SlideShare a Scribd company logo
1 of 20
Lean Six 
Sigma Group 
Lean Six Sigma Case Study 
Executive Overview 
International Standards for Lean Six Sigma (ISLSS)
“Descriptive Project Title” 
Process Capability Analysis for Average Spee 
LSLUSL 
ST 
LT 
-100 0 100 200 300 400 
LSL USL 
ST 
LT 
0 10 20 30 40 
Customer Profile: 28,000 Retail Business 
Business Problem & Impact: 
USL 
Target 
Average speed to answer (ASA) was 1 minute. As call volumes 
LSL 
Mean 
increased 30% with a recent acquisition, end user downtime Sample was 
N 
StDev (ST) 
costing the company US$500K annually. The target average StDev speed (LT) 
to 
answer was under 30 seconds. 
Measure & Analyze: 
Data Collection: Speed to answer on all calls was measured. The 
existing process sigma was 2.4. 
Root Causes: Nature of problem and time of call were identified as root 
causes. 
USL 
T arget 
LSL 
Mean 
Sample N 
StDev (ST ) 
StDev (LT ) 
Improve & Control: 
Cross-training on call types was performed and staffing was arranged 
around peak call times. Metrics are reviewed weekly and posted to an 
IT dashboard. 
Cp 
CPU 
CPL 
Cpk 
Cpm 
Pp 
PPU 
PPL 
Ppk 
PPM < LSL 
PPM > USL 
PPM T otal 
PPM < LSL 
PPM > USL 
PPM T otal 
PPM < LSL 
PPM > USL 
PPM T otal 
20.0000 
* 
0.0000 
14.7929 
169 
3.38716 
4.61648 
0.98 
0.51 
1.46 
0.51 
* 
0.72 
0.38 
1.07 
0.38 
0.00 
130177.51 
130177.51 
6.29 
62109.19 
62115.48 
129673.00 
130349.79 
Proces s Data 
Potential (ST ) Capabi l i ty 
Overal l (LT ) Capabi l i ty Observed Performance Expec ted ST Performance Expec ted LT Performance 
Cp 
CPU 
CPL 
Cpk 
Cpm 
Pp 
PPU 
PPL 
Ppk 
PPM < LSL 
PPM > USL 
PPM Total 
PPM < LSL 
PPM > USL 
PPM Total 
PPM < LSL 
PPM > USL 
PPM Total 
20.0000 
* 
0.0000 
71.4444 
117 
38.9880 
50.6272 
0.09 
-0.44 
0.61 
-0.44 
* 
0.07 
-0.34 
0.47 
-0.34 
0.00 
948717.95 
948717.95 
33440.39 
906498.25 
939938.64 
79094.94 
845218.98 
924313.92 
Process Data 
Potential (ST) Capability 
Overall (LT) Capability Observed Performance Expected ST Performance Expected LT Performance 
Results/Benefits 
After the 3 month project, the customer saved US$150K, or 30%, as a 
result of reduced end user downtime. 
Process Capability 
– Before 
Process Capability 
– After 
A Savings of US $150k in 20XX 
Create Candor in the Workplace with Jack Welch 
Video by Stanford Graduate School of Business 
International Standards for Lean Six Sigma (ISLSS) 2
Project “Storyboard” 
Example 
Enter Key Slide Take Away (Key Point) Here 
How a Passionate Lean Thinking Enterprise is Developed by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS)
Lean Six 
Sigma Group 
Lean Six Sigma Case Study 
Backup Slides 
International Standards for Lean Six Sigma (ISLSS)
Project Charter 
Problem/Goal Statement 
Problem: Describe problem in non-technical terms 
 Statement should explain why project is important; why 
working on it is a priority 
Goal: Goals communicate “before” and “after” conditions 
 Shift mean, variance, or both? 
 Should impact cost, time, quality dimensions 
 Express goals using SMART criteria 
 Specific, Measurable, Attainable, Resource 
Requirements, Time Boundaries 
 Explain leverage and strategic implications (if any) 
Financial Impact 
Tollgate Review Schedule 
Team 
 Scope: 
 In-Scope/Out-of-Scope 
 (Process Start/Stop 
 State financial impact of project 
 Expenses 
 Investments (inventory, capital, A/R) 
 Revenues 
 Separate “hard” from “soft” dollars 
 State financial impact of leverage opportunities (future 
projects, replication opportunities, project iterations) 
 PES Name Project Executive Sponsor (if different from PS) 
 PS Name Project Sponsor/Process Owner 
 DC Name Deployment Champion 
 GB/BB Name Green Belt/Black Belt 
 MBB Name Master Black Belt 
Core Team Role % Contrib. LSS Training 
 Team Member 1 SME XX YB 
 Team Member 2 TM XX GB 
 Team Member 3 SME XX PS 
Extended Team 
 Team Member 1 BFM XX Not Trained 
 Team Member 2 IT XX Not Trained 
Tollgate Scheduled Revised Complete 
Define: XX/XX/XX - XX/XX/XX 
Measure: XX/XX/XX XX/XX/XX XX/XX/XX 
Analyze: XX/XX/XX XX/XX/XX XX/XX/XX 
Improve: XX/XX/XX XX/XX/XX XX/XX/XX 
Control: XX/XX/XX XX/XX/XX XX/XX/XX 
 Review high-level schedule milestones here: 
 Phase Completions 
 Tollgate Reviews 
Enter Key Slide Take Away (Key Point) Here 
How Hoshin Planning helps Organizations Video by iNexusTV1 
International Standards for Lean Six Sigma (ISLSS) 5
Measure Overview 
 CTQ: ? 
 Unit (d) or Mean (c): ? 
 Defect (d) or St. Dev. (c): ? 
 PCE%: ? 
 DPMO (d): ? 
 Sigma (Short Term): ? 
 Sigma (Long Term):? 
 MSA Results: show the percentage result of the GR&R, 
AR&R or other MSA carried out in the project 
 Root cause: 
 Quick Win #1 
 Root cause: 
 Quick Win #2 
 Root cause: 
 Quick Win #3 
Observation 
Individual Value 
1 28 55 82 109 136 163 190 217 244 
40 
35 
30 
25 
20 
UC L=37.70 
_ 
X=29.13 
LC L=20.56 
Observation 
Moving Range 
1 28 55 82 109 136 163 190 217 244 
10.0 
7.5 
5.0 
2.5 
0.0 
UC L=10.53 
__ 
MR=3.22 
LC L=0 
I-MR Chart of Delivery Time 
 Detailed process mapping 
MSA 
 Value Stream Mapping 
 Data Collection Planning 
 Basic Statistics 
 Process Capability 
 Histograms 
 Time Series Plot 
 Probability Plot 
 Pareto Analysis 
 Operational Def. 
 5s 
 Pull 
 Control Charts 
Enter Key Slide Take Away (Key Point) Here 
6 
Process Capability Graphical Analysis 
Root Cause / Quick Win Tools Used 
Gemba Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS)
Analyze Overview 
Value Add Analysis - Current State 
80 
60 
40 
20 
0 
