Lean Six Sigma 
Group 
Lean Six Sigma Measure Phase 
Tollgate Review
Lean Six Sigma 
DMAIC Tools and Activities 
 Review Project Charter 
 Validate High-Level Value 
Stream Map and Scope 
 Validate Voice of the 
Customer 
& Voice of the Business 
 Validate Problem Statement 
and Goals 
 Validate Financial Benefits 
 Create Communication Plan 
 Select and Launch Team 
 Develop Project Schedule 
 Complete Define Tollgate 
 Identify Root Causes 
 Reduce List of Potential Root 
Causes 
 Confirm Root Cause to 
Output Relationship 
 Estimate Impact of Root 
Causes on Key Outputs 
 Prioritize Root Causes 
 Value-Add Analysis 
 Takt Rate Analysis 
 Quick Wins 
 Statistical Analysis 
 Complete Analyze Tollgate 
 Develop Potential Solutions 
 Evaluate, Select, and 
Optimize Best Solutions 
 Develop ‘To-Be’ Value 
Stream Map(s) 
 Develop and Implement Pilot 
Solution 
 Implement 5s Program 
 Develop Full Scale 
Implementation Plan 
 Cost/Benefit Analysis 
 Benchmarking 
 Complete Improve Tollgate 
 Develop SOP’s, Training 
Plan & Process Controls 
 Implement Solution and 
Ongoing Process 
Measurements 
 Confirm Attainment of Project 
Goals 
 Identify Project Replication 
Opportunities 
 Training 
 Complete Control Tollgate 
 Transition Project to Process 
Owner 
 Project Charter 
 Voice of the Customer and 
Kano Analysis 
 SIPOC Map 
 Project Valuation/ROIC 
Analysis Tools 
 RACI and Quad Charts 
 Stakeholder Analysis 
 Communication Plan 
 Effective Meeting Tools 
 Inquiry and Advocacy Skills 
 Time Lines, Milestones, 
and Gantt Charting 
 Pareto Analysis 
 Value Stream Mapping 
 Process Cycle 
Efficiency/Little’s Law 
 Operational Definitions 
 Data Collection Plan 
 Statistical Sampling 
 Measurement System 
Analysis (MSA) 
 Gage R&R 
 Kappa Studies 
 Control Charts 
 Spaghetti Diagrams 
 Histograms 
 Normality Test 
 Process Capability Analysis 
 Process Constraint ID and 
Takt Time Analysis 
 Cause & Effect Analysis 
 FMEA 
 Hypothesis Tests/Conf. 
Intervals 
 Simple & Multiple Regression 
 ANOVA 
 Components of Variation 
 Conquering Product and 
Process Complexity 
 Queuing Theory 
 Replenishment Pull/Kanban 
 Stocking Strategy 
 Process Flow Improvement 
 Process Balancing 
 Analytical Batch Sizing 
 Total Productive Maintenance 
 Design of Experiments (DOE) 
 Solution Selection Matrix 
 Piloting and Simulation 
Work Control System 
 Setup reduction 
 Pugh Matrix 
 Pull System 
 Mistake-Proofing/ 
Zero Defects 
 Standard Operating 
Procedures (SOP’s) 
 Process Control Plans 
 Visual Process Control Tools 
 MGPP 
 Statistical Process Controls 
(SPC) 
 Solution Replication 
 Visual Workplace 
 Metrics 
 Project Transition Model 
 Team Feedback Session 
 Value Stream Map Flow 
 Identify Key Input, Process 
and Output Metrics 
 Develop Operational 
Definitions 
 Develop Data Collection Plan 
 Validate Measurement 
System 
 Collect Baseline Data 
 Determine Process Capability 
 Complete Measure Tollgate 
Define Measure Analyze Improve Control 
Kaizen Events Targeted in Measure to Accelerate Results 
Ten Commandments of Lean Six Sigma Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS) 2
Project Charter Updates 
Problem/Goal Statement 
Problem: Describe problem in non-technical terms 
 Statement should explain why project is important; why 
working on it is a priority 
Goal: Goals communicate “before” and “after” conditions 
 Shift mean, variance, or both? 
 Should impact cost, time, quality dimensions 
 Express goals using SMART criteria 
 Specific, Measurable, Attainable, Resource 
Requirements, Time Boundaries 
 Explain leverage and strategic implications (if any) 
Financial Impact 
Tollgate Review Schedule 
Team 
 Scope: (In-Scope/Out-of-Scope) (Process Start/Stop) 
 State financial impact of project 
 Expenses 
 Investments (inventory, capital, A/R) 
 Revenues 
 Separate “hard” from “soft” dollars 
 State financial impact of leverage opportunities (future 
projects) 
 PES Name Project Executive Sponsor (if different from PS) 
 PS Name Project Sponsor/Process Owner 
 DC Name Deployment Champion 
 GB/BB Name Green Belt/Black Belt 
 MBB Name Master Black Belt 
Core Team Role % Contrib. LSS Training 
 Team Member 1 SME XX YB 
 Team Member 2 TM XX GB 
 Team Member 3 SME XX PS 
Extended Team 
 Team Member 1 BFM XX Not Trained 
 Team Member 2 IT XX Not Trained 
Tollgate Scheduled Revised Complete 
Define: XX/XX/XX - XX/XX/XX 
Measure: XX/XX/XX XX/XX/XX XX/XX/XX 
Analyze: XX/XX/XX XX/XX/XX XX/XX/XX 
Improve: XX/XX/XX XX/XX/XX XX/XX/XX 
Control: XX/XX/XX XX/XX/XX XX/XX/XX 
 Review high-level schedule milestones here: 
 Phase Completions 
 Tollgate Reviews 
Enter Key Slide Take Away (Key Point) Here 
How to Write a Project Charter Training Video by projectmanagervideos 
International Standards for Lean Six Sigma (ISLSS) 3
Measure Overview 
 CTQ: ? 
 Unit (d) or Mean (c): ? 
 Defect (d) or St. Dev. (c): ? 
 PCE%: ? 
 DPMO (d): ? 
 Sigma (Short Term): ? 
 Sigma (Long Term):? 
 MSA Results: show the percentage result of the GR&R, 
AR&R or other MSA carried out in the project 
 Root cause: 
 Quick Win #1 
 Root cause: 
 Quick Win #2 
 Root cause: 
 Quick Win #3 
Observation 
Individual Value 
1 28 55 82 109 136 163 190 217 244 
40 
35 
30 
25 
20 
UC L=37.70 
_ 
X=29.13 
LC L=20.56 
Observation 
Moving Range 
1 28 55 82 109 136 163 190 217 244 
10.0 
7.5 
5.0 
2.5 
0.0 
UC L=10.53 
__ 
MR=3.22 
LC L=0 
I-MR Chart of Delivery Time 
 Detailed process mapping 
MSA 
 Value Stream Mapping 
 Data Collection Planning 
 Basic Statistics 
 Process Capability 
 Histograms 
 Time Series Plot 
 Probability Plot 
 Pareto Analysis 
 Operational Def. 
 5s 
 Pull 
 Control Charts 
Enter Key Slide Take Away (Key Point) Here 
4 
Process Capability Graphical Analysis 
Root Cause / Quick Win Tools Used 
Process Capability Training Video by SigmaXL 
International Standards for Lean Six Sigma (ISLSS)
Data Collection Plan 
Performance 
Measure 
Operational 
Definition 
Data Source 
and Location 
How Will Data 
Be Collected 
 For each performance measure (Y), update a data collection plan 
 Include MSA measure plan (Gantt chart, MS project plan is Optional) 
 Add Financial measure plan if separate from performance Y 
 Add any Time Study or other data collection plans for Value Stream Map 
 Sample Size Calculation 
 Use additional slides if needed 
Who Will 
Collect Data 
When Will Data 
Be Collected 
Sample 
Size 
Stratification 
Factors 
How will data 
be used? 
VOC 
MSA 
Process 
VSM 
Financials 
Others 
Enter Key Slide Take Away (Key Point) Here 
DMAIC Case Study to Improve Customer Satisfaction Video by SigmaXL 
International Standards for Lean Six Sigma (ISLSS) 5
Operational Definitions 
 Y – Continuous data Process start/stop and 
cycle time boundaries, such as the unit of 
measure (ex minutes), the unit (the thing you are 
measuring), will you include weekends, holidays, 
non-business hours? 
 Y – Discrete data Define Success/Defect or other 
attribute values you will measure 
 X – The subgroups values or X-factor groupings 
you will use on your project data collection 
 Other unique terms that apply to your project 
that require clear operational definitions 
 Use additional slides as needed to complete your 
operational definitions 
Add Visual Example 
Add Visual Example 
Enter Key Slide Take Away (Key Point) Here 
The Gemba Glossary Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS) 6
MSA Conclusions 
 The measurement systems are acceptable. The data is considered to have no potential for 
significant error. Need to be careful to appropriately use the data during the Analyze Phase. 
Type of 
Measurement Error 
Description Considerations to this Project 
Discrimination 
(resolution) 
The ability of the measurement system 
to divide into “data categories” 
Work hrs can be measured to <.25 hrs. 
Tool usage measure to +- 2 min. 
Bias The difference between an observed 
average measurement result and a 
reference value 
No bias - Work hours and radar start-stop 
times consistent through population. 
Stability The change in bias over time No bias of work hrs & radar usage data. 
Repeatability The extent variability is consistent Not an issue. Labor and radar usage is 
historical and felt to be accurate enough 
for insight and analysis. 
Reproducibility Different appraisers produce consistent 
results 
Remarks in usage data deemed not 
reproducible, not used in determining 
which radars were used in each op 
Variation The difference between parts n/a to this process. 
Enter Key Slide Take Away (Key Point) Here 
Gage R&R (Variable Data) Training Video using Minitab by Janeth Leon 
International Standards for Lean Six Sigma (ISLSS) 7
Baseline Basic Statistics 
 Describe the current 
process shape “normality” 
and distribution. 
 Describe the center, Mean 
or Median? 
 Describe the range 
(maximum value – 
minimum value) the 
standard deviation in X 
(Time) 
Download a 30 Day Free Trial at http://www.sigmaxl.com 
SigmaXL now Available for Mac! 
Use as an Add-in to the already familiar Excel, SigmaXL simplifies 
your data analysis and is a pleasure to use 
Enter Key Slide Take Away (Key Point) Here 
Descriptive Statistic’s Training Video by SigmaXL 
International Standards for Lean Six Sigma (ISLSS) 8
Baseline Process Capability 
 # data points collected between 
XX/XX/XX thru XX/XX/XX 
 Mean X days, St. Dev. X.XX 
days, Describe the impact the 
current state process capability. 
 With an overall PPM of X 
defects per million opportunity, 
the current process has a 
Sigma Quality Level of X.X or a 
X% yield 
Download a 30 Day Free Trial at http://www.sigmaxl.com 
SigmaXL now Available for Mac! 
As an Add-in to the already familiar Excel, SigmaXL simplifies your 
data analysis and is a pleasure to use 
Enter Key Slide Take Away (Key Point) Here 
Process Capability and Statistical Process Control Training Video by SigmaXL 
International Standards for Lean Six Sigma (ISLSS) 9
Sigma Calculator: 
Continuous Data 
Enter Key Slide Take Away (Key Point) Here 
Process Capability (Continuous) Training Video by SigmaXL 
International Standards for Lean Six Sigma (ISLSS) 10
Sigma Calculator: 
Discrete Data 
Enter Key Slide Take Away (Key Point) Here 
Process Capability (Discrete) Training Video by SigmaXL 
International Standards for Lean Six Sigma (ISLSS) 11
Quick Win Documentation 
Template 
Examples Where Used 
 5s 
 4-Step Setup Reduction 
 Inventory Reduction 
 MSA Improvements 
 Price reductions 
 Reduced DOWNTIME 
Process Name: ______________________ Process Lead: ___________________ 
Process Owner: ______________________ Start Date: ______________________ 
Process Area: ________________________ Stop Date: ______________________ 
1. Root Cause: _______________________________ 
2. Obvious Solution: ___________________________ 
3. Low or No Cost: ____________________________ 
4. Low Risk: _________________________________ 
5. Implementation Plan: ________________________ 
6. Stakeholder(s) Approval: _____________________ 
Benefit(s): 
 _________________________________________ 
 _________________________________________ 
 _________________________________________ 
(NVA steps or work) 
 Pull System 
 Kaizen events 
Add Visual Example 
Before 
Add Visual Example 
After 
Enter Key Slide Take Away (Key Point) Here 
Gemba Academy Training Video on the 7 Forms of Waste 
International Standards for Lean Six Sigma (ISLSS) 12
Sources of Waste 
 Waste #1 (%) 
 Waste #2 (%) 
 Waste #3 (%) 
 Waste #4 (%) 
 Waste #5 (%) 
Sources of Waste 
NVA 
Defect Overproduction Transportation 
Motion Inventory Waiting 
Area 1 
Sub area 1 
Area 1 
Sub area 1 
Area 1 
Sub area 1 
Processing 
Area 1 
Sub area 1 
Area 1 
Sub area 1 
Area 1 
Sub area 1 
5% 
5% 
5% 
40% 
10% 
30% 
5% 
Defect 
Overproduction 
Transportation 
Waiting 
Inventory 
Motion 
Processing 
< Insert your waste percentage as 
shown in pie chart > 
Enter Key Slide Take Away (Key Point) Here 
SigmaXL Training Video on Cause & Effect Diagrams 
International Standards for Lean Six Sigma (ISLSS) 13
Swim Lane 
Process Map 
Client 
Mgr. 
