Domain expertise in Engineering-production
Expertise in ramping up projects with competent cross-functional skills and on time execution
Diligently implemented 5S and WCM activities; proficient in Erection & Commissioning of equipments; successfully
managed various projects at Gujarat Guardian Ltd., Petrofils Cooperative Ltd. and Birla Copper (Hindalco Industries)
CORE COMPETENCIES
Engineering
Project Management
Project Execution
Team management
Operation
Liaison & Coordination
PROFILE SUMMARY
EDUCATION
B.E. (Mechanical Engineering) from
Saurastra University, with 69% in
IT SKILSS
Autocad-2000 and other computer
packages
ORGANISATIONAL EXPERIENCE
• A result-oriented professional with 22 years of experience
 Diligent in steering improvement initiatives with focus on
streamlining and managing projects and plants.
 Implementing project plans within pre-set budgets and facilitating
end-to-end management of multiple projects.
 Good team builder and leader
• An excellent communicator with honed relationship, leadership, planning,
coordination and analytical skills with ability to view the larger picture,
taking business-critical decisions from the front to attain business/
operational excellence
SI N CE MM’05: BI R L A CO P PE R , HIN DA L CO I N D U ST R I E S
LO CA T IO N
GR O WT H PA T H :
04’05 TO 08’08 MA I N T E N A NC E MAN A G ER
08’08 TO 08’11 SR . MA N AG ER ME C H AN I C AL
08’11 TO 08’14 AS S I S T A N T GE N ER A L M A NA G E R
0814 TO T I L L D A T E HE A D -UT I L I T Y
EXPERTISE
Commissioning of Utility (Boiler,
DM plant, Nitrogen plant) Nylon
plant, Polyester plant, LPG System,
LNG stream.
Maintenance of Polyplant -36x2
tons per day includes dowtherm
heating units, polymerization
vessels, pumps, drier, screws,
winders etc.
Selection, commissioning and
maintenance of Gold and silver
plant expansion
De-bottlenecking and successful
running of Water treatment and
Effluent treatment plant
Commissioned and maintained
2X2.5MW D. G. sets, Maintenance
of 132kv yard, 11KV PCC
Batch house and Float plant-640
tpd of glass, Copper Refinery 2.5
lacs tons per annum,Precious
Mineral Recovery (Gold + silver)
Commissioning and successful
running of Aluminum mirror plant,
UV coating plant in Guardian
Planning & implementing the
preventive and predictive
maintenance schedules for DG sets,
compressors, DM plant, Poly plant,
cooling tower, LPG system, batch
house, air conditioning and float
plant
Liaising with agencies & regulatory
authorities like GEB, Water supply
department etc to ensure
compliance to the requisite rules &
regulation
Formulating system for cost
management
Corporate Insurance Management
PERSONAL DETAILS
Date of Birth: 8th February 1966
Address: C 5/6 Birla copper township
Dahej –Gujarat -392130
Languages Known: English, Gujarati
& Hindi
Key Result Areas:
 Responsible for overall performance of the department in multi-
project scenario to execute within time & quality venders
 Supervising project progress and outstanding issues; ensuring the
quality & timeliness of the deliverables; reporting on the project’s
progress, department progress and escalating issues
 Monitoring the entire gamut of project work for ensuring
completion of project within the time & cost parameters
 Participating in regular meetings to interact with contractors,
client and the project team for discussing & resolving potential
issues including those of contracts
 Involved in engineering coordination with site, commissioning
support and tackling all technical issues coming from site and
 Driving strong processes and discipline across the teams and
ensuring that team work on issues with pride, integrity, and a
sense of urgency
 Interacting with higher management at divisional head level,
taking decisions on administrative and policy matters planning &
forecast of resources, budget, strategic planning for optimum
utilization of resources and setting a clear vision of company goals,
etc.
PREVIOUS EXPERIENCE
MM’93 T O MM’02: GU J A R A T GUA R D I A N LT D .,LO C A T IO N
GR O WT H PA T H :
09’93 TO 97 SH I F T MA I N T EN A N CE EX EC U T I V E
97 T O 2000 EN I N E ER I N G EX E C U T I V E
2000 TO 05 FL O A T PL A N T EN G I N EER
MM’91 T O MM’93: PE T R O F IL S CO O PE RA T I VE L T D ., LO C A T IO N
GR O WT H PA T H :
01’91TO 12’91 GET
08’91 TO 08’93 MA I N T E N A NC E EN G I N E ER
SIGNIFICANT ACHIEVEMENTS
 Core member of the 'Maximo & Procurement Team' of the plant
 Successfully designed, procured, fabricated & commissioned lean
phase conveying system for conveying lime powder at 4.5tons/hr.
 Developed team from BSC/Diploma Cadre to successfully run
water treatment plant of 28000m3/day and effluent treatment
plant of 100tons/day of acid; referred as role model plant by our
COO; UV coating plant in 1999
 Diligently streamlined the maintenance activities in copper
refinery, Gold and silver area, WTP/ ETP area of Birla copper.Plant
running practically maintenance free
 Revamped the material procurement & delivering system of pipe
fittings & pipes required for the commissioning of plant
 Served as Project Manager, successfully commissioned Aluminum
Plant (40km3 of mirror capacity), in 1998
 Conceptualized and implemented cutting project of 19mm thick
glass (maiden project of the company)
 Effectively commissioned 5 ton loader in place of the preexisting
3 ton loader, resulting in bringing down the plant breakdowns
 Strengthen the existing 80 km long pipe to ensure smooth supply
of 7MGD Water to birla copper

