SlideShare a Scribd company logo
TNZ Apparels Ltd.
Work study is the systematic
examination of the methods of carrying
on the recourse and to set up standard
of performance for the activities being
carried out.
Education with matriculation better skill a
university education, preferably in the
engineering or business fields.
•Simplify or modify the operation to reduce
unnecessary work.
•Increase production or productivity
•Setting time standard.
•Reduce cost by most effective usage of inputs.
•Improvement of condition which involve an
element of excessive fatigue or danger.
•Improve Quality.
•Evaluation of human work.
•Land and building.
•Materials(That can be converted into product)
•Energy (power) Electricity, oil, solar power etc.
•Machine and Equipment: (For operational activities,
transport, heating, air, and conditional office
equipment).
•Man power recourse (man power).
People how are tried to perform operational activities.
In Words – Man, Machine, Materials, Money, Method.
To increase company profit.
Savings means to stop the unnecessary things of
the factory is as,
•Manpower: Extra manpower release
•Over time: Extra time reduce
•Maximum utilization of inputs.
•Workers not support.
•Sometimes production staff does not
support.
•Sometime they can say “what you
know”
•Sometime they blame.
.
Work measurement
(time it takes to the
job)
Method study
(better way to do
the job)
Work-study
Higher Productivities
Work plan engineering.
Motion study.
Minimum work plan.
Maximum work plan.
Time study.
GSD
Sew easy.
Capacity study.
Historical data
Analytical Estimating.
Method study is the systematic recording and critical examination of
way of doing things in order make improvements.
•Simply the task.
•Eliminate unnecessary motions.
•Reduced inherent work content.
•Engineering the production
Work measurement is the application of techniques design to establish
the time for a qualified worker to carry out a task at a defined rate of
working.
•Measure work content.
•Determine the time.
•Key to scientific measurement
•Set target.
•Calculate efficiency.
•Determine cost.
•Man power allocation.
•Production planning& control.
•Inactive schemes.
•Time study.
-directly observing an operator.
•Pre-determined motion time study system
(pmts).
-analyzing the motion used to carry out the
activity.
•Analysis the past record.
-using previous record studied available in
the factory.
•Select: The job to be studied.
•Record: By collecting data or direct observation.
•Examine: By challenging purpose, place sequence &
methods of work
•Develop: New method drawing on contribution of
those concerned.
•Evaluation: Result of different alternative solution.
•Define: New methods & present it.
•Install: New methods and train person in applying it.
•Maintain: Establish control process.
•Reduce the number of motions.
•Reduce the distances moved.
•Reduce the eye shaft.
•Simplify grasp.
•Toss dispose rather than place dispose.
•Best use of both hands.
•Encourage rhythm.
•Promote natural pasture & movements
•Both hands same time.
•Both hands not be idle.
•Motions of arms simultaneous.
•Continuous curved movements are preferred.
•Eye movements are confined to a comfortable area,
without the need frequent chances of focus.
•Eye-hand co-ordination.
•Order of movements natural of rhythm.
•Hand and body motions lowest classification.
Productivity is ratio of input and output .productivity is
needed to reduce cost of product.
Productivity=
Input
Output
•Definition: SMV is the time taken by a qualified
worker to perform a specified task in a defined level
of performance.
• SMV = Basic time x allowance
•Basic time = Observed time x rating%
•To calculate the individual operator target.
•To calculate the section target.
•For man power allocation.
•For product costing.
•For production planning.
•Evaluate the performance.
•For set the incentive levels.
There are three types of fabric
•Woven
•Knit
•Non woven
•Standard minute value.
•How to calculate SMV?
•What are the methods to calculate SMV?
 Time study
 PMTS(Predetermine motion time study
(No of operator + helper)* working time
X 100
Formula:
SMV X no of good garment
•Excess product variety.
•Lack of standardization.
•Design change.
•Bad planning.