Takt Time = 55 
1 2 3 4 5 6 7 8 9 10 
Task # 
Task Time (seconds) 
CVA Time BVA Time NVA Time 
 Root cause: 
Effect 
 Root cause: 
Effect 
 Root cause: 
Effect 
 Value Add Analysis 
 One-Way ANOVA 
 Two-Way ANOVA 
 Pareto Plots 
 Simple Linear Regression 
 Multiple Regression 
 Test for Equal Variance 
 Scatter Plots 
 C&E Matrix 
 Complexity 
 Cause & Effect Diagram 
 Kaizen/Quick Wins 
 FMEA 
 Control/Impact Chart 
 T-Test 
 Other 
Hypothesis Test 
(ANOVA, 1 or 2 sample t - test, Chi Squared, 
Regression, Test of Equal Variance, etc) 
Factor (x) 
Tested 
p Value Observations/Conclusion 
Example: ANOVA Location 0.030 
Significant factor - 1 hour driving time from DC 
to Baltimore office causes ticket cycle time to 
generally be longer for the Baltimore site 
Example: ANOVA Part vs. No Part 0.004 
Significant factor - on average, calls requiring 
parts have double the cycle time (22 vs 43 
hours) 
Example: Chi Squared Department 0.000 
Significant factor - Department 4 has digitized 
addition of customer info to ticket and less 
human intervention, resulting in fewer errors 
Example: Pareto Region n/a 
South region accounted for 59% of the defects 
due to their manual process and distance from 
the parts warehouse 
Describe any other observations about the root cause (x) data 
Enter Key Slide Take Away (Key Point) Here 
Analyze Tools using SigmaXL Virtual Menus Training Video by SigmaXL Inc. 
7 
Hypothesis Tests Value-Add Analysis 
Root Cause / Effect Tools Used 
International Standards for Lean Six Sigma (ISLSS)
Improve Summary 
Vital X (root cause) Proof of Causation 
Practical Solution (process change 
to address X) 
Operating 
Tolerances for X 
Client IT need to reverify 
all exit data received from 
Client HR 
Average delay between 
reception of information 
from Client HR until it 
reaches NT Admin or 
general admin 
Eliminate process - Place accountability 
on Client HR for information placed into 
new database. 
n/a 
E-mail vendor's contract 
with Client 
The SLA has a range of 3- 
5 business days for the 
completion of a delete 
request 
E-mail vendor instituted new web 
interface for all add/delete requests, 
vastly improving request processing 
time. 
1 - 2 days 
E-mail vendor's contract 
with Client 
The SLA has a range of 3- 
5 business days for the 
completion of a delete 
request 
E-mail vendor instituted new web 
interface for all add/delete requests, 
vastly improving request processing 
time. 
1 - 2 days 
How the solution was determined: 
 What was the solution selection tool used? 
 What project management tools were used? 
 Cost/benefit analysis? 
 Include any other tools or methods used 
1. ? 
2. ? 
3. ? 
4. ? 
5. ? 
Enter Key Slide Take Away (Key Point) Here 
8 
Solution Selection Criteria Pilot and Implementation Plan 
The 3 Key Secrets of Strategy Execution (Paul Docherty) Video by i-nexus 
International Standards for Lean Six Sigma (ISLSS)
Control Summary 
 ? 
 ? 
 ? 
 ? 
 ? 
Documentation 
 Provide any necessary training 
Translation project within/ outside of region/function: 
 Any resulting spin-off projects initiated 
 Any Replication in other locations? 
Communication: 
 Communicate project results with customer 
 Communicate results with the business 
Include text here to explain 
highlights of the plan to monitor and 
respond to variation in y’s and x’s 
Baseline Improved 
Units ? ? 
Defects ? ? 
DPMO ? ? 
Mean* ? ? 
PCE% ? ? 
Std. Deviation* ? ? 
Sigma (ST) ? ? 
Sigma (LT) ? ? 
 ? 
 ? 
 ? 
 ? 
 ? 
Summarize benefits to the 
internal/external customers here. 
Start tracking benefits from date of 
implementation of Improve Phase 
Improvements. 
Enter Key Slide Take Away (Key Point) Here 
9 
Control/Response Plan Highlights Benefits of Project 
Sigma Levels/Improvements Communication & Translation 
Standard Work Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS)
Business Impact 
 State financial impact of future project leverage opportunities 
 Separate “hard or Type 1” from “soft Type 2 or 3” dollars 
Annual Estimate Replicated Estimate 
Revenue 
Enhancement 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Expenses 
Reduction 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Loss Reduction • Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Cost Avoidance • Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Total Savings • Type 1: ? 
• Type 2: ? 
• Type 3: ? 
• Type 1: ? 
• Type 2: ? 
• Type 3: ? 
Floyd Boilanger CFO Lean Six Sigma Interview National Energy Technology Lab 
10 
Enter Key Slide Take Away (Key Point) Here 
International Standards for Lean Six Sigma (ISLSS)
Business Impact Details 
 Type 1: Describe the chain of causality that shows how you determined the Direct Cash Flow. Tell the story 
with cause & effect relationships, on how the proposed change should create the desired financial result ($) in 
your project. 
 Show the financial calculation savings and assumptions used. 
 Assumption #1 (i.e. source of data, clear Operational Definitions?) 
 Assumption #2 (i.e. hourly rate + incremental benefit cost + travel) 
 Type 2: Describe the chain of causality that shows how you determined the Labor Efficiency savings. Tell the 
story with cause & effect relationships on how the change should create the desired financial result ($). 
 Show the financial calculation savings and assumptions used. 
 Assumption #1 (i.e. Labor rate used, period of time, etc…) 
 Assumption #2 (i.e. contractor hrs or FTE, source of data, etc…) 
