Types of Developments
 In studying the subject of hydropower engineering, it is
important to understand the different types of development.
The following classification system are:
i. Run-of-river developments:
 A dam with a short penstock (supply pipe) directs the water to
the turbines, using the natural flow of the river with very little
alteration to the terrain (land) stream channel at the site and
little impoundment of the water.
ii. Diversion and canal developments:
 The water is diverted from the natural channel into canal or a
long penstock, thus changing the flow of the water in the
stream for a considerable distance.
Cont’…
iii. Storage regulation developments:
 An extensive impoundment at the power plant or at reservoirs
upstream of the power plant permits changing the flow of the
river by storing water during high-flow periods to augment
(enlarge) the water available during the low-flow periods, thus
supplying the demand for energy in a more efficient manner.
 The word storage is used for long-time impounding (storing) of
water to meet the seasonal fluctuation in water, availability and
the fluctuations in energy demand.
 While the word pondage refers to short-time (daily) impounding
of water to meet the short-time changes
Cont’…
iv. Pumped storage developments:
 Water is pumped from a lower reservoir to a higher reservoir
using inexpensive dump power during periods of low energy
demand.
 The water is then run down through the turbines to produce
power to meet peak demands.
v. Tidal power developments:
 In some estuaries, tidal power can be economically harnessed
to develop electric energy.
 These developments use the water flowing back and forth as a
result of tidal action and the fact that there is a significant
difference in elevation of the water surface in the estuary from
one stage of tide to another.
Cont’…
VI. Single-purpose developments:
 The water is used only for the purpose only producing
electricity.
VII. Multipurpose developments:
 Hydropower production is just one of many purposes for which
the water resources are used. Other uses might include, for
example:
 irrigation, flood control, navigation (direction finding),
municipal (public), and industrial water supply.
 Another way of classifying hydropower development is with
respect to the manner in which the hydropower plant is used to
meet the demand for electrical power.
Cont’…
VIII. Base-load developments:
 Energy available essentially at all times is referred to as firm
power.
IX. Peak-load developments:
 Peak demands for electric power occur daily, weekly, and
seasonally
 Five main aspects commonly used for classification of
hydropower plants
 design capacity (installed capacity)
 design head
 design type
 type of supply: grid type / destination of supply
 operation (base or peak)
Hydropower Efficiency

Hydropower Efficiency
 Hydropower is very efficient
– Efficiency = (electrical power delivered to the “busbar”)
÷ (potential energy of head water)
 Typical losses are due to
– Frictional drag and turbulence of flow
– Friction and magnetic losses in turbine & generator
 Overall efficiency ranges from 75-95%
H
Q
g
P 


 
Cont’…
P = power in kilowatts (kW)
g = gravitational acceleration (9.81 m/s2)
 = turbo-generator efficiency (0<n<1)
Q = quantity of water flowing (m3/sec)
H = effective head (m)
Example 1. Consider a mountain stream with an
effective ead of 25 meters (m) and a flow rate of
600 liters (ℓ) per minute. How much power could a
hydro plant generate? Assume plant efficiency ()
of 83%.
Cont’…
 H = 25 m
 Q = 600 ℓ/min × 1 m3/1000 ℓ × 1 min/60sec
Q = 0.01 m3/sec
  = 0.83
 P  10QH = 10(0.83)(0.01)(25) = 2.075
P  2.1 kW
Cont’…
Hydropower Advantages
 No fuel charges.
 an hydro-electric plant is highly reliable
 Maintenance and operation charges are very low.
 Running cost of the plant is low.
 The plant has no stand by losses.
 The plant efficiency does not change with age.
 It takes a few minutes to run and synchronise the plant.
 Less supervising staff is required.
 No fuel transportation problem.
 No ash problem and atmosphere is not polluted since no smoke
is produced in the plant.
 In addition to power generation these plants are also used for
Based on Generating capacity
Hydropower Disadvantages
 It requires large initial investments
 It requires long transmission lines
 Social and environmental impacts
Social impact
 Population displacement
 Loss of social networks and changing way of living
 Dams can facilitate development of diseases
 Diversion of mountain streams
 Blockage of fish passage both upstream and downstream
 Storing water in reservoir may reduce the final flow as a result
of evaporation
Cont’…
Environmental impacts
 Reduction in the flow of soil and nutrients
 Pollution is stored in the reservoir
 Possible dam failure
 Seismic risks
 Loss of cultural heritage
 local increase in water vapor and some temperature
effects
 Vegetation rotting under water produces methane implies
emissions
THANK YOU

