HIGH-TECH - OLD INFRASTRUCTURE Installing a state-of-the-art Robotic OR suite in a 60 year old hospital
AGENDA 		1Goals & Challenges 		2Design Process 3Best Value Contract Award 4Team Building/OAC Meetings 5Working in a Live OR 6Shutdowns 7MEP Coordination 8Summary 9Questions
PRESENTERS ▪Tom Peterson, Architect      The Design Partnership ▪  Rick Schaffel, Contractor       TCB Builders, Inc.  ▪ Bruce Mace, Director    UCSF Medical Center Facilities ▪  Sean Wilkins     Ray L. Hellwig Mechanical ▪   Craig Moore     Ray L. Hellwig Mechanical
DESIGN
GOALS & CHALLENGES Goals ▪Create a state-of-the-art robotic OR ▪ A model for the future at UCSF ▪ On time and on budget Challenges ▪ Don’t disrupt existing infrastructure ▪ 12’-0” between floors, 10’-2” to bottom of beams ▪ Raise ceilings to 9’-6” ▪ Seismic upgrades required ▪ Integration of all systems Existing infrastructure   New OR ceiling  9” below beams 1
DESIGNPROCESS Phase 1 ▪Replace HVAC ▪Reorganize storage 2
DESIGNPROCESS Phase 2 ▪Built 600 sf/ft robotic OR room ▪ Reconfigure storage areas ▪ Added scrub room, & soiled holding
DESIGNPROCESS Phase 3 ▪Rebuilt OR 1 (Cysto Room) ▪Demo and replace main desk ▪New staff toilets ▪ Move corridor & rebuild storage
DESIGNPROCESS Phase 4 ▪Finished two offices and removed barriers
building consensus LISTEN TO EVERY USER TOUR SIMILAR FACILITIES
existing conditions 11 EXISTING OR 1
existing conditions EXISTING FRONT DESK SPACE EXISTING OR 11 SPACE 12
laser scanning to validate the model  EXISTING MECHANICAL SYSTEMS
med modeling EXISTING OR SUITE Case carts in corridors Storage in all empty spaces Picking done in the OR PROPOSED OR SUITE Additional  robotic OR Redesigned central core with modular storage system Added storage on floor above MedModeling simulated operations
med modeling 15
med modeling Number of Times each Preference Card Item was Used between 5/1/06 – 4/30/07 ■  776 items picked were never used during the year and should be eliminated from inventory. ■ 2467 items picked were only used 1-10 times / year and should be evaluated for staying in the inventory. ■ All preference cards need to be evaluated and updated based upon item usage data and physician input. 16 10/31/07 -  16 Kavinsky Consulting, LLC
central core remodeling BEFORE
central core remodeling AFTER
3d modeling
CONSTRUCTION
BEST VALUE CONTRACT AWARD ▪ Prequalification ▪ Bid Job – Bids Remain Sealed ▪ Submit Best Value Questionnaire   Response Package – With MEP  ▪ University to evaluate and score best    value packages ▪ Sealed bids are opened  ▪ Project is awarded on lowest dollar    amount per point 3
best value results
TEAM BUILDING/OAC MEETINGS ▪Team      owner 	architects    	engineers 	contractor 	key subs      	facilities 	vendors 	medical professionals 	medical support staff ▪ Team creation of schedules ▪ Real time meeting minutes 4
WORKING IN A LIVE OR ▪ Dust/infection control ▪ Noise mitigation ▪ Night and weekend work ▪ Hourly schedules 5
noise mitigation WORKING DIRECTLY WITH OR STAFF
night and weekend work WARMING CABINET INSTALLATION
hourly schedules 27
abatement conditions for demo
field verification/existing conditions
SHUTDOWNS that which does not kill us… only makes us stronger ▪ 187 shutdown requests ▪ Communication (communication,     communication, communication) ▪ Investigation, research and field visits ▪ Isolation and verification ▪ MOP – develop/review & verify/sign off ▪ Perform flawlessly ▪ SF-2 – shutdown and replacement 6
187 shutdown requests NEW OLYMPIC AND WORLD RECORD! 31
shutdown requests BOTH RECORDS STILL STANDING… ▪ Project number & descriptor ▪ Full contacts & emergency ▪ Request reasoning ▪ Type of request ▪ Location and description ▪ Attached photo documentation ▪ Estimated duration ▪ Target date & time ▪ Blue copy (internal) ▪ Scheduling (internal) 32
communication THE MOST IMPORTANT TOOL ON YOUR BELT
investigation 60 YEARS, 2 BUILDINGS AND A LOT OF HISTORY
investigation So tell me, punk… do you feel lucky?
isolation & verification EVER SEVERED A LIVE FEED TO AN INTERVENTIONAL RADIOLOGY PROCEDURE?
method of procedures INEXPENSIVE INSURANCE TO PROTECT EVERYTHING 37
perform flawlessly PROPER PREPARATION PERMITS PERFECT PERFORMANCE ▪ Do your homework thoroughly ▪ Don’t skip steps ▪ Communicate the plan with everyone    and their mom ▪ Contingencies and redundancies as back-up ▪ Enforce the rules – prevent “creep” ▪ Safety is no accident ▪ Weekends & night time are your friends ▪ Communicate some more ▪ Trust, but verify ▪ In spite of all this – be flexible within the safety of your larger plan
sf-2 shutdown RIPPING THE GUTS OUT OF A LIVING OR SUITE OVER THE WEEKEND
MEP COORDINATION ▪ Conventional drawing process ▪ BIM drawing process ▪ Clash detection ▪ BIM and facilities management ▪ BIM object information ▪ Importance of BIM ▪ Benefits of BIM for Facility Managers 7
conventional drawing process ▪ Created in 2D, on paper ▪ Multiple drawings required to represent      3D views ▪ Redundancy and open to errors
bim drawing process ▪ Building and objects drawn in 2D and 3D ▪ 3D model easier to interpret and     visualize ▪ Information attached to objects in the     model ▪ 4D BIM – project scheduling incorporated     into model
clash detection
clash detection MODELED 44
clash detection BUILT
bim and facilities management OR1
bim and facilities management OR11 OR1
bim object information
importance of bim
importance of bim
benefits of bimfor facility managers ▪ Improved space management ▪ Efficient use of energy ▪ Streamlined preventive maintenance ▪ Economical retrofits and renovations ▪Enhanced lifecycle management
SUMMARY  ▪ BIM works – even for remodels  ▪Have a contingency plan  ▪Worked as a cohesive team  ▪Maintained communication and sensitivity  ▪Project finished ahead of schedule  ▪Project was under budget 8
QUESTIONS Thank you for your time! 9