 Describe the Type 3 Business Impact(s) areas and how these were measured (i.e. Cost/Risk Avoidance) 
 Assumption #1 (i.e. project is driven by the Business strategy?) 
 Assumption #2 (i.e. Customer service rating, employee moral, etc…) 
 Other Questions 
 Stakeholders agree on the project’s impact and how it will be measured in financial terms? 
 What steps were taken to ensure the integrity & accuracy of the data? 
 Has the project tracking worksheet been updated? 
11 
Enter Key Slide Take Away (Key Point) Here 
How to Calculate ROI Training Video by Mike Turco 
International Standards for Lean Six Sigma (ISLSS)
Lessons Learned 
1. ? 
2. ? 
3. ? 
4. ? 
5. ? 
6. ? 
7. ? 
8. ? 
9. ? 
10.? 
Enter Key Slide Take Away (Key Point) Here 
Learn the 7 Quality Control Tools Training Video by Gemba Academy 
International Standards for Lean Six Sigma (ISLSS) 12
Project Contributors 
Steering Team Support Team 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
Project Ownership Team Deployment Team 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
 <Name>: <Contribution> 
Enter Key Slide Take Away (Key Point) Here 
What does a good Leader or Coach do? (Jeff Liker) Video by George Trachilis 
International Standards for Lean Six Sigma (ISLSS) 13
Lean Six 
Sigma Group 
Lean Six Sigma 
Additional Resources 
How to Upgrade to SigmaXL Video by SigmaXL Inc. 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma Tollgate 
Template Notes 
The Lean Six Sigma Tollgate Templates are: 
 Free and intended as a guide in documenting a Lean Six Sigma 
Project. I grant permission for you to modify these templates to meet 
the specific needs of your process improvement project. 
 Instructional - a video has been linked to each Template, I selected a 
mix of videos from Thought Leaders in the Lean Six Sigma Group. 
I included reference links to all video’s should you want to learn more 
information. Also included guidelines in the Note’s section of each 
slide. 
 Efficient and Effective – Placeholders for Graphic or Video Examples 
for various tools and methods across each DMAIC Phase. 
How to Use These Templates: 
 Collaboratively – use as a guide, reuse templates independently or 
across phases as needed, and change the order as needed to best 
capture the execution of Lean Six Sigma in each phase, and 
summarize in the final Case Study. 
 Use as a Communication tool, and document your findings and 
results. 
15 
My name is Steven 
Bonacorsi, Author of the 
Lean Six Sigma Tollgate 
Templates, President of 
the International 
Standard for Lean Six 
Sigma (ISLSS), and 
Owner of the LinkedIn 
Lean Six Sigma Group. 
Replace the content of this slide with images or video’s 
related to your process improvement project 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma Resources 
16 
 Lean Six Sigma Group: https://www.linkedin.com/groups/Lean-Six-Sigma-37987 
 Lean Six Sigma Subgroups: https://www.linkedin.com/groups?subgroups=&gid=37987 
 International Standard for Lean Six Sigma (ISLSS): http://www.islss.com 
Best Wishes in Continuously Improving Your Business Processes 
– Steven Bonacorsi, Certified Lean Six Sigma Master Black Belt 
International Standards for Lean Six Sigma (ISLSS) 
 i-nexus: http://www.i-nexus.com 
 Strategy Execution Community LinkedIn Group 
https://www.linkedin.com/groups/Strategy-Execution-Community-3725091 
 SigmaXL: http://www.sigmaxl.com 
 SigmaXL LinkedIn Group: https://www.linkedin.com/groups/SigmaXL-1812101?gid=1812101 
 Gemba Academy http://www.gembaacademy.com Lean CEO Group: 
 Gemba Academy LinkedIn Group: https://www.linkedin.com/groups/Gemba-Academy-1844998?gid=1844998 
 PEX Network http://www.processexcellencenetwork.com 
 PEX Network & IQPC - Lean Six Sigma & Process Excellence for Continuous Improvement 
 Lean Leadership Institute: http://www.LeanLeadership.guru/books.html The Toyota Way Group
Lean Six Sigma Groups 
(Click Logo’s to Join Group) 
Lean Six Sigma Group 
Each Week, the Lean Six Sigma Group Grows +1,500 New Members; +2,000 Lean 
17 
Six Sigma Jobs; +200 Discussions; +500 Comments 
+280,000 Members – Come Join the Conversation 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma Resource Blogs 
(Click Logo’s to Follow Blogs) 
18 
See Notes Section for Links to Lean Six Sigma Group Contributors 
International Standards for Lean Six Sigma (ISLSS)
Lean Six Sigma Executive Overview 
Video References – Set 22 
Create Candor in the Workplace 
with Jack Welch Video by Stanford 
Graduate School of Business 
How a Passionate Lean Thinking 
Enterprise is Developed by 
Gemba Academy 
Floyd Boilanger CFO Lean Six 
Sigma Interview 
National Energy Technology Lab 
Analyze Tools using 
SigmaXL Virtual Menus 
Video by SigmaXL Inc. 
Gemba Training Video 
by Gemba Academy 
19 
Join the Lean Six Sigma Jobs Group: 
http://www.linkedin.com/groups?gid=2161051 
International Standards for Lean Six Sigma (ISLSS) 
How Hoshin Planning 
helps Organizations 
Video by iNexusTV1 
The 3 Key Secrets of Strategy 
Execution (Paul Docherty) Video 
by i-nexus 
Standard Work Video by 
Gemba Academy
Lean Six Sigma Executive Overview 
Video References – Set 23 
20 
What does a good Leader or 
Coach do? (Jeff Liker) Video by 
George Trachilis 
Join the Careers in Operational Excellence Group: 
http://www.linkedin.com/groups?gid=3723227 
International Standards for Lean Six Sigma (ISLSS) 
How to Calculate ROI 
Training Video by 
Mike Turco 
Learn the 7 Quality Control 
Tools Video by Gemba Academy 
How to Upgrade to 
SigmaXL Video by 
SigmaXL Inc.

