Specifications and Their Importance
Aspects of Contract Administration
• Preparing proper and accurate bid document
• Compliance to all local body and regulators
• Method statements for Quality compliance
• Maintaining Records and Standard forms
• Negotiating and processing change orders
• Have good Public Relations
• Claims analysis and processes
• Close out
What are Specifications?
Specification is…
Specifications
• Set of Standard Documents that describe requirement of the job in
detail
Specifications
Remove ambiguity of work to be done
Common Types of Specifications
• Requirement Specifications
• Standard Specifications
• Design Specifications
• Material Specifications
• Quality Specification
• Test Specifications
• Performance Specification
• Acceptance Criteria
Contract Document Management
• Scope clarity
• Budget information
• BIM / Conditions
• Specifications
• Contract Conditions
• Equipment and Resource information
• Billing and Measurement standards
• Making good of defects
Major aspects of Contract - issues
• Variations
• Defects
• Acceleration of Work
• Extension of Time
• Faulty billing by contractor
• Under-runs and Over-runs
• Cost of Delay (LD clause)
• Valuation of work
Cause of Disputes
• Acceleration
• Coordination
• Workmanship and quality
• Differing goals
• Delays
• Feasibility of Schedule
• Design and communication of intent
• Complexity of project
Recapitulation
Importance of English
• An English professor wrote on the board: A woman without her man
is nothing.
The class was then asked to punctuate the sentence.
The men wrote: "A woman, without her man, is nothing."
The women wrote: "A woman: without her, man is nothing."
Thank You

More Related Content

What's hot

Things to check in a donors contract
Things to check in a donors contractThings to check in a donors contract
Things to check in a donors contract
Bahria University, Islamabad
 
Common Interest Repair Issues
Common Interest Repair IssuesCommon Interest Repair Issues
Common Interest Repair IssuesTRIslides
 
Presentation: Nondeterministic events in business processes
Presentation: Nondeterministic events in business processesPresentation: Nondeterministic events in business processes
Presentation: Nondeterministic events in business processes
MetasonicAG
 
RESUME 001rev
RESUME 001revRESUME 001rev
RESUME 001revDan Coll
 
Commercial processes in Oracle for a contracting compnay
Commercial processes in Oracle for a contracting compnayCommercial processes in Oracle for a contracting compnay
Commercial processes in Oracle for a contracting compnay
Ali kekhia PMP,ITIL,OCP,ETM
 
Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]
Delhi Technological University
 
Contract Administrator
Contract AdministratorContract Administrator
Contract AdministratorDionne DaCosta
 
Structuring Software Sales Transactions for Optimal Revenue Recognition
Structuring Software Sales Transactions for Optimal Revenue RecognitionStructuring Software Sales Transactions for Optimal Revenue Recognition
Structuring Software Sales Transactions for Optimal Revenue Recognition
Tensoft, Inc.
 
How to write an rfp
How to write an rfpHow to write an rfp
How to write an rfpWayne Smith
 
Benjamen Walsh - Presentation
Benjamen Walsh - PresentationBenjamen Walsh - Presentation
Benjamen Walsh - PresentationBenjamen Walsh
 
Diksha BSS Case Study
Diksha BSS Case StudyDiksha BSS Case Study
Diksha BSS Case Study
Diksha Technologies
 
Kenan USA Diksha Case Study
Kenan USA Diksha Case StudyKenan USA Diksha Case Study
Kenan USA Diksha Case Study
Diksha Technologies
 
Resume
ResumeResume
Resume
Gloria Tripp
 
Oracle Textura Overview
Oracle Textura OverviewOracle Textura Overview
Oracle Textura Overview
Nacer Malof
 
35 days bid procedure for construction project
35 days bid procedure for construction project35 days bid procedure for construction project
35 days bid procedure for construction project
Marvin M Gamboa
 

What's hot (20)

Things to check in a donors contract
Things to check in a donors contractThings to check in a donors contract
Things to check in a donors contract
 
Common Interest Repair Issues
Common Interest Repair IssuesCommon Interest Repair Issues
Common Interest Repair Issues
 
Presentation: Nondeterministic events in business processes
Presentation: Nondeterministic events in business processesPresentation: Nondeterministic events in business processes
Presentation: Nondeterministic events in business processes
 
