SUPPLIER MANAGEMENT
A TOOL TO PREVENT THE DELAY AND NON-
COMPLIANCE WITH CONTRACTUAL
REQUIREMENTS IN HEAVY & MEDIUM
CONSTRUCTION PROJECT
QUALITY CULTURE SAC
Management to continuous improvement
Background
• Capital projects are capitalized investment in time. (T = $)
• Projects with overlapping activities (fast-track), and
construction requirements JIT (Just in Time)
• A delay in the previous activities have a multiplifier effect
in time and project's costs.
Id Nombre de tarea Duración
1 Adquisición de emplazamiento 30 días
2 Obra civil 20 días
3 Instalación 5 días
4 Configuración 2 días
5 Pruebas 2 días
11/04 11/11 11/18 11/25 12/02 12/09 12/16 12/23 12/30 01/06 01/13 01/20 01/27
iembre diciembre enero f
Background
• The construction are exposed to no meet the deadline.
These indice reach almost 75%
• 45% of this delay are due to management problems.
• According to Jurans, for american suppliers, the costs of
no Quality reach in some cases 30% of sales price.
• No investigation studies in supply management , in our
country.
Problem
• In Project Management is unavoidable to have new
suppliers that allow us to outsource new activities.
• The poor training in management of manufacturing
companies produce 80% of the errors.
• Culture of "don't report errors" within providers.
• Culture of unpunctuality: Little commitment to meeting
deadlines of manufacturing startups.
Three Cause - Effect
DELAYS FOR NON-
CUMPLIANCE OF
CONTRACT
REQUIREMENTS
Poor Evaluation of Supplier
Poor Quality Control
Poor Project Management
QMS No implemented
Poor Production Capacity
QMS No Executed
Personal without Competence
Supplier's PM without experience
Derating Capacity by lack of attention
Unknow of Quality Requirements
Desynchronized Administrative
Processes
Poor Finantial Capacity
Supplier Management Services seeks to minimize or
better yet avoid the consequences caused by :
• Delays in delivery date or promised date .
• Fail in compliance with contractual requirements, and
• Failure to meet changes or modifications to the
purchase order.
• Additional costs not covered: for claims (MO and
paralyzed Resources & others in site).
• Saving by penalties of opportunity cost for delays of
PROJECT start up.
Objetives
Objetives
General Objetive:
• Analyze the management of metalworking, electrics, and
civil suppliers, so that would prevent cost overruns by a
delay and compliance with contractual specifications.
Specific Objetives
• Relation of supplier management with the delay or non-
delivery.
• Relation of supplier management with the fulfill of
contractual specifications.
IMPORTANCE
8
The benefits of this research are for both companies
Operators and suppliers, since this proposal is made to
increase the competitiveness of both
• For supplier improve the management, quality and
delivery time with consequent savings and economic
benefit, and
• For construction consolidating of its
supply chain and reducing the risks
inherent to sub-contracting or
purchasing equipment.
IMPORTANCE
9
The benefits of this research are for both companies
Operators and metalworking suppliers, since this proposal is
made to increase the competitiveness of both
• Logistic
• Quality, &
• Sub-Contract management
Supplier Management
We make available this work Supplier Management that
will allow:
• Contro & Meet real delivery time
• Anticipate the consequences of non-compliance with
contractual requirements and take steps in advance.
• Anticipated construction cost overruns for claims.
• Establish Supplier Management indicators in their
contracts.
Supplier Management
We make available this Supplier Management Services which breaks
down into:
• Supplier Evaluation
• Quality Assurance
• Shop Expediting (Activation)
For more information contact us:
Quality & Projects Management
Eng. Jorge Hugo Torres F.
Celular: (+51) 996.796.776
jorge.torres@qualityculture.pe

More Related Content

What's hot

Construction of a General Cargo Vessel
Construction of a General Cargo VesselConstruction of a General Cargo Vessel
Construction of a General Cargo VesselArjun Reghu
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projectsD.Pawan Kumar
 
