INTRODUCTION
The design of a MIS may seem to :
 management to be an expensive project
 the cost of getting the MIS on line satisfactorily
often be comparable to that of its design.
 the implementation has been accomplished when
outputs of the MIS are continuously utilized by
makers.
2
FOUR BASIC METHODS
FOR IMPLEMENTING
THE MIS
1. Install the system in a new operation or organization.
2. Cut off the old system and install the new.
 This produces a time gap during which no system is in
operation.
 Practically, installation requires one or two days for small
companies or small systems.
3
3. Cut over by segments.
 This method is also referred as” phasing in” the new
system.
 Small parts or subsystems are substituted for the old.
 In the case of upgrading old systems, this may be a very
desirable method.
4. Operate in parallel and cut over.
 The new system is installed and operated in parallel with
the current system until it has been checked out, then only
the current system is cut out.
 This method is expensive because of personal and related
costs.
4
PLAN THE
IMPLEMENTATION
1. Initial installation
2. Test of the system as a whole
3. Evaluation, maintenance and control of the
system
5
PLAN THE
IMPLEMENTATION•The first step in the implementation procedure is to plan the
implementation.
•Some analyst includes the planning of the implementation
with the design of the system, the planning and the action to
implement the plan should be bound closely together.
•Planning is the first step of management, not the last.
•The MIS design and the urgent need for the system at the
time the design is completed will weigh heavily on the plan for
implementation
6
IMPLEMENTATION TASKS
1. Planning the implementation activities
2. Acquiring and laying out facilities and offices
3. Organizing the personnel for implementation
4. Developing procedures for installation and testing
5. Developing the training program for operating personnel
6. Completing the system’s software
7. Acquiring required hardware
8. Generating files
9. Designing forms
10. Testing the entire system
11. Completing cutover to the new system
12. Documenting the system
13. Evaluating the MIS
14. Providing system maintenance (debugging and improving)
7
PLANNING THE
IMPLEMENTATION
ACTIVITIES
Establish Relationships among tasks:
For small projects, the order of performance may
described in text form.
A Gantt chart or network diagram makes visualization
plan and schedule much clearer.
For large projects, many concurrent and sequential
activities are interrelated so that a network diagram
employed in any good plan.
8
PLANNING THE
IMPLEMENTATION
ACTIVITIES
Establish a Schedule:
Schedule is prepared by having the system
estimate the times between the events in the
network.
The critical path (longest time through the network)
be calculated.
After specifying the starting date, the end date is
established.
9
PLANNING THE
IMPLEMENTATION
ACTIVITIES
Cost Schedule to Tasks and Time:
 The cost for completing each task required to
is established as part of the plan.
 Then the rate of expenditures should be
Reporting and control of the work in progress may
obtained by weekly meetings.
•The financial personnel must make certain that
formats allow them to show cost and technical
relationship as well as cost and time. 10
ACQUIRING AND LAYING OUT
FACILITIES AND OFFICES
•For the installation of a new system to replace a current one
may require a major revision of facilities as well as completely
new office, computer room etc.
•The MIS project manager must prepare rough layouts and
estimates of particular floor areas that feel to be needed.
•The manager then prepares cost estimates.
•Space planning must be done by the space to be occupied by
people, the space occupied by equipment and the movement
of people and equipment in the work progress.
•A large investment in good working conditions will repay its
cost many times
11
ORGANIZING THE PERSONNEL
FOR IMPLEMENTATION
•As the implementation tasks have been defined,
management usually assigns a project manager to guide
the implementation.
•The purpose of the MIS is to increase the amount and
quality of their contributions, the system is their system.
•Top management must make the middle managers for
their involvement in implementation, besides these,
systems specialists, computer programmer.
• Top management should make sure that each people who
will operate the system should have active parts in the
implementation.
12
DEVELOPING PROCEDURES FOR
INSTALLATION AND TESTING
•After organizing the personnel for implementation the next
task is to develop or prepare the procedures for
implementation.
•As the project leader has the network plan for proceeding with
the implementation, this leader calls the key people in the
project to prepare more detailed procedures for system
installation.
•Procedures for evaluating and selecting hardware must be
spelled out.
•Procedures for phasing in parts of the MIS or operating the
MIS in parallel must be developed.
•The major part of implementing the MIS is the testing of each
segment of total system as it is installed. 13
DEVELOPING THE TRAINING
PROGRAM FOR OPERATING
PERSONNEL
•A program is developed keeping in mind to impress
management and support.
•After that , it is necessary to train operating personnel in their
new duties.
•They must have a thorough understanding of what the new
MIS is like and what it is supposed to do.
•They must learn how it will operate.
•They are faced with many changes in their work and have to
obtain acceptance of changes.
14
THANK YOU
15

