Key factors for top availability
of geothermal power plants
– Exergy’s Experience
European Geothermal Congress
12th June 2019
2
SUMMARY
› Winning Factors for geothermal power plants
› Exergy’s references
3
WINNING FACTORS OF A GEOTHERMAL
POWER PLANT
Every geothermal project needs the
following factors for its success:
› High plant availability for constant
and reliable revenues production
› Reduced environmental impact to
ease the process of obtaining
permits and facilitate the local
community support
4
EXERGY’s PLANT AVAILABILITY
Site Customer Operation Year Output gross Availability
Kubilay Bestepeler Enerji 2016 27 MW 98.6 %
Karkey-Umurlu 2 Karadeniz Holding 2016 12 MW 99.1 %
Saraykoy 2 Greeneco Enerji 2016 12 MW 99.0 %
Mehmet Han Kipas Holding 2016 25 MW 99.1 %
Ken Kipas Kipas Holding 2016 25 MW 99.8 %
Karkey-Umurlu I Karadeniz Holding 2015 12 MW 99.5 %
Saraykoy Greeneco Enerji 2015 12 MW 99.3 %
Denizli – Tosunlar Akca Enerji 2014 3.5 MW 99.5 %
Bagnore Enel Green Power 2012 1 MW 99.3 %
Over 98.5% availability in all the tracked units, average 99.2%
5
TOP AVAILABILITY FACTORS
Plant Configuration
10%
Materials Choice
5%
Erection & Commissioning
Execution
15%
Planning Maintenance Activities
15%
Training of Operator/Client
10%
Careful Choice of the Operation
Personnel
10%
Excellent Knowledge of ORC
process for Remote Support
15%
Spare Parts Stock
15%
Dedicated Site Staff
5%
Plant Configuration Materials Choice
Erection & Commissioning Execution Planning Maintenance Activities
Training of Operator/Client Careful Choice of the Operation Personnel
Excellent Knowledge of ORC process for Remote Support Spare Parts Stock
Dedicated Site Staff
6
FACTOR 1 – PLANT CONFIGURATION
Plant configuration 10%
7
PLANT CONFIGURATION
The configuration of the ORC plant must take
into account the desired level of availability and
reliability:
› Correct design to the resource and location
conditions
› Appropriate redundancies of the equipment
and minor items (e.g. pumps,
instrumentation)
› Accessibility of the components for
maintenance operation
› Equipment design to facilitate maintenance
and reduction of plant downtime (Special
maintenance for the mechanical group)
PLANT CONFIGURATION
8
Mechanical group Maintenance
9
FACTOR 2 – MATERIAL SELECTION
Material choice 5%
10
MATERIALS SELECTION
The selection of correct material is key
to maintaining high availability.
During the design phase, the following
aspects have to be taken in
consideration:
› Chemistry of the geothermal fluid and
dosing chemicals
› Geothermal harsh environment with
presence of H2S
› Other environmental factors (extreme
temperatures, atmosphere humidity
and salinity)
11
FACTOR 3 – ERECTION & COMMISSIONING
Erection & Commissioning 15%
12
ERECTION AND COMMISSIONING
Having designed and constructed 25
geothermal power plants, in only 6 years,
we have developed internal quality
procedures for the correct execution of
construction and commissioning phases
to guarantee high quality standards even
under tight project schedules and short
deadlines
13
FACTOR 4 – TRAINING
Training of operators/client 10%
14
TRAINING OF THE OPERATORS/CLIENT
day Description Location
1 Introduction to ORC Exergy office
1 Plant process principles Exergy office
1 Plant process description Exergy office
2 Mechanical system description #1 Exergy office
2 Mechanical system description #2 Exergy office
2 ORC Electrical system description Exergy office
3 ORC Control system description Exergy office
3 Operating principles Exergy office
