SlideShare a Scribd company logo
TM for iGCDP
iGCDP | Tier 3
Tier 1 MC Tier 3 MC Tier 4 MC
organic and balanced
growth
Tier 2 MC
organic and balanced
growth
These tiers must focus, for Tier 1 and 2 the focus should be on organic and balanced growth (particularly
balancing focus with GIP). For Tier 3 and 4 it’s about jumping in GCDP.
What does this mean?
The	
  iGCDP	
  OD	
  Model	
  for	
  1er	
  3	
  
GCDP Clustering for LC
iGCDP
Beginner 0-25 X RE
Intermediate 25-100 X RE
Advanced 100-200 X RE
Mature +200 X RE
 
What is the current
state?
En11es	
  in	
  Tier	
  3	
  iGCDP	
  
LCs	
  
Combined these entities have…
121 RE
24 RE
average LC
Highest
achievement
in 2013
LC FTU HCMMost LCs do between
20 - 45 RE
These are the LCs we
need to focus on to
grow.
LCs in Tier 3 iGCDP overview
LCs 0-25 Re LCs 25-100 Re
LCs have a lot of scope to JUMP!!
What we are aiming for?
Growth Models in Tier 3
iGCDP being aligned to a
jump in the programme
LCs in tier 4 (0-25 in iGCDP)
being able to make a BIG
jump
If these entities are also
focused on a GIP
programme, being able to
manage both because they
have 10 LCs or lesser
What is this about?
•  Pick focus LCs for iGCDP growth in your entity based
on entity growth model
•  Using HR Intelligence to grow
•  Building Capacity for iGCDP
•  Learning and Development for iGCDP
•  Team Minimums implementation for iGCDP
•  Role of MC
How can you take
advantage of it?
Let’s GO!
1.Pick focus LCs
for iGCDP growth
121 RE
24 RE
average LC
Highest
achievement
in 2013
LC FTU HCMMost LCs do between
20 - 45 RE
These are the LCs we
need to focus on to
grow.
LCs in Tier 3 iGCDP overview
LC	
  Performance	
  over	
  view	
  in	
  this	
  3er	
  
The top LC does
121 Re in this
tier – AIESEC
FTC HCM in
Vietnam
A large number
of LCs in this
tier do between
0-25 Re
Most entities in
this tier have
between 2-10
LCs
Only Korea has
12 LCs, rest
entities have 10
or less than 10
LCs
Only about 5
LCs in this tier
do above 100
What we observe?
•  There	
  are	
  enough	
  1er	
  3	
  and	
  1er	
  4	
  LCs	
  in	
  that	
  can	
  make	
  the	
  JUMP	
  in	
  Tier	
  3	
  MCs	
  for	
  iGCDP	
  
•  Most	
  of	
  these	
  en11es	
  are	
  either:	
  
	
  
1.  Focused	
  on	
  iGCDP	
  
2.  Have	
  iGCDP	
  as	
  their	
  second	
  focus	
  
3.  Intend	
  to	
  ensure	
  iGCDP	
  growth	
  in	
  their	
  1er	
  4	
  LCs	
  	
  
•  These	
  en11es	
  should	
  be	
  increasing	
  in	
  their	
  iGCDP	
  contribu1on	
  globally	
  and	
  KEY	
  to	
  their	
  growt
h	
  is	
  having	
  the	
  right	
  capacity	
  and	
  L&D	
  to	
  be	
  able	
  to	
  grow!	
  
Go through the OD Toolkit for tier 1 and 2 if you have more
than 6 LCs and OD toolkit for tier 3 and 4 if you have less
than 6 LCs!	
  
2. Using HR Intelligence to grow in iGCDP
Why	
  does	
  informa1on	
  help?	
  
Example	
  of	
  this	
  
EVERY LC within the MC/Entity needs to
increase its productivity, the question is
HOW?
An increase in productivity is POSSIBLE by IDENTIFYING what is your challenge!
Examples:
1.  If new members/TMP Participants leave the organization within 1-2 weeks of the role
starting, focus on INCREASE in TMP Retention Rate can increase productivity
2.  If you do not know which level of membership is achieving or not achieving results,
team minimums implementation to manage performance will allow you to see which
level is contributing most to performance and allow you to focus on this segment or
the segment that is not performing to increase productivity
REMEMBER: The FINAL
KPI you are measuring is
PRODUCTIVITY, however
you need other KPIs that
are based on your specific
challenges to indicate this
increase in productivity!
How do I measure
productivity?
You can measure productivity at raise,
match and realize stage!
•  Produc'vity	
  at	
  RAISE	
  =	
  Number	
  of	
  members	
  working	
  for	
  raise	
  in	
  iGCDP	
  (in	
  
front	
  office	
  and	
  back	
  office)/	
  Number	
  of	
  Raises	
  (In	
  the	
  specific	
  'me	
  period)	
  
•  Produc'vity	
  at	
  MATCH	
  =	
  Number	
  of	
  members	
  working	
  for	
  match	
  in	
  iGCDP	
  
(in	
  front	
  office	
  and	
  back	
  office)/Number	
  of	
  matched	
  (In	
  the	
  specific	
  'me	
  
period)	
  
•  Produc'vity	
  at	
  REALIZE	
  =	
  Total	
  number	
  of	
  members	
  working	
  in	
  iGCDP	
  
(front	
  office	
  and	
  back	
  office)/Number	
  of	
  realiza'ons	
  in	
  iGCDP	
  (In	
  the	
  
specific	
  'me	
  period)	
  
Generally, team structures
in iGCDP involve the same
people/number of people
working for raise, match
and realize – even so since
iGCDP runs in peaks it
makes sense to measure
productivity through the
peaks
Productivity at realize is most
accurate but we measure
productivity at raise and
match only to check the
progress and always establish
the connection between TM/
OD and programme growth!
Set an MC goal for productivity
per programme: How?
•  Work with all iGCDP focus/growth LCs (from your OD
Model/Growth Model) to identify what is their challenge,
how to solve this and how much productivity increase this
will lead to
•  Set this as the iGCDP Productivity goal along with LC
•  An accumulation of set goals with LCs leads to being
certain of the entity productivity goal!
•  Though talent planning based on current
productivity happens first at an MC level,
productivity planning happens with MC and LC
together so the goal for productivity has LC
Alignment towards MC and is connected to the OD
Model!
What business Intelligence can help to drive increase in
productivity?
% of people in iGCDP
and % of people in
Support Functions
Time a new member
or new team leader
takes to start
performing
Applicants to
iGCDP TLP
positions
TMP Retention
Rate
3. Planning and Building CAPACITY based
on challenge identification, Exchange flow and
OD Model of your entity
Use TM Planning Tool to Plan for iGCDP
"
1. Number of Members
in iGCDP and support
functions
2. Number of TMP and
TLP Experiences in
iGCDP and support
functions
TM	
  Planning	
  tool	
  download	
  	
  
	
  
hTp://www.myaiesec.net/content/viewwiki.do?
conten1d=10299749	
  
After planning for capacity you can have any one of these 3 outcomes
1. I do not have enough
Members in any
programme/function
2. We have enough
members in iGCDP and
support areas
3. We have the right
number of members in
the LC/MC but not
allocated in the right
proportion across
programmes/functions
Run	
  an	
  OPTIMIZED	
  recruitment–	
  2	
  weeks!!	
  