More Related Content

What's hot

Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingTimothy Wooi
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt ProjectAndrey Lygin
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with examplebhanutomar
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesTKMG, Inc.
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 
Lean Manufacturing Training Course Basics - Nilesh Arora
Lean Manufacturing Training Course Basics - Nilesh AroraLean Manufacturing Training Course Basics - Nilesh Arora
Lean Manufacturing Training Course Basics - Nilesh AroraADD VALUE CONSULTING Inc
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project managementSimon Misiewicz
 
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...Bonny V Pappachan
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its toolAnkit Gupta
 
Eliminating the production bottlenecks
Eliminating the production bottlenecksEliminating the production bottlenecks
Eliminating the production bottlenecksdutconsult
 
3P Production Preparation Process Overview
3P Production Preparation Process Overview3P Production Preparation Process Overview
3P Production Preparation Process Overviewopexcreative
 
Lean Project Management Principles
Lean Project Management Principles Lean Project Management Principles
Lean Project Management Principles Ryder System, Inc.
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 

What's hot (20)

Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in Manufacturing
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt Project
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case Studies
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean Manufacturing Training Course Basics - Nilesh Arora
Lean Manufacturing Training Course Basics - Nilesh AroraLean Manufacturing Training Course Basics - Nilesh Arora
Lean Manufacturing Training Course Basics - Nilesh Arora
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project management
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to Kanban
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
Eight pillars of Total Productive Maintenance (TPM) and TPM at Unilever Opera...
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Dmaic
DmaicDmaic
Dmaic
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
Lean Six Sigma Projects
Lean Six Sigma ProjectsLean Six Sigma Projects
Lean Six Sigma Projects
 
Eliminating the production bottlenecks
Eliminating the production bottlenecksEliminating the production bottlenecks
Eliminating the production bottlenecks
 
3P Production Preparation Process Overview
3P Production Preparation Process Overview3P Production Preparation Process Overview
3P Production Preparation Process Overview
 
Lean Project Management Principles
Lean Project Management Principles Lean Project Management Principles
Lean Project Management Principles
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 

Viewers also liked

Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best pptRabia Sgh S
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlySteven Bonacorsi
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case StudyNitesh Verma
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Studysanjay_asati
 
Dell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudyDell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudySteven Bonacorsi
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentationvivekissar
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case StudyNitesh Verma
 
Case study on Six Sigma (2014 ExL Conference)
Case study on Six Sigma (2014 ExL Conference)Case study on Six Sigma (2014 ExL Conference)
Case study on Six Sigma (2014 ExL Conference)George Betts, MBA, CPM
 
Lean six sigma deployment success checklist
Lean six sigma deployment success checklistLean six sigma deployment success checklist
Lean six sigma deployment success checklistVishy Chandra
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingAnkit Sharma
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate templateSteven Bonacorsi
 
Therese Boutwell Case Study Analysis
Therese Boutwell Case Study AnalysisTherese Boutwell Case Study Analysis
Therese Boutwell Case Study AnalysisTherese Boutwell
 
Bmw Imac Form Completeness Six Sigma Case Study
Bmw Imac Form Completeness Six Sigma Case StudyBmw Imac Form Completeness Six Sigma Case Study
Bmw Imac Form Completeness Six Sigma Case StudySteven Bonacorsi
 