More Related Content

Similar to 2. Development .ppt

Small scale-water-current-turbines-for-river-applications
Small scale-water-current-turbines-for-river-applicationsSmall scale-water-current-turbines-for-river-applications
Small scale-water-current-turbines-for-river-applicationsToz Koparan
 
hydro power ppt in digital ekectronics ppt
hydro power ppt in digital ekectronics  ppthydro power ppt in digital ekectronics  ppt
hydro power ppt in digital ekectronics pptkumarankit06875
 
Studies on Small Hydro-Power Potentials of Itapaji Dam in Ekiti State, Nigeria.
Studies on Small Hydro-Power Potentials of Itapaji Dam in Ekiti State, Nigeria.Studies on Small Hydro-Power Potentials of Itapaji Dam in Ekiti State, Nigeria.
Studies on Small Hydro-Power Potentials of Itapaji Dam in Ekiti State, Nigeria.inventionjournals
 
Development trend of chinese hydroelectric generation technology of hydro pow...
Development trend of chinese hydroelectric generation technology of hydro pow...Development trend of chinese hydroelectric generation technology of hydro pow...
Development trend of chinese hydroelectric generation technology of hydro pow...Kambohwell Publisher Enterprises
 
Hydro power by salik haroon abbasi
Hydro  power by salik haroon abbasiHydro  power by salik haroon abbasi
Hydro power by salik haroon abbasiSalik Haroon Abbasi
 
Hydroelectric power plant (2)
Hydroelectric power plant (2)Hydroelectric power plant (2)
Hydroelectric power plant (2)AISSMS IOIT,PUNE
 
Earth Sci Report (With Animations) (2).pptx
Earth Sci Report (With Animations) (2).pptxEarth Sci Report (With Animations) (2).pptx
Earth Sci Report (With Animations) (2).pptxChrisLibarios
 
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT Al KAREEM SHAIKH
 
orca_share_media1554943191261.pptx
orca_share_media1554943191261.pptxorca_share_media1554943191261.pptx
orca_share_media1554943191261.pptxJohnwil Sunio
 
Lecture Note 2_2023A Power Systems II (PWRS 201).pdf
Lecture Note 2_2023A Power Systems II (PWRS 201).pdfLecture Note 2_2023A Power Systems II (PWRS 201).pdf
Lecture Note 2_2023A Power Systems II (PWRS 201).pdfNandi77
 
Hydroelectric energy
Hydroelectric energy Hydroelectric energy
Hydroelectric energy ameermudasar
 
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote VillagesPico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villagesiosrjce
 
The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)theijes
 
hydro-electric-power-plant-.pptx
hydro-electric-power-plant-.pptxhydro-electric-power-plant-.pptx
hydro-electric-power-plant-.pptxSuryakant Morey
 
Hydro Electric Power Plant
Hydro Electric Power Plant Hydro Electric Power Plant
Hydro Electric Power Plant ANKIT KUMAR
 

Similar to 2. Development .ppt (20)

Small scale-water-current-turbines-for-river-applications
Small scale-water-current-turbines-for-river-applicationsSmall scale-water-current-turbines-for-river-applications
Small scale-water-current-turbines-for-river-applications
 
hydro power ppt in digital ekectronics ppt
hydro power ppt in digital ekectronics  ppthydro power ppt in digital ekectronics  ppt
hydro power ppt in digital ekectronics ppt
 
Studies on Small Hydro-Power Potentials of Itapaji Dam in Ekiti State, Nigeria.
Studies on Small Hydro-Power Potentials of Itapaji Dam in Ekiti State, Nigeria.Studies on Small Hydro-Power Potentials of Itapaji Dam in Ekiti State, Nigeria.
Studies on Small Hydro-Power Potentials of Itapaji Dam in Ekiti State, Nigeria.
 