•Lack of fabric & accessories.
•Badly maintained machine.
•Accident.
•Poor service.
•Absence, lateness, laziness.
•Talking
•Carelessness
•Accidents due to carelessness.
Definition of time study: Time study is a
work measurement techniques for
recording the time of performing a certain
specific job or its elements carried out
under specified conditions and for analyzing
the data so as to obtain the time necessary
for an operation to carry out at a define rate
of performance.
•Stand diagonally behind the operator about
1.5-2.0meters.
•Take more than 20 observations.
•Record relevant detailed about the method
and the machine.
•Method study should be done.
•Method study produces the required quality.
•For new methods plenty of time should give to
settle down.
•Operator should be rate between 70%-110%.
•Inform the supervisor before start.
•Operator should not be disturbed during the
study.
•Ensure operator gets enough supply.
•Definite and fixed location.
•Pre position reduces reach.
•Gravity feed.
•Tools and materials, best sequence of
motions.
•Drop deliveries whenever possible.
•Chair height of the work place & comfort.
•Color contrast with that of the work &
reduce eye fatigue.
•Obtaining and recording all the information available
about the job the operative and surrounding condition
which is likely to affect the carrying out the work.
•Recording a complete description of the method
breaking down the operation into elements. (Break
down the elements).
•Examining the detailed breakdown to ensure that the
most effective method of motions is being used and
determining the sample size.
•Measuring with a timing device (stop watch) and
recording the same time taken by the operation to
perform each elements of the operation.
•At the same time assessing the effective speed of the
working of the operator relative to the observes
concept of the rate corresponding to standard rating.
•Convert the observed time to basic times (basic time
calculation).
•Adding necessary allowance to the basic time.
•Determining the standard time for the operation
Rating is the assessment of the workers rate
of working relative to the observer’s concept
of rate corresponding to standard place.
•Standard worker is not available all the
time.
•Different people take different times.
•To compare the observed worker with a
qualified worker.
•To convert the observed time to a time a
qualified worker would likely to take.
•Establish in mind how standard worker should work.
•Compare the effective needs of the observed
worker with standard worker.
In terms of
Skills: The techniques apply to perform the job.
Effort: Expression of the will to work efficiency.
50 : Very slow - not interest
75 : steady –unhurried
100 :brisk –businesses like (standard)
125 : Very fast – above average
150 : Outstanding- unusual
An element is a distinct part of a specified job selected
for convenience of observation measurement and
analysis.
•To give a systematic detailed specialization of
work.
•To identify subsequent omissions or insertions
elements.
•Operation may not work at the same place
throughout the operation.
•To extract the time for certain parts.
•To keep the concentration of the time study
officer.
•Repetitive elements: Repetitive elements are elements which are
occurring every work cycle of an operation.
•Occasional elements: Occasional elements are an element which does not
occur is every work cycle of an operation but which may occur at regular or
irregular intervals.
•Constant element: Constant element is an element for which the basic
time remains constant whenever it is performed.
•Variable elements: Variable elements are elements for which the basic
time varies in relation to some characteristics of the product equipment or
process.
•Machines elements: Machines elements is an elements
performed automatically by any process physical, chemical or
otherwise that once standard cannot be influence by worker
except to determinate it prematurely.
•Governing elements: Governing elements is an elements
occurring a longer time with in a work cycle than that of any
other elements which is being performed.
•Foreign elements: Foreign elements are elements observed
which does not form a part of the operation being studies.
