• Work measurement is the application of techniques designed
to establish the time for a qualified worker to carry out
specified jobs at a defined level of performance.
• We have seen how total time to manufacture a product is
increased by:
 adding undesirable features to product,
 bad operation of the processes, and
 ineffective time added because of worker and management.
• All this leads to decreased productivity.
3
Introduction
• Method study is one of principal techniques by which work
content in the product manufacture or process could be
decreased.
It is a systematic method of investigating and critically
examining the existing methods, to develop the improved
ones.
Method study is, then, a technique to reduce the work content
mainly by eliminating unnecessary movements by workers
and/or materials and/or equipments.
However, even after that, there could be substantial
unnecessary time taken for the process because of lack of
management control and/or inaction of worker.
•
•
•
4
Introduction
• Work measurement (WM) is concerned with investigating,
reducing and eliminating ineffective time, whatever may be
the cause.
WM is the means of measuring the time taken in the
performance of an operation or series of operations in such a
way that the ineffective time is shown up and can be separated
out.
In practice, proving existence of the ineffective time is the
most difficult task.
After existence is proved, nature and extent is easy to see!
•
•
•
5
Introduction
• WM is also used to set standard times to carry out the work, so
that any ineffective time is not included later.
Any addition the standard time would show up as excess time
and thus can be brought to attention.
Since, standard times are set for all the activities through WM,
it has earned bad reputation amongst workers.
Major reason for that has been the initial focus of the WM
methods, which essentially targeted only the worker
controllable ineffective times.
Management controllable ineffective times were ignored
traditionally.
•
•
•
•
6
Introduction
Two critical issues in work study:
2. Method study should precede the work measurement,
always.
3. Elimination of management controllable ineffective time
should precede the elimination of the ineffective time within
the control of the workers.
7
Purpose of WM
• To reveal the nature and extent of ineffective time, from
whatever cause,
So that action can be taken to eliminate it; and then,
To set standards of performance that are attainable only if all
avoidable ineffective time is eliminated and work is performed
by the best method available.
•
•
8
Uses of WM
• To compare the efficiency of alternative methods. Other
conditions being equal, the method which takes the least time
will be the best method.
To balance the work of members of teams, in association with
the multiple activity charts, so that, as far as possible, each
member has tasks taking an equal time.
To determine, in association with man and machine multiple
activity charts, the number of machines an worker can run.
•
•
9
Uses of time standards
• To provide information on which the planning and scheduling
of production can be based, including the plant and labor
requirements for carrying out the program of work and
utilization of resources.
To provide information on which estimates for tenders, selling
prices and delivery promises can be based.
To set standards of machine utilization and labor performance
which can be used for incentive scheme.
To provide information for labor-cost control and to enable
standard costs to be fixed and maintained.
•
•
•
10
Techniques for WM
•
•
•
•
•
•
•
Time study
Activity sampling; and rated activity sampling
Synthesis from standard data
Pre-determined motion time system
Estimating
Analytical estimating
Comparative estimating.
11
Time study
A WM technique for
• Recording the times and rates of working for the elements of
a specified job carried out under specified conditions,
Analyzing the data so as to obtain the time necessary for
carrying out the job at a defined level of performance.
•
12
Selecting a job for time study
•
•
The job in question is a new one not previously carried out.
A change in material or method of working has been made and
a new time standard is required.
A complaint has been received about the time standard for an
operation.
A particular operation appears to be “bottleneck” holding up
the subsequent operations and possibly previous operations.
Standard times are required prior to the introduction of an
incentive scheme.
•
•
•
13
Selecting a job for time study
• To investigate the utilization of a piece of plant, the output of
which is low, or which appears to be idle for an excessive
time.
As a preliminary to making a method study, or to compare the
efficiency of two proposed methods.
When the costs of a particular job appears to be excessive.
•
•
14
Qualified worker
• One who is accepted as having the necessary physical
attributes, who possesses the required intelligence, education,
and has acquired the necessary skill and knowledge to carry
out the work in hand to satisfactory standard of safety,
quantity and quality.
In setting the time standards, specially when they are to be
used for incentives, the standard to aimed at is one which can
be attained by the qualified worker.
A representative worker is one whose skill and performance is
the average of the group under consideration. (S/)He may not
necessarily be a qualified worker.
•
•
15
Steps in making a time study
• Obtaining and recording all the information about the job, the
operator and the surrounding conditions, which is likely to
affect the carrying out of the work.
Recording a complete description of the method, breaking
down the operation into “elements.”
Examining the detailed breakdown to ensure that the most
effective method and motions are being used.
Measuring and recording the time taken by the operator to
perform each “element” of the operation.
•
•
•
16
Steps in making a time study
• At the same time assessing the effective speed of the working
of the operative in relation to the observer’s concept of the rate
corresponding to standard rating.
Extending the observed times to “basic times.”
Determining the allowances to be made over and above the
basic time for operation.
Determining the “standard time” for the operation.
•
•
•
17
Breaking the job into elements
• An element is an distinct part of a specified job selected for
convenience of observation, measurement and analysis.
A work cycle is the sequence of elements which are required