More Related Content

What's hot

Information Systems Evolution (IS)
Information Systems Evolution (IS)Information Systems Evolution (IS)
Information Systems Evolution (IS)
Helmee Halim
 
Group decision support systems (gdss)
Group decision support systems (gdss)Group decision support systems (gdss)
Group decision support systems (gdss)
Mihir joshi
 
MIS Support to Management
MIS Support to ManagementMIS Support to Management
MIS Support to Management
Maria Stella Solon
 
Structure of MIS
Structure of MISStructure of MIS
Structure of MIS
Mohammed Jasir PV
 
FORMAL & INFORMAL INFORMATION SYSTEM
FORMAL & INFORMAL  INFORMATION SYSTEMFORMAL & INFORMAL  INFORMATION SYSTEM
FORMAL & INFORMAL INFORMATION SYSTEM
Zahid Parvez
 
Organizational appraisal
 Organizational appraisal Organizational appraisal
Organizational appraisal
Laith Alasadi
 
Six major types of information systems
Six major types of information systemsSix major types of information systems
Six major types of information systems
Mohanraj V
 
Management Information System (MIS)
Management Information System (MIS)Management Information System (MIS)
Management Information System (MIS)
Navneet Jingar
 
negotiation and collective bargaining
negotiation and collective bargainingnegotiation and collective bargaining
negotiation and collective bargaining
omar taha
 
strategic information system
strategic information systemstrategic information system
strategic information system
Prateek Singh
 
Nrb it policy_points_(english)
Nrb it policy_points_(english)Nrb it policy_points_(english)
Nrb it policy_points_(english)
Dipak Khadka
 
Management Information System (Full Notes)
Management Information System (Full Notes)Management Information System (Full Notes)
Management Information System (Full Notes)
Harish Chand
 
Mis structure of digital firm
Mis structure of digital firmMis structure of digital firm
Mis structure of digital firm
Dr. Vardhan choubey
 
Operations Research - Meaning, Origin & Characteristics
Operations Research -  Meaning, Origin & CharacteristicsOperations Research -  Meaning, Origin & Characteristics
Operations Research - Meaning, Origin & Characteristics
Sundar B N
 
Techniques of strategic evaluation and control
Techniques of strategic evaluation and controlTechniques of strategic evaluation and control
Techniques of strategic evaluation and control
NidhinaThottuvayalil
 
Security & ethical challenges
Security & ethical challengesSecurity & ethical challenges
Security & ethical challengesLouie Medinaceli
 
MIS Role in Production
MIS Role in ProductionMIS Role in Production
MIS Role in Productionpugsrockon
 
Mis presentation topics bca2
Mis presentation topics bca2Mis presentation topics bca2
Mis presentation topics bca2rupalidhir
 
Strategic managemnet process ppt
Strategic managemnet process pptStrategic managemnet process ppt
Strategic managemnet process ppt
MUHAMMAD HASRATH
 
Use of computers and information technology in management control
Use of computers and information technology in management controlUse of computers and information technology in management control
Use of computers and information technology in management control
R.Arun Kumar M.E (Ph.D.)
 

What's hot (20)

Information Systems Evolution (IS)
Information Systems Evolution (IS)Information Systems Evolution (IS)
Information Systems Evolution (IS)
 
Group decision support systems (gdss)
Group decision support systems (gdss)Group decision support systems (gdss)
Group decision support systems (gdss)
 
MIS Support to Management
MIS Support to ManagementMIS Support to Management
MIS Support to Management
 
Structure of MIS
Structure of MISStructure of MIS
Structure of MIS
 
FORMAL & INFORMAL INFORMATION SYSTEM
FORMAL & INFORMAL  INFORMATION SYSTEMFORMAL & INFORMAL  INFORMATION SYSTEM
FORMAL & INFORMAL INFORMATION SYSTEM
 
Organizational appraisal
 Organizational appraisal Organizational appraisal
Organizational appraisal
 
Six major types of information systems
Six major types of information systemsSix major types of information systems
Six major types of information systems
 