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
What is Lean Six Sigma -  ADDVALUE - Nilesh AroraWhat is Lean Six Sigma -  ADDVALUE - Nilesh Arora
What is Lean Six Sigma - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Maximizing Results: The lean approach to driving innovation, user delight, an...
Maximizing Results: The lean approach to driving innovation, user delight, an...Maximizing Results: The lean approach to driving innovation, user delight, an...
Maximizing Results: The lean approach to driving innovation, user delight, an...Tom McCracken
 
Conducting Successful Lean Six Sigma Deployment Reviews
Conducting Successful Lean Six Sigma Deployment ReviewsConducting Successful Lean Six Sigma Deployment Reviews
Conducting Successful Lean Six Sigma Deployment ReviewsJuran Global
 

Viewers also liked (19)

Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
 
Dell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudyDell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case Study
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
 
Case study on Six Sigma (2014 ExL Conference)
Case study on Six Sigma (2014 ExL Conference)Case study on Six Sigma (2014 ExL Conference)
Case study on Six Sigma (2014 ExL Conference)
 
Lean six sigma deployment success checklist
Lean six sigma deployment success checklistLean six sigma deployment success checklist
Lean six sigma deployment success checklist
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete training
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
Therese Boutwell Case Study Analysis
Therese Boutwell Case Study AnalysisTherese Boutwell Case Study Analysis
Therese Boutwell Case Study Analysis
 
Bmw Imac Form Completeness Six Sigma Case Study
Bmw Imac Form Completeness Six Sigma Case StudyBmw Imac Form Completeness Six Sigma Case Study
Bmw Imac Form Completeness Six Sigma Case Study
 
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
What is Lean Six Sigma -  ADDVALUE - Nilesh AroraWhat is Lean Six Sigma -  ADDVALUE - Nilesh Arora
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
 
Maximizing Results: The lean approach to driving innovation, user delight, an...
Maximizing Results: The lean approach to driving innovation, user delight, an...Maximizing Results: The lean approach to driving innovation, user delight, an...
Maximizing Results: The lean approach to driving innovation, user delight, an...
 
Conducting Successful Lean Six Sigma Deployment Reviews
Conducting Successful Lean Six Sigma Deployment ReviewsConducting Successful Lean Six Sigma Deployment Reviews
Conducting Successful Lean Six Sigma Deployment Reviews
 

Similar to Lean six sigma executive overview (case study) templates

Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesSteven Bonacorsi
 
QM-007-Design for 6 sigma
QM-007-Design for 6 sigmaQM-007-Design for 6 sigma
QM-007-Design for 6 sigmahandbook
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysGoLeanSixSigma.com
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltRajiv Tiwari
 
PROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 Weeks
PROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 WeeksPROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 Weeks
PROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 WeeksGoLeanSixSigma.com
 
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...Cisco Canada
 
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip LewWhen Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip LewXBOSoft
 
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)Mustafa Said YILDIZ
 
Feasibility Analysis.ppt
Feasibility Analysis.pptFeasibility Analysis.ppt
Feasibility Analysis.pptBetshaTizazu2
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 EstimationLawrence Bernstein
 

Similar to Lean six sigma executive overview (case study) templates (20)

Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
15 Deliv template
15 Deliv template15 Deliv template
15 Deliv template
 
6 sigma LTE release management process improvement
6 sigma LTE release management process improvement6 sigma LTE release management process improvement
6 sigma LTE release management process improvement
 
QM-007-Design for 6 sigma
QM-007-Design for 6 sigmaQM-007-Design for 6 sigma
QM-007-Design for 6 sigma
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green Belt
 
6sigma
6sigma6sigma
6sigma
 
PROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 Weeks
PROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 WeeksPROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 Weeks
PROJECT STORYBOARD: Reducing Learning Curve Ramp for Temp Employees by 2 Weeks
 
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
 
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip LewWhen Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
When Agile is a Quality Game Changer Webinar - Michael Mah, Philip Lew
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
 
DFSS short
DFSS shortDFSS short
DFSS short
 
Feasibility Analysis.ppt
Feasibility Analysis.pptFeasibility Analysis.ppt
Feasibility Analysis.ppt
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 Estimation
 

More from Steven Bonacorsi

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingSteven Bonacorsi
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsSteven Bonacorsi
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sSteven Bonacorsi
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study PromappSteven Bonacorsi
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilSteven Bonacorsi
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI GlobalSteven Bonacorsi
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonaldsSteven Bonacorsi
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis EnergySteven Bonacorsi
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study PromappSteven Bonacorsi
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case StudySteven Bonacorsi
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans OlexSteven Bonacorsi
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma TemplatesSteven Bonacorsi
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studiesSteven Bonacorsi
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement SummitSteven Bonacorsi
 
Improving Your Strategic Focus &amp; Performance Dan Ryan
Improving Your Strategic Focus &amp; Performance   Dan RyanImproving Your Strategic Focus &amp; Performance   Dan Ryan
Improving Your Strategic Focus &amp; Performance Dan RyanSteven Bonacorsi
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Steven Bonacorsi
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Steven Bonacorsi
 

More from Steven Bonacorsi (20)

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffing
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goals
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 s
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study Promapp
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study Toyota
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District Council
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI Global
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Improving Your Strategic Focus &amp; Performance Dan Ryan
Improving Your Strategic Focus &amp; Performance   Dan RyanImproving Your Strategic Focus &amp; Performance   Dan Ryan
Improving Your Strategic Focus &amp; Performance Dan Ryan
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 

Recently uploaded

SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowSRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTSJHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTSkajalroy875762
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableChandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGpriyakumari801827
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Puja Sharma
 

Recently uploaded (20)

SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowSRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTSJHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableChandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 