4 Operation Exergy office
4 Operation Exergy office
5 Safety Exergy office / working fluid supplier office
5 Safety Exergy office / working fluid supplier office
6 Transfer to site Exergy ORC plant
6 Plant introduction Exergy ORC plant
6 Plant visit and explanation Exergy ORC plant
7 Practical Site activities Exergy ORC plant
15
FACTOR 5 – PLANNING OF MAINTENANCE
Planning of maintenance
activities 15%
16
PLANNING OF MAINTENANCE ACTIVITIES
A correct planning and execution of the
maintenance activities is key to obtain high
plant availability. Exergy provides after
sales service contracts which include:
All the main programmed maintenance
activities that cause unavailability in a binary
plant are addressed within the service
contract. It is key to properly predict and
schedule the activities to be done in order to
reduce at minimum plant downtime.
› Remote assistance 24/7 online and
by phone
› Up to 2 services per year by Exergy
technicians
› Preventive monitoring of parts
replacements
› Filters, seals and fluids replacement
› Control and monitoring of systems
checks
17
FACTOR 6&7 – OPERATION PERSONNEL
Careful choice of
operation personnel 10%
Site staff 5%
18
SELECTION OF OPERATION PERSONNEL
AND SITE STAFF
The site staff have to be carefully
selected and trained for correct
operation of the plant:
› Experienced personnel
› Committed to the good result of
the project and proactive in
looking for problems and rapidly
solve them
A good team of site personnel is
generally composed by one
mechanical and one electrical
technician that remain 24/7 at site
19
FACTOR 8 – KNOWLEDGE OF ORC PROCESS
Knowledge of ORC process for remote support 15%
20
KNOWLEDGE OF ORC PROCESS AND
REMOTE SUPPORT
Exergy’s service personnel is:
› Experienced on numerous
other geothermal power
plants
› Constantly trained and
updated
› Involved in the project from
the early design phases
21
FACTOR 9 – SPARE PARTS STOCK
Spare parts stocks 15%
22
SPARE PARTS STOCK
The selection of the correct spare
parts list and replacement
strategy depend on the following
factors:
› Plant design
› Plant accessibility and shipping
logistics
› Customer’s Business Plan
23
CONCLUSION
› EXERGY binary power plant register very high
availability records.
› The correct management of some key plant
factors is key for reliable and constant operation
of binary power plants which result in constant
revenues and successful business plans
REFERENCES
24
EXERGY REFERENCES
25
26
EDA REN OVAVEIS,
PICO ALT O,
T E R C E I R A ( A Z O R E S , P T )
Y E A R : 2 0 1 5
A P P L I C A T I O N : G E O
P O W E R : 4 M W
27
BEŞTEPELER
ENERJI,
KUBILAY 1,
TURKEY
Y E A R : 2 0 1 5
A P P L I C A T I O N : G E O
P O W E R : 2 4 M W
28
GREENECO
ENERJI,
SARAYKÖY 1,
TURKEY
Y E A R : 2 0 1 5
A P P L I C A T I O N : G E O
P O W E R : 1 2 M W
29
ENERGY
HOLDING,
KEMALIYE 1 & 2
TURKEY
Y E A R : 2 0 1 5
A P P L I C A T I O N : G E O
P O W E R : 1 2 M W
30
KEN KIPAS,
MEHMET HAN,TURKEY
Y E A R : 2 0 1 5 A P P L I C A T I O N : G E O
P O W E R : 2 5 M W
31
KARADENIZ
HOLDING,
UMURLU 1,
TURKEY
Y E A R : 2 0 1 5
A P P L I C A T I O N : G E O
P O W E R : 1 2 M W
32
AKÇA ENERJI
DENIZLI,
TURKEY
Y E A R : 2 0 1 4
A P P L I C A T I O N : G E O
P O W E R : 4 M W
C l i c k f o r v i d e o
H E A D O F F I C E
Via degli Agresti, 6
40123 Bologna (BO) ITALY
Via Santa Rita, 14
21057 Olgiate Olona (VA) ITALY
Tel +39 0331 18 17 711
Fax +39 0331 18 17 731
O P E R A T I N G H E A D Q U A R T E R S
E X E R G Y - O R C . C O M
I N F O @ E X E R G Y . I T
33
operating
hq