Client 
HR 
Client 
Contact 
Admin 
Places 
information 
into HR 
database 
Sends Email 
to Admin 
Sends exit 
date to IT, 
telecom & 
facilities 
Oval shapes: Start/Stop of process 
Diamonds: Decision points 
Rectangles: Process steps 
Half-Moon: Delay/Queue Time 
Re-verifies with mgr on 
employee’s exit status 
NT 
Admin 
Email 
Vendor 
Utilize e-mail vendor’s 
web tool to submit delete 
request to vendor 
Sends Email 
to Admin 
Admin closes 
ticket and 
manager notified 
Generates ticket & 
forwards to Admin 
Delete 
account 
Mark request as 
completed on 
admin web site 
Create ticket if 
request coming 
directly from client 
Avg. 
Delay 
2 days 
Avg. 
Delay 
2 days 
Avg. 
Delay 
1 day 
Avg. 
Delay 
4 
days 
Form 
require 
approval? 
No 
Yes 
Secure 
approval(s) 
Note: Steps in blue 
shapes are non-value 
added steps 
Avg. 
Delay 
2 days 
Avg. 
Delay 
1 day 
Enter Key Slide Take Away (Key Point) Here 
International Standards for Lean Six Sigma (ISLSS) 14 
Notify HR of 
employee exit date 
Metrics Based Process Mapping Training Video by The Karen Martin Group
Value Stream Map 
Current State 
Service lead time = 384 min 
Customer call time = 24 min 
Weekly Update 
Phone Call 
Order Mgmt 
Order Mgmt Order Mgmt Order Mgmt Order Mgmt DIST 
P/T = 2 min 
Error Rate=2% 
Volume=800 
P/T = 6 Min 
Error Rate=0% 
Volume=800 
P/T = 6 Min 
Error Rate=2% 
Volume=800 
P/T = 2 Min 
Error Rate=1% 
Volume=800 
20 Orders 
3 min 
Automate 
Monitoring 
Large 
Business 
6 Customers 
Small 
Business 
5 Customers 
3 Customers 
Customer 
Info 
4 
Product 
Need 4 
Pricing 
4 
Shipping 
Info 
4 
Pick 
Pack & Ship 
10 
P/T = 120 Min 
Error Rate=1% 
Volume=1200 
5 min 240 min 
2 min 6 min 6 min 2 min 120 min 
SUPPLIERS 
Manual Update 
Phone Call 
Trigger: 
Completion Criteria: 
Cycle Time: 
Takt Time: 
Number of People: 
Number of Approvals: 
Items in Inbox: 
% Rework: 
# of Iterations (cycles): 
# of Databases: 
Top 3 Rework Issues: 
1. 
2. 
3. 
CUSTOMER 
Screen for Acct Mgr 
P/T = 3 min 
Lost calls=10% 
Volume=1200 
Simplify/ 
Mistake Proof 
Forecast 
Improvement 
Improve 
Visibility 
Simplify/ 
Combine 
Enter Key Slide Take Away (Key Point) Here 
Value Stream Mapping Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS) 15 
Home 
Order Mgmt Supervisor
Business Impact 
 State financial impact of future project leverage opportunities 
 Separate “hard or Type 1” from “soft Type 2 or 3” dollars 
Annual Estimate Replicated Estimate 
Revenue 
Enhancement 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Expenses 
Reduction 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Loss Reduction • Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Cost Avoidance • Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Total Savings • Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
16 
Enter Key Slide Take Away (Key Point) Here 
Cost/Benefit Training Video by Conservation Strategy Fund 
International Standards for Lean Six Sigma (ISLSS)
Business Impact Details 
 Type 1: Describe the chain of causality that shows how you determined the Direct Cash Flow. Tell the story 
with cause & effect relationships, on how the proposed change should create the desired financial result ($) in 
your project. 
 Show the financial calculation savings and assumptions used. 
 Assumption #1 (i.e. source of data, clear Operational Definitions?) 
 Assumption #2 (i.e. hourly rate + incremental benefit cost + travel) 
 Type 2: Describe the chain of causality that shows how you determined the Labor Efficiency savings. Tell the 
story with cause & effect relationships on how the change should create the desired financial result ($). 
 Show the financial calculation savings and assumptions used. 
 Assumption #1 (i.e. Labor rate used, period of time, etc…) 
 Assumption #2 (i.e. contractor hrs or FTE, source of data, etc…) 
 Describe the Type 3 Business Impact(s) areas and how these were measured (i.e. Cost/Risk Avoidance) 
 Assumption #1 (i.e. project is driven by the Business strategy?) 
 Assumption #2 (i.e. Customer service rating, employee moral, etc…) 
 Other Questions 
 Stakeholders agree on the project’s impact and how it will be measured in financial terms? 
 What steps were taken to ensure the integrity & accuracy of the data? 
 Has the project tracking worksheet been updated? 
17 
Enter Key Slide Take Away (Key Point) Here 
Lean Accounting Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS)
Current Status 
 Key actions 
completed 
 Issues 
 Lessons learned 
 Communications, 
team building, 
organizational 
activities 
Lean Six Sigma Project Status and Planning 
Deliverables/Tasks Completed last week Comments 
Deliverable/Action Who Due Revised Due Comments/Issue/Risk Who Due Revised Due Recommended Upcoming Deliverables/Tasks - 2 weeks out Due Revised Due 
For deliverables due thru: 
Actions Scheduled for next 2 Weeks 
Current Issues and Risks 
Enter Key Slide Take Away (Key Point) Here 
18 
Top 5 Types of Project Management Reports Video by projectmanagervideos 
International Standards for Lean Six Sigma (ISLSS)
Next Steps 
 Key actions? 
 Planned Lean Six Sigma 
Tools/Activities to be used? 
 Questions to answer? 
 Barrier/risk mitigation activities? 
 Kaizen or Quick Win Opportunities? 
Last Revised: 
No. Description/Recommendation 
Status 
Open/Closed/Hold 
Due Date 
Revised Due 
Date 
Resp Comments / Resolution 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
Lean Six Sigma Project Issue Log 
19 
Enter Key Slide Take Away (Key Point) Here 
8-Step Problem Solving Training Video – Lean Leadership Institute 
International Standards for Lean Six Sigma (ISLSS)
Sign Off 
 I concur that the Measure phase was successfully completed on MM/DD/YYYY 
 I concur the project is ready to proceed to next phase: Analyze 
Enter Name Here 
Deployment Champion 
Enter Name Here 
Green Belt/Black Belt 
Enter Name Here 
Financial Representative 
Enter Name Here 
Master Black Belt 
Enter Name Here 
Sponsor / Process Owner 
20 
Enter Key Slide Take Away (Key Point) Here 
The Explosion of Data Video by pexnetwork 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma 
Group 
Lean Six Sigma 
Tollgate Review 
Backup Slides 
International Standards for Lean Six Sigma (ISLSS)
Measure 
Tollgate Checklist 
 Has a more detailed Value Stream Map been completed to better understand the 
process and problem, and where in the process the root causes might reside? 
 Has the team conducted a value-added and cycle time analysis, identifying areas 
where time and resources are devoted to tasks not critical to the customer? 
 Has the team identified the specific input (x), process (x), and output (y) measures 
needing to be collected for both effectiveness and efficiency categories (i.e. Quality, 
Speed, and Cost measures)? 
 Has the team developed clear, unambiguous operational definitions for each 
measurement and tested them with others to ensure clarity/consistent interpretation? 
 Has a clear, reasonable choice been made between gathering new data or taking 
advantage of existing data already collected by the organization? 
 Has an appropriate sample size and sampling frequency been established to ensure 
valid representation of the process we’re measuring? 
 Has the measurement system been checked for repeatability and reproducibility, 
potentially including training of data collectors? 
 Has the team developed and tested data collection forms or check sheets which are 
easy to use and provide consistent, complete data? 
 Has baseline performance and process capability been established? How large is the 
gap between current performance and the customer (or project) requirements? 
 Has the team been able to identify any complete ‘Quick Wins’? 
 Have any Kaizen opportunities been identified to accelerate momentum and results? 
 Have key learning(s) to-date required any modification of the Project Charter? If so, 
have these changes been approved by the Project Sponsor and the Key Stakeholders? 
 Have any new risks to project success been identified, added to the Risk Mitigation 
Plan, and a mitigation strategy put in place? 
Key Deliverables: 
 Detailed Value Stream Map(s) 
 Data Collection Plan 
 Measurement Collection Results 
 Process Capability Results 
 Current Baseline Process 
Performance 
 Quick Wins, if applicable 
 Identification of Kaizen 
Opportunities, if applicable 
 Refined Charter, as necessary 
 Updated Risk Mitigation Plan 
 Deliverables Uploaded to 
Central Storage Location or 
Deployment Management 
System. 
Tollgate Review 
22 
Enter Key Slide Take Away (Key Point) Here 
Measure Phase Success Criteria Training Video by educatevirtually 
International Standards for Lean Six Sigma (ISLSS)
 Define the opportunity from both the customer 
 Identify the critical X factors 
 Develop solutions 
linked to critical x’s 
23 
Lean Six Sigma 
DMAIC Improvement Process 
Define 
and business perspective 
Measure 
 Understand the baseline process 
Analyze 
performance 
and root causes impacting 
process performance 
Improve 
Control 
 Implement 
solutions & 
control plan 
Enter Key Slide Take Away (Key Point) Here 
8 Step Practical Problem Solving Methodology by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS)
 Prioritized List of Validated Root 
 Updated Risk Mitigation Plan 
 Deliverables Uploaded to Central 
Storage Location or Deployment 
Management System 
24 
Analyze 
Tollgate Checklist 
 Has the team examined the process and identified potential bottlenecks, 
disconnects and redundancies that could contribute to the problem statement? 
 Has the team analyzed data about the process and its performance to help stratify 
the problem, understand reasons for variation in the process, and generate 
hypothesis as to the root causes of the current process performance? 
 Has an evaluation been done to determine whether the problem can be solved 
without a fundamental recreation of the process? Has the decision been confirmed 
with the Project Sponsor? 
 Has the team investigated and validated (or de-validated) the root cause 
hypotheses generated earlier, to gain confidence that the “vital few” root causes 
have been uncovered? 
 Does the team understand why the problem (the Quality, Cycle Time or Cost 
Efficiency issue identified in the Problem Statement) is being seen? 
 Has the team been able to identify any additional ‘Quick Wins’? 
 Have learnings to-date required modification of the Project Charter? If so, have 
these changes been approved by the Project Sponsor and the Key Stakeholders? 
 Have any new risks to project success been identified, added to the Risk 
Mitigation Plan, and a mitigation strategy put in place? 
Deliverables: 
 List of Potential Root causes 
Causes 
 Additional “Quick Wins”, if 
applicable 
 Refined Charter, as necessary 
Tollgate Review 
Has the team identified the key factors (critical X’s) that have the biggest 
impact on process performance? Have they validated the root causes? 