Lean six sigma executive overview (case study) templates

  • 1. Lean Six Sigma Group Lean Six Sigma Case Study Executive Overview International Standards for Lean Six Sigma (ISLSS)
  • 2. “Descriptive Project Title” Process Capability Analysis for Average Spee LSLUSL ST LT -100 0 100 200 300 400 LSL USL ST LT 0 10 20 30 40 Customer Profile: 28,000 Retail Business Business Problem & Impact: USL Target Average speed to answer (ASA) was 1 minute. As call volumes LSL Mean increased 30% with a recent acquisition, end user downtime Sample was N StDev (ST) costing the company US$500K annually. The target average StDev speed (LT) to answer was under 30 seconds. Measure & Analyze: Data Collection: Speed to answer on all calls was measured. The existing process sigma was 2.4. Root Causes: Nature of problem and time of call were identified as root causes. USL T arget LSL Mean Sample N StDev (ST ) StDev (LT ) Improve & Control: Cross-training on call types was performed and staffing was arranged around peak call times. Metrics are reviewed weekly and posted to an IT dashboard. Cp CPU CPL Cpk Cpm Pp PPU PPL Ppk PPM < LSL PPM > USL PPM T otal PPM < LSL PPM > USL PPM T otal PPM < LSL PPM > USL PPM T otal 20.0000 * 0.0000 14.7929 169 3.38716 4.61648 0.98 0.51 1.46 0.51 * 0.72 0.38 1.07 0.38 0.00 130177.51 130177.51 6.29 62109.19 62115.48 129673.00 130349.79 Proces s Data Potential (ST ) Capabi l i ty Overal l (LT ) Capabi l i ty Observed Performance Expec ted ST Performance Expec ted LT Performance Cp CPU CPL Cpk Cpm Pp PPU PPL Ppk PPM < LSL PPM > USL PPM Total PPM < LSL PPM > USL PPM Total PPM < LSL PPM > USL PPM Total 20.0000 * 0.0000 71.4444 117 38.9880 50.6272 0.09 -0.44 0.61 -0.44 * 0.07 -0.34 0.47 -0.34 0.00 948717.95 948717.95 33440.39 906498.25 939938.64 79094.94 845218.98 924313.92 Process Data Potential (ST) Capability Overall (LT) Capability Observed Performance Expected ST Performance Expected LT Performance Results/Benefits After the 3 month project, the customer saved US$150K, or 30%, as a result of reduced end user downtime. Process Capability – Before Process Capability – After A Savings of US $150k in 20XX Create Candor in the Workplace with Jack Welch Video by Stanford Graduate School of Business International Standards for Lean Six Sigma (ISLSS) 2
  • 3. Project “Storyboard” Example Enter Key Slide Take Away (Key Point) Here How a Passionate Lean Thinking Enterprise is Developed by Gemba Academy International Standards for Lean Six Sigma (ISLSS)
  • 4. Lean Six Sigma Group Lean Six Sigma Case Study Backup Slides International Standards for Lean Six Sigma (ISLSS)
  • 5. Project Charter Problem/Goal Statement Problem: Describe problem in non-technical terms  Statement should explain why project is important; why working on it is a priority Goal: Goals communicate “before” and “after” conditions  Shift mean, variance, or both?  Should impact cost, time, quality dimensions  Express goals using SMART criteria  Specific, Measurable, Attainable, Resource Requirements, Time Boundaries  Explain leverage and strategic implications (if any) Financial Impact Tollgate Review Schedule Team  Scope:  In-Scope/Out-of-Scope  (Process Start/Stop  State financial impact of project  Expenses  Investments (inventory, capital, A/R)  Revenues  Separate “hard” from “soft” dollars  State financial impact of leverage opportunities (future projects, replication opportunities, project iterations)  PES Name Project Executive Sponsor (if different from PS)  PS Name Project Sponsor/Process Owner  DC Name Deployment Champion  GB/BB Name Green Belt/Black Belt  MBB Name Master Black Belt Core Team Role % Contrib. LSS Training  Team Member 1 SME XX YB  Team Member 2 TM XX GB  Team Member 3 SME XX PS Extended Team  Team Member 1 BFM XX Not Trained  Team Member 2 IT XX Not Trained Tollgate Scheduled Revised Complete Define: XX/XX/XX - XX/XX/XX Measure: XX/XX/XX XX/XX/XX XX/XX/XX Analyze: XX/XX/XX XX/XX/XX XX/XX/XX Improve: XX/XX/XX XX/XX/XX XX/XX/XX Control: XX/XX/XX XX/XX/XX XX/XX/XX  Review high-level schedule milestones here:  Phase Completions  Tollgate Reviews Enter Key Slide Take Away (Key Point) Here How Hoshin Planning helps Organizations Video by iNexusTV1 International Standards for Lean Six Sigma (ISLSS) 5
  • 6. Measure Overview  CTQ: ?  Unit (d) or Mean (c): ?  Defect (d) or St. Dev. (c): ?  PCE%: ?  DPMO (d): ?  Sigma (Short Term): ?  Sigma (Long Term):?  MSA Results: show the percentage result of the GR&R, AR&R or other MSA carried out in the project  Root cause:  Quick Win #1  Root cause:  Quick Win #2  Root cause:  Quick Win #3 Observation Individual Value 1 28 55 82 109 136 163 190 217 244 40 35 30 25 20 UC L=37.70 _ X=29.13 LC L=20.56 Observation Moving Range 1 28 55 82 109 136 163 190 217 244 10.0 7.5 5.0 2.5 0.0 UC L=10.53 __ MR=3.22 LC L=0 I-MR Chart of Delivery Time  Detailed process mapping MSA  Value Stream Mapping  Data Collection Planning  Basic Statistics  Process Capability  Histograms  Time Series Plot  Probability Plot  Pareto Analysis  Operational Def.  5s  Pull  Control Charts Enter Key Slide Take Away (Key Point) Here 6 Process Capability Graphical Analysis Root Cause / Quick Win Tools Used Gemba Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS)