1. I do not have
enough Members in
any programme/
function
Tips to run an optimized recruitment
1. Clear and focused Promotion of Job
description
	
  
Example: Selling the global internship programme to language institutes !
!
2. Specific people responsible for the recruitment
3. Online promotion and Offline promotion ONLY in specific
universities
4. Selection based on Interests and Values (striving for
excellence, pro active learner etc.) over only skills for the role
5. When Promotion is on-going through the year, an optimized
recruitment becomes simpler since LC/MC already has a pool of
applicants
Determine who is the right member
Skill AttitudeBackground Interest Time
Timeline	
  
Approach existing
sign ups for TXP
and GCDP
Rejected
applicants from
last recruitment
Optimized
Selection
1 week 5 days
Optimize
d
Selection
Value	
  based	
  recruitmen
q  Committed and motivated members ( GIP needs
commitment and persistence)!
q  Building "
2. We have enough
members in iGCDP
and support areas
Focus on increasing productivity through L&D and
team minimums
3. We have the right
number of members in
the LC/MC but not
allocated in the right
proportion across
programmes/functions
In	
  many	
  cases	
  there	
  is	
  enough	
  capacity	
  in	
  iGCDP	
  and	
  
members	
  need	
  to	
  be	
  re-­‐allocated	
  so	
  even	
  the	
  GIP	
  
programmes	
  have	
  the	
  right	
  capacity!	
  
How to balance the iGCDP and iGIP support?
Clear JD for members in
Exchange Support
Clear KPIs for each member
specifically in iGIP and
support areas (TM and BD)
Hybrid Members – Example:
TM members in iGIP team and
iGCDP team
What structure should I recruit into?
Structures for…
0-25 Re 25-100 Re
100-200 Re
FIN JD in iGCDP
TM JD in iGCDP
MKT JD in iGCDP
iGCDP Coordination JD
Project Structure
LC
VPiGCDP
OCP
OCP
OCP
VPFIN VPTM VPMKT
Do Ra-Ma-Re!!
Note!
For
ALL
levels!
Beginner LC
VP
Member Member Member
(0-25 Re)
∞
Ra-Ma-Re Inner & Outer
Journey Delivery
Note!
∞
Basic Consideration:
•  As start up, LC manage the basic
process of iGCDP delivery
•  There is no need to manage iGCDP
as a project yet - in general
experience delivery will be TN based
•  Member Efficiency: 0-4 X / member
Number of members: 3-4
Job Description:
•  Selling and raising, matching, and realizing
•  Incoming preparation seminar
•  Experience Co-delivery
VP
Member Member Member
∞Ra-Ma-Re
Beginner LC (0-25 Re)
Back Office Supports
TM Member L&D;
Sales Development Program
Finance Project Financial Model
Marketing &
Communication
Project packaging,
Project showcasing;
ER External Resources
integration(new Partners)
VP
Member Member Member
∞Ra-Ma-Re
Beginner LC
(0-25 Re)
VP
TL TL TL
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
Intermediate LC (25-100 Re)
VP
TL
 TL
 TL
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
Basic Consideration:
•  LCs have more capacity in project management
•  Project concept will be centralized Nationally
(National project implementation in LCs)
•  Start to have the needs of event/project management
•  Member Efficiency: 3-4 X /member
Number of members: Depends on TM Planning
Job Description:
•  Selling and raising, matching, and realizing
•  Project concept development and execution
•  Incoming preparation seminar
•  Experience Co-delivery (country-country partnership management)
Intermediate LC (25-100 Re)
Back Office Supports
TM Member profiling
Member Learning & Development
Sales Development Program
Finance Project financial model
Member development investment
Marketing &
Communication
National brand alignment
Showcasing
EwA
Public Relations Management
ER External resources integration
Partner engagement
VP
OCP
 OCP
 OCP
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
Intermediate LC (25-100 Re)
Advanced LC (100-200 Re)
•  Un1l	
  this	
  stage,	
  an	
  LC	
  is	
  only	
  working	
  on	
  na1onal	
  project	
  
implementa1on,	
  however	
  here	
  an	
  LC	
  can	
  also	
  start	
  working	
  with	
  
local	
  projects	
  
•  The	
  LC	
  also	
  should	
  start	
  focusing	
  much	
  more	
  on	
  balancing	
  quality	
  
with	
  quan1ty	
  (to	
  ensure	
  it	
  can	
  keep	
  growing	
  in	
  Realiza1ons	
  and	
  
NPS)	
  