More Related Content

Similar to High-Tech vs. Old Infrastruction

Workface Planning (WFP) with Forge
Workface Planning (WFP) with ForgeWorkface Planning (WFP) with Forge
Workface Planning (WFP) with ForgeBlackSmithSoft B.V.
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 20163 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016Aconex
 
ANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANVeera Narayanan
 
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...Paladino and Company
 
Electrical Installations
Electrical InstallationsElectrical Installations
Electrical InstallationsIEEEP Karachi
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionGalala University
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last PlanningThomas Almore
 
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...Chris Carson
 
From Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome ThemFrom Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome ThemCprime
 
DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16Don Castaldo
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302Rhod Mayers
 
Veda Williams Project Management Secrets A Disciplined Approach To Develo...
Veda Williams   Project Management Secrets   A Disciplined Approach To Develo...Veda Williams   Project Management Secrets   A Disciplined Approach To Develo...
Veda Williams Project Management Secrets A Disciplined Approach To Develo...Vincenzo Barone
 
Transforming the customer experience crb
Transforming the customer experience   crbTransforming the customer experience   crb
Transforming the customer experience crbrobgirvan
 
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docxRUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docxagnesdcarey33086
 

Similar to High-Tech vs. Old Infrastruction (20)

Workface Planning (WFP) with Forge
Workface Planning (WFP) with ForgeWorkface Planning (WFP) with Forge
Workface Planning (WFP) with Forge
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 20163 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
 
ANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANAN
 
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
Using Retro-Commissioning to Improve Operations and Energy Use through Climat...
 
Electrical Installations
Electrical InstallationsElectrical Installations
Electrical Installations
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
 
Time-resource v&v for complex systems
Time-resource v&v for complex systemsTime-resource v&v for complex systems
Time-resource v&v for complex systems
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last Planning
 
PEnDAR webinar 2 with notes
PEnDAR webinar 2 with notesPEnDAR webinar 2 with notes
PEnDAR webinar 2 with notes
 
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...Using Symptoms To Develop Appropriate Claims Avoidance Documentation   Wpl We...
Using Symptoms To Develop Appropriate Claims Avoidance Documentation Wpl We...
 
From Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome ThemFrom Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome Them
 
Make BIM work for you
Make BIM work for youMake BIM work for you
Make BIM work for you
 
PEnDAR webinar 3
PEnDAR webinar 3PEnDAR webinar 3
PEnDAR webinar 3
 
DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
Veda Williams Project Management Secrets A Disciplined Approach To Develo...
Veda Williams   Project Management Secrets   A Disciplined Approach To Develo...Veda Williams   Project Management Secrets   A Disciplined Approach To Develo...
Veda Williams Project Management Secrets A Disciplined Approach To Develo...
 
Transforming the customer experience crb
Transforming the customer experience   crbTransforming the customer experience   crb
Transforming the customer experience crb
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
CV M.KMunshi
CV M.KMunshi CV M.KMunshi
CV M.KMunshi
 
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docxRUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
RUNNINGHEADERCOFFEESHOPPROJECT1Quintessential’s Coffee Shop.docx
 

More from The Design Partnership

Collaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the SensesCollaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the SensesThe Design Partnership
 
IFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life EasierIFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life EasierThe Design Partnership
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFThe Design Partnership
 
Shenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition JuryShenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition JuryThe Design Partnership
 
Advancing Healing Design to the Next Level
Advancing Healing Design to the Next LevelAdvancing Healing Design to the Next Level
Advancing Healing Design to the Next LevelThe Design Partnership
 

More from The Design Partnership (9)

Collaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the SensesCollaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the Senses
 
IFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life EasierIFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life Easier
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSF
 
Reducing Risk with BIM
Reducing Risk with BIMReducing Risk with BIM
Reducing Risk with BIM
 
Shenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition JuryShenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition Jury
 
Advancing Healing Design to the Next Level
Advancing Healing Design to the Next LevelAdvancing Healing Design to the Next Level
Advancing Healing Design to the Next Level
 
Navisworks Clash Course
Navisworks Clash CourseNavisworks Clash Course
Navisworks Clash Course
 
Labs 21 BIM & Sustainability
Labs 21 BIM & SustainabilityLabs 21 BIM & Sustainability
Labs 21 BIM & Sustainability
 
Set-Based Concurrent Desgin
Set-Based Concurrent DesginSet-Based Concurrent Desgin
Set-Based Concurrent Desgin
 

Recently uploaded

Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 

Recently uploaded (20)

Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 

High-Tech vs. Old Infrastruction

  • 1. HIGH-TECH - OLD INFRASTRUCTURE Installing a state-of-the-art Robotic OR suite in a 60 year old hospital
  • 2. AGENDA 1Goals & Challenges 2Design Process 3Best Value Contract Award 4Team Building/OAC Meetings 5Working in a Live OR 6Shutdowns 7MEP Coordination 8Summary 9Questions
  • 3. PRESENTERS ▪Tom Peterson, Architect The Design Partnership ▪ Rick Schaffel, Contractor TCB Builders, Inc. ▪ Bruce Mace, Director UCSF Medical Center Facilities ▪ Sean Wilkins Ray L. Hellwig Mechanical ▪ Craig Moore Ray L. Hellwig Mechanical
  • 5. GOALS & CHALLENGES Goals ▪Create a state-of-the-art robotic OR ▪ A model for the future at UCSF ▪ On time and on budget Challenges ▪ Don’t disrupt existing infrastructure ▪ 12’-0” between floors, 10’-2” to bottom of beams ▪ Raise ceilings to 9’-6” ▪ Seismic upgrades required ▪ Integration of all systems Existing infrastructure New OR ceiling 9” below beams 1
  • 6. DESIGNPROCESS Phase 1 ▪Replace HVAC ▪Reorganize storage 2
  • 7. DESIGNPROCESS Phase 2 ▪Built 600 sf/ft robotic OR room ▪ Reconfigure storage areas ▪ Added scrub room, & soiled holding
  • 8. DESIGNPROCESS Phase 3 ▪Rebuilt OR 1 (Cysto Room) ▪Demo and replace main desk ▪New staff toilets ▪ Move corridor & rebuild storage
  • 9. DESIGNPROCESS Phase 4 ▪Finished two offices and removed barriers
  • 10. building consensus LISTEN TO EVERY USER TOUR SIMILAR FACILITIES
  • 11. existing conditions 11 EXISTING OR 1
  • 12. existing conditions EXISTING FRONT DESK SPACE EXISTING OR 11 SPACE 12
  • 13. laser scanning to validate the model EXISTING MECHANICAL SYSTEMS
  • 14. med modeling EXISTING OR SUITE Case carts in corridors Storage in all empty spaces Picking done in the OR PROPOSED OR SUITE Additional robotic OR Redesigned central core with modular storage system Added storage on floor above MedModeling simulated operations
  • 16. med modeling Number of Times each Preference Card Item was Used between 5/1/06 – 4/30/07 ■ 776 items picked were never used during the year and should be eliminated from inventory. ■ 2467 items picked were only used 1-10 times / year and should be evaluated for staying in the inventory. ■ All preference cards need to be evaluated and updated based upon item usage data and physician input. 16 10/31/07 - 16 Kavinsky Consulting, LLC
  • 21. BEST VALUE CONTRACT AWARD ▪ Prequalification ▪ Bid Job – Bids Remain Sealed ▪ Submit Best Value Questionnaire Response Package – With MEP ▪ University to evaluate and score best value packages ▪ Sealed bids are opened ▪ Project is awarded on lowest dollar amount per point 3
  • 23. TEAM BUILDING/OAC MEETINGS ▪Team owner architects engineers contractor key subs facilities vendors medical professionals medical support staff ▪ Team creation of schedules ▪ Real time meeting minutes 4
  • 24. WORKING IN A LIVE OR ▪ Dust/infection control ▪ Noise mitigation ▪ Night and weekend work ▪ Hourly schedules 5
  • 25. noise mitigation WORKING DIRECTLY WITH OR STAFF
  • 26. night and weekend work WARMING CABINET INSTALLATION
  • 30. SHUTDOWNS that which does not kill us… only makes us stronger ▪ 187 shutdown requests ▪ Communication (communication, communication, communication) ▪ Investigation, research and field visits ▪ Isolation and verification ▪ MOP – develop/review & verify/sign off ▪ Perform flawlessly ▪ SF-2 – shutdown and replacement 6
  • 31. 187 shutdown requests NEW OLYMPIC AND WORLD RECORD! 31
  • 32. shutdown requests BOTH RECORDS STILL STANDING… ▪ Project number & descriptor ▪ Full contacts & emergency ▪ Request reasoning ▪ Type of request ▪ Location and description ▪ Attached photo documentation ▪ Estimated duration ▪ Target date & time ▪ Blue copy (internal) ▪ Scheduling (internal) 32
  • 33. communication THE MOST IMPORTANT TOOL ON YOUR BELT
  • 34. investigation 60 YEARS, 2 BUILDINGS AND A LOT OF HISTORY
  • 35. investigation So tell me, punk… do you feel lucky?
  • 36. isolation & verification EVER SEVERED A LIVE FEED TO AN INTERVENTIONAL RADIOLOGY PROCEDURE?
  • 37. method of procedures INEXPENSIVE INSURANCE TO PROTECT EVERYTHING 37
  • 38. perform flawlessly PROPER PREPARATION PERMITS PERFECT PERFORMANCE ▪ Do your homework thoroughly ▪ Don’t skip steps ▪ Communicate the plan with everyone and their mom ▪ Contingencies and redundancies as back-up ▪ Enforce the rules – prevent “creep” ▪ Safety is no accident ▪ Weekends & night time are your friends ▪ Communicate some more ▪ Trust, but verify ▪ In spite of all this – be flexible within the safety of your larger plan
  • 39. sf-2 shutdown RIPPING THE GUTS OUT OF A LIVING OR SUITE OVER THE WEEKEND
  • 40. MEP COORDINATION ▪ Conventional drawing process ▪ BIM drawing process ▪ Clash detection ▪ BIM and facilities management ▪ BIM object information ▪ Importance of BIM ▪ Benefits of BIM for Facility Managers 7
  • 41. conventional drawing process ▪ Created in 2D, on paper ▪ Multiple drawings required to represent 3D views ▪ Redundancy and open to errors
  • 42. bim drawing process ▪ Building and objects drawn in 2D and 3D ▪ 3D model easier to interpret and visualize ▪ Information attached to objects in the model ▪ 4D BIM – project scheduling incorporated into model
  • 46. bim and facilities management OR1
  • 47. bim and facilities management OR11 OR1
  • 51. benefits of bimfor facility managers ▪ Improved space management ▪ Efficient use of energy ▪ Streamlined preventive maintenance ▪ Economical retrofits and renovations ▪Enhanced lifecycle management
  • 52. SUMMARY ▪ BIM works – even for remodels ▪Have a contingency plan ▪Worked as a cohesive team ▪Maintained communication and sensitivity ▪Project finished ahead of schedule ▪Project was under budget 8
  • 53. QUESTIONS Thank you for your time! 9