Hydro Power Plants
Hydro Power PlantsHydro Power Plants
Hydro Power Plants
 
Development trend of chinese hydroelectric generation technology of hydro pow...
Development trend of chinese hydroelectric generation technology of hydro pow...Development trend of chinese hydroelectric generation technology of hydro pow...
Development trend of chinese hydroelectric generation technology of hydro pow...
 
Hydro power by salik haroon abbasi
Hydro  power by salik haroon abbasiHydro  power by salik haroon abbasi
Hydro power by salik haroon abbasi
 
Hydroelectric power plant (2)
Hydroelectric power plant (2)Hydroelectric power plant (2)
Hydroelectric power plant (2)
 
Earth Sci Report (With Animations) (2).pptx
Earth Sci Report (With Animations) (2).pptxEarth Sci Report (With Animations) (2).pptx
Earth Sci Report (With Animations) (2).pptx
 
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
 
orca_share_media1554943191261.pptx
orca_share_media1554943191261.pptxorca_share_media1554943191261.pptx
orca_share_media1554943191261.pptx
 
Lecture Note 2_2023A Power Systems II (PWRS 201).pdf
Lecture Note 2_2023A Power Systems II (PWRS 201).pdfLecture Note 2_2023A Power Systems II (PWRS 201).pdf
Lecture Note 2_2023A Power Systems II (PWRS 201).pdf
 
Hydroelectric energy
Hydroelectric energy Hydroelectric energy
Hydroelectric energy
 
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote VillagesPico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
 
Hydropower part -I.pptx
Hydropower part -I.pptxHydropower part -I.pptx
Hydropower part -I.pptx
 
The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
hydro-electric-power-plant-.pptx
hydro-electric-power-plant-.pptxhydro-electric-power-plant-.pptx
hydro-electric-power-plant-.pptx
 
Thesis on Hydro Power Plant
Thesis on Hydro Power PlantThesis on Hydro Power Plant
Thesis on Hydro Power Plant
 
hydro-181014224840.pdf
hydro-181014224840.pdfhydro-181014224840.pdf
hydro-181014224840.pdf
 
Hydro Electric Power Plant
Hydro Electric Power Plant Hydro Electric Power Plant
Hydro Electric Power Plant
 

More from hussenbelew

Computer Applications in Power Systems 2023 SECOND.pdf
Computer Applications in Power Systems 2023 SECOND.pdfComputer Applications in Power Systems 2023 SECOND.pdf
Computer Applications in Power Systems 2023 SECOND.pdfhussenbelew
 
Research Methodology 2014.ppt
Research Methodology 2014.pptResearch Methodology 2014.ppt
Research Methodology 2014.ppthussenbelew
 
Chapter 3 ;Plant Design.ppt
Chapter 3 ;Plant Design.pptChapter 3 ;Plant Design.ppt
Chapter 3 ;Plant Design.ppthussenbelew
 
6. Hydraulic Turbines.ppt
6. Hydraulic Turbines.ppt6. Hydraulic Turbines.ppt
6. Hydraulic Turbines.ppthussenbelew
 
Ch-10-Grid off.ppt
Ch-10-Grid off.pptCh-10-Grid off.ppt
Ch-10-Grid off.ppthussenbelew
 
4_5958416552171670667.ppt
4_5958416552171670667.ppt4_5958416552171670667.ppt
4_5958416552171670667.ppthussenbelew
 
Ch-2-2 Thermal power plant.ppt
Ch-2-2 Thermal power plant.pptCh-2-2 Thermal power plant.ppt
Ch-2-2 Thermal power plant.ppthussenbelew
 
Chapter one(1).pdf
Chapter one(1).pdfChapter one(1).pdf
Chapter one(1).pdfhussenbelew
 
