The document discusses the PipeFab plugin for Revit, which automates pipe fabrication and drafting. It reduces production of installation drawings by 60%. The plugin lists pipes, exports data to Excel, and generates CNC files. It provides direction labels and exports cutting sheets to Excel for easier review. The document also discusses several other BIM projects for facilities in Saudi Arabia.
ARCHITECT and BIM MODELER (Proven right to work and live in the UK) +44 07825690901
13 years of experience in architectural and structural projects for buildings and civil works of international scope for consultancy firms and collaborating with multidisciplinary teams.
Development of projects in CAD and BIM platforms covering different levels of development (LOD), including the following roles:
BIM implementation, modelling and drafting.
Civil work projects including: Beam Bridges, Arch Bridges, Tied Bridges, Walkways, Mobile Bridges, Buried Works, Industrial Works and Water Works.
Architectural practice : Executive Projects, Rehabilitation of Buildings, Pathologies, Facilities Design, Site Planning and Urbanism. Airports, Train Stations, Housing, etc..
ARCHITECT and BIM MODELER (Proven right to work and live in the UK) +44 07825690901
13 years of experience in architectural and structural projects for buildings and civil works of international scope for consultancy firms and collaborating with multidisciplinary teams.
Development of projects in CAD and BIM platforms covering different levels of development (LOD), including the following roles:
BIM implementation, modelling and drafting.
Civil work projects including: Beam Bridges, Arch Bridges, Tied Bridges, Walkways, Mobile Bridges, Buried Works, Industrial Works and Water Works.
Architectural practice : Executive Projects, Rehabilitation of Buildings, Pathologies, Facilities Design, Site Planning and Urbanism. Airports, Train Stations, Housing, etc..
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
Webinar presented by Mr. Zuhair Haddad, CCT's Chairman for the Lean Construction Institute on 1 September 2016.
Hospitals are ecosystems of diverse functions: laboratories, imaging units, ERs, surgery and operating rooms, inpatient quarters, etc. This makes building them one of the most complex tasks, specifically room completion systems as each set of rooms have their own furnishing and finishing requirements. This entails the existence of several number of trades, where coordination grows exponentially in importance. King Hussein Cancer Center in Jordan is a prime example with fast track requirements (3 years delivery) which increase the complexity further.
Join in this webinar Consolidated Contractors Company (CCC), a leading global construction contractor who will share the above case study where BIM, advanced work packaging and Lean were implemented in an integrated approach to manage the finishing activities for the hospital. The presenter will share some of key drivers for the success of this implementation:
• BIM authoring requirements to suit project controls
• Leveraging BIM to manage schedule, cost, sub-contractors, and material delivery.
• Installation Work Packages (IWPs) creation
• IWPs management using Lean approach
• Collaboration using BIM to support Lean processes
• Lessons learned.
About the Presenter:
Zuhair Haddad is the CIO, Corporate Asset and Risk Management for Consolidated Contractors Company (CCC). He is in charge of mapping out and implementing the Project Control IT and Communication strategy for CCC group as well as directly overseeing CCC’s Information Systems, Corporate Risk, Communication and E-procurement Departments. He also leads the Plants Machinery and Vehicles (PMV) Department which manages CCC’s extensive fleet of construction equipment. Zuhair holds a Masters in Construction Management from Stanford University and a Bachelor of Science from the California State University of Chico in Civil Engineering. In 2014, Zuhair and two other inventors were granted a US Patent for their invention entitled: “System and method for hybrid solid and surface modeling for computer-aided design environments."
All text that is green is for illustrative purposes only and should not be construed as formalized responses to this execution plan. The text can and should be modified to suit the needs of the organization filling out the template.
Building Information Modelling (BIM) beoogt het meer efficiënt aanmaken en beheren van projectinformatie gedurende de hele levenscyclus van een project. Deze methodiek promoot de integrale samenwerking tussen opdrachtgevers, ontwerpende, uitvoerende, onderhoudende en beherende partijen.
Autodesk Revit MEP is building information modeling software for architects, structural engineers, engineers, contractors, and Construction professionals. Real-time Revit MEP Training by Industry experts.
BIM status report 2016 - BIM use casesDaan Moreels
BIM use cases presented by Besix and deBIMspecialist during the BIM manifest event in Brussels, October 2015
Video about real-time collaboration from www.gdaas.com
A set of Working Drawings is a ‘construction manual’ describing accurate information of the designers intentions for construction, in a manner that is clearly expressed and easily understood to ensure on that wastes emanating from on site decision making are eliminated.