More Related Content

What's hot

SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
Sudarshan Caushik
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
shaikh haroon
 
CV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process ProjectCV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process Project
Jose F. Gonzalez, P. Eng.
 
Nirav Fanasia
Nirav FanasiaNirav Fanasia
Nirav Fanasia
NIRAV FANASIA
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
bannichensavier savier
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
Srinivas Sirigineedi
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
Rizwan Haider
 
Clifton SC - CV 2017
Clifton SC - CV 2017Clifton SC - CV 2017
Clifton SC - CV 2017
Stewart Clifton
 
Roy Ong CV (2015)
Roy Ong CV (2015)Roy Ong CV (2015)
Roy Ong CV (2015)
Roy Ong
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
Saif kharal
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
Muthukumar RajaGounder
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
gufron gufron
 
Piping foreman resume Binoy tc
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tc
BINOY TC
 
Maintenance Engineer
Maintenance EngineerMaintenance Engineer
Maintenance Engineer
DK vikas
 
Jose f gonzalez, p. eng mech & process project
Jose f gonzalez, p. eng mech & process projectJose f gonzalez, p. eng mech & process project
Jose f gonzalez, p. eng mech & process project
Jose F. Gonzalez, P. Eng.
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internal
Jeff Sperlbaum
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
Suresha Rao
 
Resume UAE
Resume UAEResume UAE
Resume UAE
santosh pawar
 
shahul HVAC - new 1
shahul HVAC - new 1shahul HVAC - new 1
shahul HVAC - new 1
shahulhameed peer mohamed
 

What's hot (20)

SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
CV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process ProjectCV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process Project
 
Nirav Fanasia
Nirav FanasiaNirav Fanasia
Nirav Fanasia
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
 
Clifton SC - CV 2017
Clifton SC - CV 2017Clifton SC - CV 2017
Clifton SC - CV 2017
 
Roy Ong CV (2015)
Roy Ong CV (2015)Roy Ong CV (2015)
Roy Ong CV (2015)
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
Piping foreman resume Binoy tc
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tc
 
Maintenance Engineer
Maintenance EngineerMaintenance Engineer
Maintenance Engineer
 
Jose f gonzalez, p. eng mech & process project
Jose f gonzalez, p. eng mech & process projectJose f gonzalez, p. eng mech & process project
Jose f gonzalez, p. eng mech & process project
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internal
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
shahul HVAC - new 1
shahul HVAC - new 1shahul HVAC - new 1
shahul HVAC - new 1
 

Similar to Resume

Ashok Kumar_CV_Mar2015
Ashok Kumar_CV_Mar2015Ashok Kumar_CV_Mar2015
Ashok Kumar_CV_Mar2015
Ashok Kumar
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
MAHENDRA SINGH
 