Management Information System (MIS)
Management Information System (MIS)Management Information System (MIS)
Management Information System (MIS)
 
negotiation and collective bargaining
negotiation and collective bargainingnegotiation and collective bargaining
negotiation and collective bargaining
 
strategic information system
strategic information systemstrategic information system
strategic information system
 
Nrb it policy_points_(english)
Nrb it policy_points_(english)Nrb it policy_points_(english)
Nrb it policy_points_(english)
 
Management Information System (Full Notes)
Management Information System (Full Notes)Management Information System (Full Notes)
Management Information System (Full Notes)
 
Mis structure of digital firm
Mis structure of digital firmMis structure of digital firm
Mis structure of digital firm
 
Operations Research - Meaning, Origin & Characteristics
Operations Research -  Meaning, Origin & CharacteristicsOperations Research -  Meaning, Origin & Characteristics
Operations Research - Meaning, Origin & Characteristics
 
Techniques of strategic evaluation and control
Techniques of strategic evaluation and controlTechniques of strategic evaluation and control
Techniques of strategic evaluation and control
 
Security & ethical challenges
Security & ethical challengesSecurity & ethical challenges
Security & ethical challenges
 
MIS Role in Production
MIS Role in ProductionMIS Role in Production
MIS Role in Production
 
Mis presentation topics bca2
Mis presentation topics bca2Mis presentation topics bca2
Mis presentation topics bca2
 
Strategic managemnet process ppt
Strategic managemnet process pptStrategic managemnet process ppt
Strategic managemnet process ppt
 
Use of computers and information technology in management control
Use of computers and information technology in management controlUse of computers and information technology in management control
Use of computers and information technology in management control
 

Viewers also liked

System Development Methodologies
System Development MethodologiesSystem Development Methodologies
System Development Methodologies
Devon Ravihansa
 
Chapter18 maintaining information systems
Chapter18 maintaining information systemsChapter18 maintaining information systems
Chapter18 maintaining information systems
Dhani Ahmad
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system developmentcymark09
 
History of Management Information System
History of Management Information SystemHistory of Management Information System
History of Management Information System
Emil Mesina
 
Management information and evaluation system
Management information and evaluation systemManagement information and evaluation system
Management information and evaluation systemGagan Preet
 
Mis ppt
Mis pptMis ppt
Decision Support System
Decision Support SystemDecision Support System
Decision Support Systemparamalways
 
Decision Support System - Management Information System
Decision Support System - Management Information SystemDecision Support System - Management Information System
Decision Support System - Management Information System
Nijaz N
 
MIS Presentation
MIS PresentationMIS Presentation
MIS Presentation
Dhiren Gala
 
Decision Support System(DSS)
Decision Support System(DSS)Decision Support System(DSS)
Decision Support System(DSS)Sayantan Sur
 
Types Of Information Systems
Types Of Information SystemsTypes Of Information Systems
Types Of Information Systems
Manuel Ardales
 
System Analysis and Design
System Analysis and DesignSystem Analysis and Design
System Analysis and Design
Aamir Abbas
 
Management information system
Management information systemManagement information system
Management information system
Sikander Saini
 

Viewers also liked (16)

Evolution of mis
Evolution of misEvolution of mis
Evolution of mis
 
System Development Methodologies
System Development MethodologiesSystem Development Methodologies
System Development Methodologies
 
Chapter18 maintaining information systems
Chapter18 maintaining information systemsChapter18 maintaining information systems
Chapter18 maintaining information systems
 
Mis introduction
Mis introductionMis introduction
Mis introduction
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system development
 
History of Management Information System
History of Management Information SystemHistory of Management Information System
History of Management Information System
 
Component level design
Component   level designComponent   level design
Component level design
 
Management information and evaluation system
Management information and evaluation systemManagement information and evaluation system
Management information and evaluation system
 
Mis ppt
Mis pptMis ppt
Mis ppt
 
Decision Support System
Decision Support SystemDecision Support System
Decision Support System
 
Decision Support System - Management Information System
Decision Support System - Management Information SystemDecision Support System - Management Information System
Decision Support System - Management Information System
 
MIS Presentation
MIS PresentationMIS Presentation
MIS Presentation
 
Decision Support System(DSS)
Decision Support System(DSS)Decision Support System(DSS)
Decision Support System(DSS)
 