Analyze Phase Success Criteria Training Video by educatevirtually 
International Standards for Lean Six Sigma (ISLSS)
Abridged Process Sigma Conversion Table… 
Bonacors2i C5onsulting 
Long-Term 
Yeild 
Process 
Sigma (ST) 
Defects Per 
1,000,000 
Defects Per 
100,000 
Defects Per 
10,000 
Defects Per 
1,000 
Defects Per 
100 
99.99966% 6.0 3.4 0.34 0.034 0.0034 0.00034 
99.9995% 5.9 5 0.5 0.05 0.005 0.0005 
99.9992% 5.8 8 0.8 0.08 0.008 0.0008 
99.9900% 5.7 10 1 0.1 0.01 0.001 
99.8000% 5.6 20 2 0.2 0.02 0.002 
99.9970% 5.5 30 3 0.3 0.03 0.003 
99.9960% 5.4 40 4 0.4 0.04 0.004 
99.9930% 5.3 70 7 0.7 0.07 0.007 
99.9900% 5.2 100 10 1 0.1 0.01 
99.9850% 5.1 150 15 1.5 0.15 0.015 
99.9770% 5.0 230 23 2.3 0.23 0.023 
99.9670% 4.9 330 33 3.3 0.33 0.033 
99.9520% 4.8 480 48 4.8 0.48 0.048 
99.9320% 4.7 680 68 6.8 0.68 0.068 
99.9040% 4.6 960 96 9.6 0.96 0.096 
99.8650% 4.5 1350 135 13.5 1.35 0.135 
99.8140% 4.4 1860 186 18.6 1.86 0.186 
99.7450% 4.3 2550 255 25.5 2.55 0.255 
99.6540% 4.2 3460 346 34.6 3.46 0.346 
99.5340% 4.1 4660 466 46.6 4.66 0.466 
99.3790% 4.0 6210 621 62.1 6.21 0.621 
99.181% 3.9 8190 819 81.9 8.19 0.819 
98.930% 3.8 10700 1070 107 10.7 1.07 
98.610% 3.7 13900 1390 139 13.9 1.39 
98.220% 3.6 17800 1780 178 17.8 1.78 
97.730% 3.5 22700 2270 227 22.7 2.27 
97.130% 3.4 28700 2870 287 28.7 2.87 
96.410% 3.3 35900 3590 359 35.9 3.59 
95.540% 3.2 44600 4460 446 44.6 4.46 
94.520% 3.1 54800 5480 548 54.8 5.48 
93.320% 3.0 66800 6680 668 66.8 6.68 
91.920% 2.9 80800 8080 808 80.8 8.08 
90.320% 2.8 96800 9680 968 96.8 9.68 
88.50% 2.7 115000 11500 1150 115 11.5 
86.50% 2.6 135000 13500 1350 135 13.5 
84.20% 2.5 158000 15800 1580 158 15.8 
81.60% 2.4 184000 18400 1840 184 18.4 
78.80% 2.3 212000 21200 2120 212 21.2 
75.80% 2.2 242000 24200 2420 242 24.2 
72.60% 2.1 274000 27400 2740 274 27.4 
69.20% 2.0 308000 30800 3080 308 30.8 
65.60% 1.9 344000 34400 3440 344 34.4 
61.80% 1.8 382000 38200 3820 382 38.2 
58.00% 1.7 420000 42000 4200 420 42 
54.00% 1.6 460000 46000 4600 460 46 
50% 1.5 500000 50000 5000 500 50 
46% 1.4 540000 54000 5400 540 54 
43% 1.3 570000 57000 5700 570 57 
39% 1.2 610000 61000 6100 610 61 
35% 1.1 650000 65000 6500 650 65 
31% 1.0 690000 Application 69000 of Statistical Analysis 6900 Training 
690 69 
28% 0.9 720000 25% 0.8 750000 Video 72000 75000 by Amir H. Ghaseminejad 
7200 720 72 
7500 750 75 
22% 0.7 780000 78000 7800 780 78 
19% 0.6 810000 81000 8100 810 81 
16% 0.5 840000 84000 8400 840 84 
14% 0.4 860000 86000 8600 860 86 
12% 0.3 880000 88000 8800 880 88 
10% 0.2 900000 90000 9000 900 90 
8% 0.1 920000 92000 9200 920 92
Table of the Standard Normal (z) Distribution 
z 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 
0.0 0.0000 0.0040 0.0080 0.0120 0.0160 0.0190 0.0239 0.0279 0.0319 0.0359 
0.1 0.0398 0.0438 0.0478 0.0517 0.0557 0.0596 0.0636 0.0675 0.0714 0.0753 
0.2 0.0793 0.0832 0.0871 0.0910 0.0948 0.0987 0.1026 0.1064 0.1103 0.1141 
0.3 0.1179 0.1217 0.1255 0.1293 0.1331 0.1368 0.1406 0.1443 0.1480 0.1517 
0.4 0.1554 0.1591 0.1628 0.1664 0.1700 0.1736 0.1772 0.1808 0.1844 0.1879 
0.5 0.1915 0.1950 0.1985 0.2019 0.2054 0.2088 0.2123 0.2157 0.2190 0.2224 
0.6 0.2257 0.2291 0.2324 0.2357 0.2389 0.2422 0.2454 0.2486 0.2517 0.2549 
0.7 0.2580 0.2611 0.2642 0.2673 0.2704 0.2734 0.2764 0.2794 0.2823 0.2852 
0.8 0.2881 0.2910 0.2939 0.2969 0.2995 0.3023 0.3051 0.3078 0.3106 0.3133 
0.9 0.3159 0.3186 0.3212 0.3238 0.3264 0.3289 0.3315 0.3340 0.3365 0.3389 
1.0 0.3413 0.3438 0.3461 0.3485 0.3508 0.3513 0.3554 0.3577 0.3529 0.3621 
1.1 0.3643 0.3665 0.3686 0.3708 0.3729 0.3749 0.3770 0.3790 0.3810 0.3830 
1.2 0.3849 0.3869 0.3888 0.3907 0.3925 0.3944 0.3962 0.3980 0.3997 0.4015 
1.3 0.4032 0.4049 0.4066 0.4082 0.4099 0.4115 0.4131 0.4147 0.4162 0.4177 
1.4 0.4192 0.4207 0.4222 0.4236 0.4251 0.4265 0.4279 0.4292 0.4306 0.4319 
1.5 0.4332 0.4345 0.4357 0.4370 0.4382 0.4394 0.4406 0.4418 0.4429 0.4441 
1.6 0.4452 0.4463 0.4474 0.4484 0.4495 0.4505 0.4515 0.4525 0.4535 0.4545 
1.7 0.4554 0.4564 0.4573 0.4582 0.4591 0.4599 0.4608 0.4616 0.4625 0.4633 
1.8 0.4641 0.4649 0.4656 0.4664 0.4671 0.4678 0.4686 0.4693 0.4699 0.4706 
1.9 0.4713 0.4719 0.4726 0.4732 0.4738 0.4744 0.4750 0.4756 0.4761 0.4767 
2.0 0.4772 0.4778 0.4783 0.4788 0.4793 0.4798 0.4803 0.4808 0.4812 0.4817 
2.1 0.4821 0.4826 0.4830 0.4834 0.4838 0.4842 0.4846 0.4850 0.4854 0.4857 
2.2 0.4861 0.4864 0.4868 0.4871 0.4875 0.4878 0.4881 0.4884 0.4887 0.4890 
2.3 0.4893 0.4896 0.4898 0.4901 0.4904 0.4906 0.4909 0.4911 0.4913 0.4916 
2.4 0.4918 0.4920 0.4922 0.4925 0.4927 0.4929 0.4931 0.4932 0.4934 0.4936 
2.5 0.4938 0.4940 0.4941 0.4943 0.4945 0.4946 0.4948 0.4949 0.4951 0.4952 
2.6 0.4953 0.4955 0.4956 0.4957 0.4959 0.4960 0.4961 0.4962 0.4963 0.4964 
2.7 0.4965 0.4966 0.4967 0.4968 0.4969 0.4970 0.4971 0.4972 0.4973 0.4974 
2.8 0.4974 0.4975 0.4976 0.4977 0.4977 0.4978 0.4979 0.4979 0.4980 0.4981 
2.9 0.4981 0.4982 0.4982 0.4983 0.4984 0.4984 0.4985 0.4985 0.4986 0.4986 
3.0 0.4987 0.4987 0.4987 0.4988 How 0.4988 to deal with 0.4989 non-normal 0.4989 data 
0.4989 0.4990 0.4990 
3.1 0.4990 0.4991 0.4991 0.4991 Training 0.4992 Video 0.4992 by SigmaXL.0.4992 com 
0.4992 0.4993 0.4993 
3.2 0.4993 0.4993 0.4994 0.4994 0.4994 0.4994 0.4994 0.4995 0.4995 0.4995 
3.3 0.4995 0.4995 0.4995 0.4996 0.4996 0.4996 0.4996 0.4996 0.4996 0.4997 
3.4 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4998 
Bonacors2i C6onsulting
Attitude Charting & Key 
Constituency Map (Optional) 
15% 
Attitude Charting 
35% 35% 
15% 
40% 
35% 
30% 
25% 
20% 
15% 
10% 
5% 
0% 
Innovators Early Adopters Late Adopters Resistors 
Key Constituents Map 
Finance 
37% 
Operations 
25% 
Customer 
13% 
HR 
25% 
“Critical mass 
must be won-over” 
Enter Key Slide Take Away (Key Point) Here 
How to Manage Stakeholder Expectations Video by projectmanagervideos 
International Standards for Lean Six Sigma (ISLSS) 27
Sample Size: 
Continuous Data (Optional) 
Calculation for Confidence Intervals - Continuous Data 
Population Size (N) 10,000 
Confidence Level (1-alpha) 0.95000 (Percent expressed as decimal) 
Observed Sample Mean 25.00000 (Best estimate from data) 
Observed Sample Std. Dev. 5.00000 (Best estimate from data) 
Actual Sample Size 100 
Lower Conf. Int. Limit (Mean) 23.86764596 (Corrected for finite population) 
Upper Conf. Int. Limit (Mean) 26.13235404 (Corrected for finite population) 
Lower Conf. Int. Limit (S.D.) 4.390034232 
Upper Conf. Int. Limit (S.D.) 5.808376227 
Calculation for Sample Size - Continuous Data 
Population Size (N) 860 
Confidence Level (1-alpha) 0.95000 (Percent expressed as decimal) 
Power Level (1-beta) 0.90000 (Percent expressed as decimal) 
Standard Deviation (s) 10.00000 (Best prior estimate or Range/5) 
Required Precision (+/- delta) 3.00000 (Margin of Error) 
Initial Sample Size 117 (Assumes infinite population) 
Corrected for Population 104 (Correction for finite population) 
Recommended Sample Size 104 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
 ? 
Enter Key Slide Take Away (Key Point) Here 
Sample Size with Continuous Data Training Video by SigmaXL 
International Standards for Lean Six Sigma (ISLSS) 28
Sample Size: 
Discrete Data (Optional) 
Calculation for Sample Size - Discrete Data (Proportions) 
Population Size (N) 1,000 
Confidence Level (1-alpha) 0.95000 (Percent expressed as decimal) 
Power Level (1-beta) 0.90000 (Percent expressed as decimal) 
Expected Proportion (p) 0.50000 (Best prior estimate or 0.50) 
Required Precision (+/- delta) 0.03000 (Margin of Error) 
Initial Sample Size 2919 (Assumes infinite population) 
Corrected for Population 746 (Correction for finite population) 
Recommended Sample Size 746 
 ? 
 ? 
 ? 
 ? 
 ? 
Calculation for Confidence Interval - Discrete Data 
Population Size (N) 10,000 
Confidence Level (1-alpha) 0.95000 (Percent expressed as decimal) 
Observed Proportion (p) 0.50000 (Best estimate from data) 
Actual Sample Size 100 
Lower Conf. Int. Limit 0.402488147 (Corrected for finite population) 
Upper Conf. Int. Limit 0.597511853 (Corrected for finite population) 
 ? 
 ? 
 ? 
 ? 
 ? 