VP
OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local)
Advanced LC (100-200 Re)
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
VP
OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local)
Number of members: Depends on TM Planning
Job Description:
•  Selling and raising, matching, and realizing
•  Project concept development and execution
•  Project brand management
•  Incoming preparation seminar
•  Experience Co-delivery (LC-LC partnership management)
Basic Consideration:
•  LC is considered to have the capacity in
understanding Project management
concept and put into implementation
•  LC has capacity in innovate a project
based on issue
•  Member Efficiency: 4-6 X /member
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
Advanced LC (100-200 Re)
Back Office Supports
TM Member profiling;
Buddy engagement;
Learning & Development for Members;
SDP;
Finance Project financial model;
Crisis management
Marketing &
Communication
Brand audit and national alignment;
EwA;
Showcasing.
ER Partnership raise and maintenance
IM Process optimization
VP
OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local)
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
Advanced LC (100-200 Re)
4. Learning
and
Development
USE TM Planning tool
How do I
plan?
FOCUS ON EDUCATION TO DRIVE RESULTS
How can
i achieve
this?
1.
Create a specific
iGCDP education
cycle
2.
Ensure the education for potential and
high potential is making membership
productive and able to raise and match
simultaneously.
3.
For start up LCs
focus on raising
education and for
one sub-product.
4.
Track length of time for membership to
perform – IMPORTANT!
5.
Ensure strong organizational and
operational induction into AIESEC for
contribution to summer
iGCDP
All Levels
TOPIC! CONTENT! OBJECTIVES! TARGET!
PRODUCT
KNOWLEDGE!
q  Relevance of the product in the
society "
q  What is a product and product life
cycle"
q  Know the elements of products (price,
brand, quality, value, customer
segments, etc.) and the different stages
of products"
q  Understand the exchange process from
Calls until Completed "
q  Know how to use all the functions on
myaiesec.net for exchange
management to make the process fast
and effective" Members,
Leaders,
VPs!
EXCHANGE
PROCESSES!
q  Exchange process flow and yearly
timeline (product customer flow)"
q  Exchange Management on the GIS"
SUPPLY &
DEMAND
MANAGEMENT!
q  Supply and demand theory and
necessity"
q  Exchange management on the GIS"
INNER&OUTER
JOURNEY!
q  Why and how and what of inner and
outer journey in AIESEC"
q  Delivery of I&O journey to our
customers"
q  Understand how AIESEC develops
leadership through I&O journey and
know how to support our customers to
go through an intense I&O journey"
CUSTOMER
EXPERIENCE
MANAGEMENT!
q  Why, how and what of CEM?"
q  Co-delivery"
q  Information system management for
better customer service "
q  Understand the importance of customer
experience management and know how
to use the resources (data, partners) we
have to create strategies for
All levelsiGCDP
All levels
TOPIC! CONTENT! OBJECTIVES! TARGET!
ISSUE-BASED
SEGMENTATION!
!
q  Why and how of issue
segmentation for GCDP in
AIESEC"
q  Changes in product and
process management in the
LC"
q  Understand why issue segmentation
was created and how to work with
this model in the LC (changes in
processes, product development,
structures)"
Leaders &
VPs!
!
CROSS-
CULTURAL
COMMUNICATION!
q  Hofstede’s cultural dimensions"
q  Behaviours and attitude
needed for effective cross-
cultural communication"
q  Understand the 5 cultural
dimensions of Hofstede and how to
adapt communication based on that"
Members,
Leaders,
VPs!
CUSTOMER
LOYALTY FOR
STUDENTS!
q  Building a customer
relationship with trainees"
q  Minimums of project delivery"
q  How to satisfy our customers"
q  Understand the standards and extra
deliveries in iGCDP projects in order
to have promoters and develop
leadership"
Leaders &
VPs!
SALES
TRAINING!
q  Basic sales knowledge and
techniques"
q  Practice sales of our
products"
q  Understand the process of sales
and know how to deliver a full
selling cycle"
Members,
Leaders,
VPs!
iGCDP
iGCDPIntermediate (LCs doing between 25-100)
TOPIC! CONTENT! OBJECTIVES! TARGET!
NATIONAL
PROJECTS!
q  Product knowledge of national projects"
q  The responsibility of making national projects"
q  Devision of responsibilities and roles between
MC and LC and the rules of communication"
q  Value of national partners & projects"
q  Understanding what is the
national project, how to operate
with MC and feel responsible
and commited to national
projects."
Leaders &
VPs!
PROJECT
MANAGEMENT!
q  Definition and characterisitics of a project."
q  Process in project management"
q  Goals achievement"
q  Resource management"
q  Understand how to build your
project and the processes inside,
manage effecively resources to
achieve the goals."
Leaders &
VPs!
COUNTRY-TO-
COUNTRY
PARTNERSHIPS!
q  What is CY2CY partnership"
q  Value of CY2CY partnership"
q  Responsibilities in partnerships"
q  Main processes in cooperation management"
q  Understand the processes in
CY2CY partnerships,
responsibility towards delivering
the XPs on LC levels and clear
WHY of working by CY2CY "
VPs!
SHOWCASING
& PROMOTERS!
q  What is showcasing and promoters stories
usage"
q  How to brand promoters stories and showcase
them"
q  Showcasing channels and partnerships"
q  Understand how to showcase
the srories of promoters for
getting more customers"
Leaders &
VPs!
INTERMEDIATEiGCDP
iGCDPAdvanced (LCs doing between 100-200)
TOPIC! CONTENT! OBJECTIVES! TARGET!
BUSINESS
MODEL!
q Business model canvas"
q Financial model"
q Understand the business strategy and
processes within that and feel responsible
towards financial sustainability of the project "
Members,
leaders, VPs!
PRODUCT
DEVELOPMENT!
q Product packaging"
q Product development flow &
processes"
q Customization"
q Understanding how to package the project,
how to sell to different stakeholders and
customize to different target groups."
Leaders and VPs!
SALES
DEVELOPMENT
PROGRAM!
q Knowledge and practice of
advance sales techniques"
q Increasing the capacity and the productivity
to reach the higer level of sales results"
Members,
leaders, VPs!
CRM
MANAGEMENT!
q Account management"
q System usage and
management"
q Rules and regulations of
CRM"
q Working professionaly on customer
relationship management"
Members,
leaders, VPs!
!
ADVANCEDiGCDP
TOPIC! CONTENT! OBJECTIVE! TARGET!
BUDDY & HOST
PROGRAM!
q Packaging of host & buddy
program"
q Attitude and responsibility
towards engaging those
customers"
q Concrete processes on working
with H&B"
q Know how to engage B&H as a cutomer and
have the long-term realtions with them. They
understand the clear value of this program"
Leaders,
VPs !
CRISIS
MANAGEMENT!
q XPP review"
q How to deal with the threats
before, during and after they
occure"
q Case solving practice"
q Know how to deal with cases and crisises
and are not afraid of fire-fighting process."
Leaders.
VPs!
LC2LC
PARTNERSHIPS!
q What is LC2LC partnership"
q Value of LC2LC partnership"
q Responsibilities in partnerships"
q Main processes in cooperation
management"
q Understand the processes in LC2LC
partnerships, responsibility towards
delivering the XPs on LC levels and clear
WHY of working by LC2LC"
VPs!
ADVANCEDiGCDP
Customization is the key to success
Customize by LC
Scale
Customize By Target
Profile Eg: Team Leader
Customize by LC
current reality and
focus
HANDY TIPS
1.  Make Virtual learning
effective and fun –
Ensure continuity and
consistency
2. Have practical tasks/
assignments at the end
of every virtual session
CONTINUITY AND
CONSISTENCY
PRACTICAL 
3. Create virtual
trainings aligned to
your exchange flow and
exchange timeline
Exchange timeline
4. Ensure there is customised
content for specific LCs and
specific profiles within LCs.
(customize to your OD Model)
CUSTOMISED
How to Measure this?
TMP Retention rate
(for new members and
existing team
members
Increase in
Performance over a
period of time
Time to start performing
Eg: from 1 month to 1
week – for new members
and team leaders
Increase in
Performance over a
period of time
A	
  lever	
  to	
  support	
  our	
  
ambi1ons	
  for	
  iGCDP	
   Grow	
  iGCDP	
  Raises	
  
we need to have a
lever big and strong
enough to support
our iGCDP
ambitions :)
sdp for igCDP
why? Using the Sales
Development Program a
education and tracking
tool to increase the sales
capacity and intensity of
iGCDP members
Sales Development for iGCDP 
Golden
Rule
70%PRODUCT & PROCESS
KNOWLEDGE
30%SALES KNOWLEDGE
TG C M
RA
Goal
Sales
Negotiation
Meeting Goal
Sales Meeting
Goal
Cold Calling
Goal
Cold Leads
Goal
how much time does this process take?
Define what you want to achieve in iGCDP and when so that your SDP
can be tailored to your sales needs.
Sales Development for iGCDP
How?
tg c m
RA
Goal
Sales
Negotiation
Meeting Goal
Sales Meeting
Goal
Cold Calling
Goal
Cold Leads
Goal
how much time does this process take?
Who is going to achieve this?
This will define the key target for your SDP. eg. I’m going to target iGCDP
Sales-Raising TMP
sdp for igCDP how?
c m
This is where you make your sales development program framework with
the key message and best channels to connect to your target
audience! :D
A tracker system
Education
Framework/ timelineCustomize as per
your sales reality
and OD Model!
what is sdp made of?
Content and Delivery
Sales Conference
if needed
Educa1on	
  
framework	
  
and	
  1meline	
  
Ensure	
  educa1on	
  is	
  ploTed	
  on	
  a	
  1meline	
  ALIGNED	
  TO	
  PEAKS	
  
link	
  all	
  training	
  to	
  relevant	
  
team	
  and	
  individual	
  
activity	
  happening	
  at	
  the	
  
time	
  (link	
  content	
  to	
  push	
  
for	
  Peak)	
  
each	
  class	
  must	
  have	
  clear	
  
KPIs	
  and	
  output	
  that	
  are	
  
tracked	
  by	
  the	
  LCVP	
  and	
  
MCVP	
  responsibles	
  
Ensure	
  the	
  local	
  TM	
  can	
  
leverage	
  off	
  SDP	
  by	
  time	
  
lining	
  their	
  activity	
  too.	
  
Educa1on	
  
framework	
  and	
  
1meline	
  
Right Target/Profile
Right Content
Right Delivery/Channel
Right Timeline
Right KPI and Measurement
Ensure that SDP
content is tailored
for LC scale:
-  0-25
-  25-100
-  100-200
View	
  sample	
  tracking	
  system	
  
and	
  Sample	
  sales	
  conference	
  
Agenda	
  on	
  spreadsheets	
  below	
  
Though	
  there	
  is	
  a	
  sample	
  tracker,	
  what	
  makes	
  
most	
  sense	
  is	
  to	
  embed	
  even	
  SDP	
  tracking	
  into	
  
team	
  minimums	
  tracking	
  (by	
  focusing	
  on	
  tracking	
  
sales	
  teams)	
  
5. Implement
Team minimums
Team Minimums
Team
Plan
JD
Training
Tracking & Coaching
Evaluation Standard and sense
Reason
Direction
Contribution
Tool
Performance
The	
  team	
  minimums	
  are	
  the	
  basis	
  of	
  
EVERYTHING	
  YOU	
  DO	
  IN	
  YOUR	
  ENTITY!	
  