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resumeresume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
H K Sharma
 
arco.cv
arco.cvarco.cv
arco.cv
Arco Ghosh
 
CV rajesh
CV rajeshCV rajesh
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_dates
Dominique Tharandt
 
PRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CPRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016C
Roderick Pruks
 
Topside
TopsideTopside
Topside
sachi Sachi
 
Gangopadhaya Shekhar CV
Gangopadhaya Shekhar CVGangopadhaya Shekhar CV
Gangopadhaya Shekhar CV
Shekhar Gangopadhaya
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
Rashid Faruqi
 
Resume
ResumeResume
Resume
singh R.P
 
updated CV
updated CVupdated CV
updated CV
sahadevan pillai
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
Prasad naik
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
Abhinav Rawat
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
Tarek Fergani
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
Vinoth Kumar
 
Mohammad Rehan Akbar Khan .P.M
Mohammad Rehan Akbar Khan .P.MMohammad Rehan Akbar Khan .P.M
Mohammad Rehan Akbar Khan .P.M
Rehan Khan
 
Ramzi Sahnoun_Application_for_Projects_Manager.pdf
Ramzi Sahnoun_Application_for_Projects_Manager.pdfRamzi Sahnoun_Application_for_Projects_Manager.pdf
Ramzi Sahnoun_Application_for_Projects_Manager.pdf
sahnounramzi2
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
Mrutyunjay Matarangimath
 
updated_resume
updated_resumeupdated_resume
updated_resume
sreedhar govindapillai
 

Similar to Resume (20)

Ashok Kumar_CV_Mar2015
Ashok Kumar_CV_Mar2015Ashok Kumar_CV_Mar2015
Ashok Kumar_CV_Mar2015
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
 
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resumeresume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
 
arco.cv
arco.cvarco.cv
arco.cv
 
CV rajesh
CV rajeshCV rajesh
CV rajesh
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_dates
 
PRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CPRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016C
 
Topside
TopsideTopside
Topside
 
Gangopadhaya Shekhar CV
Gangopadhaya Shekhar CVGangopadhaya Shekhar CV
Gangopadhaya Shekhar CV
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Resume
ResumeResume
Resume
 
updated CV
updated CVupdated CV
updated CV
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
Mohammad Rehan Akbar Khan .P.M
Mohammad Rehan Akbar Khan .P.MMohammad Rehan Akbar Khan .P.M
Mohammad Rehan Akbar Khan .P.M
 
Ramzi Sahnoun_Application_for_Projects_Manager.pdf
Ramzi Sahnoun_Application_for_Projects_Manager.pdfRamzi Sahnoun_Application_for_Projects_Manager.pdf
Ramzi Sahnoun_Application_for_Projects_Manager.pdf
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
updated_resume
updated_resumeupdated_resume
updated_resume
 