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Ian Carr SCMP, MCIPS
 
Episode 28 : Project Management Contract
Episode 28 :  Project Management ContractEpisode 28 :  Project Management Contract
Episode 28 : Project Management ContractSAJJAD KHUDHUR ABBAS
 
Project Development
Project DevelopmentProject Development
Project DevelopmentDevin Mack
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman LewisEvan Lewis
 
Diverso Energy Presentation: HRAI Conference 2019
Diverso Energy Presentation: HRAI Conference 2019Diverso Energy Presentation: HRAI Conference 2019
Diverso Energy Presentation: HRAI Conference 2019Susan Smith
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony Vitola
 
Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ finalScott Coombes
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentCenter for Energy and Environment
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendationsubk1411
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
 
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2GreenData.IO
 

What's hot (20)

Construction of a General Cargo Vessel
Construction of a General Cargo VesselConstruction of a General Cargo Vessel
Construction of a General Cargo Vessel
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
 
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
 
Episode 28 : Project Management Contract
Episode 28 :  Project Management ContractEpisode 28 :  Project Management Contract
Episode 28 : Project Management Contract
 
Why EPC
Why EPCWhy EPC
Why EPC
 
Asset management review
Asset management reviewAsset management review
Asset management review
 
budget master
budget masterbudget master
budget master
 
Project Development
Project DevelopmentProject Development
Project Development
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
 
Diverso Energy Presentation: HRAI Conference 2019
Diverso Energy Presentation: HRAI Conference 2019Diverso Energy Presentation: HRAI Conference 2019
Diverso Energy Presentation: HRAI Conference 2019
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
 
Projects DWDobbs 2016a
Projects DWDobbs 2016aProjects DWDobbs 2016a
Projects DWDobbs 2016a
 
Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ final
 
KBC scheduling hydrocarbon supply chain
KBC scheduling hydrocarbon supply chainKBC scheduling hydrocarbon supply chain
KBC scheduling hydrocarbon supply chain
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the Envrinment
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
DeltaBahn - Improving Safety & Productivity in the American Oil Industry v2
 
Resume word format
Resume word formatResume word format
Resume word format
 
EPC Business Model
EPC Business ModelEPC Business Model
EPC Business Model
 

Similar to QC_Supplier Management_ALL En

Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projectsweshumba
 
Industry_Definitions_Construction.pdf
Industry_Definitions_Construction.pdfIndustry_Definitions_Construction.pdf
Industry_Definitions_Construction.pdfPratibha178649
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE S. Sathishkumar
 
Construction management I lecture note (QUS 3166).pptx
Construction management I lecture note  (QUS 3166).pptxConstruction management I lecture note  (QUS 3166).pptx
Construction management I lecture note (QUS 3166).pptxJacquesTwubahimana1
 
CSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agileCSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agileEst
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGCCordell Parvin
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric Stemen
 
Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...IRJET Journal
 
Another Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham ZeinounAnother Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham ZeinounPMILebanonChapter
 
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTBASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTNiruban Projoth
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionGalala University
 
Balancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBalancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBrown Smith Wallace
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designSustainableEnergyAut
 

Similar to QC_Supplier Management_ALL En (20)

Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
Industry_Definitions_Construction.pdf
Industry_Definitions_Construction.pdfIndustry_Definitions_Construction.pdf
Industry_Definitions_Construction.pdf
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE
 
Construction management I lecture note (QUS 3166).pptx
Construction management I lecture note  (QUS 3166).pptxConstruction management I lecture note  (QUS 3166).pptx
Construction management I lecture note (QUS 3166).pptx
 
CSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agileCSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agile
 
iom case.pptx
iom case.pptxiom case.pptx
iom case.pptx
 
CCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference SeminarCCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference Seminar
 
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGC
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...
 
