The document discusses how building information modeling (BIM) can reduce risks and costs for facility managers on projects. It presents results from three identical cath lab projects that used different levels of BIM: one with CAD only had the highest costs and longest schedule, while one with full BIM integration had the lowest costs, shortest schedule, and virtually no change orders. The document recommends facility managers use the existing BIM model from construction with free software for navigation and linking systems information with QR codes to help operations and maintenance.