•Easily identifiable beginning and ending (break point).
•As short as can be conveniently timed (between 6.30
sec).
• Re present naturally unified distinct segment of
operation.
•Separate machine and manual elements if possible.
•Elements which do not occur every cycle should be
timed separately before starting a time study.
•Standard Performance is the rate of output which
qualified workers will naturally achieve without over
exertion as an average over the working day or shift.
Provide that they know adhere to the specified
method and provided that they are motivated to
apply themselves to their work.
This performance is denoted as 100 on the standard
rating and performance scales.
•Achieve smooth & consist movements.
•Acquired rhythm.
•Responds more rapidly to signals.
•Anticipates difficulties and more ready to overcome
them.
•Carries out the task without giving the appearance
of conscious attention and there for more relaxed.
•Avoidance of all unnecessary motions.
•Shortest path of movements.
•Sureness of touch and methods.
•Smooth rather than jerky movements.
•Consistently stick to the best methods.
•Consistent cycle time.
•Intelligent anticipation of the next move.
•Lack of rhythm.
•Inconsistency.
•Jerky movements.
A qualified worker is one who has acquired
the skill; knowledge and other attributes t
carry out the work in hand to satisfactory
standards of quality, quantity and safety.
•First approach the supervisor before the operator.
•Always be polite.
•Ask permission to do the work study.
•Stand in fall view of the operator.
•Thanks the operator once the test is completed.
•Make the operator feel relax.
•Flat bed machine
•Raised bed machine
•Cylinder bed machine
•Side bed machine
•Post bed machine
•Thread same or not(color)
•SPI
•Needle type.
•Needle distance.
•Attachment use or not.
•Operator skills.
•Consider for the machine feed.
As per the ISO classification there are mainly 6 stitch
classes-
•Class -100 chain stitch
•Class -200 hand stitch
•Class -300 lock stitch
•Class -400 multithread chain stitch
•Class- 500 over edge chain stitch
•Class -600 covering stitch
Each loop is interconnected with the
following with the same thread. Opposite
side of the seam look different. This stitch
type can be very easily unlocked by running
back from the last stitch to the first. The
seam is generally quite extensible. It is often
used for temporary stitching.
Formed by single threads being passed
completely from one side of the material to
the other. The thread is held by the material
originally made by hand, some of them can
now also be formed by m/c.
Formed by two different thread systems. A needle
thread introduced from one side of the material
is interlaced with and under thread supplied from a
spool from the other side. The stitch is different to
unpick and both side have the same appearance
generally, lock stitch are less extensible then chain
stitch seam. This type finds the widest application. Two
or more thread lock stitch using needle thread and one
bobbin thread.
This also formed two thread systems. The loops of
the needle thread are drawn all the way through
the material and they are interconnected on the
under side by thread supplied from a lopper.Top and
bottom side have a different appearance. The stitch
can easily be unpicked is quite extensible special
applications are elastic cross over seams in knitted
fabric and seam which have to be flat.
Multi thread chain stitch using one or more needle
thread and one or more loopers thread.
Over edge chain stitch are formed from one or more
needle or lopper. Needle thread loops are taken all the
way through the materials and interconnected with
themselves or with other thread. At least one thread
system passes around the edge of the materials. Over
edge chain stitch of various types are used to neaten
and to bund the cut edge woven and to knitted
materials.
Multithread over edge chain stitch using needle thread
and lopper thread.
This stitch types is generally formed from
three thread systems. The over thread lie
on the top surface and are held in place
by the needle threads which in turn are
interlaced on the back of the seam by the
lopper threads. They are used specially
for making flat extensible seam in knit
fabric.