to perform a job or yield a unit of production. The sequence
may sometimes include occasional elements.
For each job, a detailed breakdown of the complete job into
elements is necessary. Because….
•
•
18
Reasons for breakdown of job
• To ensure that productive work (or effective time) is
separated from unproductive activity (or ineffective time).
To permit the rate of working to be assessed more accurately
than would be possible if the assessment were made over a
complete cycle.
To enable different types of elements to be identified and
distinguished, so that each may be accorded the treatment
appropriate.
To enable elements involving high fatigue to be isolated and
to make the allocation of fatigue allowances more accurate.
•
•
•
19
Reasons for breakdown of job
• To facilitate checking the method and so that subsequent
omission or insertion of elements may be detected quickly.
To enable a detailed work specification to be prepared.
The enable time values for frequently recurring elements, such
as the operation of machine control or loading and unloading
work-pieces from fixtures, to be extracted and used in
compilation of the synthetic data.
•
•
20
Types of elements
• A repetitive element is an element which occurs in every work
cycle of the job.
An occasional element does not occur in each work cycle of
the job, but which may occur at regular or irregular intervals.
e.g. machine setting.
For a constant element, the basic time remains constant
whenever it is performed. e.g. switch the machine on.
A variable element is an element for which the basic time
varies in relation to some characteristics of the product,
equipment or process, e.g. dimensions, weight, quality etc. e.g.
push trolley of parts to next shop.
•
•
•
21
Types of elements
•
•
A manual element is an element performed by a worker.
A machine element is automatically performed by a power-
driven machine (or process).
A governing element occupies a longer time than any of the
other elements which are being performed concurrently. e.g.
boil kettle of water, while setting out teapot and cups.
A foreign element is observed during a study which, after
analysis, is not found to be necessary part of the job. e.g.
degreasing a part that has still to be machined further.
•
•
22
Recording time for activities
Cumulative timing
•
•
•
The watch runs continuously throughout the study.
At the end of each element the watch reading is recorded.
The individual element times are obtained by subsequent
subtractions.
The purpose of this procedure is to ensure that all the time
during which the job is observed is recorded in the study.
Typically, most work-study persons attain fair degree of
accuracy quickly when using the cumulative method.
•
•
23
Recording time for activities
Flyback time
•
• The hands of the stopwatch is returned to zero at the end of
each element and are allowed to start immediately, the time
for each element being obtained directly.
In a comparative study of two methods carried out the Purdue
University, the average error in reading the watch using the
cumulative method was +0.000097 min per reading and using
the flyback method was -0.00082 min per reading.
24
Recording time for activities
Cumulative time recording is preferred, because:
•
•
Trainees achieve reasonable accuracy more quickly.
It does not matter if element times are occasionally missed by
observed; the over-all time of the study will not be affected.
Foreign elements and interruptions are automatically included
since the watch is never stopped.
Temptation to adjust the element time to rating is less
compared to flyback time.
Workers have greater faith in the fairness as they see that no
time can have been omitted.
Flyback method can have slight delays when the stopwatch is
snapped back to zero at the end of each element.
•
•
•
•
25
Recording time for activities
Differential timing
•
•
• The elements are timed in groups, first including and then
excluding each small element.
Typically used for short element short cycle work, where
elements are so short that there is not enough time for study-
person to look at the watch and make a recording.
In this process, either the cumulative or the flyback method of
watch manipulation may be used.
26
Time study: Rating
• Rating is the assessment of the worker’s rate of working
relative to the observer’s concept of the rate corresponding to
the standard pace.
It is a comparison of rate of working observed by the work-
study person with a picture of some standard level.
The standard level is the average rate at which qualified
workers will naturally work at a job, when using the correct
method and when motivated to apply themselves to their work.
This rate of working is called standard rating.
•
•
•
27
Time study: Rating
• If the standard pace is maintained and the appropriate
relaxation is taken, a worker will achieve standard
performance over the working day.
Standard performance is the rate of output which qualified
workers will naturally achieve without over-exertion as an
average over the working shift provided they know and adhere
to the specified method and, they are motivated to apply
themselves to their work.
This performance is denoted as 100 on the standard rating and
performance scales.
•
•
28
Time study: Rating
• It should be noted though that the “standard pace” applies to
particular workers (with good physique, physical
conditioning) working in appropriate environment.
In practice, because of the inherent dissimilarities amongst
workers, the rate of work is never the same throughout the
working day.
It is not uncommon for workers to work faster at some periods
of the day than they do during others. So standard performance
is achieved on average over a period of time with in-built
standard deviation.
In fact, working at the standard rate will not always mean
moving the limbs with the same speed.
•
•
•
29
Time study: Rating
• The purpose of rating is to determine from the time actually
taken by the operator being observed the standard time which
can be maintained by the average qualified worker and which
can be used as a realistic basis for planning, and incentive
schemes.
Time study is concerned with speed at which operator carries
out the work, in relation to the concept of normal speed.
“Speed” here means the effective speed of operation.
•
•
30
Factors affecting rate of working
Factors outside the control of workers include:
•
•
•
•
• Variation in the quality or other characteristics of the material