BIM has been great at automating documentation of the design intent of architects. ARCHICAD 21 makes a huge step forward with making the BIM tool an active part of the design process itself introducing improvements both to its core design processes as well as its multidisciplinary workflows.
CENSindia an engineering consulting firm.
Building information modeling (Bim) Digital Architectural services
Structural Engineering services Structural steel detailing and pre engineering building services
Precast Detailing services Reinforced concrete structure detailing services
Finite element analysis consultancy Proof checking of structural detailing designs
Fire audit, structural audit, energy audit Building physics-fire, energy ,noise calculation software
Civil engineering manpower services-contract & staffing Civil engineering software development & IT services
Waikong Lam is a senior structural engineer and has worked in the UK and Japan. Since joining Arup, he has been involved in the design of a number of high-profile structures, collaborating with world- renowned architects. The projects are both domestic and international. Many of these challenging projects include complex structural geometry and/or multi discipline coordination to deliver total design solution. He now has a leadership role on the 3DCAD/BIM skills in Shanghai Arup.
In this presentation Waikong talks about how Arup's building structures team utilizes a range of softwares and technologies to make their designs and projects smarter.
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
Webinar presented by Mr. Zuhair Haddad, CCT's Chairman for the Lean Construction Institute on 1 September 2016.
Hospitals are ecosystems of diverse functions: laboratories, imaging units, ERs, surgery and operating rooms, inpatient quarters, etc. This makes building them one of the most complex tasks, specifically room completion systems as each set of rooms have their own furnishing and finishing requirements. This entails the existence of several number of trades, where coordination grows exponentially in importance. King Hussein Cancer Center in Jordan is a prime example with fast track requirements (3 years delivery) which increase the complexity further.
Join in this webinar Consolidated Contractors Company (CCC), a leading global construction contractor who will share the above case study where BIM, advanced work packaging and Lean were implemented in an integrated approach to manage the finishing activities for the hospital. The presenter will share some of key drivers for the success of this implementation:
• BIM authoring requirements to suit project controls
• Leveraging BIM to manage schedule, cost, sub-contractors, and material delivery.
• Installation Work Packages (IWPs) creation
• IWPs management using Lean approach
• Collaboration using BIM to support Lean processes
• Lessons learned.
About the Presenter:
Zuhair Haddad is the CIO, Corporate Asset and Risk Management for Consolidated Contractors Company (CCC). He is in charge of mapping out and implementing the Project Control IT and Communication strategy for CCC group as well as directly overseeing CCC’s Information Systems, Corporate Risk, Communication and E-procurement Departments. He also leads the Plants Machinery and Vehicles (PMV) Department which manages CCC’s extensive fleet of construction equipment. Zuhair holds a Masters in Construction Management from Stanford University and a Bachelor of Science from the California State University of Chico in Civil Engineering. In 2014, Zuhair and two other inventors were granted a US Patent for their invention entitled: “System and method for hybrid solid and surface modeling for computer-aided design environments."
All text that is green is for illustrative purposes only and should not be construed as formalized responses to this execution plan. The text can and should be modified to suit the needs of the organization filling out the template.
Building Information Modelling (BIM) beoogt het meer efficiënt aanmaken en beheren van projectinformatie gedurende de hele levenscyclus van een project. Deze methodiek promoot de integrale samenwerking tussen opdrachtgevers, ontwerpende, uitvoerende, onderhoudende en beherende partijen.
Autodesk Revit MEP is building information modeling software for architects, structural engineers, engineers, contractors, and Construction professionals. Real-time Revit MEP Training by Industry experts.
BIM status report 2016 - BIM use casesDaan Moreels
BIM use cases presented by Besix and deBIMspecialist during the BIM manifest event in Brussels, October 2015
Video about real-time collaboration from www.gdaas.com
A set of Working Drawings is a ‘construction manual’ describing accurate information of the designers intentions for construction, in a manner that is clearly expressed and easily understood to ensure on that wastes emanating from on site decision making are eliminated.
BIM has been great at automating documentation of the design intent of architects. ARCHICAD 21 makes a huge step forward with making the BIM tool an active part of the design process itself introducing improvements both to its core design processes as well as its multidisciplinary workflows.
CENSindia an engineering consulting firm.