More Related Content

What's hot

Work measurement
Work measurementWork measurement
Work measurement
Huy Tạ Ngọc
 
Work measurement
Work measurementWork measurement
Work measurement
lokesh Panneer selvam
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
Ahmad Alzbeidat
 
Method Study
Method Study Method Study
Method Study
Ira Tobing
 
Work motion study
Work motion studyWork motion study
Work motion study
RishiRajSharma16
 
Basic of work study, work measurement & job design om
Basic of work study, work measurement & job design    om Basic of work study, work measurement & job design    om
Basic of work study, work measurement & job design om
swapnil23488
 
Motion study on shopfloor and design of work
Motion study on shopfloor and design of workMotion study on shopfloor and design of work
Motion study on shopfloor and design of work
avijit biswas
 
3...work study
3...work study3...work study
3...work study
DEVIKA ANTHARJANAM
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
grubinm
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
ahmad bassiouny
 
Work Study
Work StudyWork Study
Work Study
ahmad bassiouny
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation management
Saravanan Murugan
 
Work measurement
Work measurementWork measurement
Work measurement
Princess Angela Moranta
 
work measurement
work measurementwork measurement
work measurement
Mahesh Kumar Attri
 
Work measurement
Work measurementWork measurement
Work measurement
Ratnadeepsinh Jadeja
 
Work study Training Manual
Work study Training ManualWork study Training Manual
History of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job designHistory of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job design
Rajeswari Balakrishnan
 
Performance rating
Performance ratingPerformance rating
Performance rating
Shivam Kumar
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
Lizzette Danan
 
Presentation on work study
Presentation on work studyPresentation on work study
Presentation on work study
sourov17
 

What's hot (20)

Work measurement
Work measurementWork measurement
Work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
 
Method Study
Method Study Method Study
Method Study
 
Work motion study
Work motion studyWork motion study
Work motion study
 
Basic of work study, work measurement & job design om
Basic of work study, work measurement & job design    om Basic of work study, work measurement & job design    om
Basic of work study, work measurement & job design om
 
Motion study on shopfloor and design of work
Motion study on shopfloor and design of workMotion study on shopfloor and design of work
Motion study on shopfloor and design of work
 
3...work study
3...work study3...work study
3...work study
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study
Work StudyWork Study
Work Study
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation management
 
Work measurement
Work measurementWork measurement
Work measurement
 
work measurement
work measurementwork measurement
work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
History of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job designHistory of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job design
 
Performance rating
Performance ratingPerformance rating
Performance rating
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
 
Presentation on work study
Presentation on work studyPresentation on work study
Presentation on work study
 

Similar to IE Training

Sanket work study-1
Sanket work study-1Sanket work study-1
Sanket work study-1
Sanket Rahane
 
Work study new
Work study newWork study new
Work study new
Chakravarti Chakri
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
Shweta Varshney
 
Work Study
Work StudyWork Study
Work Study
varsharocks
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
varsharocks
 
Work Study.ppt
Work Study.pptWork Study.ppt
Work Study.ppt
SajibDas40
 
Production and material management
Production and material managementProduction and material management
Production and material management
sksbatish
 
work-measurement.pptx
work-measurement.pptxwork-measurement.pptx
work-measurement.pptx
rajarawat12
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
Seta Wicaksana
 
work-measurement-ppt.pptx
work-measurement-ppt.pptxwork-measurement-ppt.pptx
work-measurement-ppt.pptx
RDTCPOLYTECHNICMECHD
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptx
amanuel236786
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systems
aizellbernal
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .ppt
AryaRukmana1
 
Lecture9,10,11
Lecture9,10,11Lecture9,10,11
Lecture9,10,11
Tanya Mathur
 
Unit 2 work measurement.pdf
Unit 2 work measurement.pdfUnit 2 work measurement.pdf
Unit 2 work measurement.pdf
Saurabh Jain
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
Dhruvit Lakhani
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
Vivek Shelke
 
module 3 OM.ppt
module 3 OM.pptmodule 3 OM.ppt
module 3 OM.ppt
RajeswariRamachandra5
 
Techniques of scientific management
Techniques of scientific managementTechniques of scientific management
Techniques of scientific management
Farheen Khilji
 
Management tools
Management toolsManagement tools
Management tools
Paritosh Kasaudhan
 

Similar to IE Training (20)

Sanket work study-1
Sanket work study-1Sanket work study-1
Sanket work study-1
 
Work study new
Work study newWork study new
Work study new
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Work Study
Work StudyWork Study
Work Study
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Work Study.ppt
Work Study.pptWork Study.ppt
Work Study.ppt
 
Production and material management
Production and material managementProduction and material management
Production and material management
 
work-measurement.pptx
work-measurement.pptxwork-measurement.pptx
work-measurement.pptx
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
work-measurement-ppt.pptx
work-measurement-ppt.pptxwork-measurement-ppt.pptx
work-measurement-ppt.pptx
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptx
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systems
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .ppt
 