4. Spillways.ppt
4. Spillways.ppt4. Spillways.ppt
4. Spillways.ppthussenbelew
 
5. Conduits, Intake, Power house and Accessories.ppt
5. Conduits, Intake, Power house and Accessories.ppt5. Conduits, Intake, Power house and Accessories.ppt
5. Conduits, Intake, Power house and Accessories.ppthussenbelew
 
3. Hydrologic and Hydraulic Design Concept.ppt
3. Hydrologic and Hydraulic Design Concept.ppt3. Hydrologic and Hydraulic Design Concept.ppt
3. Hydrologic and Hydraulic Design Concept.ppthussenbelew
 
GSM_UMTS_Single_RAN_operation_and_Maintenance_training_Volume_2.pptx
GSM_UMTS_Single_RAN_operation_and_Maintenance_training_Volume_2.pptxGSM_UMTS_Single_RAN_operation_and_Maintenance_training_Volume_2.pptx
GSM_UMTS_Single_RAN_operation_and_Maintenance_training_Volume_2.pptxhussenbelew
 

More from hussenbelew (13)

Computer Applications in Power Systems 2023 SECOND.pdf
Computer Applications in Power Systems 2023 SECOND.pdfComputer Applications in Power Systems 2023 SECOND.pdf
Computer Applications in Power Systems 2023 SECOND.pdf
 
CHAPTER- 4.ppt
CHAPTER- 4.pptCHAPTER- 4.ppt
CHAPTER- 4.ppt
 
Research Methodology 2014.ppt
Research Methodology 2014.pptResearch Methodology 2014.ppt
Research Methodology 2014.ppt
 
Chapter 3 ;Plant Design.ppt
Chapter 3 ;Plant Design.pptChapter 3 ;Plant Design.ppt
Chapter 3 ;Plant Design.ppt
 
6. Hydraulic Turbines.ppt
6. Hydraulic Turbines.ppt6. Hydraulic Turbines.ppt
6. Hydraulic Turbines.ppt
 
Ch-10-Grid off.ppt
Ch-10-Grid off.pptCh-10-Grid off.ppt
Ch-10-Grid off.ppt
 
4_5958416552171670667.ppt
4_5958416552171670667.ppt4_5958416552171670667.ppt
4_5958416552171670667.ppt
 
Ch-2-2 Thermal power plant.ppt
Ch-2-2 Thermal power plant.pptCh-2-2 Thermal power plant.ppt
Ch-2-2 Thermal power plant.ppt
 
Chapter one(1).pdf
Chapter one(1).pdfChapter one(1).pdf
Chapter one(1).pdf
 
4. Spillways.ppt
4. Spillways.ppt4. Spillways.ppt
4. Spillways.ppt
 
5. Conduits, Intake, Power house and Accessories.ppt
5. Conduits, Intake, Power house and Accessories.ppt5. Conduits, Intake, Power house and Accessories.ppt
5. Conduits, Intake, Power house and Accessories.ppt
 
3. Hydrologic and Hydraulic Design Concept.ppt
3. Hydrologic and Hydraulic Design Concept.ppt3. Hydrologic and Hydraulic Design Concept.ppt
3. Hydrologic and Hydraulic Design Concept.ppt
 
GSM_UMTS_Single_RAN_operation_and_Maintenance_training_Volume_2.pptx
GSM_UMTS_Single_RAN_operation_and_Maintenance_training_Volume_2.pptxGSM_UMTS_Single_RAN_operation_and_Maintenance_training_Volume_2.pptx
GSM_UMTS_Single_RAN_operation_and_Maintenance_training_Volume_2.pptx
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

