Project Management
Project Management
 Introduction
 Principles & Importance of PM
 Knowledge Areas
 Processes
 Project identification and Planning
 Organisational structure and issues
 PERT and CPM
 Resource management
 Risk management
 Quality management
 Contract management
 Project schedule using software
 Project execution
 Project closure
I
Great Examples
Olympic Games
Taj Mahal
Launching of a Product or Book
Vaccination Program
Building a Metro
Developing a commercial Software App
Launching a satellite in Space
Development of commercial aircraft
Project
• Non-routine tasks are involved
• Planning is required
• Specific objectives are to be met or a specified
product is to be created
• The project has a predetermined time span
• Work involves several specialisms
• Work is carried out in several phases
• The resources that are available for use on the
project are constrained
• The project is large or complex
Project Objectives
• Projects are undertaken to fulfill objectives by producing
deliverables.
• An objective is defined as
– an outcome toward which work is to be directed,
– a strategic position to be attained,
– a purpose to be achieved,
– a result to be obtained, or
– a service to be performed.
• A deliverable is defined as any unique and verifiable
product, result, or capability to perform a service that is
required to be produced to complete a process, phase,
or project. It may be tangible or intangible.
Project Management
Project Management is the dynamic process that utilizes
the appropriate resources of the organization in a
controlled and structured manner, to achieve some clearly
defined objectives identified as strategic needs. It is
always conducted within a defined set of constraints.
Importance of PM
• Meet objectives
• Satisfy stakeholder expectations
• Be more predictable
• Increase chances of success
• Deliver the right products at the right time
• Resolve problems and issues on time
• Respond to risks in a timely manner
• Optimize the use of organizational resources
• Manage constraints
• Manage change effectively
• Identify, recover, or terminate failing projects
Organization
• Systems:
– A system is a collection of various components that
can produce results not obtainable by the individual
components alone.
• Principles:
– Systems are dynamic
– Systems can be optimized
– System components can be optimized
– Systems and their components cannot be optimize at
the same time, and
– Systems are nonlinear in responsiveness
Organization – Governance
• Governance Framework:
– This framework includes but is not limited to: Rules,
Policies, Procedures, Norms, Relationships, Systems,
and Processes.
• This framework influences how:
– Objectives of the organization are set and achieved
– Risk is monitored and assessed, and
– Performance is optimized
Management Elements
Components that comprise the key functions or principles
of general management in the organization.
The key functions or principles of management:
 Division of work using specialized skills and availability
 Authority given to perform work
 Responsibility to perform work appropriately assigned
 Discipline of action
 Unity of command
 Unity of direction
 Goals of the organization take precedence over individual goals
 Paid fairly for work performed
 Optimal use of resources
 Clear communication channels
Factors in Organization Structure Selection
Major factors to consider selecting an organizational
structure:
 Degree of alignment with organizational objectives
 Specialization capabilities
 Span of control, efficiency, and effectiveness
 Clear path for escalation of decisions
 Clear line and scope of authority
 Delegation capabilities
 Accountability assignment
 Adaptability and Simplicity of design
 Efficiency of performance
 Cost considerations
 Physical locations, and
 Clear communication
Software Projects Vs Other types of
project
• Invisibility – Progress is not immediately visible.
• Complexity – Software products contain more
complexity than other engineered artefacts.
• Conformity – Traditional engineering projects
though complex are governed by physical laws
that are consistent. Software developers have to
conform to the requirements of human clients
• Flexibility – Software systems are likely to be
subject to a high degree of change. The ease
with which software can be changed is usually
seen as one of its strength
Feasibility study/plan/execution cycle
Feasibility Study
Plan
Project Execution
Is it worth
doing?
How do we do
it?
Do it!
Activities
• Feasibility study – investigates whether a
prospective project is worth starting – that it has
a valid business case
• Planning – Formulation of outline plan for the
whole project and a detailed one for the first
stage. Detailed planning for the later stages
would be done as they approach.
