(S8/1)  DIVISION 2(S8/2)  DIVISION 3(S8/3)  SOME IMPORTANT POINTS FOR EACH DIVISION ARE GIVEN IN THE FOLLOWING SLIDES.
  • 8. 8  DIVISION 1 : RULES FOR CONSTRUCTION OF PRESSURE VESSELS  DIVISION 2 : ALTERNATIVE RULES FOR CONSTRUCTION OF PRESSURE VESSELS  DIVISION 3 : ALTERNATIVE RULES FOR CONTRUCTION OF HIGH PRESSURE VESSELS
  • 9. 9  S8/1 (DESIGN & TEST CRITERIA)  Pressure = 3000 psi (MAX.)  Temperature = No limitation  Factor of safety = 3.5  Hydro test = 1.3 x Design pressure  Pneumatic test = 1.1 x Design pressure  Operating cycles = 100 – 10 6  Radiography = Spot TO 100%  STATIC & MOBILE VESSELS PERMITTED Note the change, Earlier 1.5 Note the change, Earlier 1.25
  • 10. 10  S8/2 (DESIGN & TEST CRITERIA)  Pressure = No limitation  Temperature = No limitation  Factor of safety = 3  Hydro test = 1.25 x Design pressure  Pneumatic test = 1.15 x Design pressure  Operating cycles = 100 – 10 6  NDT = 100%  Fatigue analysis required  Proximity analysis of nozzles required  ONLY STATIC.NO MOBILE VESSELS PERMITTED
  • 11. 11 HOW TO USE THE CODE S8/1  DIVISION 1 CONSISTS OF THREE SUBSECTIONS  SUBSECTION A  SUBSECTION B  SUBSECTION C
  • 12. 12  SUBSECTION A: GENERAL REQUIREMENTS (PART-UG) THIS SECTION COVERS THE SCOPE OF THE CODE & GENERAL REQUIREMENTS FOR ALL METHODS OF CONTRUCTION & ALL MATERIALS
  • 13. 13  SUBSECTION B: REQUIREMENTS PERTAINING TO METHODS OF FABRICATION OF PRESSURE VESSELS THIS SUBSECTION CONSISTS OF THREE PARTS:  PART UW : WELDING  PART UF : FORGING  PART UB : BRAZING
  • 14. 14  SUBSECTION C: REQUIREMENTS PERTAINING TO CLASSES OF MATERIALS THIS SUBSECTION HAS 9 PARTS WHICH ARE AS FOLLOWS:
  • 15. 15  PART UCS : CARBON & LOW ALLOY STEELS  PART UNF : NON FERROUS MATERIALS  PART UHA : HIGH ALLOY STEEL  PART UCI : CAST IRON  PART UCL : CLADDING  PART UCD : CAST DUCTILE IRON  PART UHT : HEAT TREATMENT  PART ULW : LAYERED CONSTRUCTION  PART ULT : LOW TEMPERATURE
  • 16. 16 SECTION VIII (DIVISION I) SUBSECTION A SUBSECTION B SUBSECTION C Part UG Part UW UF UB Part UCS UNF UHA UCI UCL UCD UHT ULW ULT
  • 17. 17  REMAINING PART OF THE CODE CONTAINS:  TABLES (For types & grades of CS,NF etc.)  MANDATORY APPENDICES  NONMANDATORY APPENDICES
  • 18. 18  THERE ARE 31 MANDATORY APPENDICES IN ASME SECTION VIII DIVISION 1  APPENDICES CONCERNING/RELATED TO NDT ARE:  APPENDIX 4 (RADIOGRAPHY EXAMINATION)  APPENDIX 6 (MAGNETIC PARTICLE EXAMINATION)  APPENDIX 8 (LIQUID PENETRANT EXAMINATION)  APPENDIX 12 (ULTRASONIC EXAMINATION) THESE APPENDICES ALSO GIVES THE ACCEPTANCE CRITERIA
  • 19. 19  CLAUSES IMPORTANT FOR INSPECTION & TESTING IN PART-UG OF SUBSECTION A ARE:  UG-93 : Inspection Of Materials  UG-99 : Hydrostatic Test  UG-100 : Pneumatic Test  UG-102 : Test Gages  UG-103 : NDT
  • 20. 20  CLAUSES IMPORTANT FOR INSPECTION & TESTING IN PART-UW OF SUBSECTION B ARE:  UW-47 : Welding Procedure  UW-48 : Welder & Welding Operator Qualification  UW-49 : Post Weld Heat Treatment
  • 21. 21  Please Note The Pressure Vessel Code Section-VIII Is Not Complete In Itself. It Asks Us To Refer :  Section – IX (Welding & Brazing Qualifications) &  Section – V (Non Destructive Examination)
  • 22. THANK YOU Facebook https://web.facebook.com/Alexinspectors/ website https://alex-inspectors.site123.me/ Linkedin https://www.linkedin.com/in/alex-inspectors twitter https://twitter.com/AInspectors YouTube https://www.youtube.com/channel/Alex inspectors Email Alexinspectors@gmail.com Alex Inspectors