Enter Key Slide Take Away (Key Point) Here 
Sample Size with Discrete Data Training Video by SigmaXL.com 
International Standards for Lean Six Sigma (ISLSS) 29
Measurement Systems 
Analysis (MSA) (Optional) 
Gage R&R Gage R&R (ANOVA) for Response 
 Measurement system is 
acceptable with the Total 
% Contribution <10% 
Percent 
Gage R&R Repeat Reprod Part-to-Part 
100 
50 
0 
Reported by : 
Tolerance: 
Misc: 
% Contribution 
% Study Var 
Sample Range 
0.10 
0.05 
0.00 
UCL=0.1073 
_ 
R=0.0417 
LCL=0 
1 2 3 
Sample Mean 
10.00 
9.75 
9.50 
UCL=9.8422 
__ 
X=9.7996 
LCL=9.7569 
1 2 3 
1 2 3 4 5 6 7 8 9 10 
Part 
10.00 
9.75 
9.50 
1 2 3 
Operator 
10.00 
9.75 
9.50 
Part 
Average 
1 2 3 4 5 6 7 8 9 10 
10.00 
9.75 
9.50 
Operator 
1 
2 
3 
Gage name: 
Date of study : 
Components of Variation 
R Chart by Operator 
Xbar Chart by Operator 
Response by Part 
Response by Operator 
Operator * Part Interaction 
%Contribution 
Source VarComp (of VarComp) 
Total Gage R&R 0.0015896 3.70 
Repeatability 0.0005567 1.29 
Reproducibility 0.0010330 2.40 
Operator 0.0003418 0.79 
Operator*Part 0.0006912 1.61 
Part-To-Part 0.0414247 96.30 
Total Variation 0.0430143 100.00 
Study Var %Study Var 
Source StdDev (SD) (6 * SD) (%SV) 
Total Gage R&R .039870 0.23922 19.22 
Repeatability 0.023594 0.14156 11.38 
Reproducibility 0.032140 0.19284 15.50 
Operator 0.018488 0.11093 8.91 
Operator*Part 0.026290 0.15774 12.68 
Part-To-Part 0.203531 1.22118 98.13 
Total Variation 0.207399 1.24439 100.00 
Number of Distinct Categories = 7 
Enter Key Slide Take Away (Key Point) Here 
Create & Analyze a Gage R&R (Crossed) Training Video by SigmaXL.com 
International Standards for Lean Six Sigma (ISLSS) 30
Probability Plot 
(Optional) 
Probability Plot of Anderson-Darling Normality 
10 15 20 25 30 35 40 
99.9 
99 
95 
90 
80 
70 
60 
50 
40 
30 
20 
10 
5 
1 
0.1 
QTY 
Percent 
Mean 24.74 
StDev 4.177 
N 100 
AD 0.380 
P-Value 0.397 
Normal - 95% CI 
Enter Key Slide Take Away (Key Point) Here 
Create a Normal Probability Plot Training Video by SigmaXL.com 
International Standards for Lean Six Sigma (ISLSS) 31
Control Chart 
(Optional) 
 The current baseline 
delivery time is stable 
over time with both the 
Moving Range (MR) 
(3.22 days) and Individual 
Average (29.13 days) 
experiencing common 
cause variation 
 255 data points collected 
with zero subgroups, thus 
the I&MR control chart 
selected 
Observation 
Individual Value 
1 28 55 82 109 136 163 190 217 244 
40 
35 
30 
25 
20 
UC L=37.70 
_ 
X=29.13 
LC L=20.56 
Observation 
Moving Range 
1 28 55 82 109 136 163 190 217 244 
10.0 
7.5 
5.0 
2.5 
0.0 
UC L=10.53 
__ 
MR=3.22 
LC L=0 
I-MR Chart of Delivery Time 
Enter Key Slide Take Away (Key Point) Here 
Create an Xbar & R Control Chart Training Video by SigmaXL.com 
International Standards for Lean Six Sigma (ISLSS) 32
PDCA 
(Optional) 
 Plan: 
 ? 
 ? 
 Do: 
 ? 
 ? 
 Check: 
 ? 
 ? 
 Act: 
 ? 
 ? 
? 
? 
? 
? 
Plan 
Do 
Check 
Act 
Enter Key Slide Take Away (Key Point) Here 
Gemba Academy Training Video on How to Leverage the Powerful A3 Report 
International Standards for Lean Six Sigma (ISLSS) 33
5s 
(Optional) 
Sort 
 ? 
 ? 
Set Order 
 ? 
 ? 
Shine 
 ? 
 ? 
Standardize 
 ? 
 ? 
Sustain 
 ? 
 ? 
5s FORM 
IDENTIFICATION 
ITEM NAME TAG NUMBER TAGGED BY 
TAG DATE 
CLASSIFICATION 
o RAW MATERIAL o TOOLS o FURNITURE o OTHER (EXPLAIN) 
o WIP o SUPPLIES o OFFICE MATERIAL 
o FINISHED GOOD o EQUIPMENT o BOOKS/MAGAZINES 
QUANTITY CELL / AREA 
REASON 
o UNNECESSARY o LEFTOVER MATERIAL 
o DEFECTIVE o UNKNOWN 
o NON-URGENT o OTHER (EXPLAIN) 
DISPOSITION REQUIRED 
o DISCARD o TRANSFER 
o IN-CELL STORAGE o LONG-TERM STORAGE 
o REDUCE o OTHER (EXPLAIN) 
ACTION TAKEN 
ACTION DESCRIPTION APPROVED BY 
DATE 
NEW LOCATION NEW CELL / AREA 
Enter Key Slide Take Away (Key Point) Here 
“What is 5S?” Training Video by GembaAcademy.com 
International Standards for Lean Six Sigma (ISLSS) 34
Benchmark Analysis 
(Optional) 
CTQ 
Process 
Capability 
(X/Y) 
Benchmark 
Gap / 
Opportunity 
Source Assumptions Risks 
Based on the information above, what is the performance objective*? 
• Reduce defects by % 
• Reduce long-term DPMO from to . 
• Improve short-term Z from to . 
*If you do not benchmark, performance standards are based on: 
• For a process with  3 sigma level, decrease % defects by 10x. 
• For a process with > 3 sigma level, decrease % defects by 2x. 
• Other….please explain (corporate mandate, compliance/legal, VOC data, etc) 
Enter Key Slide Take Away (Key Point) Here 
“What is Benchmarking?” Training Video by www.coer.org.nz 
International Standards for Lean Six Sigma (ISLSS) 35
Key Buying Factor Analysis 
(Optional) 
CTQ Importance Company Comp 1 Comp 2 Comp 3 
10.0 
9.0 
8.0 
7.0 
6.0 
5.0 
4.0 
Delivery 
time On-% Complete Order 
Inventory Turns 
Warranty Returns 
Price 
Special Order Lead Time 
Relationship Management 
Correct Invoice 
New Product Development 
Brand Image 
Product Offering Breadth 
Proximity to Customer 
Enter Key Slide Take Away (Key Point) Here 
“How does the customer fit into process improvement?” Training Video by 
processexcellencenetwork.com and BP Group 
International Standards for Lean Six Sigma (ISLSS) 36
Sample Value Stream 
Mapping Symbols (Optional) 
Quotes 
Machining C/T = 36 Sec 
Set Up Time 7 Min 
Uptime 86% 
Process Box 
Data Box 
I 
Queue/ 
Inventory 
1 
Personnel 
Flow 
(Information) 
Electronic 
Information 
Sign Off Point 
Push Systems 
Truck Shipment 
Supplier/ 
Customer 
Flow 
(Physical) 
Physical Pull 
Project 
Burst 
Supermarket 
Replenishment 
Kanban 
Station 
Paper 
Kanban 
Electronic 
Data 
System F I F O 
FIFO Lane 
Physical 
Transport 
“Go See” 
Monitoring 
Enter Key Slide Take Away (Key Point) Here 
Value Stream Map Glossary Training Video by gembaacademy.com 
International Standards for Lean Six Sigma (ISLSS) 37
To Office Parking Lot 
EAST 
Supply 
Room 
(paper and 
office supplies) 
Records 
Room 
(Order 
Management) 
Vault 
(finance) 
Printer, Fax OM Lead 
OM Supr Office 
Reception 
Restrooms Cafeteria 
Engineering Offices 
Foyer 
Order 
Taker 1 
Order 
Taker 2 
Order 
Taker 3 
Order 
Entry 1 
Order 
Entry 2 
Order 
Entry 3 
CC & 
Val 2 
CC & 
Val 3 
CC & 
Val 1 
Copier 
Indicates an in-box 
or outbox where 
work (forms/ 
information) waits 
to be worked on or 
transferred 
Planning & 
Scheduling 
Lines indicate 
paper/information 
travel: 
- No set path 
- Lots of rework 
Spaghetti Diagram 
(Optional) 
Enter Key Slide Take Away (Key Point) Here 
Spaghetti Diagram Training Video by Dwane Lay 
International Standards for Lean Six Sigma (ISLSS) 38 
Dwane Lay 
Dwane Lay 
Dwane Lay
AS-IS Process Mapping 
Symbols (Optional) 
Enter Key Slide Take Away (Key Point) Here 
Process Mapping Training Video by Mark Zabel 
International Standards for Lean Six Sigma (ISLSS) 39
Lean Six Sigma 
Group 
Lean Six Sigma 
Additional Resources 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma Tollgate 
Template Notes 
The Lean Six Sigma Tollgate Templates are: 
 Free and intended as a guide in documenting a Lean Six Sigma 
Project. I grant permission for you to modify these templates to meet 
the specific needs of your process improvement project. 
 Instructional - a video has been linked to each Template, I selected a 
mix of videos from Thought Leaders in the Lean Six Sigma Group. 
I included reference links to all video’s should you want to learn more 
information. Also included guidelines in the Note’s section of each 
slide. 
 Efficient and Effective – Placeholders for Graphic or Video Examples 
for various tools and methods across each DMAIC Phase. 
How to Use These Templates: 
 Collaboratively – use as a guide, reuse templates independently or 
across phases as needed, and change the order as needed to best 
capture the execution of Lean Six Sigma in each phase, and 
summarize in the final Case Study. 
 Use as a Communication tool, and document your findings and 
results. 
41 
My name is Steven 
Bonacorsi, Author of the 
Lean Six Sigma Tollgate 
Templates, President of 
the International 
Standard for Lean Six 
Sigma (ISLSS), and 
Owner of the LinkedIn 
Lean Six Sigma Group. 
Replace the content of this slide with images or video’s 
related to your process improvement project 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma Resources 
42 
 Lean Six Sigma Group: https://www.linkedin.com/groups/Lean-Six-Sigma-37987 
 Lean Six Sigma Subgroups: https://www.linkedin.com/groups?subgroups=&gid=37987 
 International Standard for Lean Six Sigma (ISLSS): http://www.islss.com 
Best Wishes in Continuously Improving Your Business Processes 
– Steven Bonacorsi, Certified Lean Six Sigma Master Black Belt 
International Standards for Lean Six Sigma (ISLSS) 
 i-nexus: http://www.i-nexus.com 
 Strategy Execution Community LinkedIn Group 
https://www.linkedin.com/groups/Strategy-Execution-Community-3725091 
 SigmaXL: http://www.sigmaxl.com 
 SigmaXL LinkedIn Group: https://www.linkedin.com/groups/SigmaXL-1812101?gid=1812101 
 Gemba Academy http://www.gembaacademy.com Lean CEO Group: 
 Gemba Academy LinkedIn Group: https://www.linkedin.com/groups/Gemba-Academy-1844998?gid=1844998 
 PEX Network http://www.processexcellencenetwork.com 
 PEX Network & IQPC - Lean Six Sigma & Process Excellence for Continuous Improvement 
 Lean Leadership Institute: http://www.LeanLeadership.guru/books.html The Toyota Way Group
Lean Six Sigma Groups 
(Click Logo’s to Join Group) 
Lean Six Sigma Group 
Each Week, the Lean Six Sigma Group Grows +1,500 New Members; +2,000 Lean 
43 
Six Sigma Jobs; +200 Discussions; +500 Comments 
+280,000 Members – Come Join the Conversation 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma Resource Blogs 
(Click Logo’s to Follow Blogs) 
44 
See Notes Section for Links to Lean Six Sigma Group Contributors 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma Measure Phase 
Video References – Set 5 
45 
Ten Commandments of Lean Six 
Sigma Video by Gemba Academy 
How to Write a Project Charter 
Training Video by 
projectmanagervideos 
Process Capability Training 
Video by SigmaXL 
DMAIC Case Study to Improve 
Customer Satisfaction Video by 
SigmaXL 
Share Your Video with the Kaizen Group: 
http://www.linkedin.com/groups?gid=2057909 
International Standards for Lean Six Sigma (ISLSS) 
The Gemba Glossary 
Training Video by Gemba 
Academy 
Gage R&R (Variable Data) 
Training Video using 
Minitab by Janeth Leon 
Descriptive Statistic’s 
Training Video by SigmaXL 
Process Capability and 
Statistical Process Control 
Training Video by SigmaXL
Lean Six Sigma Measure Phase 
Video References – Set 6 
46 
Process Capability (Continuous) 
Training Video by SigmaXL 
Process Capability (Discrete) 
Training Video by SigmaXL 
Metrics Based Process Mapping 
Training Video by 
The Karen Martin Group 
Share Your Video with the Statistics & Analytics Group: 
http://www.linkedin.com/groups?gid=4183029 
International Standards for Lean Six Sigma (ISLSS) 
Gemba Academy 
Training Video on the 
7 Forms of Waste 
SigmaXL Training Video on 
Cause & Effect Diagrams 
Value Stream Mapping 
Training Video by 
Gemba Academy 
Cost/Benefit Training 
Video by Conservation 
Strategy Fund 
Lean Accounting Training 
Video by Gemba 
Academy
Lean Six Sigma Measure Phase 
Video References – Set 7 
Top 5 Types of Project 
Management Reports Video by 
projectmanagervideos 
8-Step Problem Solving 
Training Video by the 
Lean Leadership Institute 
The Explosion of Data Video by 
PexNetwork 
Measure Phase Success Criteria 
Training Video by 
educatevirtually 
Share Your Video with the Design for Lean Six Sigma Group: 
47 
http://www.linkedin.com/groups?gid=3065466 
International Standards for Lean Six Sigma (ISLSS) 
8 Step Practical Problem 
Solving Methodology by 
Gemba Academy 
Analyze Phase Success 
Criteria Training Video by 
educatevirtually 
Application of Statistical 
Analysis Training Video by 
Amir H. Ghaseminejad 
How to deal with non-normal 
data Training Video 
by SigmaXL.com
Lean Six Sigma Measure Phase 
Video References – Set 8 
How to Manage Stakeholder 
Expectations Video by 
projectmanagervideos 
Sample Size with Continuous 
Data Training Video by SigmaXL 
Sample Size with Discrete Data 
Training Video by SigmaXL.com 
Create & Analyze a Gage R&R 
(Crossed) Training Video by 
SigmaXL.com 
Share Your Video with the Business Process Management Group: 
48 
http://www.linkedin.com/groups?gid=3929208 
International Standards for Lean Six Sigma (ISLSS) 
Create a Normal 
Probability Plot Training 
Video by SigmaXL.com 
Create an Xbar & R Control 
Chart Training Video by 
SigmaXL.com 
Gemba Academy Training 
Video on How to Leverage 
the Powerful A3 Report 
“What is 5S?” 