Building information modeling (Bim) Digital Architectural services
Structural Engineering services Structural steel detailing and pre engineering building services
Precast Detailing services Reinforced concrete structure detailing services
Finite element analysis consultancy Proof checking of structural detailing designs
Fire audit, structural audit, energy audit Building physics-fire, energy ,noise calculation software
Civil engineering manpower services-contract & staffing Civil engineering software development & IT services
Waikong Lam is a senior structural engineer and has worked in the UK and Japan. Since joining Arup, he has been involved in the design of a number of high-profile structures, collaborating with world- renowned architects. The projects are both domestic and international. Many of these challenging projects include complex structural geometry and/or multi discipline coordination to deliver total design solution. He now has a leadership role on the 3DCAD/BIM skills in Shanghai Arup.
In this presentation Waikong talks about how Arup's building structures team utilizes a range of softwares and technologies to make their designs and projects smarter.
AEC Digital Solutions LLC (www.aecdsl.co) is a pioneering Building Information Modelling (BIM) services firm, providing Virtual Design & Construction (VDC) technology services, and global sourcing solutions to leading international architects, engineering and construction firms. AEC's objective is to leverage international best practices and latest advancements in BIM technology, to add value to clients businesses, and help client's save time and money.
Chemionix is Engineering Design Outsourcing Company providing wide range on Engineering Design Solutions & CAD Drafting Services for wide range of Project for our International client. Kindly visit our website www.chemionix.com for more information about our company services offered.
We are interested to do project with your esteemed organisation. Please find our company presentation for your persual.
We provide with Architecture ,Structure & MEP BIM (mechanical,electrical &
plumbing)Building information Modeling and HVAC designing,revit
software & Auto cad software.we have specialized knowledge in this
field.
Hence we are looking to serve in your esteemed organisation.
Benefits of our application.
A) cost savings.
B) Time saving.
C) Best quality.
D) Details of drawing will be delivered fast and all parts standardized.
E) Easy to identify on BOQ ( BILL OF QUANTITY)
F) Sufficient input for design.
G)Manpower saving.
H) Space savings.
I) Design standards part as per client requirements of all reputed markes.
J) we are providing GFC drawings ( good for construction)
k) As build drawing.
Thank you
With regards
Neena Deb
Ravi kumar
S-260 second floor
Greater Kailash
Part 2
New Delhi-110048(INDIA)
Mobile no :- +91-9811470036
+91- 9958179748
Email Id:- nrbimconsultant@gmail.com
neena.deb@gmail.com
Website:- www.nrbimconsultant.co.in
CAD Outsourcing is engineering consulting firm offering high class MEP Engineering Services to customers globally. Our groups of Engineers are highly qualified and lots of experience with advanced level of work knowledge in MEP Engineering Services.
Similar to Ibrahim Naeem BIM Projects Portfolio (20)
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
3. PipeFab cut down the production of Installation Drawing by 60%
Project: PIPEFAB PLUGIN FOR REVIT -- FIRE PROTECTION SHOPDRAWING UTILITY FOR REVIT
The PipeFab Plugin has many tools for Pipe Fabrication – Modelling Automation
and Drafting Automation
4. Typical Automated Cutting Sheets Production Process
Cut pipes List pipes
Inputprocessoutput
number pipes Export to Excel Review with Excel
Revit pipe network
Start
CNC File Export
Project: PIPEFAB PLUGIN FOR REVIT -- FIRE PROTECTION SHOPDRAWING UTILITY FOR REVIT
7. list pipes and made on fittings.
Here are a few examples:
Left Right
Pipe Start Point Pipe End Point
F (FORWARD)
A (AWAY)
Listing Directions
PAP (TAP)
U (UP) D (DOWN)
Project: PIPEFAB PLUGIN FOR REVIT -- FIRE PROTECTION SHOPDRAWING UTILITY FOR REVIT
17. Export Cutting Sheets to Excel
Export Cutting sheets to excel for easier review and
further use.