used, although they be within the prescribed tolerance limit.
Changes in the operating efficiency of tools or equipment
within their normal life.
Minor and unavoidable changes in methods or conditions of
operations.
Variation in the mental attention for the performance of
elements.
Changes in the climatic and other conditions.
31
Factors affecting rate of working
Factors within worker’s control:
•
•
•
Acceptable variation in the quality of the process/product.
Variation due to worker’s ability.
Variation due to ability of mind, specifically attitude.
Optimum pace at which the worker will work depends on –
•
•
•
The physical effort demanded by the work.
The care required on the part of the worker.
Training and experience.
32
Rating factor
•
•
The figure 100 represents standard performance.
If the operator is apparently performing with less effective
speed, than the assigned factor is less than 100.
If, on the other hand, the effective rate of working is above
standard, the operator gets a factor above hundred.
Essential idea being:
•
•
Observed time x Rating = Constant
Rating factor
• This constant is known as the basic time:
• So, depending on the rating assigned for the operator, the
basic time can either be less than or greater than the
observed time.
 BasicTime
33
Standard Rating
Rating
Observed time x
34
Selected time
• The selected time is the time chosen as being representative of
a group of times for which an element or group of elements.
These times may be either observed or basic times; and should
be denoted as selected observed or selected basic times.
•
• Theoretically, the results of all the computations of the basic
time for any single constant element should be same.
However, because of inherent process variations, it happens
rarely!
•
35
Selected time
• It becomes necessary to select a representative time for each
element from all the basic times which have been entered into
the time study.
Multiple ways to pick a representative selected time from the
available ones.
Statistics suggests….. Taking averages!
There are other ways though!
Before the selected time is decided, the anomalies in the
sample should be noted.
Exceptionally high or low points should get some attention.
•
•
•
•
•
36
Selected time
Constant element
•
•
•
• A very high or short observed time for a given element of job
should be treated with caution.
An exceptionally high observed time could be due to incorrect
recording, but most common reason is material or
environment variation.
In such as case, it should be checked whether such a variation
is frequent or rare.
Excess observed time because of rarely occurring events is
typically not included as a representative.
37
Selected time
• The average time calculations should exclude this observation.
But, the excess-over-average time is added to the contingency
allowance.
Frequent large variations indicate that the element is not a
constant one but a variable element.
Excessively large time for this element could be detected by
corresponding reduction in time for the immediate element.
Exceptionally short times could be due to human error.
A rare reason of observation of such short times could also be
a last-minute-process-improvement. In such as case, the job
should be studied again with more detailed attention.
•
•
•
•
38
Selected time
Variable element
•
•
•
• In general more observations will be necessary of a variable
element than of a constant element before reliable
representative basic times can be established.
The analysis of factors affecting the time to complete the
element should be closely studied.
Some relationship should be established between the observed
time and the variable factors.
Multiple factors could be affecting the observed time variation
and establishing relationships amongst multiple factors is
difficult
39
Work content
• The work content of a job or operation is defined as: basic
time+ relaxation allowance+ any allowance for additional
work (e.g. the part of relaxation allowance that is work
related).
Standard time is the total time in which a job should be
completed at standard performance – i.e. work content,
contingency allowance for delay, unoccupied time and
interference allowance.
Allowance for unoccupied time and interference may not be
frequently included in the standard time calculations; however,
the relaxation allowance is.
•
•
40
Standard time constituents
• A contingency allowance is a small allowance of time which
may be included in a standard time to meet legitimate and
expected items of work or delays, precise measurement of
which is uneconomical because of their infrequent or irregular
occurrence.
Contingency allowance for work should include fatigue
allowance; whereas the allowance for delay should be
dependent on the workers.
Typically contingency allowances are very small and are
generally expressed as percentage of the total repetitive
minutes of the job.
•
•
41
Standard time constituents
• Contingency allowance should not be more than 5%, and
should only be given where the contingencies cannot be
eliminated and are justified.
42
Standard time constituents
• Relaxation allowance is an addition to the basic time intended
to provide the worker with the opportunity to recover from the
physiological and psychological effects of carrying out
specified work under specified conditions and to allow
attention to personal needs.
The amount of the allowance will depend on the nature of the
job.
One of the major additions to the basic time.
Industrial fatigue allowance, in turn, forms a major portion of
the relaxation allowance.
Relaxation allowances are also given as percentages of the
basic times.
•
•
•
•
43
Standard time constituents
•
•
Typical values of relaxation allowance are 12-20%.
In addition to including relaxation allowances, short rest
pauses could be added over the period of work for an operator.
44
Other allowances
•
•
•
•
•
•
•
Start-up / shut-down allowance
Cleaning allowance
Tooling allowance
Set-up / change-over allowance
Reject / excess production allowance
Learning / training allowance
Policy allowance is an increment, other than the bonus
increment, applied to standard time to provide a satisfactory
level of earning for certain level of performances under
exceptional conditions.
45
Standard time
• Now, we can add all the constituents to arrive at the standard
time for a job.
Standard time = observed time + rating factor + relaxation
allowance + work related contingency allowance + delay
related contingency allowance.