Editor's Notes

  1. Welcome and thank you for joining us tonight. How many in the room are facility engineers?How many have had trouble squeezing a new system into an old building?We’d like to show you some tools used to solve problems of too little space.
  2. Our agenda covers the processes our team used.Each issue was dealt with in unique ways.I hope our experience will be of value to you.
  3. Tom Peterson -My experience spans 25 years as a high-tech medical planner designing surgeries, radiology departments, and radiation oncology installations. I’ve worked at institutions across the country like Mayo Clinic, Johns Hopkins, and Wallace-Kettering Medical Center. I seem to see the same problems in every institution when it comes to complex systems going into old buildings.Rick Schaffel is a Sr. Project Manager with TCB Builders who’s been in the San Francisco bay area for the last 30 years.  Rick heads up TCB’s healthcare division and has completed 30 plus projects at UCSF while at TCB.  Rick specializes in radiology projects, operating room renovations, and highly specialized construction.  Rick is adept at managing complex OSHPD projects with difficult logistical challenges.  His understanding of infection control procedures, patient safety standards, and project impacts on health care providers and patients is outstanding.Bruce Mace came to UCSF Medical Center in the role of Capital Projects Construction Coordinator. He has a background in architecture, planning, construction and a heavy dose of regulatory compliance. He enjoys supporting the providers who are passionate about caring for patients who are dependent on the built environment. After learning to love the hospital environment Bruce recently moved into the position of Director of Facilities where he found a niche that suits him well. Sean Wilkins HVAC Detailer / Coordinator has over thirty-two years of construction experience in the HVAC and sheet metal trade, of which the past twenty years has been with the Hellwig Companies. He’s been involved in MEP design and coordination on various projects using computer aided 3D drafting and modeling software for the past 16 years. Completed projects include semiconductor manufacturing, clean rooms, pharmaceutical and health care facilities, including the Mt Zion OR project.Craig Moore is a Sr. Project Manager with Helwig Mechanical. He’s been in the HVAC industry for 32 years and has worked on a full range of HVAC projects, fast track and critical schedule, industrial, hospital, public works, commercial, bio-tech and semi conductor. Craig started his career as a Sheet Metal Local #104 apprentice, journeyman, field foreman and detailer/coordinator. Craig moved into estimating and management 17 years ago and has been with Hellwig Mechanical for the past five years. 
  4. I am going to review some of the teams design challenges.The process was traditional in that we had a program and a space to work.This project was to be one of the pilot studies on “Best Value” Contractor SelectionUCSF’s Design & Construction Department even gave us the layout that they wanted, which worked well.Our first look at the space however showed us we had a long way to go.
  5. The goal to add another OR while not disrupting operations was a difficult challenge. We began with a 60 year old building so full of systems we had no idea what it all was.Ceilings had to be raised to 9‘ 6“ to accommodate new systems. Everything was to be squeezed so tight there was no room for guesswork.Of course it had to come in on time and on budget.
  6. The 1st phase was to empty out the space and build a new HVAC system.A new storage system was installed in the core and additional space was built on the floor above.The HVAC unit was replaced over a long weekend.
  7. In the 2nd phase We built a new 600 SF robotic OR with an attached robot garage.The new waste holding room and stair access was installed.A temporary front desk was installed to redirect traffic during phase 3.
  8. 3rd phase Shut down the front desk and rebuilt the existing cystoscopy room. Shift the main entry corridor and added storage spaceTwo staff toilets, offices for anesthesia, and scheduling office was added.
  9. In the 4th Phase We completed the connecting work, removed the barriers and added two managers offices.
  10. The project began like many others with touring similar facilities to develop a “ baseline” of expectations. Recent OR remodeling at the Parnassus campus was evaluated. We heard a lot of “don’t do that again” !Bringing together the OR staff for input was important to building consensus.
  11. CLICK ONCE* We hired a laser scanner to build a 3D “point cloud” of everything above the ceiling.This information was then imported into our 3D Building Information Model.Our initial drawing was adjusted and accuracy was within ¼”.We found columns off by 3” and some ductwork in need of major repair.Our specifications included allowances for repair work that we knew would be required.