• Project execution – Often contains design and
implementation sub-phases
Project Execution
• Requirement analysis – Process of investigating what the
potential users and their managers and employers require as
features and qualities of the new system. These ‘customer-
facing’ requirements then have to be translated into technical
requirements from which the developers of the new system
can work
• Architecture design – This maps the requirements to the
components of the system that is to be built.
– Decision to be made about which processes in the new
system will be carried out by the user and which can be
computerized. This design of the system architecture thus
forms an input to the development of the software
requirements.
– A second architecture design process then takes place
which maps the software requirements to software
components.
• Detailed design – Each software component is made up of a
number of software units that can be separately coded and tested.
The detailed design of these units is carried out separately.
• Code and test – This could refer to writing code for each software
unit or could refer to the use of an application-builder. Initial testing to
debug individual errors.
• Integration – The individual components are collected together and
tested to see if they meet the overall requirements. Integration could
be at the level of
– Software where different components are combined,
– At the level of the system as a whole where the software and other
components of the system such as the hardware platforms and networks
and the user procedures are brought together
• Qualification testing – Testing the system, including the software
components to ensure that all the requirements have been fulfilled
• Installation – Process of making new system operational. Would
also include setting system parameters, installing the software onto
the hardware platforms and user training
• Acceptance support – Stage of resolving problems with the
newly installed system, error rectification, any extensions and
improvements
Case study
Project Life cycle
• Starting the Project
• Organizing and Preparing
• Carrying out the work
• Ending the Project
Process Groups
• Initiating
• Planning
• Execution
• Monitoring and Controlling
• Closure
Problems identified by Software
professionals
• Inadequate specification of work
• Management ignorance
• Lack of knowledge of application area
• Lack of standards
• Lack of up-to-date documentation
• Lack of communication between users and technicians
• Deadline pressure
• Lack of quality control
• Remote management
• Lack of training
Business Case
• Most projects need to have a justification or a business
case – effort and expense
• Cost – benefit analysis
For e.g.
• That development costs are not allowed to rise to a level
which threatens to exceed the value of benefits;
• That the features of the system are not reduced to a
level where the expected benefits cannot be realized;
• That the delivery date is not delayed so that there is an
unacceptable loss benefits
Requirement Specification
• Functional requirements
These define what the end-product of the project is to do.
• Quality requirements
These define about the end-product should do. These are still
things that the user will be able to experience.
• Resource requirements
This would keep a record of how much the organization is willing to
spend on the system.
Case Study
ABC College is a higher education institution which used to
be managed by a local government authority but has
now become autonomous. Its payroll is still administered
by the local authority and pay slips and other output are
produced in the local authority’s computer centre. The
authority now charges the college for this serve. The
college management are of the opinion that it would be
cheaper to obtain an ‘off-the-shelf’ payroll package and
do the payroll processing themselves.
What would be the main stages of the project to convert to
independent payroll processing by the college? Bearing
in mind that an off-the-shelf package is to be used, how
would this project differ from one where the software was
to be written from scratch?
• Project evaluation – All the costs that would be incurred by the college if it
were to carry out its own payroll processing would need to be carefully
examined to ensure that it would be more cost effective than letting the
local authority carry on providing the service.
• Planning – The way that the transfer to local processing is to be carried out
needs to be carefully planned with the participation of all those concerned.
Some detailed planning would need to be deferred until more information
was available, for example which payroll package was to be used.
• Requirements elicitation and analysis – This is finding out what the users
need from the system. To a large extent it will often consist of finding out
what the current system does, as it may be assumed that in general the
new system is to provide the same functions as the old. The users might
have additional requirements, however, or there might even be facilities
that are no longer needed.
• Specification – This involves documenting what the new system is to be
able to do.
• Design/Coding – As an ‘off-the-shelf’ package is envisaged, these
stages will be replaced by a package evaluation and selection
activity.
• Verification and validation – Tests will need to be carried out to
ensure that the selected package will actually do what is required.
This task might well involve parallel running of the old and new
systems and a comparison of the output from them both to check for
any inconsistencies.
• Implementation – This would involve the things like installing the
software, setting system parameters such as the salary scales, and
setting up details of employees.