•  Team	
  Minimums	
  help	
  an	
  LC	
  in	
  capacity	
  planning	
  and	
  implementa1on	
  (and	
  
makes	
  it	
  simpler	
  for	
  MC	
  to	
  track)	
  
•  Team	
  Minimums	
  allows	
  an	
  MC	
  to	
  create	
  the	
  right	
  educa1on	
  cycle	
  for	
  the	
  
en1ty	
  and	
  an	
  LC	
  to	
  customize	
  educa1on	
  for	
  every	
  func1on	
  in	
  the	
  right	
  way	
  
•  Team	
  Minimums	
  help	
  in	
  Performance	
  Management	
  (Because	
  every	
  team	
  
needs	
  to	
  have	
  a	
  JD,	
  MoS,	
  Plan	
  and	
  this	
  needs	
  to	
  be	
  tracked	
  which	
  means	
  
performance	
  management	
  in	
  the	
  en1ty	
  can	
  be	
  structures)	
  
•  Team	
  minimums	
  help	
  the	
  MC	
  to	
  have	
  the	
  right	
  informa1on	
  to	
  iden1fy	
  what	
  is	
  
going	
  well	
  and	
  what	
  are	
  the	
  challenges	
  and	
  how	
  can	
  this	
  lead	
  to	
  increasing	
  
produc1vity!	
  
Team minimums are a tool for TEAM
MANAGEMENT and not something that
is implemented by an MCVP TM or an
MCVP OD! OR AN LCVP TM!
Every MCVP and LCVP is using these to
lead, manage and track their teams!
HOW DO I
TRACK THESE?
Example	
  of	
  how	
  to	
  track	
  team	
  minimums 	
  	
  
What	
  should	
  I	
  do	
  to	
  implement	
  them?	
  
ü  Educate	
  membership	
  completely	
  on	
  the	
  team	
  minimums	
  and	
  how	
  to	
  implement	
  them	
  
ü  Create	
  examples	
  of	
  how	
  team	
  minimums	
  need	
  to	
  be	
  implemented	
  across	
  programmes/
func1ons	
  by	
  connec1ng	
  them	
  to	
  the	
  structures	
  of	
  teams	
  at	
  LC	
  level	
  
ü  Train	
  team	
  leaders	
  across	
  GIP	
  to	
  ensure	
  they	
  know	
  how	
  to	
  implement	
  team	
  minimums	
  
through	
  the	
  whole	
  team	
  cycle/dura1on	
  
ü  Embed	
  team	
  minimums	
  into	
  capacity	
  and	
  L&D	
  Planning	
  for	
  ALL	
  TEAMS	
  	
  
ü  Team	
  minimums	
  implementa1on	
  as	
  a	
  part	
  of	
  na1onal	
  educa1on	
  cycle	
  
ü  Track	
  team	
  minimums	
  	
  
 MC Team should start implementing team
minimums with LCVPs!!
Role of MC! FOCUS ON LCs doing
between 0-25
GROWING IN iGCDP!!!
Role of MC!
•  Pick focus LCs for iGCDP growth
•  Support Planning process - Plan for number of
members needed through TM Planning tool
•  Take action based on your current reality and recruit
into the right structures
•  Create a specific Learning and Development cycle
(embed SDP and Supply and Demand into this)
•  Implement Team Minimums (not just the MCVP TM,
all MCVPs need to do this)
Role of MC!
•  Through data, identify the CHALLENGE of LCs
to figure out what will lead to an increase in
productivity!
•  Set CLEAR GOALS for PRODUCTIVITY with
LCs per programme, specifically in iGCDP and
measure constantly

More Related Content

What's hot

oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DAIESEC
 
Tier 1 oGCDP Structures for peak and off-peak management
Tier 1 oGCDP Structures for peak and off-peak managementTier 1 oGCDP Structures for peak and off-peak management
Tier 1 oGCDP Structures for peak and off-peak managementAIESEC
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP AIESEC
 
oGCDP Tier 1 IXP Strategy
 oGCDP Tier 1 IXP Strategy oGCDP Tier 1 IXP Strategy
oGCDP Tier 1 IXP StrategyAIESEC
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyAIESEC
 
iGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaksiGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaksAIESEC
 
oGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceoGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceAIESEC
 
Capacity for high quality experiences in iGIP
Capacity for high quality experiences in iGIPCapacity for high quality experiences in iGIP
Capacity for high quality experiences in iGIPAIESEC
 
Tier 1 IXP for oGIP
Tier 1 IXP for oGIPTier 1 IXP for oGIP
Tier 1 IXP for oGIPAIESEC
 
Goal product partner planning o gcdp all tiers
Goal product partner planning o gcdp all tiersGoal product partner planning o gcdp all tiers
Goal product partner planning o gcdp all tiersAIESEC
 
Tier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JDTier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JDAIESEC
 
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...Christina Kelman
 
Backwards planning & strategy planning gcdp all tiers
Backwards planning & strategy planning gcdp all tiersBackwards planning & strategy planning gcdp all tiers
Backwards planning & strategy planning gcdp all tiersAIESEC
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationAIESEC
 
AIESEC Indonesia |1314| iGCDP Summer Structures
AIESEC Indonesia |1314| iGCDP Summer StructuresAIESEC Indonesia |1314| iGCDP Summer Structures
AIESEC Indonesia |1314| iGCDP Summer StructuresChristina Kelman
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DAIESEC
 
OD Model creation tier 1 and tier 2
OD Model creation tier 1 and tier 2 OD Model creation tier 1 and tier 2
OD Model creation tier 1 and tier 2 AIESEC
 
Managing high scale or high growth non focus programme
Managing high scale or high growth non focus programmeManaging high scale or high growth non focus programme
Managing high scale or high growth non focus programmeAIESEC
 
Intro to built to last
Intro to built to lastIntro to built to last
Intro to built to lastJuan Puertas
 

What's hot (20)

oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&D
 
Tier 1 oGCDP Structures for peak and off-peak management
Tier 1 oGCDP Structures for peak and off-peak managementTier 1 oGCDP Structures for peak and off-peak management
Tier 1 oGCDP Structures for peak and off-peak management
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP
 
oGCDP Tier 1 IXP Strategy
 oGCDP Tier 1 IXP Strategy oGCDP Tier 1 IXP Strategy
oGCDP Tier 1 IXP Strategy
 
oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergy
 
iGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaksiGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaks
 
Synergy, Raising,MOS and OS
Synergy, Raising,MOS and OSSynergy, Raising,MOS and OS
Synergy, Raising,MOS and OS
 
oGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performanceoGIP Tier 2 structures and L&D for increased LC performance
oGIP Tier 2 structures and L&D for increased LC performance
 
Capacity for high quality experiences in iGIP
Capacity for high quality experiences in iGIPCapacity for high quality experiences in iGIP
Capacity for high quality experiences in iGIP
 
Tier 1 IXP for oGIP
Tier 1 IXP for oGIPTier 1 IXP for oGIP
Tier 1 IXP for oGIP
 
Goal product partner planning o gcdp all tiers
Goal product partner planning o gcdp all tiersGoal product partner planning o gcdp all tiers
Goal product partner planning o gcdp all tiers
 
Tier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JDTier 2 oGIP Marketing structures and JD
Tier 2 oGIP Marketing structures and JD
 
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
 
Backwards planning & strategy planning gcdp all tiers
Backwards planning & strategy planning gcdp all tiersBackwards planning & strategy planning gcdp all tiers
Backwards planning & strategy planning gcdp all tiers
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementation
 
AIESEC Indonesia |1314| iGCDP Summer Structures
AIESEC Indonesia |1314| iGCDP Summer StructuresAIESEC Indonesia |1314| iGCDP Summer Structures
AIESEC Indonesia |1314| iGCDP Summer Structures
 
iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&D
 
OD Model creation tier 1 and tier 2
OD Model creation tier 1 and tier 2 OD Model creation tier 1 and tier 2
OD Model creation tier 1 and tier 2
 