  • 7. Analyze Overview Value Add Analysis - Current State 80 60 40 20 0 Takt Time = 55 1 2 3 4 5 6 7 8 9 10 Task # Task Time (seconds) CVA Time BVA Time NVA Time  Root cause: Effect  Root cause: Effect  Root cause: Effect  Value Add Analysis  One-Way ANOVA  Two-Way ANOVA  Pareto Plots  Simple Linear Regression  Multiple Regression  Test for Equal Variance  Scatter Plots  C&E Matrix  Complexity  Cause & Effect Diagram  Kaizen/Quick Wins  FMEA  Control/Impact Chart  T-Test  Other Hypothesis Test (ANOVA, 1 or 2 sample t - test, Chi Squared, Regression, Test of Equal Variance, etc) Factor (x) Tested p Value Observations/Conclusion Example: ANOVA Location 0.030 Significant factor - 1 hour driving time from DC to Baltimore office causes ticket cycle time to generally be longer for the Baltimore site Example: ANOVA Part vs. No Part 0.004 Significant factor - on average, calls requiring parts have double the cycle time (22 vs 43 hours) Example: Chi Squared Department 0.000 Significant factor - Department 4 has digitized addition of customer info to ticket and less human intervention, resulting in fewer errors Example: Pareto Region n/a South region accounted for 59% of the defects due to their manual process and distance from the parts warehouse Describe any other observations about the root cause (x) data Enter Key Slide Take Away (Key Point) Here Analyze Tools using SigmaXL Virtual Menus Training Video by SigmaXL Inc. 7 Hypothesis Tests Value-Add Analysis Root Cause / Effect Tools Used International Standards for Lean Six Sigma (ISLSS)
  • 8. Improve Summary Vital X (root cause) Proof of Causation Practical Solution (process change to address X) Operating Tolerances for X Client IT need to reverify all exit data received from Client HR Average delay between reception of information from Client HR until it reaches NT Admin or general admin Eliminate process - Place accountability on Client HR for information placed into new database. n/a E-mail vendor's contract with Client The SLA has a range of 3- 5 business days for the completion of a delete request E-mail vendor instituted new web interface for all add/delete requests, vastly improving request processing time. 1 - 2 days E-mail vendor's contract with Client The SLA has a range of 3- 5 business days for the completion of a delete request E-mail vendor instituted new web interface for all add/delete requests, vastly improving request processing time. 1 - 2 days How the solution was determined:  What was the solution selection tool used?  What project management tools were used?  Cost/benefit analysis?  Include any other tools or methods used 1. ? 2. ? 3. ? 4. ? 5. ? Enter Key Slide Take Away (Key Point) Here 8 Solution Selection Criteria Pilot and Implementation Plan The 3 Key Secrets of Strategy Execution (Paul Docherty) Video by i-nexus International Standards for Lean Six Sigma (ISLSS)
  • 9. Control Summary  ?  ?  ?  ?  ? Documentation  Provide any necessary training Translation project within/ outside of region/function:  Any resulting spin-off projects initiated  Any Replication in other locations? Communication:  Communicate project results with customer  Communicate results with the business Include text here to explain highlights of the plan to monitor and respond to variation in y’s and x’s Baseline Improved Units ? ? Defects ? ? DPMO ? ? Mean* ? ? PCE% ? ? Std. Deviation* ? ? Sigma (ST) ? ? Sigma (LT) ? ?  ?  ?  ?  ?  ? Summarize benefits to the internal/external customers here. Start tracking benefits from date of implementation of Improve Phase Improvements. Enter Key Slide Take Away (Key Point) Here 9 Control/Response Plan Highlights Benefits of Project Sigma Levels/Improvements Communication & Translation Standard Work Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS)
  • 10. Business Impact  State financial impact of future project leverage opportunities  Separate “hard or Type 1” from “soft Type 2 or 3” dollars Annual Estimate Replicated Estimate Revenue Enhancement • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Expenses Reduction • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Loss Reduction • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Cost Avoidance • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Total Savings • Type 1: ? • Type 2: ? • Type 3: ? • Type 1: ? • Type 2: ? • Type 3: ? Floyd Boilanger CFO Lean Six Sigma Interview National Energy Technology Lab 10 Enter Key Slide Take Away (Key Point) Here International Standards for Lean Six Sigma (ISLSS)
  • 11. Business Impact Details  Type 1: Describe the chain of causality that shows how you determined the Direct Cash Flow. Tell the story with cause & effect relationships, on how the proposed change should create the desired financial result ($) in your project.  Show the financial calculation savings and assumptions used.  Assumption #1 (i.e. source of data, clear Operational Definitions?)  Assumption #2 (i.e. hourly rate + incremental benefit cost + travel)  Type 2: Describe the chain of causality that shows how you determined the Labor Efficiency savings. Tell the story with cause & effect relationships on how the change should create the desired financial result ($).  Show the financial calculation savings and assumptions used.  Assumption #1 (i.e. Labor rate used, period of time, etc…)  Assumption #2 (i.e. contractor hrs or FTE, source of data, etc…)  Describe the Type 3 Business Impact(s) areas and how these were measured (i.e. Cost/Risk Avoidance)  Assumption #1 (i.e. project is driven by the Business strategy?)  Assumption #2 (i.e. Customer service rating, employee moral, etc…)  Other Questions  Stakeholders agree on the project’s impact and how it will be measured in financial terms?  What steps were taken to ensure the integrity & accuracy of the data?  Has the project tracking worksheet been updated? 11 Enter Key Slide Take Away (Key Point) Here How to Calculate ROI Training Video by Mike Turco International Standards for Lean Six Sigma (ISLSS)