• Maintenance/support – This will include dealing with users’ queries,
liaising with the package supplier and taking account of new payroll
requirements.
Overview of Step Wise planning
4. Identify the products and
activities
0. Select project
1. Identify project scope
and objectives
2. Identify project
infrastructure
3. Analyze project
characteristics
5. Estimate effort for each
activity
6. Identify activity risks
7. Allocate resources
8. Review/ publicize plan
9. Execute plan
10. Lower level planning
For each
activity
Lower
level detail
1. Identify project scope and objectives
1.1 Identify objectives and measures of effectiveness in
meeting them
1.2 Establish a project authority
1.3 Identify stakeholders
1.4 Modify objectives in the light of stakeholder analysis
1.5 Establish methods of communications with all parties
2. Identify project infrastructure
2.1 Establish relationship between project and strategic
planning
2.2 Identify installation standards and procedures
2.3 Identify project team organization
3. Analyze project characteristics
3.1 Distinguish the project as either objective- or product-
driven
3.2 Analyze other project characteristics
3.3 Identify high-level project risks
3.4 Take into account user requirements concerning
implementation
3.5 Select general life-cycle approach
3.6 Review overall resource estimates
4. Identify project products and
activities
4.1 Identify and describe project products
4.2 Document generic product flows
4.3 Recognize product instances
4.4 Produce ideal activity network
4.5 Modify ideal to take into account need for stages and
checkpoints Project
products
System
products
Module
products
Tested
integrated
software
Integration test
cases
Overall
specification
Management
products
Module
design
documents
Module code Progress
report
5. Estimate effort for each activity
5.1 Carry out bottom-up estimates
5.2 Revise plan to create controllable activities
6. Identify activity risks
6.1 Identify and quantify activity-based risks
6.2 Plan risk reduction and contingency measures where
appropriate
6.3 Adjust plans and estimates to take account of risks
7. Allocate resources
7.1 Identify and allocate resources
7.2 Revise plans and estimates to take account of resource
constraints
8. Review/publicize plan
8.1 Review quality aspects of project plan
8.2 Document plans and obtain agreement

Proj Mgmt.ppt

  • 1.
  • 2.
    Project Management  Introduction Principles & Importance of PM  Knowledge Areas  Processes  Project identification and Planning  Organisational structure and issues  PERT and CPM  Resource management  Risk management  Quality management  Contract management  Project schedule using software  Project execution  Project closure I
  • 3.
    Great Examples Olympic Games TajMahal Launching of a Product or Book Vaccination Program Building a Metro Developing a commercial Software App Launching a satellite in Space Development of commercial aircraft
  • 4.
    Project • Non-routine tasksare involved • Planning is required • Specific objectives are to be met or a specified product is to be created • The project has a predetermined time span • Work involves several specialisms • Work is carried out in several phases • The resources that are available for use on the project are constrained • The project is large or complex
  • 5.
    Project Objectives • Projectsare undertaken to fulfill objectives by producing deliverables. • An objective is defined as – an outcome toward which work is to be directed, – a strategic position to be attained, – a purpose to be achieved, – a result to be obtained, or – a service to be performed. • A deliverable is defined as any unique and verifiable product, result, or capability to perform a service that is required to be produced to complete a process, phase, or project. It may be tangible or intangible.
  • 7.
    Project Management Project Managementis the dynamic process that utilizes the appropriate resources of the organization in a controlled and structured manner, to achieve some clearly defined objectives identified as strategic needs. It is always conducted within a defined set of constraints.
  • 8.
    Importance of PM •Meet objectives • Satisfy stakeholder expectations • Be more predictable • Increase chances of success • Deliver the right products at the right time • Resolve problems and issues on time • Respond to risks in a timely manner • Optimize the use of organizational resources • Manage constraints • Manage change effectively • Identify, recover, or terminate failing projects
  • 9.
    Organization • Systems: – Asystem is a collection of various components that can produce results not obtainable by the individual components alone. • Principles: – Systems are dynamic – Systems can be optimized – System components can be optimized – Systems and their components cannot be optimize at the same time, and – Systems are nonlinear in responsiveness
  • 10.