Lecture9,10,11
Lecture9,10,11Lecture9,10,11
Lecture9,10,11
 
Unit 2 work measurement.pdf
Unit 2 work measurement.pdfUnit 2 work measurement.pdf
Unit 2 work measurement.pdf
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 
module 3 OM.ppt
module 3 OM.pptmodule 3 OM.ppt
module 3 OM.ppt
 
Techniques of scientific management
Techniques of scientific managementTechniques of scientific management
Techniques of scientific management
 
Management tools
Management toolsManagement tools
Management tools
 

More from shakil tutul

DENIM STYLE
DENIM STYLEDENIM STYLE
DENIM STYLE
shakil tutul
 
IE training
IE training IE training
IE training
shakil tutul
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
shakil tutul
 
Costing technique in clothing industry
Costing technique in clothing industryCosting technique in clothing industry
Costing technique in clothing industry
shakil tutul
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
shakil tutul
 
CV of shakil all mamun
CV of shakil all mamunCV of shakil all mamun
CV of shakil all mamun
shakil tutul
 

More from shakil tutul (6)

DENIM STYLE
DENIM STYLEDENIM STYLE
DENIM STYLE
 
IE training
IE training IE training
IE training
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Costing technique in clothing industry
Costing technique in clothing industryCosting technique in clothing industry
Costing technique in clothing industry
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 
CV of shakil all mamun
CV of shakil all mamunCV of shakil all mamun
CV of shakil all mamun
 

Recently uploaded

How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 

Recently uploaded (20)