Training Video by 
GembaAcademy.com
Lean Six Sigma Measure Phase 
Video References – Set 9 
“What is Benchmarking?” 
Training Video by 
www.coer.org.nz 
“How does the customer fit into 
process improvement?” by 
PEXNetwork and BP Group 
Value Stream Map Glossary 
Training Video by 
gembaacademy.com 
Spaghetti Diagram Training 
Video by Dwane Lay 
Share Your Video with the Strategy Execution Community Group: 
https://www.linkedin.com/groups/Strategy-Execution-Community-3725091 
49 
International Standards for Lean Six Sigma (ISLSS) 
Process Mapping Training 
Video by Mark Zabel

Measure phase lean six sigma tollgate template

  • 1.
    Lean Six Sigma Group Lean Six Sigma Measure Phase Tollgate Review
  • 2.
    Lean Six Sigma DMAIC Tools and Activities  Review Project Charter  Validate High-Level Value Stream Map and Scope  Validate Voice of the Customer & Voice of the Business  Validate Problem Statement and Goals  Validate Financial Benefits  Create Communication Plan  Select and Launch Team  Develop Project Schedule  Complete Define Tollgate  Identify Root Causes  Reduce List of Potential Root Causes  Confirm Root Cause to Output Relationship  Estimate Impact of Root Causes on Key Outputs  Prioritize Root Causes  Value-Add Analysis  Takt Rate Analysis  Quick Wins  Statistical Analysis  Complete Analyze Tollgate  Develop Potential Solutions  Evaluate, Select, and Optimize Best Solutions  Develop ‘To-Be’ Value Stream Map(s)  Develop and Implement Pilot Solution  Implement 5s Program  Develop Full Scale Implementation Plan  Cost/Benefit Analysis  Benchmarking  Complete Improve Tollgate  Develop SOP’s, Training Plan & Process Controls  Implement Solution and Ongoing Process Measurements  Confirm Attainment of Project Goals  Identify Project Replication Opportunities  Training  Complete Control Tollgate  Transition Project to Process Owner  Project Charter  Voice of the Customer and Kano Analysis  SIPOC Map  Project Valuation/ROIC Analysis Tools  RACI and Quad Charts  Stakeholder Analysis  Communication Plan  Effective Meeting Tools  Inquiry and Advocacy Skills  Time Lines, Milestones, and Gantt Charting  Pareto Analysis  Value Stream Mapping  Process Cycle Efficiency/Little’s Law  Operational Definitions  Data Collection Plan  Statistical Sampling  Measurement System Analysis (MSA)  Gage R&R  Kappa Studies  Control Charts  Spaghetti Diagrams  Histograms  Normality Test  Process Capability Analysis  Process Constraint ID and Takt Time Analysis  Cause & Effect Analysis  FMEA  Hypothesis Tests/Conf. Intervals  Simple & Multiple Regression  ANOVA  Components of Variation  Conquering Product and Process Complexity  Queuing Theory  Replenishment Pull/Kanban  Stocking Strategy  Process Flow Improvement  Process Balancing  Analytical Batch Sizing  Total Productive Maintenance  Design of Experiments (DOE)  Solution Selection Matrix  Piloting and Simulation Work Control System  Setup reduction  Pugh Matrix  Pull System  Mistake-Proofing/ Zero Defects  Standard Operating Procedures (SOP’s)  Process Control Plans  Visual Process Control Tools  MGPP  Statistical Process Controls (SPC)  Solution Replication  Visual Workplace  Metrics  Project Transition Model  Team Feedback Session  Value Stream Map Flow  Identify Key Input, Process and Output Metrics  Develop Operational Definitions  Develop Data Collection Plan  Validate Measurement System  Collect Baseline Data  Determine Process Capability  Complete Measure Tollgate Define Measure Analyze Improve Control Kaizen Events Targeted in Measure to Accelerate Results Ten Commandments of Lean Six Sigma Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS) 2
  • 3.
    Project Charter Updates Problem/Goal Statement Problem: Describe problem in non-technical terms  Statement should explain why project is important; why working on it is a priority Goal: Goals communicate “before” and “after” conditions  Shift mean, variance, or both?  Should impact cost, time, quality dimensions  Express goals using SMART criteria  Specific, Measurable, Attainable, Resource Requirements, Time Boundaries  Explain leverage and strategic implications (if any) Financial Impact Tollgate Review Schedule Team  Scope: (In-Scope/Out-of-Scope) (Process Start/Stop)  State financial impact of project  Expenses  Investments (inventory, capital, A/R)  Revenues  Separate “hard” from “soft” dollars  State financial impact of leverage opportunities (future projects)  PES Name Project Executive Sponsor (if different from PS)  PS Name Project Sponsor/Process Owner  DC Name Deployment Champion  GB/BB Name Green Belt/Black Belt  MBB Name Master Black Belt Core Team Role % Contrib. LSS Training  Team Member 1 SME XX YB  Team Member 2 TM XX GB  Team Member 3 SME XX PS Extended Team  Team Member 1 BFM XX Not Trained  Team Member 2 IT XX Not Trained Tollgate Scheduled Revised Complete Define: XX/XX/XX - XX/XX/XX Measure: XX/XX/XX XX/XX/XX XX/XX/XX Analyze: XX/XX/XX XX/XX/XX XX/XX/XX Improve: XX/XX/XX XX/XX/XX XX/XX/XX Control: XX/XX/XX XX/XX/XX XX/XX/XX  Review high-level schedule milestones here:  Phase Completions  Tollgate Reviews Enter Key Slide Take Away (Key Point) Here How to Write a Project Charter Training Video by projectmanagervideos International Standards for Lean Six Sigma (ISLSS) 3
  • 4.
    Measure Overview CTQ: ?  Unit (d) or Mean (c): ?  Defect (d) or St. Dev. (c): ?  PCE%: ?  DPMO (d): ?  Sigma (Short Term): ?  Sigma (Long Term):?  MSA Results: show the percentage result of the GR&R, AR&R or other MSA carried out in the project  Root cause:  Quick Win #1  Root cause:  Quick Win #2  Root cause:  Quick Win #3 Observation Individual Value 1 28 55 82 109 136 163 190 217 244 40 35 30 25 20 UC L=37.70 _ X=29.13 LC L=20.56 Observation Moving Range 1 28 55 82 109 136 163 190 217 244 10.0 7.5 5.0 2.5 0.0 UC L=10.53 __ MR=3.22 LC L=0 I-MR Chart of Delivery Time  Detailed process mapping MSA  Value Stream Mapping  Data Collection Planning  Basic Statistics  Process Capability  Histograms  Time Series Plot  Probability Plot  Pareto Analysis  Operational Def.  5s  Pull  Control Charts Enter Key Slide Take Away (Key Point) Here 4 Process Capability Graphical Analysis Root Cause / Quick Win Tools Used Process Capability Training Video by SigmaXL International Standards for Lean Six Sigma (ISLSS)
  • 5.
    Data Collection Plan Performance Measure Operational Definition Data Source and Location How Will Data Be Collected  For each performance measure (Y), update a data collection plan  Include MSA measure plan (Gantt chart, MS project plan is Optional)  Add Financial measure plan if separate from performance Y  Add any Time Study or other data collection plans for Value Stream Map  Sample Size Calculation  Use additional slides if needed Who Will Collect Data When Will Data Be Collected Sample Size Stratification Factors How will data be used? VOC MSA Process VSM Financials Others Enter Key Slide Take Away (Key Point) Here DMAIC Case Study to Improve Customer Satisfaction Video by SigmaXL International Standards for Lean Six Sigma (ISLSS) 5
  • 6.
    Operational Definitions Y – Continuous data Process start/stop and cycle time boundaries, such as the unit of measure (ex minutes), the unit (the thing you are measuring), will you include weekends, holidays, non-business hours?  Y – Discrete data Define Success/Defect or other attribute values you will measure  X – The subgroups values or X-factor groupings you will use on your project data collection  Other unique terms that apply to your project that require clear operational definitions  Use additional slides as needed to complete your operational definitions Add Visual Example Add Visual Example Enter Key Slide Take Away (Key Point) Here The Gemba Glossary Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS) 6
  • 7.
    MSA Conclusions The measurement systems are acceptable. The data is considered to have no potential for significant error. Need to be careful to appropriately use the data during the Analyze Phase. Type of Measurement Error Description Considerations to this Project Discrimination (resolution) The ability of the measurement system to divide into “data categories” Work hrs can be measured to <.25 hrs. Tool usage measure to +- 2 min. Bias The difference between an observed average measurement result and a reference value No bias - Work hours and radar start-stop times consistent through population. Stability The change in bias over time No bias of work hrs & radar usage data. Repeatability The extent variability is consistent Not an issue. Labor and radar usage is historical and felt to be accurate enough for insight and analysis. Reproducibility Different appraisers produce consistent results Remarks in usage data deemed not reproducible, not used in determining which radars were used in each op Variation The difference between parts n/a to this process. Enter Key Slide Take Away (Key Point) Here Gage R&R (Variable Data) Training Video using Minitab by Janeth Leon International Standards for Lean Six Sigma (ISLSS) 7
  • 8.
    Baseline Basic Statistics  Describe the current process shape “normality” and distribution.  Describe the center, Mean or Median?  Describe the range (maximum value – minimum value) the standard deviation in X (Time) Download a 30 Day Free Trial at http://www.sigmaxl.com SigmaXL now Available for Mac! Use as an Add-in to the already familiar Excel, SigmaXL simplifies your data analysis and is a pleasure to use Enter Key Slide Take Away (Key Point) Here Descriptive Statistic’s Training Video by SigmaXL International Standards for Lean Six Sigma (ISLSS) 8
  • 9.
    Baseline Process Capability  # data points collected between XX/XX/XX thru XX/XX/XX  Mean X days, St. Dev. X.XX days, Describe the impact the current state process capability.  With an overall PPM of X defects per million opportunity, the current process has a Sigma Quality Level of X.X or a X% yield Download a 30 Day Free Trial at http://www.sigmaxl.com SigmaXL now Available for Mac! As an Add-in to the already familiar Excel, SigmaXL simplifies your data analysis and is a pleasure to use Enter Key Slide Take Away (Key Point) Here Process Capability and Statistical Process Control Training Video by SigmaXL International Standards for Lean Six Sigma (ISLSS) 9
  • 10.
    Sigma Calculator: ContinuousData Enter Key Slide Take Away (Key Point) Here Process Capability (Continuous) Training Video by SigmaXL International Standards for Lean Six Sigma (ISLSS) 10
  • 11.