Managing high scale or high growth non focus programme
Managing high scale or high growth non focus programmeManaging high scale or high growth non focus programme
Managing high scale or high growth non focus programme
 
Intro to built to last
Intro to built to lastIntro to built to last
Intro to built to last
 

Similar to iGCDP Tier 3 structures and L&D

iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPAIESEC
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmesAIESEC
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementAIESEC
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementAIESEC
 
GIP Monthly Meeting May 2014
GIP Monthly Meeting May 2014GIP Monthly Meeting May 2014
GIP Monthly Meeting May 2014Cole Wirpel
 
Why and the need for changing growth model Sumco 2015
Why and the need for changing growth model Sumco 2015  Why and the need for changing growth model Sumco 2015
Why and the need for changing growth model Sumco 2015
aiesec_poland
 
Lets take action
Lets take actionLets take action
Lets take action
Nikita Singh
 
YGIP_AIESECDU 2013 Audit
YGIP_AIESECDU  2013 AuditYGIP_AIESECDU  2013 Audit
YGIP_AIESECDU 2013 AuditAakash Malhotra
 
Od framework and role across tiers
Od framework and role across tiersOd framework and role across tiers
Od framework and role across tiersChristina Kelman
 
NCF Customized in oGIP
NCF Customized in oGIPNCF Customized in oGIP
NCF Customized in oGIP
Chuck Chaoke 朝克
 
iGIP Tier 1 Talent Capacity for Re-raising and up scaling
iGIP Tier 1 Talent Capacity for Re-raising and up scaling iGIP Tier 1 Talent Capacity for Re-raising and up scaling
iGIP Tier 1 Talent Capacity for Re-raising and up scaling AIESEC
 

Similar to iGCDP Tier 3 structures and L&D (20)

Capacity
CapacityCapacity
Capacity
 
iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDP
 
Balance gcdp and gip
Balance gcdp and gipBalance gcdp and gip
Balance gcdp and gip
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmes
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline Management
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline Management
 
TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15
 
GIP Monthly Meeting May 2014
GIP Monthly Meeting May 2014GIP Monthly Meeting May 2014
GIP Monthly Meeting May 2014
 
Big aiesec 1
Big aiesec 1Big aiesec 1
Big aiesec 1
 
iGCDP Quality Capacity
iGCDP Quality CapacityiGCDP Quality Capacity
iGCDP Quality Capacity
 
Why and the need for changing growth model Sumco 2015
Why and the need for changing growth model Sumco 2015  Why and the need for changing growth model Sumco 2015
Why and the need for changing growth model Sumco 2015
 
Lets take action
Lets take actionLets take action
Lets take action
 
Lets take action
Lets take actionLets take action
Lets take action
 
Sales for i gcdp
Sales for i gcdpSales for i gcdp
Sales for i gcdp
 
YGIP_AIESECDU 2013 Audit
YGIP_AIESECDU  2013 AuditYGIP_AIESECDU  2013 Audit
YGIP_AIESECDU 2013 Audit
 
Sales for i gcdp
Sales for i gcdpSales for i gcdp
Sales for i gcdp
 
GCDP FOR NETWORK
GCDP FOR NETWORKGCDP FOR NETWORK
GCDP FOR NETWORK
 
Od framework and role across tiers
Od framework and role across tiersOd framework and role across tiers
Od framework and role across tiers
 
NCF Customized in oGIP
NCF Customized in oGIPNCF Customized in oGIP
NCF Customized in oGIP
 
iGIP Tier 1 Talent Capacity for Re-raising and up scaling
iGIP Tier 1 Talent Capacity for Re-raising and up scaling iGIP Tier 1 Talent Capacity for Re-raising and up scaling
iGIP Tier 1 Talent Capacity for Re-raising and up scaling
 

More from AIESEC

AI 1718 plan presentation
AI 1718 plan presentationAI 1718 plan presentation
AI 1718 plan presentation
AIESEC
 
The AIESECer Survey March 2017
The AIESECer Survey March 2017The AIESECer Survey March 2017
The AIESECer Survey March 2017
AIESEC
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction Guideline
AIESEC
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership Selection
AIESEC
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership Planning
AIESEC
 
APLS-IR guide for LCP
APLS-IR guide for LCP APLS-IR guide for LCP
APLS-IR guide for LCP
AIESEC
 
APLS-Clarity of what
APLS-Clarity of whatAPLS-Clarity of what
APLS-Clarity of what
AIESEC
 
APLS-iGV product session
APLS-iGV product sessionAPLS-iGV product session
APLS-iGV product session
AIESEC
 
APLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAPLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LC
AIESEC
 
The ultimate lcp wisdom book
The ultimate lcp wisdom bookThe ultimate lcp wisdom book
The ultimate lcp wisdom book
AIESEC
 
Planning planning framework odm
Planning  planning framework odmPlanning  planning framework odm
Planning planning framework odm
AIESEC
 
Building culture of_success
Building culture of_successBuilding culture of_success
Building culture of_success
AIESEC
 
Building sales driven_culture
Building sales driven_cultureBuilding sales driven_culture
Building sales driven_culture
AIESEC
 
Our role as p
Our role as pOur role as p
Our role as p
AIESEC
 
P tips for planning
P tips for planningP tips for planning
P tips for planning
AIESEC
 
Role of lcp
Role of lcpRole of lcp
Role of lcp
AIESEC
 
Building culture of excellence+recognition
Building culture of excellence+recognitionBuilding culture of excellence+recognition
Building culture of excellence+recognition
AIESEC
 
[Tm]forming teams
[Tm]forming teams[Tm]forming teams
[Tm]forming teams
AIESEC
 
Building working culture
Building working cultureBuilding working culture
Building working culture
AIESEC
 
Building high performance_culture_rockefeller
Building high performance_culture_rockefellerBuilding high performance_culture_rockefeller
Building high performance_culture_rockefeller
AIESEC
 

More from AIESEC (20)

AI 1718 plan presentation
AI 1718 plan presentationAI 1718 plan presentation
AI 1718 plan presentation
 
The AIESECer Survey March 2017
The AIESECer Survey March 2017The AIESECer Survey March 2017
The AIESECer Survey March 2017
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction Guideline
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership Selection
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership Planning
 
APLS-IR guide for LCP
APLS-IR guide for LCP APLS-IR guide for LCP
APLS-IR guide for LCP
 
APLS-Clarity of what
APLS-Clarity of whatAPLS-Clarity of what
APLS-Clarity of what
 
APLS-iGV product session
APLS-iGV product sessionAPLS-iGV product session
APLS-iGV product session
 
APLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAPLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LC
 
The ultimate lcp wisdom book
The ultimate lcp wisdom bookThe ultimate lcp wisdom book
The ultimate lcp wisdom book
 
Planning planning framework odm
Planning  planning framework odmPlanning  planning framework odm
Planning planning framework odm
 
Building culture of_success
Building culture of_successBuilding culture of_success
Building culture of_success
 
Building sales driven_culture
Building sales driven_cultureBuilding sales driven_culture
Building sales driven_culture
 
Our role as p
Our role as pOur role as p
Our role as p
 
P tips for planning
P tips for planningP tips for planning
P tips for planning
 
Role of lcp
Role of lcpRole of lcp
Role of lcp
 
Building culture of excellence+recognition
Building culture of excellence+recognitionBuilding culture of excellence+recognition
Building culture of excellence+recognition
 
[Tm]forming teams
[Tm]forming teams[Tm]forming teams
[Tm]forming teams
 
Building working culture
Building working cultureBuilding working culture
Building working culture
 
Building high performance_culture_rockefeller
Building high performance_culture_rockefellerBuilding high performance_culture_rockefeller
Building high performance_culture_rockefeller
 

Recently uploaded

Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
A. F. M. Rubayat-Ul Jannat
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
juniourjohnstone
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
akaash13
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
Amir H. Fassihi
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
CIOWomenMagazine
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
William (Bill) H. Bender, FCSI
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
Tata Consultancy Services
 