More Related Content

Similar to work-measurement-ppt.pptx

Production and material management
Production and material managementProduction and material management
Production and material managementsksbatish
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxLakshayKumar504432
 
Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurementAkash Bakshi
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .pptAryaRukmana1
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations SchedulingAshish Jain
 
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesvideoaakash15
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptxArpanKumar79
 
Civil Construction management : time and motion study
Civil Construction management : time and motion study Civil Construction management : time and motion study
Civil Construction management : time and motion study Yash Shah
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Studylearnito
 

Similar to work-measurement-ppt.pptx (20)

Production and material management
Production and material managementProduction and material management
Production and material management
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Work study
Work studyWork study
Work study
 
Work measurement
Work measurementWork measurement
Work measurement
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .ppt
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
Operations management
Operations managementOperations management
Operations management
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Good work measurement
Good work measurementGood work measurement
Good work measurement
 
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptx
 
Work measurement
Work measurementWork measurement
Work measurement
 
Civil Construction management : time and motion study
Civil Construction management : time and motion study Civil Construction management : time and motion study
Civil Construction management : time and motion study
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
Lecture9,10,11
Lecture9,10,11Lecture9,10,11
Lecture9,10,11
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 

More from RDTCPOLYTECHNICMECHD

work study and ergonomics-ppt.pptx ergonomics
work study and ergonomics-ppt.pptx ergonomicswork study and ergonomics-ppt.pptx ergonomics
work study and ergonomics-ppt.pptx ergonomicsRDTCPOLYTECHNICMECHD
 
blandino_we0413.ppt ergonomics .....pptt
blandino_we0413.ppt ergonomics .....ppttblandino_we0413.ppt ergonomics .....pptt
blandino_we0413.ppt ergonomics .....ppttRDTCPOLYTECHNICMECHD
 