    Sigma Calculator: DiscreteData Enter Key Slide Take Away (Key Point) Here Process Capability (Discrete) Training Video by SigmaXL International Standards for Lean Six Sigma (ISLSS) 11
  • 12.
    Quick Win Documentation Template Examples Where Used  5s  4-Step Setup Reduction  Inventory Reduction  MSA Improvements  Price reductions  Reduced DOWNTIME Process Name: ______________________ Process Lead: ___________________ Process Owner: ______________________ Start Date: ______________________ Process Area: ________________________ Stop Date: ______________________ 1. Root Cause: _______________________________ 2. Obvious Solution: ___________________________ 3. Low or No Cost: ____________________________ 4. Low Risk: _________________________________ 5. Implementation Plan: ________________________ 6. Stakeholder(s) Approval: _____________________ Benefit(s):  _________________________________________  _________________________________________  _________________________________________ (NVA steps or work)  Pull System  Kaizen events Add Visual Example Before Add Visual Example After Enter Key Slide Take Away (Key Point) Here Gemba Academy Training Video on the 7 Forms of Waste International Standards for Lean Six Sigma (ISLSS) 12
  • 13.
    Sources of Waste  Waste #1 (%)  Waste #2 (%)  Waste #3 (%)  Waste #4 (%)  Waste #5 (%) Sources of Waste NVA Defect Overproduction Transportation Motion Inventory Waiting Area 1 Sub area 1 Area 1 Sub area 1 Area 1 Sub area 1 Processing Area 1 Sub area 1 Area 1 Sub area 1 Area 1 Sub area 1 5% 5% 5% 40% 10% 30% 5% Defect Overproduction Transportation Waiting Inventory Motion Processing < Insert your waste percentage as shown in pie chart > Enter Key Slide Take Away (Key Point) Here SigmaXL Training Video on Cause & Effect Diagrams International Standards for Lean Six Sigma (ISLSS) 13
  • 14.
    Swim Lane ProcessMap Client Mgr. Client HR Client Contact Admin Places information into HR database Sends Email to Admin Sends exit date to IT, telecom & facilities Oval shapes: Start/Stop of process Diamonds: Decision points Rectangles: Process steps Half-Moon: Delay/Queue Time Re-verifies with mgr on employee’s exit status NT Admin Email Vendor Utilize e-mail vendor’s web tool to submit delete request to vendor Sends Email to Admin Admin closes ticket and manager notified Generates ticket & forwards to Admin Delete account Mark request as completed on admin web site Create ticket if request coming directly from client Avg. Delay 2 days Avg. Delay 2 days Avg. Delay 1 day Avg. Delay 4 days Form require approval? No Yes Secure approval(s) Note: Steps in blue shapes are non-value added steps Avg. Delay 2 days Avg. Delay 1 day Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma (ISLSS) 14 Notify HR of employee exit date Metrics Based Process Mapping Training Video by The Karen Martin Group
  • 15.
    Value Stream Map Current State Service lead time = 384 min Customer call time = 24 min Weekly Update Phone Call Order Mgmt Order Mgmt Order Mgmt Order Mgmt Order Mgmt DIST P/T = 2 min Error Rate=2% Volume=800 P/T = 6 Min Error Rate=0% Volume=800 P/T = 6 Min Error Rate=2% Volume=800 P/T = 2 Min Error Rate=1% Volume=800 20 Orders 3 min Automate Monitoring Large Business 6 Customers Small Business 5 Customers 3 Customers Customer Info 4 Product Need 4 Pricing 4 Shipping Info 4 Pick Pack & Ship 10 P/T = 120 Min Error Rate=1% Volume=1200 5 min 240 min 2 min 6 min 6 min 2 min 120 min SUPPLIERS Manual Update Phone Call Trigger: Completion Criteria: Cycle Time: Takt Time: Number of People: Number of Approvals: Items in Inbox: % Rework: # of Iterations (cycles): # of Databases: Top 3 Rework Issues: 1. 2. 3. CUSTOMER Screen for Acct Mgr P/T = 3 min Lost calls=10% Volume=1200 Simplify/ Mistake Proof Forecast Improvement Improve Visibility Simplify/ Combine Enter Key Slide Take Away (Key Point) Here Value Stream Mapping Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS) 15 Home Order Mgmt Supervisor
  • 16.
    Business Impact State financial impact of future project leverage opportunities  Separate “hard or Type 1” from “soft Type 2 or 3” dollars Annual Estimate Replicated Estimate Revenue Enhancement • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Expenses Reduction • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Loss Reduction • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Cost Avoidance • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Total Savings • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? 16 Enter Key Slide Take Away (Key Point) Here Cost/Benefit Training Video by Conservation Strategy Fund International Standards for Lean Six Sigma (ISLSS)
  • 17.
    Business Impact Details  Type 1: Describe the chain of causality that shows how you determined the Direct Cash Flow. Tell the story with cause & effect relationships, on how the proposed change should create the desired financial result ($) in your project.  Show the financial calculation savings and assumptions used.  Assumption #1 (i.e. source of data, clear Operational Definitions?)  Assumption #2 (i.e. hourly rate + incremental benefit cost + travel)  Type 2: Describe the chain of causality that shows how you determined the Labor Efficiency savings. Tell the story with cause & effect relationships on how the change should create the desired financial result ($).  Show the financial calculation savings and assumptions used.  Assumption #1 (i.e. Labor rate used, period of time, etc…)  Assumption #2 (i.e. contractor hrs or FTE, source of data, etc…)  Describe the Type 3 Business Impact(s) areas and how these were measured (i.e. Cost/Risk Avoidance)  Assumption #1 (i.e. project is driven by the Business strategy?)  Assumption #2 (i.e. Customer service rating, employee moral, etc…)  Other Questions  Stakeholders agree on the project’s impact and how it will be measured in financial terms?  What steps were taken to ensure the integrity & accuracy of the data?  Has the project tracking worksheet been updated? 17 Enter Key Slide Take Away (Key Point) Here Lean Accounting Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS)
  • 18.
    Current Status Key actions completed  Issues  Lessons learned  Communications, team building, organizational activities Lean Six Sigma Project Status and Planning Deliverables/Tasks Completed last week Comments Deliverable/Action Who Due Revised Due Comments/Issue/Risk Who Due Revised Due Recommended Upcoming Deliverables/Tasks - 2 weeks out Due Revised Due For deliverables due thru: Actions Scheduled for next 2 Weeks Current Issues and Risks Enter Key Slide Take Away (Key Point) Here 18 Top 5 Types of Project Management Reports Video by projectmanagervideos International Standards for Lean Six Sigma (ISLSS)
  • 19.
    Next Steps Key actions?  Planned Lean Six Sigma Tools/Activities to be used?  Questions to answer?  Barrier/risk mitigation activities?  Kaizen or Quick Win Opportunities? Last Revised: No. Description/Recommendation Status Open/Closed/Hold Due Date Revised Due Date Resp Comments / Resolution 1 2 3 4 5 6 7 8 9 10 Lean Six Sigma Project Issue Log 19 Enter Key Slide Take Away (Key Point) Here 8-Step Problem Solving Training Video – Lean Leadership Institute International Standards for Lean Six Sigma (ISLSS)
  • 20.
    Sign Off I concur that the Measure phase was successfully completed on MM/DD/YYYY  I concur the project is ready to proceed to next phase: Analyze Enter Name Here Deployment Champion Enter Name Here Green Belt/Black Belt Enter Name Here Financial Representative Enter Name Here Master Black Belt Enter Name Here Sponsor / Process Owner 20 Enter Key Slide Take Away (Key Point) Here The Explosion of Data Video by pexnetwork International Standards for Lean Six Sigma (ISLSS)
  • 21.
    Lean Six Sigma Group Lean Six Sigma Tollgate Review Backup Slides International Standards for Lean Six Sigma (ISLSS)
  • 22.
    Measure Tollgate Checklist  Has a more detailed Value Stream Map been completed to better understand the process and problem, and where in the process the root causes might reside?  Has the team conducted a value-added and cycle time analysis, identifying areas where time and resources are devoted to tasks not critical to the customer?  Has the team identified the specific input (x), process (x), and output (y) measures needing to be collected for both effectiveness and efficiency categories (i.e. Quality, Speed, and Cost measures)?  Has the team developed clear, unambiguous operational definitions for each measurement and tested them with others to ensure clarity/consistent interpretation?  Has a clear, reasonable choice been made between gathering new data or taking advantage of existing data already collected by the organization?  Has an appropriate sample size and sampling frequency been established to ensure valid representation of the process we’re measuring?  Has the measurement system been checked for repeatability and reproducibility, potentially including training of data collectors?  Has the team developed and tested data collection forms or check sheets which are easy to use and provide consistent, complete data?  Has baseline performance and process capability been established? How large is the gap between current performance and the customer (or project) requirements?  Has the team been able to identify any complete ‘Quick Wins’?  Have any Kaizen opportunities been identified to accelerate momentum and results?  Have key learning(s) to-date required any modification of the Project Charter? If so, have these changes been approved by the Project Sponsor and the Key Stakeholders?  Have any new risks to project success been identified, added to the Risk Mitigation Plan, and a mitigation strategy put in place? Key Deliverables:  Detailed Value Stream Map(s)  Data Collection Plan  Measurement Collection Results  Process Capability Results  Current Baseline Process Performance  Quick Wins, if applicable  Identification of Kaizen Opportunities, if applicable  Refined Charter, as necessary  Updated Risk Mitigation Plan  Deliverables Uploaded to Central Storage Location or Deployment Management System. Tollgate Review 22 Enter Key Slide Take Away (Key Point) Here Measure Phase Success Criteria Training Video by educatevirtually International Standards for Lean Six Sigma (ISLSS)
  • 23.
     Define theopportunity from both the customer  Identify the critical X factors  Develop solutions linked to critical x’s 23 Lean Six Sigma DMAIC Improvement Process Define and business perspective Measure  Understand the baseline process Analyze performance and root causes impacting process performance Improve Control  Implement solutions & control plan Enter Key Slide Take Away (Key Point) Here 8 Step Practical Problem Solving Methodology by Gemba Academy International Standards for Lean Six Sigma (ISLSS)
  • 24.
     Prioritized Listof Validated Root  Updated Risk Mitigation Plan  Deliverables Uploaded to Central Storage Location or Deployment Management System 24 Analyze Tollgate Checklist  Has the team examined the process and identified potential bottlenecks, disconnects and redundancies that could contribute to the problem statement?  Has the team analyzed data about the process and its performance to help stratify the problem, understand reasons for variation in the process, and generate hypothesis as to the root causes of the current process performance?  Has an evaluation been done to determine whether the problem can be solved without a fundamental recreation of the process? Has the decision been confirmed with the Project Sponsor?  Has the team investigated and validated (or de-validated) the root cause hypotheses generated earlier, to gain confidence that the “vital few” root causes have been uncovered?  Does the team understand why the problem (the Quality, Cycle Time or Cost Efficiency issue identified in the Problem Statement) is being seen?  Has the team been able to identify any additional ‘Quick Wins’?  Have learnings to-date required modification of the Project Charter? If so, have these changes been approved by the Project Sponsor and the Key Stakeholders?  Have any new risks to project success been identified, added to the Risk Mitigation Plan, and a mitigation strategy put in place? Deliverables:  List of Potential Root causes Causes  Additional “Quick Wins”, if applicable  Refined Charter, as necessary Tollgate Review Has the team identified the key factors (critical X’s) that have the biggest impact on process performance? Have they validated the root causes? Analyze Phase Success Criteria Training Video by educatevirtually International Standards for Lean Six Sigma (ISLSS)
  • 25.