Project: PIPEFAB PLUGIN FOR REVIT -- FIRE PROTECTION SHOPDRAWING UTILITY FOR REVIT
22. CD (MP) Engineering
Analysis Model
Planning
Owner Programming
Validate Program
Schematic Design
Architect Design Authoring
Author Schematic Design
Design Development
Architect Design Authoring
Author Design Development
Construction Documents
Architect Detailed Map
Author Construction
Documents
Operations
Contractor Record Model
Compile Record Model
Schematic Design
Architect Virtual Prototyping
Develop Virtual Prototype
Schematic Design
Contractor 4D Modeling
Create 4D Model
Schematic Design
Engineer Engineering Analysis
Perform Engineering
Analysis
Schematic Design
Architect 3D Macro Coordination
Perform 3D Coordination
Schematic Design
Contractor Cost Estimation
Perform Cost Estimate
Design Development
Architect Virtual Prototyping
Develop Virtual Prototype
Design Development
Contractor 4D Modeling
Create 4D Model
Design Development
Engineer Engineering Analysis
Perform Engineering
Analysis
Design Development
Architect 3D Macro Coordination
Perform 3D Coordination
Design Development
Contractor Cost Estimation
Perform Cost Estimate
Construction Documents
Architect Virtual Prototyping
Develop Virtual Prototype
Construction Documents
Contractor 4D Modeling
Create 4D Model
Construction Documents
Engineer Engineering Analysis
Perform Engineering
Analysis
Construction Documents
Architect 3D Macro Coordination
Perform 3D Coordination
Construction Documents
Contractor Detailed Map
Perform Cost Estimate
Program Model Schematic Design Cost
Estimation
Schematic Design 4D Model Schematic Design
Engineering Analysis Model
Schematic Design 3D Macro
Coordination Model
Schematic Design 3D
Virtual Prototypes
Architectural Model
MEP Model
Structural Model
Civil Model
Schematic Design
Architectural Model
MEP Model
Structural Model
Civil Model
Design Development
Architectural Model
MEP Model
Structural Model
Civil Model
Construction
Documents (WP)
Design Development Cost
Estimation
Design Development 4D
Model
Design Development
Engineering Analysis Model
Design Development 3D
Macro Coordination Model
Design Development 3D
Virtual Prototypes
CD (MP) Cost
Estimation
CD (MP)
4D Model
CD (MP) 3D Macro
Coordination Model
CD (MP) 3D Virtual
Prototypes
CD (MP) 3D Micro
Coordination Model
Record Model
END
PROCESS
Project: RSAF BIM Adoption and Standards
Implementing Best world BIM workflows and Processes for RSAF Projects.
Note: the above project execution plan is part of a PEN STATE CIC Research team Publications
25. Initial Massing
Model
An initial massing model of
the building is done to
Conduct site analysis upon
the design intent to help
decide the building
orientation, material
selection, shading devices,
passive design strategies
and many other decisions.
3DTRANSVERSEBUILDING
SECTION
RevitModelVsInteriorRenders
BIM USE:
SITE ANALYSIS
SOLARANALYSIS
3D Shot From The Revit
Model
Project Info:
Built-up Area: 73931.5 m2
Owner: Arabian Gulf
Unviresity
Consultant: SaudConsult
BIM USE:
BIM Model Authoring
Project: Project: King Abdullah Medical City (Hospital Buildings)
27. • MINISTRY OF COMMERCE AND INDUSTRY HEADQUARTER(MCI)
BIM USE:
Advanced Visualization
28. Initial Massing
Model
An initial massing model of
the building is done to
Conduct site analysis upon
the design intent to help
decide the building
orientation, material
selection, shading devices,
passive design strategies
and many other decisions.
3DTRANSVERSEBUILDINGSECTIONRevitModelVsInteriorRenders
BIM USE:
SITE ANALYSIS
SOLARANALYSIS
3D Shots From
The Revit Model
DEVELOPMENT
Project Info:
Built-up Area: 45000 m2
Owner: Ministry of Commerce
Consultant: SaudConsult
BIM USE:
Model Authoring
WINDANALYSIS
Fire Protection
Model
Project: MCI
29. Initial Massing
Model
An initial massing model of
the building is done to
Conduct site analysis upon
the design intent to help
decide the building
orientation, material
selection, shading devices,
passive design strategies
and many other decisions.
RevitandEtabsModelsExport
BIM USE:
SITE ANALYSIS
SOLARANALYSIS
DEVELOPMENT
BIM USE:
3D Coordination
WINDANALYSIS
BIM USE: Structural Analysis out of BIM ModelProject: MCI
Project Info:
Built-up Area: 45000 m2
Owner: Ministry of Commerce
Consultant: SaudConsult
31. Initial Massing
Model
An initial massing model of
the building is done to
Conduct site analysis upon
the design intent to help
decide the building
orientation, material
selection, shading devices,
passive design strategies
and many other decisions.
3DOFABOVECEILINGSERVICESBIM USE:
SITE ANALYSIS
SOLARANALYSIS
Project Info:
Built-up Area:65000 m2
Owner: RASF
Consultant: SaudConsult
BIM USE:
MULTI-DISCIPLINARY COORDINATION
WINDANALYSIS
3DOFENLARGEDWING
Project: Academic Wing Building – King Faisal Air Academy
33. PLUMBING WORK
STRUCTURALMODEL BIM USE:
DISCIPLINE INFORMATION MODEL
COMBINEDSYSTEMSELECTRICAL WORK
Project: Academic Wing Building – King Faisal Air Academy
34. All Disciplines can
produce project
documentation out of
Autodesk Revit no
matter how fine is the
details required, No
additional software
used.