More Related Content

What's hot

AirClean Energy Company Overview - February 2016
AirClean Energy Company Overview - February 2016AirClean Energy Company Overview - February 2016
AirClean Energy Company Overview - February 2016Blake Johnson
 
2nd law of thermodynamics
 2nd law of thermodynamics 2nd law of thermodynamics
2nd law of thermodynamicsGM Red
 
Wall hung electric boiler adaption with external tank
Wall hung electric boiler adaption with external tankWall hung electric boiler adaption with external tank
Wall hung electric boiler adaption with external tankDaxom/Navidens
 
Cold weather performance of heat pumps in Irish homes – Do we really need to ...
Cold weather performance of heat pumps in Irish homes – Do we really need to ...Cold weather performance of heat pumps in Irish homes – Do we really need to ...
Cold weather performance of heat pumps in Irish homes – Do we really need to ...Heather Morrissey
 
Tessol presentation - 31.5.13
Tessol   presentation - 31.5.13Tessol   presentation - 31.5.13
Tessol presentation - 31.5.13Jas Preet
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeriaRCREEE
 
GE ADGT Application iGas
GE ADGT Application iGasGE ADGT Application iGas
GE ADGT Application iGasGE코리아
 
TESSOL's PlugNchill Refrigeration
TESSOL's PlugNchill RefrigerationTESSOL's PlugNchill Refrigeration
TESSOL's PlugNchill RefrigerationRajat Gupta
 
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technology
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technologyZero energy market Metro St. Pölten with efficient CO2 refrigeration technology
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technologyATMOsphere Conferences & Events
 
Stationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
Stationary/Transportation Heat-to-Power Applications with CN300 ORC TechnololgyStationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
Stationary/Transportation Heat-to-Power Applications with CN300 ORC TechnololgyKeith D. Patch
 
Measuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
Measuring Energy and Occupant Satisfaction, a Evidence Based Design PresentationMeasuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
Measuring Energy and Occupant Satisfaction, a Evidence Based Design Presentationscott shell
 
Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013Yale Carden
 

What's hot (20)

Plant Layout-Model
Plant Layout-ModelPlant Layout-Model
Plant Layout-Model
 
Trans canada
Trans canadaTrans canada
Trans canada
 
AirClean Energy Company Overview - February 2016
AirClean Energy Company Overview - February 2016AirClean Energy Company Overview - February 2016
AirClean Energy Company Overview - February 2016
 
2nd law of thermodynamics
 2nd law of thermodynamics 2nd law of thermodynamics
2nd law of thermodynamics
 
Wall hung electric boiler adaption with external tank
Wall hung electric boiler adaption with external tankWall hung electric boiler adaption with external tank
Wall hung electric boiler adaption with external tank
 
Lpg liquid control valve mechanical operation
Lpg liquid control valve mechanical operationLpg liquid control valve mechanical operation
Lpg liquid control valve mechanical operation
 
Cold weather performance of heat pumps in Irish homes – Do we really need to ...
Cold weather performance of heat pumps in Irish homes – Do we really need to ...Cold weather performance of heat pumps in Irish homes – Do we really need to ...
Cold weather performance of heat pumps in Irish homes – Do we really need to ...
 
iCool CO2 transcritical condensing units
iCool CO2 transcritical condensing unitsiCool CO2 transcritical condensing units
iCool CO2 transcritical condensing units
 
Tessol presentation - 31.5.13
Tessol   presentation - 31.5.13Tessol   presentation - 31.5.13
Tessol presentation - 31.5.13
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeria
 
Lpg liquid control valve mechanical operation
Lpg liquid control valve mechanical operationLpg liquid control valve mechanical operation
Lpg liquid control valve mechanical operation
 
GE ADGT Application iGas
GE ADGT Application iGasGE ADGT Application iGas
GE ADGT Application iGas
 
TESSOL's PlugNchill Refrigeration
TESSOL's PlugNchill RefrigerationTESSOL's PlugNchill Refrigeration
TESSOL's PlugNchill Refrigeration
 
Venture Gas Conditioning
Venture Gas ConditioningVenture Gas Conditioning
Venture Gas Conditioning
 
Waste to Energy
Waste to EnergyWaste to Energy
Waste to Energy
 
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technology
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technologyZero energy market Metro St. Pölten with efficient CO2 refrigeration technology
Zero energy market Metro St. Pölten with efficient CO2 refrigeration technology
 
Fall Final Presentation
Fall Final PresentationFall Final Presentation
Fall Final Presentation
 
Stationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
Stationary/Transportation Heat-to-Power Applications with CN300 ORC TechnololgyStationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
Stationary/Transportation Heat-to-Power Applications with CN300 ORC Technololgy
 
Measuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
Measuring Energy and Occupant Satisfaction, a Evidence Based Design PresentationMeasuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
Measuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
 
Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013
 

Similar to Key factors for top availability of geothermal power plants – Exergy’s Experience

Similar to Key factors for top availability of geothermal power plants – Exergy’s Experience (20)

Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyas
 
LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1
 
Resume
ResumeResume
Resume
 
Jit ppt with case study
Jit ppt with case studyJit ppt with case study
Jit ppt with case study
 
Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyas
 
Metrology day 20 5-15 (2)
Metrology day 20 5-15 (2)Metrology day 20 5-15 (2)
Metrology day 20 5-15 (2)
 
Unit4 dr mansisingh
Unit4 dr mansisinghUnit4 dr mansisingh
Unit4 dr mansisingh
 
Resume
ResumeResume
Resume
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
 
Resume of operation specialist - Copy
Resume of operation specialist - CopyResume of operation specialist - Copy
Resume of operation specialist - Copy
 
Project Presentation
Project PresentationProject Presentation
Project Presentation
 
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
 
perfect project report (1)
perfect project report (1)perfect project report (1)
perfect project report (1)
 
Case study 1 effective and efficient communication
Case study 1 effective and efficient communicationCase study 1 effective and efficient communication
Case study 1 effective and efficient communication
 
OMKAR ELECTRICALS PROFILE
OMKAR ELECTRICALS PROFILEOMKAR ELECTRICALS PROFILE
OMKAR ELECTRICALS PROFILE
 
Job description factory services engineer
Job description   factory services engineerJob description   factory services engineer
Job description factory services engineer
 
updated_resume
updated_resumeupdated_resume
updated_resume
 
Action Plan MichaelSan
Action Plan MichaelSanAction Plan MichaelSan
Action Plan MichaelSan
 
PIA REPORT PRESENTATION
PIA REPORT PRESENTATIONPIA REPORT PRESENTATION
PIA REPORT PRESENTATION
 
ADAMRIDZUANRESUME
ADAMRIDZUANRESUMEADAMRIDZUANRESUME
ADAMRIDZUANRESUME
 

Recently uploaded

Data analysis and findings
Data analysis and findingsData analysis and findings
Data analysis and findingsCIFOR-ICRAF
 
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...marcuskenyatta275
 
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...Aggregage
 
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...Amil Baba Dawood bangali
 
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRYEFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRYSyed Atif Naseem
 
Cooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and PerspectivesCooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and PerspectivesCIFOR-ICRAF
 
LaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptxLaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptxjoshuaclack73
 
Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...Sangram Sahoo
 
Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.Christina Parmionova
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsCIFOR-ICRAF
 
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCarbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCIFOR-ICRAF
 
Lab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjjLab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjjjoshuaclack73
 
Production, dispersal, sedimentation and taphonomy of spores/pollen
Production, dispersal, sedimentation and taphonomy of spores/pollenProduction, dispersal, sedimentation and taphonomy of spores/pollen
Production, dispersal, sedimentation and taphonomy of spores/pollenSangram Sahoo
 
Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.meenakshiii2706
 
Peat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangPeat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangCIFOR-ICRAF
 
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...Model Neeha Mumbai
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...The Hebrew University of Jerusalem
 
National Tree Planting Day May 2024 Nairobi
National Tree Planting Day May 2024 NairobiNational Tree Planting Day May 2024 Nairobi
National Tree Planting Day May 2024 Nairobiayisiclare_
 
Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...Christina Parmionova
 

Recently uploaded (20)

Rosen 2017 Isranalytica Mg in Tap Water.pdf
Rosen  2017 Isranalytica Mg in Tap Water.pdfRosen  2017 Isranalytica Mg in Tap Water.pdf
Rosen 2017 Isranalytica Mg in Tap Water.pdf
 
Data analysis and findings
Data analysis and findingsData analysis and findings
Data analysis and findings
 
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
 
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
 
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
 
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRYEFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
 
Cooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and PerspectivesCooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and Perspectives
 
LaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptxLaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptx
 
Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...
 
Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnerships
 
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCarbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
 
Lab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjjLab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjj
 
Production, dispersal, sedimentation and taphonomy of spores/pollen
Production, dispersal, sedimentation and taphonomy of spores/pollenProduction, dispersal, sedimentation and taphonomy of spores/pollen
Production, dispersal, sedimentation and taphonomy of spores/pollen
 
Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.
 
Peat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangPeat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG Londerang
 
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
 
National Tree Planting Day May 2024 Nairobi
National Tree Planting Day May 2024 NairobiNational Tree Planting Day May 2024 Nairobi
National Tree Planting Day May 2024 Nairobi
 
Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...
 

Key factors for top availability of geothermal power plants – Exergy’s Experience

  • 1. Luca Xodo Head o f S ales 1 Key factors for top availability of geothermal power plants – Exergy’s Experience European Geothermal Congress 12th June 2019
  • 2. 2 SUMMARY › Winning Factors for geothermal power plants › Exergy’s references
  • 3. 3 WINNING FACTORS OF A GEOTHERMAL POWER PLANT Every geothermal project needs the following factors for its success: › High plant availability for constant and reliable revenues production › Reduced environmental impact to ease the process of obtaining permits and facilitate the local community support
  • 4. 4 EXERGY’s PLANT AVAILABILITY Site Customer Operation Year Output gross Availability Kubilay Bestepeler Enerji 2016 27 MW 98.6 % Karkey-Umurlu 2 Karadeniz Holding 2016 12 MW 99.1 % Saraykoy 2 Greeneco Enerji 2016 12 MW 99.0 % Mehmet Han Kipas Holding 2016 25 MW 99.1 % Ken Kipas Kipas Holding 2016 25 MW 99.8 % Karkey-Umurlu I Karadeniz Holding 2015 12 MW 99.5 % Saraykoy Greeneco Enerji 2015 12 MW 99.3 % Denizli – Tosunlar Akca Enerji 2014 3.5 MW 99.5 % Bagnore Enel Green Power 2012 1 MW 99.3 % Over 98.5% availability in all the tracked units, average 99.2%
  • 5. 5 TOP AVAILABILITY FACTORS Plant Configuration 10% Materials Choice 5% Erection & Commissioning Execution 15% Planning Maintenance Activities 15% Training of Operator/Client 10% Careful Choice of the Operation Personnel 10% Excellent Knowledge of ORC process for Remote Support 15% Spare Parts Stock 15% Dedicated Site Staff 5% Plant Configuration Materials Choice Erection & Commissioning Execution Planning Maintenance Activities Training of Operator/Client Careful Choice of the Operation Personnel Excellent Knowledge of ORC process for Remote Support Spare Parts Stock Dedicated Site Staff
  • 6. 6 FACTOR 1 – PLANT CONFIGURATION Plant configuration 10%
  • 7. 7 PLANT CONFIGURATION The configuration of the ORC plant must take into account the desired level of availability and reliability: › Correct design to the resource and location conditions › Appropriate redundancies of the equipment and minor items (e.g. pumps, instrumentation) › Accessibility of the components for maintenance operation › Equipment design to facilitate maintenance and reduction of plant downtime (Special maintenance for the mechanical group)
  • 9. 9 FACTOR 2 – MATERIAL SELECTION Material choice 5%
  • 10. 10 MATERIALS SELECTION The selection of correct material is key to maintaining high availability. During the design phase, the following aspects have to be taken in consideration: › Chemistry of the geothermal fluid and dosing chemicals › Geothermal harsh environment with presence of H2S › Other environmental factors (extreme temperatures, atmosphere humidity and salinity)
  • 11. 11 FACTOR 3 – ERECTION & COMMISSIONING Erection & Commissioning 15%
  • 12. 12 ERECTION AND COMMISSIONING Having designed and constructed 25 geothermal power plants, in only 6 years, we have developed internal quality procedures for the correct execution of construction and commissioning phases to guarantee high quality standards even under tight project schedules and short deadlines