How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 

IE Training

  • 2. Work study is the systematic examination of the methods of carrying on the recourse and to set up standard of performance for the activities being carried out.
  • 3. Education with matriculation better skill a university education, preferably in the engineering or business fields.
  • 4. •Simplify or modify the operation to reduce unnecessary work. •Increase production or productivity •Setting time standard. •Reduce cost by most effective usage of inputs. •Improvement of condition which involve an element of excessive fatigue or danger. •Improve Quality. •Evaluation of human work.
  • 5. •Land and building. •Materials(That can be converted into product) •Energy (power) Electricity, oil, solar power etc. •Machine and Equipment: (For operational activities, transport, heating, air, and conditional office equipment). •Man power recourse (man power). People how are tried to perform operational activities. In Words – Man, Machine, Materials, Money, Method.
  • 6. To increase company profit. Savings means to stop the unnecessary things of the factory is as, •Manpower: Extra manpower release •Over time: Extra time reduce •Maximum utilization of inputs.
  • 7. •Workers not support. •Sometimes production staff does not support. •Sometime they can say “what you know” •Sometime they blame.
  • 8. . Work measurement (time it takes to the job) Method study (better way to do the job) Work-study Higher Productivities
  • 9. Work plan engineering. Motion study. Minimum work plan. Maximum work plan.
  • 10. Time study. GSD Sew easy. Capacity study. Historical data Analytical Estimating.
  • 11. Method study is the systematic recording and critical examination of way of doing things in order make improvements. •Simply the task. •Eliminate unnecessary motions. •Reduced inherent work content. •Engineering the production
  • 12. Work measurement is the application of techniques design to establish the time for a qualified worker to carry out a task at a defined rate of working. •Measure work content. •Determine the time. •Key to scientific measurement
  • 13. •Set target. •Calculate efficiency. •Determine cost. •Man power allocation. •Production planning& control. •Inactive schemes.
  • 14. •Time study. -directly observing an operator. •Pre-determined motion time study system (pmts). -analyzing the motion used to carry out the activity. •Analysis the past record. -using previous record studied available in the factory.
  • 15. •Select: The job to be studied. •Record: By collecting data or direct observation. •Examine: By challenging purpose, place sequence & methods of work •Develop: New method drawing on contribution of those concerned. •Evaluation: Result of different alternative solution. •Define: New methods & present it. •Install: New methods and train person in applying it. •Maintain: Establish control process.
  • 16. •Reduce the number of motions. •Reduce the distances moved. •Reduce the eye shaft. •Simplify grasp. •Toss dispose rather than place dispose. •Best use of both hands. •Encourage rhythm. •Promote natural pasture & movements
  • 17. •Both hands same time. •Both hands not be idle. •Motions of arms simultaneous. •Continuous curved movements are preferred. •Eye movements are confined to a comfortable area, without the need frequent chances of focus. •Eye-hand co-ordination. •Order of movements natural of rhythm. •Hand and body motions lowest classification.
  • 18. Productivity is ratio of input and output .productivity is needed to reduce cost of product. Productivity= Input Output
  • 19. •Definition: SMV is the time taken by a qualified worker to perform a specified task in a defined level of performance. • SMV = Basic time x allowance •Basic time = Observed time x rating%
  • 20. •To calculate the individual operator target. •To calculate the section target. •For man power allocation. •For product costing. •For production planning. •Evaluate the performance. •For set the incentive levels.
  • 21. There are three types of fabric •Woven •Knit •Non woven
  • 22. •Standard minute value. •How to calculate SMV? •What are the methods to calculate SMV?  Time study  PMTS(Predetermine motion time study
  • 23. (No of operator + helper)* working time X 100 Formula: SMV X no of good garment
  • 24. •Excess product variety. •Lack of standardization. •Design change. •Bad planning. •Lack of fabric & accessories. •Badly maintained machine. •Accident. •Poor service. •Absence, lateness, laziness. •Talking •Carelessness •Accidents due to carelessness.
  • 25. Definition of time study: Time study is a work measurement techniques for recording the time of performing a certain specific job or its elements carried out under specified conditions and for analyzing the data so as to obtain the time necessary for an operation to carry out at a define rate of performance.
  • 26. •Stand diagonally behind the operator about 1.5-2.0meters. •Take more than 20 observations. •Record relevant detailed about the method and the machine.
  • 27. •Method study should be done. •Method study produces the required quality. •For new methods plenty of time should give to settle down. •Operator should be rate between 70%-110%. •Inform the supervisor before start. •Operator should not be disturbed during the study. •Ensure operator gets enough supply.
  • 28. •Definite and fixed location. •Pre position reduces reach. •Gravity feed. •Tools and materials, best sequence of motions. •Drop deliveries whenever possible. •Chair height of the work place & comfort. •Color contrast with that of the work & reduce eye fatigue.
  • 29. •Obtaining and recording all the information available about the job the operative and surrounding condition which is likely to affect the carrying out the work. •Recording a complete description of the method breaking down the operation into elements. (Break down the elements). •Examining the detailed breakdown to ensure that the most effective method of motions is being used and determining the sample size.
  • 30. •Measuring with a timing device (stop watch) and recording the same time taken by the operation to perform each elements of the operation. •At the same time assessing the effective speed of the working of the operator relative to the observes concept of the rate corresponding to standard rating. •Convert the observed time to basic times (basic time calculation). •Adding necessary allowance to the basic time. •Determining the standard time for the operation