Types Of Information Systems
Types Of Information SystemsTypes Of Information Systems
Types Of Information Systems
 
System Analysis and Design
System Analysis and DesignSystem Analysis and Design
System Analysis and Design
 
Management information system
Management information systemManagement information system
Management information system
 

Similar to Implementation evaluation and maintenance of the mis

L10 system implementation
L10 system implementationL10 system implementation
L10 system implementationOMWOMA JACKSON
 
Slide management project
Slide management projectSlide management project
Slide management project
theogrouptech
 
Proposal dms for dwf v2
Proposal   dms for dwf v2Proposal   dms for dwf v2
Proposal dms for dwf v2Media-Mosaic
 
Lesson 9 system develpment life cycle
Lesson 9 system develpment life cycleLesson 9 system develpment life cycle
Lesson 9 system develpment life cycle
Oneil Powers
 
Project scheduler doc
Project scheduler docProject scheduler doc
Project scheduler doc
NAGENDRA KUAMR
 
ERP / MRP - Selection, Qualifying, Implementation
ERP / MRP - Selection, Qualifying, ImplementationERP / MRP - Selection, Qualifying, Implementation
ERP / MRP - Selection, Qualifying, Implementation
www.SMARTvt.org
 
Management project
Management projectManagement project
Management project
gusfaleo firnando
 
System development methodologies
System development methodologiesSystem development methodologies
System development methodologies
Kashif Khan (کاشف خان)
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systems
Online
 
Student feedback system
Student feedback systemStudent feedback system
Student feedback system
msandbhor
 
Mc leod9e ch07 systems development
Mc leod9e ch07 systems developmentMc leod9e ch07 systems development
Mc leod9e ch07 systems development
sellyhood
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
Kamal Acharya
 
SDLC
SDLCSDLC
How to implement an enterprise system
How to implement an enterprise systemHow to implement an enterprise system
How to implement an enterprise system
Miki Lumnitz
 
Proj Mgmt.ppt
Proj Mgmt.pptProj Mgmt.ppt
Proj Mgmt.ppt
NikhilDudka
 
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEMHOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
RebekahSamuel2
 

Similar to Implementation evaluation and maintenance of the mis (20)

L10 system implementation
L10 system implementationL10 system implementation
L10 system implementation
 
Slide management project
Slide management projectSlide management project
Slide management project
 
Proposal dms for dwf v2
Proposal   dms for dwf v2Proposal   dms for dwf v2
Proposal dms for dwf v2
 
Lesson 9 system develpment life cycle
Lesson 9 system develpment life cycleLesson 9 system develpment life cycle
Lesson 9 system develpment life cycle
 
Project scheduler doc
Project scheduler docProject scheduler doc
Project scheduler doc
 
ERP Unit iii
ERP  Unit   iii ERP  Unit   iii
ERP Unit iii
 
ERP / MRP - Selection, Qualifying, Implementation
ERP / MRP - Selection, Qualifying, ImplementationERP / MRP - Selection, Qualifying, Implementation
ERP / MRP - Selection, Qualifying, Implementation
 
Management project
Management projectManagement project
Management project
 
System Development Methodologies
System Development MethodologiesSystem Development Methodologies
System Development Methodologies
 
System development methodologies
System development methodologiesSystem development methodologies
System development methodologies
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systems
 
Presentation2
Presentation2Presentation2
Presentation2
 
Student feedback system
Student feedback systemStudent feedback system
Student feedback system
 
Proposal DMS
Proposal   DMS Proposal   DMS
Proposal DMS
 
Mc leod9e ch07 systems development
Mc leod9e ch07 systems developmentMc leod9e ch07 systems development
Mc leod9e ch07 systems development
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
SDLC
SDLCSDLC
SDLC
 
How to implement an enterprise system
How to implement an enterprise systemHow to implement an enterprise system
How to implement an enterprise system
 
Proj Mgmt.ppt
Proj Mgmt.pptProj Mgmt.ppt
Proj Mgmt.ppt
 
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEMHOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
 

Recently uploaded

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 

Recently uploaded (20)