    Abridged Process SigmaConversion Table… Bonacors2i C5onsulting Long-Term Yeild Process Sigma (ST) Defects Per 1,000,000 Defects Per 100,000 Defects Per 10,000 Defects Per 1,000 Defects Per 100 99.99966% 6.0 3.4 0.34 0.034 0.0034 0.00034 99.9995% 5.9 5 0.5 0.05 0.005 0.0005 99.9992% 5.8 8 0.8 0.08 0.008 0.0008 99.9900% 5.7 10 1 0.1 0.01 0.001 99.8000% 5.6 20 2 0.2 0.02 0.002 99.9970% 5.5 30 3 0.3 0.03 0.003 99.9960% 5.4 40 4 0.4 0.04 0.004 99.9930% 5.3 70 7 0.7 0.07 0.007 99.9900% 5.2 100 10 1 0.1 0.01 99.9850% 5.1 150 15 1.5 0.15 0.015 99.9770% 5.0 230 23 2.3 0.23 0.023 99.9670% 4.9 330 33 3.3 0.33 0.033 99.9520% 4.8 480 48 4.8 0.48 0.048 99.9320% 4.7 680 68 6.8 0.68 0.068 99.9040% 4.6 960 96 9.6 0.96 0.096 99.8650% 4.5 1350 135 13.5 1.35 0.135 99.8140% 4.4 1860 186 18.6 1.86 0.186 99.7450% 4.3 2550 255 25.5 2.55 0.255 99.6540% 4.2 3460 346 34.6 3.46 0.346 99.5340% 4.1 4660 466 46.6 4.66 0.466 99.3790% 4.0 6210 621 62.1 6.21 0.621 99.181% 3.9 8190 819 81.9 8.19 0.819 98.930% 3.8 10700 1070 107 10.7 1.07 98.610% 3.7 13900 1390 139 13.9 1.39 98.220% 3.6 17800 1780 178 17.8 1.78 97.730% 3.5 22700 2270 227 22.7 2.27 97.130% 3.4 28700 2870 287 28.7 2.87 96.410% 3.3 35900 3590 359 35.9 3.59 95.540% 3.2 44600 4460 446 44.6 4.46 94.520% 3.1 54800 5480 548 54.8 5.48 93.320% 3.0 66800 6680 668 66.8 6.68 91.920% 2.9 80800 8080 808 80.8 8.08 90.320% 2.8 96800 9680 968 96.8 9.68 88.50% 2.7 115000 11500 1150 115 11.5 86.50% 2.6 135000 13500 1350 135 13.5 84.20% 2.5 158000 15800 1580 158 15.8 81.60% 2.4 184000 18400 1840 184 18.4 78.80% 2.3 212000 21200 2120 212 21.2 75.80% 2.2 242000 24200 2420 242 24.2 72.60% 2.1 274000 27400 2740 274 27.4 69.20% 2.0 308000 30800 3080 308 30.8 65.60% 1.9 344000 34400 3440 344 34.4 61.80% 1.8 382000 38200 3820 382 38.2 58.00% 1.7 420000 42000 4200 420 42 54.00% 1.6 460000 46000 4600 460 46 50% 1.5 500000 50000 5000 500 50 46% 1.4 540000 54000 5400 540 54 43% 1.3 570000 57000 5700 570 57 39% 1.2 610000 61000 6100 610 61 35% 1.1 650000 65000 6500 650 65 31% 1.0 690000 Application 69000 of Statistical Analysis 6900 Training 690 69 28% 0.9 720000 25% 0.8 750000 Video 72000 75000 by Amir H. Ghaseminejad 7200 720 72 7500 750 75 22% 0.7 780000 78000 7800 780 78 19% 0.6 810000 81000 8100 810 81 16% 0.5 840000 84000 8400 840 84 14% 0.4 860000 86000 8600 860 86 12% 0.3 880000 88000 8800 880 88 10% 0.2 900000 90000 9000 900 90 8% 0.1 920000 92000 9200 920 92
  • 26.
    Table of theStandard Normal (z) Distribution z 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.0 0.0000 0.0040 0.0080 0.0120 0.0160 0.0190 0.0239 0.0279 0.0319 0.0359 0.1 0.0398 0.0438 0.0478 0.0517 0.0557 0.0596 0.0636 0.0675 0.0714 0.0753 0.2 0.0793 0.0832 0.0871 0.0910 0.0948 0.0987 0.1026 0.1064 0.1103 0.1141 0.3 0.1179 0.1217 0.1255 0.1293 0.1331 0.1368 0.1406 0.1443 0.1480 0.1517 0.4 0.1554 0.1591 0.1628 0.1664 0.1700 0.1736 0.1772 0.1808 0.1844 0.1879 0.5 0.1915 0.1950 0.1985 0.2019 0.2054 0.2088 0.2123 0.2157 0.2190 0.2224 0.6 0.2257 0.2291 0.2324 0.2357 0.2389 0.2422 0.2454 0.2486 0.2517 0.2549 0.7 0.2580 0.2611 0.2642 0.2673 0.2704 0.2734 0.2764 0.2794 0.2823 0.2852 0.8 0.2881 0.2910 0.2939 0.2969 0.2995 0.3023 0.3051 0.3078 0.3106 0.3133 0.9 0.3159 0.3186 0.3212 0.3238 0.3264 0.3289 0.3315 0.3340 0.3365 0.3389 1.0 0.3413 0.3438 0.3461 0.3485 0.3508 0.3513 0.3554 0.3577 0.3529 0.3621 1.1 0.3643 0.3665 0.3686 0.3708 0.3729 0.3749 0.3770 0.3790 0.3810 0.3830 1.2 0.3849 0.3869 0.3888 0.3907 0.3925 0.3944 0.3962 0.3980 0.3997 0.4015 1.3 0.4032 0.4049 0.4066 0.4082 0.4099 0.4115 0.4131 0.4147 0.4162 0.4177 1.4 0.4192 0.4207 0.4222 0.4236 0.4251 0.4265 0.4279 0.4292 0.4306 0.4319 1.5 0.4332 0.4345 0.4357 0.4370 0.4382 0.4394 0.4406 0.4418 0.4429 0.4441 1.6 0.4452 0.4463 0.4474 0.4484 0.4495 0.4505 0.4515 0.4525 0.4535 0.4545 1.7 0.4554 0.4564 0.4573 0.4582 0.4591 0.4599 0.4608 0.4616 0.4625 0.4633 1.8 0.4641 0.4649 0.4656 0.4664 0.4671 0.4678 0.4686 0.4693 0.4699 0.4706 1.9 0.4713 0.4719 0.4726 0.4732 0.4738 0.4744 0.4750 0.4756 0.4761 0.4767 2.0 0.4772 0.4778 0.4783 0.4788 0.4793 0.4798 0.4803 0.4808 0.4812 0.4817 2.1 0.4821 0.4826 0.4830 0.4834 0.4838 0.4842 0.4846 0.4850 0.4854 0.4857 2.2 0.4861 0.4864 0.4868 0.4871 0.4875 0.4878 0.4881 0.4884 0.4887 0.4890 2.3 0.4893 0.4896 0.4898 0.4901 0.4904 0.4906 0.4909 0.4911 0.4913 0.4916 2.4 0.4918 0.4920 0.4922 0.4925 0.4927 0.4929 0.4931 0.4932 0.4934 0.4936 2.5 0.4938 0.4940 0.4941 0.4943 0.4945 0.4946 0.4948 0.4949 0.4951 0.4952 2.6 0.4953 0.4955 0.4956 0.4957 0.4959 0.4960 0.4961 0.4962 0.4963 0.4964 2.7 0.4965 0.4966 0.4967 0.4968 0.4969 0.4970 0.4971 0.4972 0.4973 0.4974 2.8 0.4974 0.4975 0.4976 0.4977 0.4977 0.4978 0.4979 0.4979 0.4980 0.4981 2.9 0.4981 0.4982 0.4982 0.4983 0.4984 0.4984 0.4985 0.4985 0.4986 0.4986 3.0 0.4987 0.4987 0.4987 0.4988 How 0.4988 to deal with 0.4989 non-normal 0.4989 data 0.4989 0.4990 0.4990 3.1 0.4990 0.4991 0.4991 0.4991 Training 0.4992 Video 0.4992 by SigmaXL.0.4992 com 0.4992 0.4993 0.4993 3.2 0.4993 0.4993 0.4994 0.4994 0.4994 0.4994 0.4994 0.4995 0.4995 0.4995 3.3 0.4995 0.4995 0.4995 0.4996 0.4996 0.4996 0.4996 0.4996 0.4996 0.4997 3.4 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4998 Bonacors2i C6onsulting
  • 27.
    Attitude Charting &Key Constituency Map (Optional) 15% Attitude Charting 35% 35% 15% 40% 35% 30% 25% 20% 15% 10% 5% 0% Innovators Early Adopters Late Adopters Resistors Key Constituents Map Finance 37% Operations 25% Customer 13% HR 25% “Critical mass must be won-over” Enter Key Slide Take Away (Key Point) Here How to Manage Stakeholder Expectations Video by projectmanagervideos International Standards for Lean Six Sigma (ISLSS) 27
  • 28.
    Sample Size: ContinuousData (Optional) Calculation for Confidence Intervals - Continuous Data Population Size (N) 10,000 Confidence Level (1-alpha) 0.95000 (Percent expressed as decimal) Observed Sample Mean 25.00000 (Best estimate from data) Observed Sample Std. Dev. 5.00000 (Best estimate from data) Actual Sample Size 100 Lower Conf. Int. Limit (Mean) 23.86764596 (Corrected for finite population) Upper Conf. Int. Limit (Mean) 26.13235404 (Corrected for finite population) Lower Conf. Int. Limit (S.D.) 4.390034232 Upper Conf. Int. Limit (S.D.) 5.808376227 Calculation for Sample Size - Continuous Data Population Size (N) 860 Confidence Level (1-alpha) 0.95000 (Percent expressed as decimal) Power Level (1-beta) 0.90000 (Percent expressed as decimal) Standard Deviation (s) 10.00000 (Best prior estimate or Range/5) Required Precision (+/- delta) 3.00000 (Margin of Error) Initial Sample Size 117 (Assumes infinite population) Corrected for Population 104 (Correction for finite population) Recommended Sample Size 104  ?  ?  ?  ?  ?  ?  ?  ?  ?  ? Enter Key Slide Take Away (Key Point) Here Sample Size with Continuous Data Training Video by SigmaXL International Standards for Lean Six Sigma (ISLSS) 28
  • 29.
    Sample Size: DiscreteData (Optional) Calculation for Sample Size - Discrete Data (Proportions) Population Size (N) 1,000 Confidence Level (1-alpha) 0.95000 (Percent expressed as decimal) Power Level (1-beta) 0.90000 (Percent expressed as decimal) Expected Proportion (p) 0.50000 (Best prior estimate or 0.50) Required Precision (+/- delta) 0.03000 (Margin of Error) Initial Sample Size 2919 (Assumes infinite population) Corrected for Population 746 (Correction for finite population) Recommended Sample Size 746  ?  ?  ?  ?  ? Calculation for Confidence Interval - Discrete Data Population Size (N) 10,000 Confidence Level (1-alpha) 0.95000 (Percent expressed as decimal) Observed Proportion (p) 0.50000 (Best estimate from data) Actual Sample Size 100 Lower Conf. Int. Limit 0.402488147 (Corrected for finite population) Upper Conf. Int. Limit 0.597511853 (Corrected for finite population)  ?  ?  ?  ?  ? Enter Key Slide Take Away (Key Point) Here Sample Size with Discrete Data Training Video by SigmaXL.com International Standards for Lean Six Sigma (ISLSS) 29
  • 30.
    Measurement Systems Analysis(MSA) (Optional) Gage R&R Gage R&R (ANOVA) for Response  Measurement system is acceptable with the Total % Contribution <10% Percent Gage R&R Repeat Reprod Part-to-Part 100 50 0 Reported by : Tolerance: Misc: % Contribution % Study Var Sample Range 0.10 0.05 0.00 UCL=0.1073 _ R=0.0417 LCL=0 1 2 3 Sample Mean 10.00 9.75 9.50 UCL=9.8422 __ X=9.7996 LCL=9.7569 1 2 3 1 2 3 4 5 6 7 8 9 10 Part 10.00 9.75 9.50 1 2 3 Operator 10.00 9.75 9.50 Part Average 1 2 3 4 5 6 7 8 9 10 10.00 9.75 9.50 Operator 1 2 3 Gage name: Date of study : Components of Variation R Chart by Operator Xbar Chart by Operator Response by Part Response by Operator Operator * Part Interaction %Contribution Source VarComp (of VarComp) Total Gage R&R 0.0015896 3.70 Repeatability 0.0005567 1.29 Reproducibility 0.0010330 2.40 Operator 0.0003418 0.79 Operator*Part 0.0006912 1.61 Part-To-Part 0.0414247 96.30 Total Variation 0.0430143 100.00 Study Var %Study Var Source StdDev (SD) (6 * SD) (%SV) Total Gage R&R .039870 0.23922 19.22 Repeatability 0.023594 0.14156 11.38 Reproducibility 0.032140 0.19284 15.50 Operator 0.018488 0.11093 8.91 Operator*Part 0.026290 0.15774 12.68 Part-To-Part 0.203531 1.22118 98.13 Total Variation 0.207399 1.24439 100.00 Number of Distinct Categories = 7 Enter Key Slide Take Away (Key Point) Here Create & Analyze a Gage R&R (Crossed) Training Video by SigmaXL.com International Standards for Lean Six Sigma (ISLSS) 30
  • 31.