RESUME 001rev
RESUME 001revRESUME 001rev
RESUME 001rev
 
Commercial processes in Oracle for a contracting compnay
Commercial processes in Oracle for a contracting compnayCommercial processes in Oracle for a contracting compnay
Commercial processes in Oracle for a contracting compnay
 
Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]
 
lifecyclesolutions.PDF
lifecyclesolutions.PDFlifecyclesolutions.PDF
lifecyclesolutions.PDF
 
Contract Administrator
Contract AdministratorContract Administrator
Contract Administrator
 
Project manager
Project managerProject manager
Project manager
 
Structuring Software Sales Transactions for Optimal Revenue Recognition
Structuring Software Sales Transactions for Optimal Revenue RecognitionStructuring Software Sales Transactions for Optimal Revenue Recognition
Structuring Software Sales Transactions for Optimal Revenue Recognition
 
How to write an rfp
How to write an rfpHow to write an rfp
How to write an rfp
 
Benjamen Walsh - Presentation
Benjamen Walsh - PresentationBenjamen Walsh - Presentation
Benjamen Walsh - Presentation
 
Diksha BSS Case Study
Diksha BSS Case StudyDiksha BSS Case Study
Diksha BSS Case Study
 
Kenan USA Diksha Case Study
Kenan USA Diksha Case StudyKenan USA Diksha Case Study
Kenan USA Diksha Case Study
 
Resume
ResumeResume
Resume
 
Rich Gesimondo
Rich GesimondoRich Gesimondo
Rich Gesimondo
 
Oracle Textura Overview
Oracle Textura OverviewOracle Textura Overview
Oracle Textura Overview
 
35 days bid procedure for construction project
35 days bid procedure for construction project35 days bid procedure for construction project
35 days bid procedure for construction project
 
2013 Federal D-B Downsized
2013 Federal D-B Downsized2013 Federal D-B Downsized
2013 Federal D-B Downsized
 
Edvin New-Resume
Edvin New-ResumeEdvin New-Resume
Edvin New-Resume
 

Similar to Lecture series on Civil Engineering - Estimation and Costing Specification in Contracts

00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptx
BimsaraRotaract
 
Balancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBalancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBrown Smith Wallace
 
CONTRACT ADMINISTRATION Updated.pptx
CONTRACT ADMINISTRATION Updated.pptxCONTRACT ADMINISTRATION Updated.pptx
CONTRACT ADMINISTRATION Updated.pptx
Aditya Mane
 
Chapter 5- Contract Management
Chapter 5- Contract ManagementChapter 5- Contract Management
Chapter 5- Contract Management
Delhi Technological University
 
QC_Supplier Management_ALL En
QC_Supplier Management_ALL EnQC_Supplier Management_ALL En
QC_Supplier Management_ALL EnJorge Torres
 
CSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscmCSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscm
Est
 
Supplier Management Service
Supplier Management ServiceSupplier Management Service
Supplier Management Service
Jorge Torres
 
Specification writing
Specification writingSpecification writing
Specification writing
BSRIA
 
Schedule-Centric View Of Contract Admin
Schedule-Centric View Of Contract AdminSchedule-Centric View Of Contract Admin
Schedule-Centric View Of Contract Admin
Chris Carson
 
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)GPTraining
 
Contract an obligation
Contract an obligationContract an obligation
Contract an obligationPraveen Sidola
 
Model Format for Building Services Specifications
Model Format for Building Services SpecificationsModel Format for Building Services Specifications
Model Format for Building Services Specifications
BSRIA
 
Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]
Delhi Technological University
 
M&E Resident Engineering Staff
M&E Resident Engineering StaffM&E Resident Engineering Staff
M&E Resident Engineering Staff
Kealym1
 
Construction Add On for Navision
Construction Add On for NavisionConstruction Add On for Navision
Construction Add On for Navision
Cetas Information Technology Pvt Ltd
 
Project Manager and EA ABRIDGED
Project Manager and EA ABRIDGEDProject Manager and EA ABRIDGED
Project Manager and EA ABRIDGEDRichard Freggi
 

Similar to Lecture series on Civil Engineering - Estimation and Costing Specification in Contracts (20)

00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptx
 
Balancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBalancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction Projects
 
CONTRACT ADMINISTRATION Updated.pptx
CONTRACT ADMINISTRATION Updated.pptxCONTRACT ADMINISTRATION Updated.pptx
CONTRACT ADMINISTRATION Updated.pptx
 