  12. The new OR meant a 20% increase in surgical volume which would be impossible to support.We did a computer simulation to study the before and after using Med Model software.Our findings helped find more space in the OR suite.
  13. The central core was a mixture of old and new storage systems.Most of which was inefficiently utilized. . . and not flexible.By reconfiguring it we were able to gain the space necessary to build an additional OR.
  14. The new core is flexible, modular and can be changed out quickly.Some of the inventory was moved back to SPD in the basement.Some little used material was stored in a new store room on the floor above.This expense had a payback of less than a year by reducing time spent setting up cases.
  15. When we laid out each space we did not waste space.Each solution was tested to make sure that the parts fit together well,And the choreography was well thought out.On the left we tested the operation of bringing in a patient to the new room on a full sized bed.3D gave us a tool to “sell” our concepts to the staff and surgeons.Shutdowns, phasing and weekend work was tested and documented in the drawings and specs.When the planning was complete we turned the process over to a “ Best Value” Contractor
  16. Thought we should show a couple of cool demo shots – Highlight Wood framingUC Facilities Team received certification to enter the abatement area for field instructionsRight after demo there are 2 main priorities.Get the field verification of the existing systems for modelingGet the shutdown notifications in to facilities to start the investigations
  17. After Demo there are 2 main items:Start of BIM ModelingStart of notification of shutdownsLead in to Bruce
  18. Previously design and construction of buildings has relied on 2d drawings for representing the work to be done, and used to manage the facility afterward. The limitations of 2d drawings are: (1) they require multiple views to depict a 3D object in adequate detail for construction, causing redundancy and possible errors; (2) they are stored as two dimensional documents that are only interpretable by some people and they cannot be interpreted by computers.The past method of designing a building once for contract drawings, then developing a set of detailed drawings for shop fabrication is being recognized as a considerable amount waste and inefficiency.MEP or Mechanical, Electrical and Plumbing drawing coordination may begin in the 2d stage, before the building envelope has been completely modeled, MEP software creates objects in 3d, which are then referenced into the building model.There may be multiple building models if there are multiple phases of construction to be done.Coordination of the MEP drawings in 2d involves overlaying of the drawings say on a light table then manually examining and identifying clashes or conflicts. This process is very time consuming.
  19. Computer modeling has reached a level of sophistication, that allows “virtual” construction of plans and graphics. These plans can be precise and can include graphicallyinteractive depictions of a building and its properties in multiple dimensions (3d) before being constructed.These capabilities also facilitate much improved coordination and collaboration. Building models tremendously facilitate this process. A 3D model is easier for all parties to interpret and visualize. Design or fabrication work can be coordinated in person or at a distance using web conferencing tools such as Webex and GoToMeeting and virtually walking through the 3D model.Building models save costs, construction time, and support better building performance and control. BIM can beneficially impact all parties in the construction process - designers, engineers, contractors, owners, as well as facility operators. (NOT USED BELOW THIS)Once the project is completed, this same information can be handed off to Facility Managersand Engineers for operation. Design-build and other forms of architect-contractor teaming have been recognized as more efficient - in terms of cost, time, and for reducing the potential for litigation.
  20. Design-build and other forms of architect-contractor teaming have been recognized as more efficient - in terms of cost, time, and for reducing the potential for litigation to all parties.(Do Not Use Below This)Let me ask with this question? Who has been involved in a BIM project or projects, small or large?How was it?Would you say it was a success?What would you like to do different next time?
  21. BIM is taking the place of conventional architectural drawings and the associated print and digitized documentation. BIM allows for a more complete handoff of building information to facility executives for improved quality operations and maintenance.BIM is able to meet the overlapping needs of not only design and construction but also the Facility Managers.Why BIM is Important?As a building representation, BIM technology is far superior to drawings. As this technology becomes more mainstream, the value will be apparent.