Recently uploaded (10)

Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
 

iGCDP Tier 3 structures and L&D

  • 2. Tier 1 MC Tier 3 MC Tier 4 MC organic and balanced growth Tier 2 MC organic and balanced growth These tiers must focus, for Tier 1 and 2 the focus should be on organic and balanced growth (particularly balancing focus with GIP). For Tier 3 and 4 it’s about jumping in GCDP. What does this mean?
  • 3. The  iGCDP  OD  Model  for  1er  3  
  • 4. GCDP Clustering for LC iGCDP Beginner 0-25 X RE Intermediate 25-100 X RE Advanced 100-200 X RE Mature +200 X RE
  • 5.   What is the current state?
  • 6. En11es  in  Tier  3  iGCDP  
  • 7. LCs   Combined these entities have…
  • 8. 121 RE 24 RE average LC Highest achievement in 2013 LC FTU HCMMost LCs do between 20 - 45 RE These are the LCs we need to focus on to grow. LCs in Tier 3 iGCDP overview
  • 9. LCs 0-25 Re LCs 25-100 Re LCs have a lot of scope to JUMP!!
  • 10. What we are aiming for? Growth Models in Tier 3 iGCDP being aligned to a jump in the programme LCs in tier 4 (0-25 in iGCDP) being able to make a BIG jump If these entities are also focused on a GIP programme, being able to manage both because they have 10 LCs or lesser
  • 11. What is this about? •  Pick focus LCs for iGCDP growth in your entity based on entity growth model •  Using HR Intelligence to grow •  Building Capacity for iGCDP •  Learning and Development for iGCDP •  Team Minimums implementation for iGCDP •  Role of MC
  • 12. How can you take advantage of it? Let’s GO!
  • 13. 1.Pick focus LCs for iGCDP growth
  • 14. 121 RE 24 RE average LC Highest achievement in 2013 LC FTU HCMMost LCs do between 20 - 45 RE These are the LCs we need to focus on to grow. LCs in Tier 3 iGCDP overview
  • 15. LC  Performance  over  view  in  this  3er   The top LC does 121 Re in this tier – AIESEC FTC HCM in Vietnam A large number of LCs in this tier do between 0-25 Re Most entities in this tier have between 2-10 LCs Only Korea has 12 LCs, rest entities have 10 or less than 10 LCs Only about 5 LCs in this tier do above 100
  • 16. What we observe? •  There  are  enough  1er  3  and  1er  4  LCs  in  that  can  make  the  JUMP  in  Tier  3  MCs  for  iGCDP   •  Most  of  these  en11es  are  either:     1.  Focused  on  iGCDP   2.  Have  iGCDP  as  their  second  focus   3.  Intend  to  ensure  iGCDP  growth  in  their  1er  4  LCs     •  These  en11es  should  be  increasing  in  their  iGCDP  contribu1on  globally  and  KEY  to  their  growt h  is  having  the  right  capacity  and  L&D  to  be  able  to  grow!  
  • 17. Go through the OD Toolkit for tier 1 and 2 if you have more than 6 LCs and OD toolkit for tier 3 and 4 if you have less than 6 LCs!  
  • 18. 2. Using HR Intelligence to grow in iGCDP
  • 21. EVERY LC within the MC/Entity needs to increase its productivity, the question is HOW? An increase in productivity is POSSIBLE by IDENTIFYING what is your challenge! Examples: 1.  If new members/TMP Participants leave the organization within 1-2 weeks of the role starting, focus on INCREASE in TMP Retention Rate can increase productivity 2.  If you do not know which level of membership is achieving or not achieving results, team minimums implementation to manage performance will allow you to see which level is contributing most to performance and allow you to focus on this segment or the segment that is not performing to increase productivity
  • 22. REMEMBER: The FINAL KPI you are measuring is PRODUCTIVITY, however you need other KPIs that are based on your specific challenges to indicate this increase in productivity!
  • 23. How do I measure productivity?
  • 24. You can measure productivity at raise, match and realize stage! •  Produc'vity  at  RAISE  =  Number  of  members  working  for  raise  in  iGCDP  (in   front  office  and  back  office)/  Number  of  Raises  (In  the  specific  'me  period)   •  Produc'vity  at  MATCH  =  Number  of  members  working  for  match  in  iGCDP   (in  front  office  and  back  office)/Number  of  matched  (In  the  specific  'me   period)   •  Produc'vity  at  REALIZE  =  Total  number  of  members  working  in  iGCDP   (front  office  and  back  office)/Number  of  realiza'ons  in  iGCDP  (In  the   specific  'me  period)  
  • 25. Generally, team structures in iGCDP involve the same people/number of people working for raise, match and realize – even so since iGCDP runs in peaks it makes sense to measure productivity through the peaks
  • 26. Productivity at realize is most accurate but we measure productivity at raise and match only to check the progress and always establish the connection between TM/ OD and programme growth!
  • 27. Set an MC goal for productivity per programme: How? •  Work with all iGCDP focus/growth LCs (from your OD Model/Growth Model) to identify what is their challenge, how to solve this and how much productivity increase this will lead to •  Set this as the iGCDP Productivity goal along with LC •  An accumulation of set goals with LCs leads to being certain of the entity productivity goal! •  Though talent planning based on current productivity happens first at an MC level, productivity planning happens with MC and LC together so the goal for productivity has LC Alignment towards MC and is connected to the OD Model!
  • 28. What business Intelligence can help to drive increase in productivity? % of people in iGCDP and % of people in Support Functions Time a new member or new team leader takes to start performing Applicants to iGCDP TLP positions TMP Retention Rate
  • 29. 3. Planning and Building CAPACITY based on challenge identification, Exchange flow and OD Model of your entity
  • 30. Use TM Planning Tool to Plan for iGCDP " 1. Number of Members in iGCDP and support functions 2. Number of TMP and TLP Experiences in iGCDP and support functions
  • 31. TM  Planning  tool  download       hTp://www.myaiesec.net/content/viewwiki.do? conten1d=10299749  
  • 32. After planning for capacity you can have any one of these 3 outcomes 1. I do not have enough Members in any programme/function 2. We have enough members in iGCDP and support areas 3. We have the right number of members in the LC/MC but not allocated in the right proportion across programmes/functions
  • 33. Run  an  OPTIMIZED  recruitment–  2  weeks!!   1. I do not have enough Members in any programme/ function
  • 34. Tips to run an optimized recruitment 1. Clear and focused Promotion of Job description   Example: Selling the global internship programme to language institutes ! ! 2. Specific people responsible for the recruitment 3. Online promotion and Offline promotion ONLY in specific universities 4. Selection based on Interests and Values (striving for excellence, pro active learner etc.) over only skills for the role 5. When Promotion is on-going through the year, an optimized recruitment becomes simpler since LC/MC already has a pool of applicants
  • 35. Determine who is the right member Skill AttitudeBackground Interest Time
  • 36. Timeline   Approach existing sign ups for TXP and GCDP Rejected applicants from last recruitment Optimized Selection 1 week 5 days
  • 37. Optimize d Selection Value  based  recruitmen q  Committed and motivated members ( GIP needs commitment and persistence)! q  Building "
  • 38. 2. We have enough members in iGCDP and support areas Focus on increasing productivity through L&D and team minimums
  • 39. 3. We have the right number of members in the LC/MC but not allocated in the right proportion across programmes/functions In  many  cases  there  is  enough  capacity  in  iGCDP  and   members  need  to  be  re-­‐allocated  so  even  the  GIP   programmes  have  the  right  capacity!  
  • 40. How to balance the iGCDP and iGIP support? Clear JD for members in Exchange Support Clear KPIs for each member specifically in iGIP and support areas (TM and BD) Hybrid Members – Example: TM members in iGIP team and iGCDP team