Chapter 5- Contract Management
Chapter 5- Contract ManagementChapter 5- Contract Management
Chapter 5- Contract Management
 
QC_Supplier Management_ALL En
QC_Supplier Management_ALL EnQC_Supplier Management_ALL En
QC_Supplier Management_ALL En
 
CSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscmCSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscm
 
Supplier Management Service
Supplier Management ServiceSupplier Management Service
Supplier Management Service
 
Specification writing
Specification writingSpecification writing
Specification writing
 
Schedule-Centric View Of Contract Admin
Schedule-Centric View Of Contract AdminSchedule-Centric View Of Contract Admin
Schedule-Centric View Of Contract Admin
 
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
 
Contract an obligation
Contract an obligationContract an obligation
Contract an obligation
 
Model Format for Building Services Specifications
Model Format for Building Services SpecificationsModel Format for Building Services Specifications
Model Format for Building Services Specifications
 
Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]
 
M&E Resident Engineering Staff
M&E Resident Engineering StaffM&E Resident Engineering Staff
M&E Resident Engineering Staff
 
SHAKEEB UDDIN C.V
SHAKEEB UDDIN C.VSHAKEEB UDDIN C.V
SHAKEEB UDDIN C.V
 
Construction Add On for Navision
Construction Add On for NavisionConstruction Add On for Navision
Construction Add On for Navision
 
Navbuild
NavbuildNavbuild
Navbuild
 
GMR
GMRGMR
GMR
 
Project Manager and EA ABRIDGED
Project Manager and EA ABRIDGEDProject Manager and EA ABRIDGED
Project Manager and EA ABRIDGED
 
Resume
ResumeResume
Resume
 

More from John Sushil Packiaraj

Lecture series on Civil Engineering - Indian Contract Act - its importance to...
Lecture series on Civil Engineering - Indian Contract Act - its importance to...Lecture series on Civil Engineering - Indian Contract Act - its importance to...
Lecture series on Civil Engineering - Indian Contract Act - its importance to...
John Sushil Packiaraj
 
Lecture 01 how to measure success of a supply chain
Lecture 01   how to measure success of a supply chainLecture 01   how to measure success of a supply chain
Lecture 01 how to measure success of a supply chain
John Sushil Packiaraj
 
Lecture 00 Introduction to the course
Lecture 00   Introduction to the courseLecture 00   Introduction to the course
Lecture 00 Introduction to the course
John Sushil Packiaraj
 
How to Plan a Construction Project - Important aspects to be considered
How to Plan a Construction Project - Important aspects to be consideredHow to Plan a Construction Project - Important aspects to be considered
How to Plan a Construction Project - Important aspects to be considered
John Sushil Packiaraj
 
Planning for Field Information for a project
Planning for Field Information for a projectPlanning for Field Information for a project
Planning for Field Information for a project
John Sushil Packiaraj
 
Construction Planning - Introduction to construction managment course and wha...
Construction Planning - Introduction to construction managment course and wha...Construction Planning - Introduction to construction managment course and wha...
Construction Planning - Introduction to construction managment course and wha...
John Sushil Packiaraj
 
Lecture 08 mathematical model of sdof system
Lecture 08   mathematical model of sdof systemLecture 08   mathematical model of sdof system
Lecture 08 mathematical model of sdof system
John Sushil Packiaraj
 
Lecture 07 formulating the stiffness matrix for a portal frame
Lecture 07   formulating the stiffness matrix for a portal frameLecture 07   formulating the stiffness matrix for a portal frame
Lecture 07 formulating the stiffness matrix for a portal frame
John Sushil Packiaraj
 
Lecture 06 formulating the stiffness matrix for a cantilever column
Lecture 06   formulating the stiffness matrix for a cantilever columnLecture 06   formulating the stiffness matrix for a cantilever column
Lecture 06 formulating the stiffness matrix for a cantilever column
John Sushil Packiaraj
 
Lecture 03, 04, 05 introducing dynamics
Lecture 03, 04, 05 introducing dynamicsLecture 03, 04, 05 introducing dynamics
Lecture 03, 04, 05 introducing dynamics
John Sushil Packiaraj
 
Lecture 02 Fascinating Aspects of Dynamics (Look for the link to the free ...
Lecture 02   Fascinating Aspects of Dynamics  (Look for the link to the free ...Lecture 02   Fascinating Aspects of Dynamics  (Look for the link to the free ...
Lecture 02 Fascinating Aspects of Dynamics (Look for the link to the free ...
John Sushil Packiaraj
 

More from John Sushil Packiaraj (11)

Lecture series on Civil Engineering - Indian Contract Act - its importance to...
Lecture series on Civil Engineering - Indian Contract Act - its importance to...Lecture series on Civil Engineering - Indian Contract Act - its importance to...
Lecture series on Civil Engineering - Indian Contract Act - its importance to...
 