  • 12. Lessons Learned 1. ? 2. ? 3. ? 4. ? 5. ? 6. ? 7. ? 8. ? 9. ? 10.? Enter Key Slide Take Away (Key Point) Here Learn the 7 Quality Control Tools Training Video by Gemba Academy International Standards for Lean Six Sigma (ISLSS) 12
  • 13. Project Contributors Steering Team Support Team  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution> Project Ownership Team Deployment Team  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution>  <Name>: <Contribution> Enter Key Slide Take Away (Key Point) Here What does a good Leader or Coach do? (Jeff Liker) Video by George Trachilis International Standards for Lean Six Sigma (ISLSS) 13
  • 14. Lean Six Sigma Group Lean Six Sigma Additional Resources How to Upgrade to SigmaXL Video by SigmaXL Inc. International Standards for Lean Six Sigma (ISLSS)
  • 15. Lean Six Sigma Tollgate Template Notes The Lean Six Sigma Tollgate Templates are:  Free and intended as a guide in documenting a Lean Six Sigma Project. I grant permission for you to modify these templates to meet the specific needs of your process improvement project.  Instructional - a video has been linked to each Template, I selected a mix of videos from Thought Leaders in the Lean Six Sigma Group. I included reference links to all video’s should you want to learn more information. Also included guidelines in the Note’s section of each slide.  Efficient and Effective – Placeholders for Graphic or Video Examples for various tools and methods across each DMAIC Phase. How to Use These Templates:  Collaboratively – use as a guide, reuse templates independently or across phases as needed, and change the order as needed to best capture the execution of Lean Six Sigma in each phase, and summarize in the final Case Study.  Use as a Communication tool, and document your findings and results. 15 My name is Steven Bonacorsi, Author of the Lean Six Sigma Tollgate Templates, President of the International Standard for Lean Six Sigma (ISLSS), and Owner of the LinkedIn Lean Six Sigma Group. Replace the content of this slide with images or video’s related to your process improvement project International Standards for Lean Six Sigma (ISLSS)
  • 16. Lean Six Sigma Resources 16  Lean Six Sigma Group: https://www.linkedin.com/groups/Lean-Six-Sigma-37987  Lean Six Sigma Subgroups: https://www.linkedin.com/groups?subgroups=&gid=37987  International Standard for Lean Six Sigma (ISLSS): http://www.islss.com Best Wishes in Continuously Improving Your Business Processes – Steven Bonacorsi, Certified Lean Six Sigma Master Black Belt International Standards for Lean Six Sigma (ISLSS)  i-nexus: http://www.i-nexus.com  Strategy Execution Community LinkedIn Group https://www.linkedin.com/groups/Strategy-Execution-Community-3725091  SigmaXL: http://www.sigmaxl.com  SigmaXL LinkedIn Group: https://www.linkedin.com/groups/SigmaXL-1812101?gid=1812101  Gemba Academy http://www.gembaacademy.com Lean CEO Group:  Gemba Academy LinkedIn Group: https://www.linkedin.com/groups/Gemba-Academy-1844998?gid=1844998  PEX Network http://www.processexcellencenetwork.com  PEX Network & IQPC - Lean Six Sigma & Process Excellence for Continuous Improvement  Lean Leadership Institute: http://www.LeanLeadership.guru/books.html The Toyota Way Group
  • 17. Lean Six Sigma Groups (Click Logo’s to Join Group) Lean Six Sigma Group Each Week, the Lean Six Sigma Group Grows +1,500 New Members; +2,000 Lean 17 Six Sigma Jobs; +200 Discussions; +500 Comments +280,000 Members – Come Join the Conversation International Standards for Lean Six Sigma (ISLSS)
  • 18. Lean Six Sigma Resource Blogs (Click Logo’s to Follow Blogs) 18 See Notes Section for Links to Lean Six Sigma Group Contributors International Standards for Lean Six Sigma (ISLSS)
  • 19. Lean Six Sigma Executive Overview Video References – Set 22 Create Candor in the Workplace with Jack Welch Video by Stanford Graduate School of Business How a Passionate Lean Thinking Enterprise is Developed by Gemba Academy Floyd Boilanger CFO Lean Six Sigma Interview National Energy Technology Lab Analyze Tools using SigmaXL Virtual Menus Video by SigmaXL Inc. Gemba Training Video by Gemba Academy 19 Join the Lean Six Sigma Jobs Group: http://www.linkedin.com/groups?gid=2161051 International Standards for Lean Six Sigma (ISLSS) How Hoshin Planning helps Organizations Video by iNexusTV1 The 3 Key Secrets of Strategy Execution (Paul Docherty) Video by i-nexus Standard Work Video by Gemba Academy
  • 20. Lean Six Sigma Executive Overview Video References – Set 23 20 What does a good Leader or Coach do? (Jeff Liker) Video by George Trachilis Join the Careers in Operational Excellence Group: http://www.linkedin.com/groups?gid=3723227 International Standards for Lean Six Sigma (ISLSS) How to Calculate ROI Training Video by Mike Turco Learn the 7 Quality Control Tools Video by Gemba Academy How to Upgrade to SigmaXL Video by SigmaXL Inc.