  • 41. What structure should I recruit into?
  • 42. Structures for… 0-25 Re 25-100 Re 100-200 Re
  • 43. FIN JD in iGCDP TM JD in iGCDP MKT JD in iGCDP iGCDP Coordination JD Project Structure LC VPiGCDP OCP OCP OCP VPFIN VPTM VPMKT Do Ra-Ma-Re!! Note! For ALL levels!
  • 44. Beginner LC VP Member Member Member (0-25 Re) ∞ Ra-Ma-Re Inner & Outer Journey Delivery Note! ∞
  • 45. Basic Consideration: •  As start up, LC manage the basic process of iGCDP delivery •  There is no need to manage iGCDP as a project yet - in general experience delivery will be TN based •  Member Efficiency: 0-4 X / member Number of members: 3-4 Job Description: •  Selling and raising, matching, and realizing •  Incoming preparation seminar •  Experience Co-delivery VP Member Member Member ∞Ra-Ma-Re Beginner LC (0-25 Re)
  • 46. Back Office Supports TM Member L&D; Sales Development Program Finance Project Financial Model Marketing & Communication Project packaging, Project showcasing; ER External Resources integration(new Partners) VP Member Member Member ∞Ra-Ma-Re Beginner LC (0-25 Re)
  • 48. VP TL TL TL ∞Ra-Ma-Re ∞Ra-Ma-Re ∞Ra-Ma-Re Basic Consideration: •  LCs have more capacity in project management •  Project concept will be centralized Nationally (National project implementation in LCs) •  Start to have the needs of event/project management •  Member Efficiency: 3-4 X /member Number of members: Depends on TM Planning Job Description: •  Selling and raising, matching, and realizing •  Project concept development and execution •  Incoming preparation seminar •  Experience Co-delivery (country-country partnership management) Intermediate LC (25-100 Re)
  • 49. Back Office Supports TM Member profiling Member Learning & Development Sales Development Program Finance Project financial model Member development investment Marketing & Communication National brand alignment Showcasing EwA Public Relations Management ER External resources integration Partner engagement VP OCP OCP OCP ∞Ra-Ma-Re ∞Ra-Ma-Re ∞Ra-Ma-Re Intermediate LC (25-100 Re)
  • 50. Advanced LC (100-200 Re) •  Un1l  this  stage,  an  LC  is  only  working  on  na1onal  project   implementa1on,  however  here  an  LC  can  also  start  working  with   local  projects   •  The  LC  also  should  start  focusing  much  more  on  balancing  quality   with  quan1ty  (to  ensure  it  can  keep  growing  in  Realiza1ons  and   NPS)  
  • 51. VP OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local) Advanced LC (100-200 Re) ∞Ra-Ma-Re ∞Ra-Ma-Re ∞Ra-Ma-Re ∞Ra-Ma-Re
  • 52. VP OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local) Number of members: Depends on TM Planning Job Description: •  Selling and raising, matching, and realizing •  Project concept development and execution •  Project brand management •  Incoming preparation seminar •  Experience Co-delivery (LC-LC partnership management) Basic Consideration: •  LC is considered to have the capacity in understanding Project management concept and put into implementation •  LC has capacity in innovate a project based on issue •  Member Efficiency: 4-6 X /member ∞Ra-Ma-Re ∞Ra-Ma-Re ∞Ra-Ma-Re ∞Ra-Ma-Re Advanced LC (100-200 Re)
  • 53. Back Office Supports TM Member profiling; Buddy engagement; Learning & Development for Members; SDP; Finance Project financial model; Crisis management Marketing & Communication Brand audit and national alignment; EwA; Showcasing. ER Partnership raise and maintenance IM Process optimization VP OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local) ∞Ra-Ma-Re ∞Ra-Ma-Re ∞Ra-Ma-Re ∞Ra-Ma-Re Advanced LC (100-200 Re)
  • 55. USE TM Planning tool How do I plan?
  • 56. FOCUS ON EDUCATION TO DRIVE RESULTS How can i achieve this? 1. Create a specific iGCDP education cycle 2. Ensure the education for potential and high potential is making membership productive and able to raise and match simultaneously. 3. For start up LCs focus on raising education and for one sub-product. 4. Track length of time for membership to perform – IMPORTANT! 5. Ensure strong organizational and operational induction into AIESEC for contribution to summer
  • 58. TOPIC! CONTENT! OBJECTIVES! TARGET! PRODUCT KNOWLEDGE! q  Relevance of the product in the society " q  What is a product and product life cycle" q  Know the elements of products (price, brand, quality, value, customer segments, etc.) and the different stages of products" q  Understand the exchange process from Calls until Completed " q  Know how to use all the functions on myaiesec.net for exchange management to make the process fast and effective" Members, Leaders, VPs! EXCHANGE PROCESSES! q  Exchange process flow and yearly timeline (product customer flow)" q  Exchange Management on the GIS" SUPPLY & DEMAND MANAGEMENT! q  Supply and demand theory and necessity" q  Exchange management on the GIS" INNER&OUTER JOURNEY! q  Why and how and what of inner and outer journey in AIESEC" q  Delivery of I&O journey to our customers" q  Understand how AIESEC develops leadership through I&O journey and know how to support our customers to go through an intense I&O journey" CUSTOMER EXPERIENCE MANAGEMENT! q  Why, how and what of CEM?" q  Co-delivery" q  Information system management for better customer service " q  Understand the importance of customer experience management and know how to use the resources (data, partners) we have to create strategies for All levelsiGCDP
  • 59. All levels TOPIC! CONTENT! OBJECTIVES! TARGET! ISSUE-BASED SEGMENTATION! ! q  Why and how of issue segmentation for GCDP in AIESEC" q  Changes in product and process management in the LC" q  Understand why issue segmentation was created and how to work with this model in the LC (changes in processes, product development, structures)" Leaders & VPs! ! CROSS- CULTURAL COMMUNICATION! q  Hofstede’s cultural dimensions" q  Behaviours and attitude needed for effective cross- cultural communication" q  Understand the 5 cultural dimensions of Hofstede and how to adapt communication based on that" Members, Leaders, VPs! CUSTOMER LOYALTY FOR STUDENTS! q  Building a customer relationship with trainees" q  Minimums of project delivery" q  How to satisfy our customers" q  Understand the standards and extra deliveries in iGCDP projects in order to have promoters and develop leadership" Leaders & VPs! SALES TRAINING! q  Basic sales knowledge and techniques" q  Practice sales of our products" q  Understand the process of sales and know how to deliver a full selling cycle" Members, Leaders, VPs! iGCDP
  • 60. iGCDPIntermediate (LCs doing between 25-100)
  • 61. TOPIC! CONTENT! OBJECTIVES! TARGET! NATIONAL PROJECTS! q  Product knowledge of national projects" q  The responsibility of making national projects" q  Devision of responsibilities and roles between MC and LC and the rules of communication" q  Value of national partners & projects" q  Understanding what is the national project, how to operate with MC and feel responsible and commited to national projects." Leaders & VPs! PROJECT MANAGEMENT! q  Definition and characterisitics of a project." q  Process in project management" q  Goals achievement" q  Resource management" q  Understand how to build your project and the processes inside, manage effecively resources to achieve the goals." Leaders & VPs! COUNTRY-TO- COUNTRY PARTNERSHIPS! q  What is CY2CY partnership" q  Value of CY2CY partnership" q  Responsibilities in partnerships" q  Main processes in cooperation management" q  Understand the processes in CY2CY partnerships, responsibility towards delivering the XPs on LC levels and clear WHY of working by CY2CY " VPs! SHOWCASING & PROMOTERS! q  What is showcasing and promoters stories usage" q  How to brand promoters stories and showcase them" q  Showcasing channels and partnerships" q  Understand how to showcase the srories of promoters for getting more customers" Leaders & VPs! INTERMEDIATEiGCDP