Tracie Kilbourn Resume
Tracie Kilbourn ResumeTracie Kilbourn Resume
Tracie Kilbourn Resume
 
Innovation technique in construction
Innovation technique in constructionInnovation technique in construction
Innovation technique in construction
 
Claims
ClaimsClaims
Claims
 
Another Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham ZeinounAnother Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham Zeinoun
 
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTBASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENT
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
 
Balancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBalancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction Projects
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
 

QC_Supplier Management_ALL En

  • 1. SUPPLIER MANAGEMENT A TOOL TO PREVENT THE DELAY AND NON- COMPLIANCE WITH CONTRACTUAL REQUIREMENTS IN HEAVY & MEDIUM CONSTRUCTION PROJECT QUALITY CULTURE SAC Management to continuous improvement
  • 2. Background • Capital projects are capitalized investment in time. (T = $) • Projects with overlapping activities (fast-track), and construction requirements JIT (Just in Time) • A delay in the previous activities have a multiplifier effect in time and project's costs. Id Nombre de tarea Duración 1 Adquisición de emplazamiento 30 días 2 Obra civil 20 días 3 Instalación 5 días 4 Configuración 2 días 5 Pruebas 2 días 11/04 11/11 11/18 11/25 12/02 12/09 12/16 12/23 12/30 01/06 01/13 01/20 01/27 iembre diciembre enero f
  • 3. Background • The construction are exposed to no meet the deadline. These indice reach almost 75% • 45% of this delay are due to management problems. • According to Jurans, for american suppliers, the costs of no Quality reach in some cases 30% of sales price. • No investigation studies in supply management , in our country.
  • 4. Problem • In Project Management is unavoidable to have new suppliers that allow us to outsource new activities. • The poor training in management of manufacturing companies produce 80% of the errors. • Culture of "don't report errors" within providers. • Culture of unpunctuality: Little commitment to meeting deadlines of manufacturing startups.
  • 5. Three Cause - Effect DELAYS FOR NON- CUMPLIANCE OF CONTRACT REQUIREMENTS Poor Evaluation of Supplier Poor Quality Control Poor Project Management QMS No implemented Poor Production Capacity QMS No Executed Personal without Competence Supplier's PM without experience Derating Capacity by lack of attention Unknow of Quality Requirements Desynchronized Administrative Processes Poor Finantial Capacity
  • 6. Supplier Management Services seeks to minimize or better yet avoid the consequences caused by : • Delays in delivery date or promised date . • Fail in compliance with contractual requirements, and • Failure to meet changes or modifications to the purchase order. • Additional costs not covered: for claims (MO and paralyzed Resources & others in site). • Saving by penalties of opportunity cost for delays of PROJECT start up. Objetives
  • 7. Objetives General Objetive: • Analyze the management of metalworking, electrics, and civil suppliers, so that would prevent cost overruns by a delay and compliance with contractual specifications. Specific Objetives • Relation of supplier management with the delay or non- delivery. • Relation of supplier management with the fulfill of contractual specifications.
  • 8. IMPORTANCE 8 The benefits of this research are for both companies Operators and suppliers, since this proposal is made to increase the competitiveness of both • For supplier improve the management, quality and delivery time with consequent savings and economic benefit, and • For construction consolidating of its supply chain and reducing the risks inherent to sub-contracting or purchasing equipment.
  • 9. IMPORTANCE 9 The benefits of this research are for both companies Operators and metalworking suppliers, since this proposal is made to increase the competitiveness of both • Logistic • Quality, & • Sub-Contract management
  • 10. Supplier Management We make available this work Supplier Management that will allow: • Contro & Meet real delivery time • Anticipate the consequences of non-compliance with contractual requirements and take steps in advance. • Anticipated construction cost overruns for claims. • Establish Supplier Management indicators in their contracts.
  • 11. Supplier Management We make available this Supplier Management Services which breaks down into: • Supplier Evaluation • Quality Assurance • Shop Expediting (Activation) For more information contact us: Quality & Projects Management Eng. Jorge Hugo Torres F. Celular: (+51) 996.796.776 jorge.torres@qualityculture.pe