    Probability Plot (Optional) Probability Plot of Anderson-Darling Normality 10 15 20 25 30 35 40 99.9 99 95 90 80 70 60 50 40 30 20 10 5 1 0.1 QTY Percent Mean 24.74 StDev 4.177 N 100 AD 0.380 P-Value 0.397 Normal - 95% CI Enter Key Slide Take Away (Key Point) Here Create a Normal Probability Plot Training Video by SigmaXL.com International Standards for Lean Six Sigma (ISLSS) 31
  • 32.
    Control Chart (Optional)  The current baseline delivery time is stable over time with both the Moving Range (MR) (3.22 days) and Individual Average (29.13 days) experiencing common cause variation  255 data points collected with zero subgroups, thus the I&MR control chart selected Observation Individual Value 1 28 55 82 109 136 163 190 217 244 40 35 30 25 20 UC L=37.70 _ X=29.13 LC L=20.56 Observation Moving Range 1 28 55 82 109 136 163 190 217 244 10.0 7.5 5.0 2.5 0.0 UC L=10.53 __ MR=3.22 LC L=0 I-MR Chart of Delivery Time Enter Key Slide Take Away (Key Point) Here Create an Xbar & R Control Chart Training Video by SigmaXL.com International Standards for Lean Six Sigma (ISLSS) 32
  • 33.
    PDCA (Optional) Plan:  ?  ?  Do:  ?  ?  Check:  ?  ?  Act:  ?  ? ? ? ? ? Plan Do Check Act Enter Key Slide Take Away (Key Point) Here Gemba Academy Training Video on How to Leverage the Powerful A3 Report International Standards for Lean Six Sigma (ISLSS) 33
  • 34.
    5s (Optional) Sort  ?  ? Set Order  ?  ? Shine  ?  ? Standardize  ?  ? Sustain  ?  ? 5s FORM IDENTIFICATION ITEM NAME TAG NUMBER TAGGED BY TAG DATE CLASSIFICATION o RAW MATERIAL o TOOLS o FURNITURE o OTHER (EXPLAIN) o WIP o SUPPLIES o OFFICE MATERIAL o FINISHED GOOD o EQUIPMENT o BOOKS/MAGAZINES QUANTITY CELL / AREA REASON o UNNECESSARY o LEFTOVER MATERIAL o DEFECTIVE o UNKNOWN o NON-URGENT o OTHER (EXPLAIN) DISPOSITION REQUIRED o DISCARD o TRANSFER o IN-CELL STORAGE o LONG-TERM STORAGE o REDUCE o OTHER (EXPLAIN) ACTION TAKEN ACTION DESCRIPTION APPROVED BY DATE NEW LOCATION NEW CELL / AREA Enter Key Slide Take Away (Key Point) Here “What is 5S?” Training Video by GembaAcademy.com International Standards for Lean Six Sigma (ISLSS) 34
  • 35.
    Benchmark Analysis (Optional) CTQ Process Capability (X/Y) Benchmark Gap / Opportunity Source Assumptions Risks Based on the information above, what is the performance objective*? • Reduce defects by % • Reduce long-term DPMO from to . • Improve short-term Z from to . *If you do not benchmark, performance standards are based on: • For a process with  3 sigma level, decrease % defects by 10x. • For a process with > 3 sigma level, decrease % defects by 2x. • Other….please explain (corporate mandate, compliance/legal, VOC data, etc) Enter Key Slide Take Away (Key Point) Here “What is Benchmarking?” Training Video by www.coer.org.nz International Standards for Lean Six Sigma (ISLSS) 35
  • 36.
    Key Buying FactorAnalysis (Optional) CTQ Importance Company Comp 1 Comp 2 Comp 3 10.0 9.0 8.0 7.0 6.0 5.0 4.0 Delivery time On-% Complete Order Inventory Turns Warranty Returns Price Special Order Lead Time Relationship Management Correct Invoice New Product Development Brand Image Product Offering Breadth Proximity to Customer Enter Key Slide Take Away (Key Point) Here “How does the customer fit into process improvement?” Training Video by processexcellencenetwork.com and BP Group International Standards for Lean Six Sigma (ISLSS) 36
  • 37.
    Sample Value Stream Mapping Symbols (Optional) Quotes Machining C/T = 36 Sec Set Up Time 7 Min Uptime 86% Process Box Data Box I Queue/ Inventory 1 Personnel Flow (Information) Electronic Information Sign Off Point Push Systems Truck Shipment Supplier/ Customer Flow (Physical) Physical Pull Project Burst Supermarket Replenishment Kanban Station Paper Kanban Electronic Data System F I F O FIFO Lane Physical Transport “Go See” Monitoring Enter Key Slide Take Away (Key Point) Here Value Stream Map Glossary Training Video by gembaacademy.com International Standards for Lean Six Sigma (ISLSS) 37
  • 38.
    To Office ParkingLot EAST Supply Room (paper and office supplies) Records Room (Order Management) Vault (finance) Printer, Fax OM Lead OM Supr Office Reception Restrooms Cafeteria Engineering Offices Foyer Order Taker 1 Order Taker 2 Order Taker 3 Order Entry 1 Order Entry 2 Order Entry 3 CC & Val 2 CC & Val 3 CC & Val 1 Copier Indicates an in-box or outbox where work (forms/ information) waits to be worked on or transferred Planning & Scheduling Lines indicate paper/information travel: - No set path - Lots of rework Spaghetti Diagram (Optional) Enter Key Slide Take Away (Key Point) Here Spaghetti Diagram Training Video by Dwane Lay International Standards for Lean Six Sigma (ISLSS) 38 Dwane Lay Dwane Lay Dwane Lay
  • 39.
    AS-IS Process Mapping Symbols (Optional) Enter Key Slide Take Away (Key Point) Here Process Mapping Training Video by Mark Zabel International Standards for Lean Six Sigma (ISLSS) 39
  • 40.
    Lean Six Sigma Group Lean Six Sigma Additional Resources International Standards for Lean Six Sigma (ISLSS)
  • 41.
    Lean Six SigmaTollgate Template Notes The Lean Six Sigma Tollgate Templates are:  Free and intended as a guide in documenting a Lean Six Sigma Project. I grant permission for you to modify these templates to meet the specific needs of your process improvement project.  Instructional - a video has been linked to each Template, I selected a mix of videos from Thought Leaders in the Lean Six Sigma Group. I included reference links to all video’s should you want to learn more information. Also included guidelines in the Note’s section of each slide.  Efficient and Effective – Placeholders for Graphic or Video Examples for various tools and methods across each DMAIC Phase. How to Use These Templates:  Collaboratively – use as a guide, reuse templates independently or across phases as needed, and change the order as needed to best capture the execution of Lean Six Sigma in each phase, and summarize in the final Case Study.  Use as a Communication tool, and document your findings and results. 41 My name is Steven Bonacorsi, Author of the Lean Six Sigma Tollgate Templates, President of the International Standard for Lean Six Sigma (ISLSS), and Owner of the LinkedIn Lean Six Sigma Group. Replace the content of this slide with images or video’s related to your process improvement project International Standards for Lean Six Sigma (ISLSS)
  • 42.
    Lean Six SigmaResources 42  Lean Six Sigma Group: https://www.linkedin.com/groups/Lean-Six-Sigma-37987  Lean Six Sigma Subgroups: https://www.linkedin.com/groups?subgroups=&gid=37987  International Standard for Lean Six Sigma (ISLSS): http://www.islss.com Best Wishes in Continuously Improving Your Business Processes – Steven Bonacorsi, Certified Lean Six Sigma Master Black Belt International Standards for Lean Six Sigma (ISLSS)  i-nexus: http://www.i-nexus.com  Strategy Execution Community LinkedIn Group https://www.linkedin.com/groups/Strategy-Execution-Community-3725091  SigmaXL: http://www.sigmaxl.com  SigmaXL LinkedIn Group: https://www.linkedin.com/groups/SigmaXL-1812101?gid=1812101  Gemba Academy http://www.gembaacademy.com Lean CEO Group:  Gemba Academy LinkedIn Group: https://www.linkedin.com/groups/Gemba-Academy-1844998?gid=1844998  PEX Network http://www.processexcellencenetwork.com  PEX Network & IQPC - Lean Six Sigma & Process Excellence for Continuous Improvement  Lean Leadership Institute: http://www.LeanLeadership.guru/books.html The Toyota Way Group
  • 43.
    Lean Six SigmaGroups (Click Logo’s to Join Group) Lean Six Sigma Group Each Week, the Lean Six Sigma Group Grows +1,500 New Members; +2,000 Lean 43 Six Sigma Jobs; +200 Discussions; +500 Comments +280,000 Members – Come Join the Conversation International Standards for Lean Six Sigma (ISLSS)
  • 44.
    Lean Six SigmaResource Blogs (Click Logo’s to Follow Blogs) 44 See Notes Section for Links to Lean Six Sigma Group Contributors International Standards for Lean Six Sigma (ISLSS)
  • 45.
    Lean Six SigmaMeasure Phase Video References – Set 5 45 Ten Commandments of Lean Six Sigma Video by Gemba Academy How to Write a Project Charter Training Video by projectmanagervideos Process Capability Training Video by SigmaXL DMAIC Case Study to Improve Customer Satisfaction Video by SigmaXL Share Your Video with the Kaizen Group: http://www.linkedin.com/groups?gid=2057909 International Standards for Lean Six Sigma (ISLSS) The Gemba Glossary Training Video by Gemba Academy Gage R&R (Variable Data) Training Video using Minitab by Janeth Leon Descriptive Statistic’s Training Video by SigmaXL Process Capability and Statistical Process Control Training Video by SigmaXL
  • 46.
    Lean Six SigmaMeasure Phase Video References – Set 6 46 Process Capability (Continuous) Training Video by SigmaXL Process Capability (Discrete) Training Video by SigmaXL Metrics Based Process Mapping Training Video by The Karen Martin Group Share Your Video with the Statistics & Analytics Group: http://www.linkedin.com/groups?gid=4183029 International Standards for Lean Six Sigma (ISLSS) Gemba Academy Training Video on the 7 Forms of Waste SigmaXL Training Video on Cause & Effect Diagrams Value Stream Mapping Training Video by Gemba Academy Cost/Benefit Training Video by Conservation Strategy Fund Lean Accounting Training Video by Gemba Academy
  • 47.
    Lean Six SigmaMeasure Phase Video References – Set 7 Top 5 Types of Project Management Reports Video by projectmanagervideos 8-Step Problem Solving Training Video by the Lean Leadership Institute The Explosion of Data Video by PexNetwork Measure Phase Success Criteria Training Video by educatevirtually Share Your Video with the Design for Lean Six Sigma Group: 47 http://www.linkedin.com/groups?gid=3065466 International Standards for Lean Six Sigma (ISLSS) 8 Step Practical Problem Solving Methodology by Gemba Academy Analyze Phase Success Criteria Training Video by educatevirtually Application of Statistical Analysis Training Video by Amir H. Ghaseminejad How to deal with non-normal data Training Video by SigmaXL.com
  • 48.
    Lean Six SigmaMeasure Phase Video References – Set 8 How to Manage Stakeholder Expectations Video by projectmanagervideos Sample Size with Continuous Data Training Video by SigmaXL Sample Size with Discrete Data Training Video by SigmaXL.com Create & Analyze a Gage R&R (Crossed) Training Video by SigmaXL.com Share Your Video with the Business Process Management Group: 48 http://www.linkedin.com/groups?gid=3929208 International Standards for Lean Six Sigma (ISLSS) Create a Normal Probability Plot Training Video by SigmaXL.com Create an Xbar & R Control Chart Training Video by SigmaXL.com Gemba Academy Training Video on How to Leverage the Powerful A3 Report “What is 5S?” Training Video by GembaAcademy.com
  • 49.
    Lean Six SigmaMeasure Phase Video References – Set 9 “What is Benchmarking?” Training Video by www.coer.org.nz “How does the customer fit into process improvement?” by PEXNetwork and BP Group Value Stream Map Glossary Training Video by gembaacademy.com Spaghetti Diagram Training Video by Dwane Lay Share Your Video with the Strategy Execution Community Group: https://www.linkedin.com/groups/Strategy-Execution-Community-3725091 49 International Standards for Lean Six Sigma (ISLSS) Process Mapping Training Video by Mark Zabel