    Organization – Governance •Governance Framework: – This framework includes but is not limited to: Rules, Policies, Procedures, Norms, Relationships, Systems, and Processes. • This framework influences how: – Objectives of the organization are set and achieved – Risk is monitored and assessed, and – Performance is optimized
  • 11.
    Management Elements Components thatcomprise the key functions or principles of general management in the organization. The key functions or principles of management:  Division of work using specialized skills and availability  Authority given to perform work  Responsibility to perform work appropriately assigned  Discipline of action  Unity of command  Unity of direction  Goals of the organization take precedence over individual goals  Paid fairly for work performed  Optimal use of resources  Clear communication channels
  • 12.
    Factors in OrganizationStructure Selection Major factors to consider selecting an organizational structure:  Degree of alignment with organizational objectives  Specialization capabilities  Span of control, efficiency, and effectiveness  Clear path for escalation of decisions  Clear line and scope of authority  Delegation capabilities  Accountability assignment  Adaptability and Simplicity of design  Efficiency of performance  Cost considerations  Physical locations, and  Clear communication
  • 13.
    Software Projects VsOther types of project • Invisibility – Progress is not immediately visible. • Complexity – Software products contain more complexity than other engineered artefacts. • Conformity – Traditional engineering projects though complex are governed by physical laws that are consistent. Software developers have to conform to the requirements of human clients • Flexibility – Software systems are likely to be subject to a high degree of change. The ease with which software can be changed is usually seen as one of its strength
  • 14.
    Feasibility study/plan/execution cycle FeasibilityStudy Plan Project Execution Is it worth doing? How do we do it? Do it!
  • 15.
    Activities • Feasibility study– investigates whether a prospective project is worth starting – that it has a valid business case • Planning – Formulation of outline plan for the whole project and a detailed one for the first stage. Detailed planning for the later stages would be done as they approach. • Project execution – Often contains design and implementation sub-phases
  • 16.
    Project Execution • Requirementanalysis – Process of investigating what the potential users and their managers and employers require as features and qualities of the new system. These ‘customer- facing’ requirements then have to be translated into technical requirements from which the developers of the new system can work • Architecture design – This maps the requirements to the components of the system that is to be built. – Decision to be made about which processes in the new system will be carried out by the user and which can be computerized. This design of the system architecture thus forms an input to the development of the software requirements. – A second architecture design process then takes place which maps the software requirements to software components.
  • 17.
    • Detailed design– Each software component is made up of a number of software units that can be separately coded and tested. The detailed design of these units is carried out separately. • Code and test – This could refer to writing code for each software unit or could refer to the use of an application-builder. Initial testing to debug individual errors. • Integration – The individual components are collected together and tested to see if they meet the overall requirements. Integration could be at the level of – Software where different components are combined, – At the level of the system as a whole where the software and other components of the system such as the hardware platforms and networks and the user procedures are brought together • Qualification testing – Testing the system, including the software components to ensure that all the requirements have been fulfilled
  • 18.
    • Installation –Process of making new system operational. Would also include setting system parameters, installing the software onto the hardware platforms and user training • Acceptance support – Stage of resolving problems with the newly installed system, error rectification, any extensions and improvements Case study
  • 19.
    Project Life cycle •Starting the Project • Organizing and Preparing • Carrying out the work • Ending the Project
  • 20.
    Process Groups • Initiating •Planning • Execution • Monitoring and Controlling • Closure
  • 21.
    Problems identified bySoftware professionals • Inadequate specification of work • Management ignorance • Lack of knowledge of application area • Lack of standards • Lack of up-to-date documentation • Lack of communication between users and technicians • Deadline pressure • Lack of quality control • Remote management • Lack of training
  • 22.
    Business Case • Mostprojects need to have a justification or a business case – effort and expense • Cost – benefit analysis For e.g. • That development costs are not allowed to rise to a level which threatens to exceed the value of benefits; • That the features of the system are not reduced to a level where the expected benefits cannot be realized; • That the delivery date is not delayed so that there is an unacceptable loss benefits
  • 23.