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 

Implementation evaluation and maintenance of the mis

  • 2. INTRODUCTION The design of a MIS may seem to :  management to be an expensive project  the cost of getting the MIS on line satisfactorily often be comparable to that of its design.  the implementation has been accomplished when outputs of the MIS are continuously utilized by makers. 2
  • 3. FOUR BASIC METHODS FOR IMPLEMENTING THE MIS 1. Install the system in a new operation or organization. 2. Cut off the old system and install the new.  This produces a time gap during which no system is in operation.  Practically, installation requires one or two days for small companies or small systems. 3
  • 4. 3. Cut over by segments.  This method is also referred as” phasing in” the new system.  Small parts or subsystems are substituted for the old.  In the case of upgrading old systems, this may be a very desirable method. 4. Operate in parallel and cut over.  The new system is installed and operated in parallel with the current system until it has been checked out, then only the current system is cut out.  This method is expensive because of personal and related costs. 4
  • 5. PLAN THE IMPLEMENTATION 1. Initial installation 2. Test of the system as a whole 3. Evaluation, maintenance and control of the system 5
  • 6. PLAN THE IMPLEMENTATION•The first step in the implementation procedure is to plan the implementation. •Some analyst includes the planning of the implementation with the design of the system, the planning and the action to implement the plan should be bound closely together. •Planning is the first step of management, not the last. •The MIS design and the urgent need for the system at the time the design is completed will weigh heavily on the plan for implementation 6
  • 7. IMPLEMENTATION TASKS 1. Planning the implementation activities 2. Acquiring and laying out facilities and offices 3. Organizing the personnel for implementation 4. Developing procedures for installation and testing 5. Developing the training program for operating personnel 6. Completing the system’s software 7. Acquiring required hardware 8. Generating files 9. Designing forms 10. Testing the entire system 11. Completing cutover to the new system 12. Documenting the system 13. Evaluating the MIS 14. Providing system maintenance (debugging and improving) 7
  • 8. PLANNING THE IMPLEMENTATION ACTIVITIES Establish Relationships among tasks: For small projects, the order of performance may described in text form. A Gantt chart or network diagram makes visualization plan and schedule much clearer. For large projects, many concurrent and sequential activities are interrelated so that a network diagram employed in any good plan. 8
  • 9. PLANNING THE IMPLEMENTATION ACTIVITIES Establish a Schedule: Schedule is prepared by having the system estimate the times between the events in the network. The critical path (longest time through the network) be calculated. After specifying the starting date, the end date is established. 9
  • 10. PLANNING THE IMPLEMENTATION ACTIVITIES Cost Schedule to Tasks and Time:  The cost for completing each task required to is established as part of the plan.  Then the rate of expenditures should be Reporting and control of the work in progress may obtained by weekly meetings. •The financial personnel must make certain that formats allow them to show cost and technical relationship as well as cost and time. 10
  • 11. ACQUIRING AND LAYING OUT FACILITIES AND OFFICES •For the installation of a new system to replace a current one may require a major revision of facilities as well as completely new office, computer room etc. •The MIS project manager must prepare rough layouts and estimates of particular floor areas that feel to be needed. •The manager then prepares cost estimates. •Space planning must be done by the space to be occupied by people, the space occupied by equipment and the movement of people and equipment in the work progress. •A large investment in good working conditions will repay its cost many times 11
  • 12. ORGANIZING THE PERSONNEL FOR IMPLEMENTATION •As the implementation tasks have been defined, management usually assigns a project manager to guide the implementation. •The purpose of the MIS is to increase the amount and quality of their contributions, the system is their system. •Top management must make the middle managers for their involvement in implementation, besides these, systems specialists, computer programmer. • Top management should make sure that each people who will operate the system should have active parts in the implementation. 12
  • 13. DEVELOPING PROCEDURES FOR INSTALLATION AND TESTING •After organizing the personnel for implementation the next task is to develop or prepare the procedures for implementation. •As the project leader has the network plan for proceeding with the implementation, this leader calls the key people in the project to prepare more detailed procedures for system installation. •Procedures for evaluating and selecting hardware must be spelled out. •Procedures for phasing in parts of the MIS or operating the MIS in parallel must be developed. •The major part of implementing the MIS is the testing of each segment of total system as it is installed. 13
  • 14. DEVELOPING THE TRAINING PROGRAM FOR OPERATING PERSONNEL •A program is developed keeping in mind to impress management and support. •After that , it is necessary to train operating personnel in their new duties. •They must have a thorough understanding of what the new MIS is like and what it is supposed to do. •They must learn how it will operate. •They are faced with many changes in their work and have to obtain acceptance of changes. 14