Resume

  • 1. THACKAR PARESH S E-Mail: paresh.thakker@adityabirla.com; pthakkar2003@yahoo.com Mobile: 09904402552 SENIOR PROFESSIONAL: ~ Project Management/ Operations/maintenance Domain expertise in Engineering-production Expertise in ramping up projects with competent cross-functional skills and on time execution Diligently implemented 5S and WCM activities; proficient in Erection & Commissioning of equipments; successfully managed various projects at Gujarat Guardian Ltd., Petrofils Cooperative Ltd. and Birla Copper (Hindalco Industries) CORE COMPETENCIES Engineering Project Management Project Execution Team management Operation Liaison & Coordination PROFILE SUMMARY EDUCATION B.E. (Mechanical Engineering) from Saurastra University, with 69% in IT SKILSS Autocad-2000 and other computer packages ORGANISATIONAL EXPERIENCE • A result-oriented professional with 22 years of experience  Diligent in steering improvement initiatives with focus on streamlining and managing projects and plants.  Implementing project plans within pre-set budgets and facilitating end-to-end management of multiple projects.  Good team builder and leader • An excellent communicator with honed relationship, leadership, planning, coordination and analytical skills with ability to view the larger picture, taking business-critical decisions from the front to attain business/ operational excellence SI N CE MM’05: BI R L A CO P PE R , HIN DA L CO I N D U ST R I E S LO CA T IO N GR O WT H PA T H : 04’05 TO 08’08 MA I N T E N A NC E MAN A G ER 08’08 TO 08’11 SR . MA N AG ER ME C H AN I C AL 08’11 TO 08’14 AS S I S T A N T GE N ER A L M A NA G E R 0814 TO T I L L D A T E HE A D -UT I L I T Y
  • 2. EXPERTISE Commissioning of Utility (Boiler, DM plant, Nitrogen plant) Nylon plant, Polyester plant, LPG System, LNG stream. Maintenance of Polyplant -36x2 tons per day includes dowtherm heating units, polymerization vessels, pumps, drier, screws, winders etc. Selection, commissioning and maintenance of Gold and silver plant expansion De-bottlenecking and successful running of Water treatment and Effluent treatment plant Commissioned and maintained 2X2.5MW D. G. sets, Maintenance of 132kv yard, 11KV PCC Batch house and Float plant-640 tpd of glass, Copper Refinery 2.5 lacs tons per annum,Precious Mineral Recovery (Gold + silver) Commissioning and successful running of Aluminum mirror plant, UV coating plant in Guardian Planning & implementing the preventive and predictive maintenance schedules for DG sets, compressors, DM plant, Poly plant, cooling tower, LPG system, batch house, air conditioning and float plant Liaising with agencies & regulatory authorities like GEB, Water supply department etc to ensure compliance to the requisite rules & regulation Formulating system for cost management Corporate Insurance Management PERSONAL DETAILS Date of Birth: 8th February 1966 Address: C 5/6 Birla copper township Dahej –Gujarat -392130 Languages Known: English, Gujarati & Hindi Key Result Areas:  Responsible for overall performance of the department in multi- project scenario to execute within time & quality venders  Supervising project progress and outstanding issues; ensuring the quality & timeliness of the deliverables; reporting on the project’s progress, department progress and escalating issues  Monitoring the entire gamut of project work for ensuring completion of project within the time & cost parameters  Participating in regular meetings to interact with contractors, client and the project team for discussing & resolving potential issues including those of contracts  Involved in engineering coordination with site, commissioning support and tackling all technical issues coming from site and  Driving strong processes and discipline across the teams and ensuring that team work on issues with pride, integrity, and a sense of urgency  Interacting with higher management at divisional head level, taking decisions on administrative and policy matters planning & forecast of resources, budget, strategic planning for optimum utilization of resources and setting a clear vision of company goals, etc. PREVIOUS EXPERIENCE MM’93 T O MM’02: GU J A R A T GUA R D I A N LT D .,LO C A T IO N GR O WT H PA T H : 09’93 TO 97 SH I F T MA I N T EN A N CE EX EC U T I V E 97 T O 2000 EN I N E ER I N G EX E C U T I V E 2000 TO 05 FL O A T PL A N T EN G I N EER MM’91 T O MM’93: PE T R O F IL S CO O PE RA T I VE L T D ., LO C A T IO N GR O WT H PA T H : 01’91TO 12’91 GET 08’91 TO 08’93 MA I N T E N A NC E EN G I N E ER SIGNIFICANT ACHIEVEMENTS  Core member of the 'Maximo & Procurement Team' of the plant  Successfully designed, procured, fabricated & commissioned lean phase conveying system for conveying lime powder at 4.5tons/hr.  Developed team from BSC/Diploma Cadre to successfully run water treatment plant of 28000m3/day and effluent treatment plant of 100tons/day of acid; referred as role model plant by our COO; UV coating plant in 1999  Diligently streamlined the maintenance activities in copper refinery, Gold and silver area, WTP/ ETP area of Birla copper.Plant running practically maintenance free  Revamped the material procurement & delivering system of pipe fittings & pipes required for the commissioning of plant  Served as Project Manager, successfully commissioned Aluminum Plant (40km3 of mirror capacity), in 1998  Conceptualized and implemented cutting project of 19mm thick glass (maiden project of the company)  Effectively commissioned 5 ton loader in place of the preexisting 3 ton loader, resulting in bringing down the plant breakdowns  Strengthen the existing 80 km long pipe to ensure smooth supply of 7MGD Water to birla copper