  • 62. iGCDPAdvanced (LCs doing between 100-200)
  • 63. TOPIC! CONTENT! OBJECTIVES! TARGET! BUSINESS MODEL! q Business model canvas" q Financial model" q Understand the business strategy and processes within that and feel responsible towards financial sustainability of the project " Members, leaders, VPs! PRODUCT DEVELOPMENT! q Product packaging" q Product development flow & processes" q Customization" q Understanding how to package the project, how to sell to different stakeholders and customize to different target groups." Leaders and VPs! SALES DEVELOPMENT PROGRAM! q Knowledge and practice of advance sales techniques" q Increasing the capacity and the productivity to reach the higer level of sales results" Members, leaders, VPs! CRM MANAGEMENT! q Account management" q System usage and management" q Rules and regulations of CRM" q Working professionaly on customer relationship management" Members, leaders, VPs! ! ADVANCEDiGCDP
  • 64. TOPIC! CONTENT! OBJECTIVE! TARGET! BUDDY & HOST PROGRAM! q Packaging of host & buddy program" q Attitude and responsibility towards engaging those customers" q Concrete processes on working with H&B" q Know how to engage B&H as a cutomer and have the long-term realtions with them. They understand the clear value of this program" Leaders, VPs ! CRISIS MANAGEMENT! q XPP review" q How to deal with the threats before, during and after they occure" q Case solving practice" q Know how to deal with cases and crisises and are not afraid of fire-fighting process." Leaders. VPs! LC2LC PARTNERSHIPS! q What is LC2LC partnership" q Value of LC2LC partnership" q Responsibilities in partnerships" q Main processes in cooperation management" q Understand the processes in LC2LC partnerships, responsibility towards delivering the XPs on LC levels and clear WHY of working by LC2LC" VPs! ADVANCEDiGCDP
  • 65. Customization is the key to success Customize by LC Scale Customize By Target Profile Eg: Team Leader Customize by LC current reality and focus
  • 66. HANDY TIPS 1.  Make Virtual learning effective and fun – Ensure continuity and consistency 2. Have practical tasks/ assignments at the end of every virtual session CONTINUITY AND CONSISTENCY PRACTICAL 3. Create virtual trainings aligned to your exchange flow and exchange timeline Exchange timeline 4. Ensure there is customised content for specific LCs and specific profiles within LCs. (customize to your OD Model) CUSTOMISED
  • 67. How to Measure this? TMP Retention rate (for new members and existing team members Increase in Performance over a period of time Time to start performing Eg: from 1 month to 1 week – for new members and team leaders Increase in Performance over a period of time
  • 68. A  lever  to  support  our   ambi1ons  for  iGCDP   Grow  iGCDP  Raises   we need to have a lever big and strong enough to support our iGCDP ambitions :) sdp for igCDP why? Using the Sales Development Program a education and tracking tool to increase the sales capacity and intensity of iGCDP members
  • 69. Sales Development for iGCDP Golden Rule 70%PRODUCT & PROCESS KNOWLEDGE 30%SALES KNOWLEDGE
  • 70. TG C M RA Goal Sales Negotiation Meeting Goal Sales Meeting Goal Cold Calling Goal Cold Leads Goal how much time does this process take? Define what you want to achieve in iGCDP and when so that your SDP can be tailored to your sales needs. Sales Development for iGCDP
  • 71. How? tg c m RA Goal Sales Negotiation Meeting Goal Sales Meeting Goal Cold Calling Goal Cold Leads Goal how much time does this process take? Who is going to achieve this? This will define the key target for your SDP. eg. I’m going to target iGCDP Sales-Raising TMP
  • 72. sdp for igCDP how? c m This is where you make your sales development program framework with the key message and best channels to connect to your target audience! :D
  • 73. A tracker system Education Framework/ timelineCustomize as per your sales reality and OD Model! what is sdp made of? Content and Delivery Sales Conference if needed
  • 74. Educa1on   framework   and  1meline   Ensure  educa1on  is  ploTed  on  a  1meline  ALIGNED  TO  PEAKS   link  all  training  to  relevant   team  and  individual   activity  happening  at  the   time  (link  content  to  push   for  Peak)   each  class  must  have  clear   KPIs  and  output  that  are   tracked  by  the  LCVP  and   MCVP  responsibles   Ensure  the  local  TM  can   leverage  off  SDP  by  time   lining  their  activity  too.  
  • 75. Educa1on   framework  and   1meline   Right Target/Profile Right Content Right Delivery/Channel Right Timeline Right KPI and Measurement Ensure that SDP content is tailored for LC scale: -  0-25 -  25-100 -  100-200
  • 76. View  sample  tracking  system   and  Sample  sales  conference   Agenda  on  spreadsheets  below  
  • 77. Though  there  is  a  sample  tracker,  what  makes   most  sense  is  to  embed  even  SDP  tracking  into   team  minimums  tracking  (by  focusing  on  tracking   sales  teams)  
  • 79. Team Minimums Team Plan JD Training Tracking & Coaching Evaluation Standard and sense Reason Direction Contribution Tool Performance
  • 80. The  team  minimums  are  the  basis  of   EVERYTHING  YOU  DO  IN  YOUR  ENTITY!   •  Team  Minimums  help  an  LC  in  capacity  planning  and  implementa1on  (and   makes  it  simpler  for  MC  to  track)   •  Team  Minimums  allows  an  MC  to  create  the  right  educa1on  cycle  for  the   en1ty  and  an  LC  to  customize  educa1on  for  every  func1on  in  the  right  way   •  Team  Minimums  help  in  Performance  Management  (Because  every  team   needs  to  have  a  JD,  MoS,  Plan  and  this  needs  to  be  tracked  which  means   performance  management  in  the  en1ty  can  be  structures)   •  Team  minimums  help  the  MC  to  have  the  right  informa1on  to  iden1fy  what  is   going  well  and  what  are  the  challenges  and  how  can  this  lead  to  increasing   produc1vity!  
  • 81. Team minimums are a tool for TEAM MANAGEMENT and not something that is implemented by an MCVP TM or an MCVP OD! OR AN LCVP TM! Every MCVP and LCVP is using these to lead, manage and track their teams!
  • 82. HOW DO I TRACK THESE?
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 88.
  • 89. Example  of  how  to  track  team  minimums    
  • 90. What  should  I  do  to  implement  them?   ü  Educate  membership  completely  on  the  team  minimums  and  how  to  implement  them   ü  Create  examples  of  how  team  minimums  need  to  be  implemented  across  programmes/ func1ons  by  connec1ng  them  to  the  structures  of  teams  at  LC  level   ü  Train  team  leaders  across  GIP  to  ensure  they  know  how  to  implement  team  minimums   through  the  whole  team  cycle/dura1on   ü  Embed  team  minimums  into  capacity  and  L&D  Planning  for  ALL  TEAMS     ü  Team  minimums  implementa1on  as  a  part  of  na1onal  educa1on  cycle   ü  Track  team  minimums    
  • 91.  MC Team should start implementing team minimums with LCVPs!!
  • 92.
  • 93. Role of MC! FOCUS ON LCs doing between 0-25 GROWING IN iGCDP!!!
  • 94. Role of MC! •  Pick focus LCs for iGCDP growth •  Support Planning process - Plan for number of members needed through TM Planning tool •  Take action based on your current reality and recruit into the right structures •  Create a specific Learning and Development cycle (embed SDP and Supply and Demand into this) •  Implement Team Minimums (not just the MCVP TM, all MCVPs need to do this)
  • 95. Role of MC! •  Through data, identify the CHALLENGE of LCs to figure out what will lead to an increase in productivity! •  Set CLEAR GOALS for PRODUCTIVITY with LCs per programme, specifically in iGCDP and measure constantly