BIM USE:
PROJECT DOCUMENTATION
Project: Academic Wing Building – King Faisal Air Academy
35. Publishing Clash Reports
Priority Order For Clash Test Check
332ClashTestitemsareresolved334ClashItemsDetected
CLASHITEMSREPORTCLASHDETECTIONMATRIX(CDM)
Coordination
STEPS
1- Clash Avoidance
Strategy.
2- Running Navisworks
Clash Detection Module
According to the Clash
Detection Matrix.
3- Publishing Reports.
Clash Detection Matrix.
Clashes to be ordered as following:
1- Ensure no Service Runner is
clashing with ceiling.
2- Ensure that no Service Runner is
clashing with Structural System
Elements
3- Ensure the space left between
Ceiling and Structural Elements is
enough for other Systems.
In The Following Example, a Duct Riser is hitting a structural Beam, The HVAC Interface
Engineer has Detected this issue and Changed the Riser Location, from a later saved NWD, shown that
the riser “Green Element” has moved away.
BIM USE:
CLASH DETECTION & RESOLUTION
Project: Academic Wing Building – King Faisal Air Academy
42. Initial Massing
Model
An initial massing model of
the building is done to
Conduct site analysis upon
the design intent to help
decide the building
orientation, material
selection, shading devices,
passive design strategies
and many other decisions.
RevitModel
BIM USE:
SITE ANALYSIS
SOLARANALYSIS
3D Shot From
The Revit Model
Project Info:
Built-up Area: 10230 m2
Owner: Saudi Royal Air Force
Consultant: SaudConsult
BIM USE: Model Authoring, Construction Drawings
LOD 350 Production
BIM USE:
3D Model Quantification
Project: Graduation Hall Building
44. Initial Massing
Model
An initial massing model of
the building is done to
Conduct site analysis upon
the design intent to help
decide the building
orientation, material
selection, shading devices,
passive design strategies
and many other decisions.
RevitModel
BIM USE:
SITE ANALYSIS
SOLARANALYSIS
3D
Shot
From
The
Revit
Model
Project Info:
Built-up Area: 10230 m2
Owner: Saudi Royal Air Force
Consultant: SaudConsult
BIM USE:
Model Authoring
BIM USE:
3D Model Quantification
Project: AMCS Clinic Building
45. STATEMENT
The ambition of a team is for a 21st
Century development which captures in
the design the essence and spirit of
fifty years of Saudconsult proud design
presence in Riyadh and Saudi Arabia
as well as Internationally.
Not a complex or overly ornate
proposal, but a design which is
consistently composed, confident, and
which will stand the tests of time. In the
opinion of team members it ought to
represent the time that it is to be built
and responds well to the way that the
Suleimaniah District townscape is
composed. The new office building
design will aim to minimize its carbon
footprint, and be an attractive place to
work as well as being calmly
appropriate to its prominent position in
the city center.
The new building will feature the
predominantly limestone color scheme
that is typical of the Saudconsult
developments. Building thus continues
the longstanding tradition of high-quality
office architecture that characterizes
record of architectural experience at
Saudconsult.
Special attention should be made to the
selection of interior finishes and art
installations, particularly in entry
spaces, conference rooms and other
areas with public access.
Saudconsult New Office Building
Concept Design
Competition, July 2014
098766433
234
1 2 3
4
5 6
SUSTAINABILITYSOLARACCESS&SKYEXPOSURECLIMATECONTROL
Main Street view View from North-East View from East
View from West
Aerial view from North-West
46. 0987664
1 2 3
4
5 6
Saudconsult New Office Building
Concept Design
Competition, July 2014
Structural
Solution
• Office Floors
Ribbed Slab
150 mm
120 mm deep
ribs
600 mm deep x
800 mm wide
one-way
beams
700 x 700 mm
columns
Structural
Solution
• Car Park
Floors
Flat Slab 350
mm
800 mm deep x
800 mm wide
boundary
beams
700 x 700mm
columns
Façade
Double Skin
The cavity
between the two
skins may be
either
naturally or
mechanically
ventilated.
In hot climates
the cavity may
be vented out of
the
building to
mitigate solar
gain and
decrease the
cooling load.
Main entrance
Rear side exit
& access
Car park entrance
Sky bridge-access from SC current offices