  • 31. Rating is the assessment of the workers rate of working relative to the observer’s concept of rate corresponding to standard place.
  • 32. •Standard worker is not available all the time. •Different people take different times. •To compare the observed worker with a qualified worker. •To convert the observed time to a time a qualified worker would likely to take.
  • 33. •Establish in mind how standard worker should work. •Compare the effective needs of the observed worker with standard worker. In terms of Skills: The techniques apply to perform the job. Effort: Expression of the will to work efficiency.
  • 34. 50 : Very slow - not interest 75 : steady –unhurried 100 :brisk –businesses like (standard) 125 : Very fast – above average 150 : Outstanding- unusual
  • 35. An element is a distinct part of a specified job selected for convenience of observation measurement and analysis.
  • 36. •To give a systematic detailed specialization of work. •To identify subsequent omissions or insertions elements. •Operation may not work at the same place throughout the operation. •To extract the time for certain parts. •To keep the concentration of the time study officer.
  • 37. •Repetitive elements: Repetitive elements are elements which are occurring every work cycle of an operation. •Occasional elements: Occasional elements are an element which does not occur is every work cycle of an operation but which may occur at regular or irregular intervals. •Constant element: Constant element is an element for which the basic time remains constant whenever it is performed. •Variable elements: Variable elements are elements for which the basic time varies in relation to some characteristics of the product equipment or process.
  • 38. •Machines elements: Machines elements is an elements performed automatically by any process physical, chemical or otherwise that once standard cannot be influence by worker except to determinate it prematurely. •Governing elements: Governing elements is an elements occurring a longer time with in a work cycle than that of any other elements which is being performed. •Foreign elements: Foreign elements are elements observed which does not form a part of the operation being studies.
  • 39. •Easily identifiable beginning and ending (break point). •As short as can be conveniently timed (between 6.30 sec). • Re present naturally unified distinct segment of operation. •Separate machine and manual elements if possible. •Elements which do not occur every cycle should be timed separately before starting a time study.
  • 40. •Standard Performance is the rate of output which qualified workers will naturally achieve without over exertion as an average over the working day or shift. Provide that they know adhere to the specified method and provided that they are motivated to apply themselves to their work. This performance is denoted as 100 on the standard rating and performance scales.
  • 41. •Achieve smooth & consist movements. •Acquired rhythm. •Responds more rapidly to signals. •Anticipates difficulties and more ready to overcome them. •Carries out the task without giving the appearance of conscious attention and there for more relaxed.
  • 42. •Avoidance of all unnecessary motions. •Shortest path of movements. •Sureness of touch and methods. •Smooth rather than jerky movements. •Consistently stick to the best methods. •Consistent cycle time. •Intelligent anticipation of the next move.
  • 44. A qualified worker is one who has acquired the skill; knowledge and other attributes t carry out the work in hand to satisfactory standards of quality, quantity and safety.
  • 45. •First approach the supervisor before the operator. •Always be polite. •Ask permission to do the work study. •Stand in fall view of the operator. •Thanks the operator once the test is completed. •Make the operator feel relax.
  • 46. •Flat bed machine •Raised bed machine •Cylinder bed machine •Side bed machine •Post bed machine
  • 47. •Thread same or not(color) •SPI •Needle type. •Needle distance. •Attachment use or not. •Operator skills. •Consider for the machine feed.
  • 48. As per the ISO classification there are mainly 6 stitch classes- •Class -100 chain stitch •Class -200 hand stitch •Class -300 lock stitch •Class -400 multithread chain stitch •Class- 500 over edge chain stitch •Class -600 covering stitch
  • 49. Each loop is interconnected with the following with the same thread. Opposite side of the seam look different. This stitch type can be very easily unlocked by running back from the last stitch to the first. The seam is generally quite extensible. It is often used for temporary stitching.
  • 50. Formed by single threads being passed completely from one side of the material to the other. The thread is held by the material originally made by hand, some of them can now also be formed by m/c.
  • 51. Formed by two different thread systems. A needle thread introduced from one side of the material is interlaced with and under thread supplied from a spool from the other side. The stitch is different to unpick and both side have the same appearance generally, lock stitch are less extensible then chain stitch seam. This type finds the widest application. Two or more thread lock stitch using needle thread and one bobbin thread.
  • 52. This also formed two thread systems. The loops of the needle thread are drawn all the way through the material and they are interconnected on the under side by thread supplied from a lopper.Top and bottom side have a different appearance. The stitch can easily be unpicked is quite extensible special applications are elastic cross over seams in knitted fabric and seam which have to be flat. Multi thread chain stitch using one or more needle thread and one or more loopers thread.
  • 53. Over edge chain stitch are formed from one or more needle or lopper. Needle thread loops are taken all the way through the materials and interconnected with themselves or with other thread. At least one thread system passes around the edge of the materials. Over edge chain stitch of various types are used to neaten and to bund the cut edge woven and to knitted materials. Multithread over edge chain stitch using needle thread and lopper thread.
  • 54. This stitch types is generally formed from three thread systems. The over thread lie on the top surface and are held in place by the needle threads which in turn are interlaced on the back of the seam by the lopper threads. They are used specially for making flat extensible seam in knit fabric.