Lecture 01 how to measure success of a supply chain
Lecture 01   how to measure success of a supply chainLecture 01   how to measure success of a supply chain
Lecture 01 how to measure success of a supply chain
 
Lecture 00 Introduction to the course
Lecture 00   Introduction to the courseLecture 00   Introduction to the course
Lecture 00 Introduction to the course
 
How to Plan a Construction Project - Important aspects to be considered
How to Plan a Construction Project - Important aspects to be consideredHow to Plan a Construction Project - Important aspects to be considered
How to Plan a Construction Project - Important aspects to be considered
 
Planning for Field Information for a project
Planning for Field Information for a projectPlanning for Field Information for a project
Planning for Field Information for a project
 
Construction Planning - Introduction to construction managment course and wha...
Construction Planning - Introduction to construction managment course and wha...Construction Planning - Introduction to construction managment course and wha...
Construction Planning - Introduction to construction managment course and wha...
 
Lecture 08 mathematical model of sdof system
Lecture 08   mathematical model of sdof systemLecture 08   mathematical model of sdof system
Lecture 08 mathematical model of sdof system
 
Lecture 07 formulating the stiffness matrix for a portal frame
Lecture 07   formulating the stiffness matrix for a portal frameLecture 07   formulating the stiffness matrix for a portal frame
Lecture 07 formulating the stiffness matrix for a portal frame
 
Lecture 06 formulating the stiffness matrix for a cantilever column
Lecture 06   formulating the stiffness matrix for a cantilever columnLecture 06   formulating the stiffness matrix for a cantilever column
Lecture 06 formulating the stiffness matrix for a cantilever column
 
Lecture 03, 04, 05 introducing dynamics
Lecture 03, 04, 05 introducing dynamicsLecture 03, 04, 05 introducing dynamics
Lecture 03, 04, 05 introducing dynamics
 
Lecture 02 Fascinating Aspects of Dynamics (Look for the link to the free ...
Lecture 02   Fascinating Aspects of Dynamics  (Look for the link to the free ...Lecture 02   Fascinating Aspects of Dynamics  (Look for the link to the free ...
Lecture 02 Fascinating Aspects of Dynamics (Look for the link to the free ...
 

Recently uploaded

一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 

Recently uploaded (20)

一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 

Lecture series on Civil Engineering - Estimation and Costing Specification in Contracts

  • 1. © J S Packiaraj www.jsp.net.in CONSTRUCTION PLANNING AND MANAGEMENT
  • 2. Lecture 02 Specifications and Their Importance
  • 3. Aspects of Contract Administration • Preparing proper and accurate bid document • Compliance to all local body and regulators • Method statements for Quality compliance • Maintaining Records and Standard forms • Negotiating and processing change orders • Have good Public Relations • Claims analysis and processes • Close out
  • 5. Specifications • Set of Standard Documents that describe requirement of the job in detail
  • 7. Common Types of Specifications • Requirement Specifications • Standard Specifications • Design Specifications • Material Specifications • Quality Specification • Test Specifications • Performance Specification • Acceptance Criteria
  • 8. Contract Document Management • Scope clarity • Budget information • BIM / Conditions • Specifications • Contract Conditions • Equipment and Resource information • Billing and Measurement standards • Making good of defects
  • 9. Major aspects of Contract - issues • Variations • Defects • Acceleration of Work • Extension of Time • Faulty billing by contractor • Under-runs and Over-runs • Cost of Delay (LD clause) • Valuation of work
  • 10. Cause of Disputes • Acceleration • Coordination • Workmanship and quality • Differing goals • Delays • Feasibility of Schedule • Design and communication of intent • Complexity of project
  • 11. Recapitulation Importance of English • An English professor wrote on the board: A woman without her man is nothing. The class was then asked to punctuate the sentence. The men wrote: "A woman, without her man, is nothing." The women wrote: "A woman: without her, man is nothing."