    Requirement Specification • Functionalrequirements These define what the end-product of the project is to do. • Quality requirements These define about the end-product should do. These are still things that the user will be able to experience. • Resource requirements This would keep a record of how much the organization is willing to spend on the system.
  • 24.
    Case Study ABC Collegeis a higher education institution which used to be managed by a local government authority but has now become autonomous. Its payroll is still administered by the local authority and pay slips and other output are produced in the local authority’s computer centre. The authority now charges the college for this serve. The college management are of the opinion that it would be cheaper to obtain an ‘off-the-shelf’ payroll package and do the payroll processing themselves. What would be the main stages of the project to convert to independent payroll processing by the college? Bearing in mind that an off-the-shelf package is to be used, how would this project differ from one where the software was to be written from scratch?
  • 25.
    • Project evaluation– All the costs that would be incurred by the college if it were to carry out its own payroll processing would need to be carefully examined to ensure that it would be more cost effective than letting the local authority carry on providing the service. • Planning – The way that the transfer to local processing is to be carried out needs to be carefully planned with the participation of all those concerned. Some detailed planning would need to be deferred until more information was available, for example which payroll package was to be used. • Requirements elicitation and analysis – This is finding out what the users need from the system. To a large extent it will often consist of finding out what the current system does, as it may be assumed that in general the new system is to provide the same functions as the old. The users might have additional requirements, however, or there might even be facilities that are no longer needed. • Specification – This involves documenting what the new system is to be able to do.
  • 26.
    • Design/Coding –As an ‘off-the-shelf’ package is envisaged, these stages will be replaced by a package evaluation and selection activity. • Verification and validation – Tests will need to be carried out to ensure that the selected package will actually do what is required. This task might well involve parallel running of the old and new systems and a comparison of the output from them both to check for any inconsistencies. • Implementation – This would involve the things like installing the software, setting system parameters such as the salary scales, and setting up details of employees. • Maintenance/support – This will include dealing with users’ queries, liaising with the package supplier and taking account of new payroll requirements.
  • 27.
    Overview of StepWise planning 4. Identify the products and activities 0. Select project 1. Identify project scope and objectives 2. Identify project infrastructure 3. Analyze project characteristics 5. Estimate effort for each activity 6. Identify activity risks 7. Allocate resources 8. Review/ publicize plan 9. Execute plan 10. Lower level planning For each activity Lower level detail
  • 28.
    1. Identify projectscope and objectives 1.1 Identify objectives and measures of effectiveness in meeting them 1.2 Establish a project authority 1.3 Identify stakeholders 1.4 Modify objectives in the light of stakeholder analysis 1.5 Establish methods of communications with all parties
  • 29.
    2. Identify projectinfrastructure 2.1 Establish relationship between project and strategic planning 2.2 Identify installation standards and procedures 2.3 Identify project team organization
  • 30.
    3. Analyze projectcharacteristics 3.1 Distinguish the project as either objective- or product- driven 3.2 Analyze other project characteristics 3.3 Identify high-level project risks 3.4 Take into account user requirements concerning implementation 3.5 Select general life-cycle approach 3.6 Review overall resource estimates
  • 31.
    4. Identify projectproducts and activities 4.1 Identify and describe project products 4.2 Document generic product flows 4.3 Recognize product instances 4.4 Produce ideal activity network 4.5 Modify ideal to take into account need for stages and checkpoints Project products System products Module products Tested integrated software Integration test cases Overall specification Management products Module design documents Module code Progress report
  • 32.
    5. Estimate effortfor each activity 5.1 Carry out bottom-up estimates 5.2 Revise plan to create controllable activities
  • 33.
    6. Identify activityrisks 6.1 Identify and quantify activity-based risks 6.2 Plan risk reduction and contingency measures where appropriate 6.3 Adjust plans and estimates to take account of risks
  • 34.
    7. Allocate resources 7.1Identify and allocate resources 7.2 Revise plans and estimates to take account of resource constraints 8. Review/publicize plan 8.1 Review quality aspects of project plan 8.2 Document plans and obtain agreement