  • 13. 13 FACTOR 4 – TRAINING Training of operators/client 10%
  • 14. 14 TRAINING OF THE OPERATORS/CLIENT day Description Location 1 Introduction to ORC Exergy office 1 Plant process principles Exergy office 1 Plant process description Exergy office 2 Mechanical system description #1 Exergy office 2 Mechanical system description #2 Exergy office 2 ORC Electrical system description Exergy office 3 ORC Control system description Exergy office 3 Operating principles Exergy office 4 Operation Exergy office 4 Operation Exergy office 5 Safety Exergy office / working fluid supplier office 5 Safety Exergy office / working fluid supplier office 6 Transfer to site Exergy ORC plant 6 Plant introduction Exergy ORC plant 6 Plant visit and explanation Exergy ORC plant 7 Practical Site activities Exergy ORC plant
  • 15. 15 FACTOR 5 – PLANNING OF MAINTENANCE Planning of maintenance activities 15%
  • 16. 16 PLANNING OF MAINTENANCE ACTIVITIES A correct planning and execution of the maintenance activities is key to obtain high plant availability. Exergy provides after sales service contracts which include: All the main programmed maintenance activities that cause unavailability in a binary plant are addressed within the service contract. It is key to properly predict and schedule the activities to be done in order to reduce at minimum plant downtime. › Remote assistance 24/7 online and by phone › Up to 2 services per year by Exergy technicians › Preventive monitoring of parts replacements › Filters, seals and fluids replacement › Control and monitoring of systems checks
  • 17. 17 FACTOR 6&7 – OPERATION PERSONNEL Careful choice of operation personnel 10% Site staff 5%
  • 18. 18 SELECTION OF OPERATION PERSONNEL AND SITE STAFF The site staff have to be carefully selected and trained for correct operation of the plant: › Experienced personnel › Committed to the good result of the project and proactive in looking for problems and rapidly solve them A good team of site personnel is generally composed by one mechanical and one electrical technician that remain 24/7 at site
  • 19. 19 FACTOR 8 – KNOWLEDGE OF ORC PROCESS Knowledge of ORC process for remote support 15%
  • 20. 20 KNOWLEDGE OF ORC PROCESS AND REMOTE SUPPORT Exergy’s service personnel is: › Experienced on numerous other geothermal power plants › Constantly trained and updated › Involved in the project from the early design phases
  • 21. 21 FACTOR 9 – SPARE PARTS STOCK Spare parts stocks 15%
  • 22. 22 SPARE PARTS STOCK The selection of the correct spare parts list and replacement strategy depend on the following factors: › Plant design › Plant accessibility and shipping logistics › Customer’s Business Plan
  • 23. 23 CONCLUSION › EXERGY binary power plant register very high availability records. › The correct management of some key plant factors is key for reliable and constant operation of binary power plants which result in constant revenues and successful business plans
  • 26. 26 EDA REN OVAVEIS, PICO ALT O, T E R C E I R A ( A Z O R E S , P T ) Y E A R : 2 0 1 5 A P P L I C A T I O N : G E O P O W E R : 4 M W
  • 27. 27 BEŞTEPELER ENERJI, KUBILAY 1, TURKEY Y E A R : 2 0 1 5 A P P L I C A T I O N : G E O P O W E R : 2 4 M W
  • 28. 28 GREENECO ENERJI, SARAYKÖY 1, TURKEY Y E A R : 2 0 1 5 A P P L I C A T I O N : G E O P O W E R : 1 2 M W
  • 29. 29 ENERGY HOLDING, KEMALIYE 1 & 2 TURKEY Y E A R : 2 0 1 5 A P P L I C A T I O N : G E O P O W E R : 1 2 M W
  • 30. 30 KEN KIPAS, MEHMET HAN,TURKEY Y E A R : 2 0 1 5 A P P L I C A T I O N : G E O P O W E R : 2 5 M W
  • 31. 31 KARADENIZ HOLDING, UMURLU 1, TURKEY Y E A R : 2 0 1 5 A P P L I C A T I O N : G E O P O W E R : 1 2 M W
  • 32. 32 AKÇA ENERJI DENIZLI, TURKEY Y E A R : 2 0 1 4 A P P L I C A T I O N : G E O P O W E R : 4 M W C l i c k f o r v i d e o
  • 33. H E A D O F F I C E Via degli Agresti, 6 40123 Bologna (BO) ITALY Via Santa Rita, 14 21057 Olgiate Olona (VA) ITALY Tel +39 0331 18 17 711 Fax +39 0331 18 17 731 O P E R A T I N G H E A D Q U A R T E R S E X E R G Y - O R C . C O M I N F O @ E X E R G Y . I T 33 operating hq