2. Development .ppt

  • 1. Hydropower Engineering Lecture 2 School of Electrical & Computer Engineering
  • 2. Types of Developments  In studying the subject of hydropower engineering, it is important to understand the different types of development. The following classification system are: i. Run-of-river developments:  A dam with a short penstock (supply pipe) directs the water to the turbines, using the natural flow of the river with very little alteration to the terrain (land) stream channel at the site and little impoundment of the water. ii. Diversion and canal developments:  The water is diverted from the natural channel into canal or a long penstock, thus changing the flow of the water in the stream for a considerable distance.
  • 3. Cont’… iii. Storage regulation developments:  An extensive impoundment at the power plant or at reservoirs upstream of the power plant permits changing the flow of the river by storing water during high-flow periods to augment (enlarge) the water available during the low-flow periods, thus supplying the demand for energy in a more efficient manner.  The word storage is used for long-time impounding (storing) of water to meet the seasonal fluctuation in water, availability and the fluctuations in energy demand.  While the word pondage refers to short-time (daily) impounding of water to meet the short-time changes
  • 4. Cont’… iv. Pumped storage developments:  Water is pumped from a lower reservoir to a higher reservoir using inexpensive dump power during periods of low energy demand.  The water is then run down through the turbines to produce power to meet peak demands. v. Tidal power developments:  In some estuaries, tidal power can be economically harnessed to develop electric energy.  These developments use the water flowing back and forth as a result of tidal action and the fact that there is a significant difference in elevation of the water surface in the estuary from one stage of tide to another.
  • 5. Cont’… VI. Single-purpose developments:  The water is used only for the purpose only producing electricity. VII. Multipurpose developments:  Hydropower production is just one of many purposes for which the water resources are used. Other uses might include, for example:  irrigation, flood control, navigation (direction finding), municipal (public), and industrial water supply.  Another way of classifying hydropower development is with respect to the manner in which the hydropower plant is used to meet the demand for electrical power.
  • 6. Cont’… VIII. Base-load developments:  Energy available essentially at all times is referred to as firm power. IX. Peak-load developments:  Peak demands for electric power occur daily, weekly, and seasonally  Five main aspects commonly used for classification of hydropower plants  design capacity (installed capacity)  design head  design type  type of supply: grid type / destination of supply  operation (base or peak)
  • 8. Hydropower Efficiency  Hydropower is very efficient – Efficiency = (electrical power delivered to the “busbar”) ÷ (potential energy of head water)  Typical losses are due to – Frictional drag and turbulence of flow – Friction and magnetic losses in turbine & generator  Overall efficiency ranges from 75-95% H Q g P     
  • 9. Cont’… P = power in kilowatts (kW) g = gravitational acceleration (9.81 m/s2)  = turbo-generator efficiency (0<n<1) Q = quantity of water flowing (m3/sec) H = effective head (m) Example 1. Consider a mountain stream with an effective ead of 25 meters (m) and a flow rate of 600 liters (ℓ) per minute. How much power could a hydro plant generate? Assume plant efficiency () of 83%.
  • 10. Cont’…  H = 25 m  Q = 600 ℓ/min × 1 m3/1000 ℓ × 1 min/60sec Q = 0.01 m3/sec   = 0.83  P  10QH = 10(0.83)(0.01)(25) = 2.075 P  2.1 kW
  • 11. Cont’… Hydropower Advantages  No fuel charges.  an hydro-electric plant is highly reliable  Maintenance and operation charges are very low.  Running cost of the plant is low.  The plant has no stand by losses.  The plant efficiency does not change with age.  It takes a few minutes to run and synchronise the plant.  Less supervising staff is required.  No fuel transportation problem.  No ash problem and atmosphere is not polluted since no smoke is produced in the plant.  In addition to power generation these plants are also used for
  • 12. Based on Generating capacity Hydropower Disadvantages  It requires large initial investments  It requires long transmission lines  Social and environmental impacts Social impact  Population displacement  Loss of social networks and changing way of living  Dams can facilitate development of diseases  Diversion of mountain streams  Blockage of fish passage both upstream and downstream  Storing water in reservoir may reduce the final flow as a result of evaporation
  • 13. Cont’… Environmental impacts  Reduction in the flow of soil and nutrients  Pollution is stored in the reservoir  Possible dam failure  Seismic risks  Loss of cultural heritage  local increase in water vapor and some temperature effects  Vegetation rotting under water produces methane implies emissions