CHAPTER 7 (2).pptx part print planning process
CHAPTER 7 (2).pptx part print planning processCHAPTER 7 (2).pptx part print planning process
CHAPTER 7 (2).pptx part print planning processRDTCPOLYTECHNICMECHD
 
Process Engineering. ppt slides presentation
Process Engineering. ppt slides presentationProcess Engineering. ppt slides presentation
Process Engineering. ppt slides presentationRDTCPOLYTECHNICMECHD
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptRDTCPOLYTECHNICMECHD
 
STATISTICAL-QUALITY-CONTROL-ppt-3-2 (1).ppt
STATISTICAL-QUALITY-CONTROL-ppt-3-2 (1).pptSTATISTICAL-QUALITY-CONTROL-ppt-3-2 (1).ppt
STATISTICAL-QUALITY-CONTROL-ppt-3-2 (1).pptRDTCPOLYTECHNICMECHD
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxRDTCPOLYTECHNICMECHD
 
fy07_sh-16637-07_acc-injury-prev2.ppt
fy07_sh-16637-07_acc-injury-prev2.pptfy07_sh-16637-07_acc-injury-prev2.ppt
fy07_sh-16637-07_acc-injury-prev2.pptRDTCPOLYTECHNICMECHD
 
89-metrology-and-measurements (1).ppt
89-metrology-and-measurements (1).ppt89-metrology-and-measurements (1).ppt
89-metrology-and-measurements (1).pptRDTCPOLYTECHNICMECHD
 
7b81c9dce469f453a809a9d10e5a3dfe (1).ppt
7b81c9dce469f453a809a9d10e5a3dfe (1).ppt7b81c9dce469f453a809a9d10e5a3dfe (1).ppt
7b81c9dce469f453a809a9d10e5a3dfe (1).pptRDTCPOLYTECHNICMECHD
 

More from RDTCPOLYTECHNICMECHD (19)

work study and ergonomics-ppt.pptx ergonomics
work study and ergonomics-ppt.pptx ergonomicswork study and ergonomics-ppt.pptx ergonomics
work study and ergonomics-ppt.pptx ergonomics
 
blandino_we0413.ppt ergonomics .....pptt
blandino_we0413.ppt ergonomics .....ppttblandino_we0413.ppt ergonomics .....pptt
blandino_we0413.ppt ergonomics .....pptt
 
CHAPTER 7 (2).pptx part print planning process
CHAPTER 7 (2).pptx part print planning processCHAPTER 7 (2).pptx part print planning process
CHAPTER 7 (2).pptx part print planning process
 
Process Engineering. ppt slides presentation
Process Engineering. ppt slides presentationProcess Engineering. ppt slides presentation
Process Engineering. ppt slides presentation
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
 
STATISTICAL-QUALITY-CONTROL-ppt-3-2 (1).ppt
STATISTICAL-QUALITY-CONTROL-ppt-3-2 (1).pptSTATISTICAL-QUALITY-CONTROL-ppt-3-2 (1).ppt
STATISTICAL-QUALITY-CONTROL-ppt-3-2 (1).ppt
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
fy07_sh-16637-07_acc-injury-prev2.ppt
fy07_sh-16637-07_acc-injury-prev2.pptfy07_sh-16637-07_acc-injury-prev2.ppt
fy07_sh-16637-07_acc-injury-prev2.ppt
 
M_I-1.ppt
M_I-1.pptM_I-1.ppt
M_I-1.ppt
 
89-metrology-and-measurements (1).ppt
89-metrology-and-measurements (1).ppt89-metrology-and-measurements (1).ppt
89-metrology-and-measurements (1).ppt
 
596b8cf865175.pptx
596b8cf865175.pptx596b8cf865175.pptx
596b8cf865175.pptx
 
Durga. ORTOGRAPHIC PROJECTION.ppt
Durga. ORTOGRAPHIC PROJECTION.pptDurga. ORTOGRAPHIC PROJECTION.ppt
Durga. ORTOGRAPHIC PROJECTION.ppt
 
CHAPTER 1.pptx
CHAPTER 1.pptxCHAPTER 1.pptx
CHAPTER 1.pptx
 
7b81c9dce469f453a809a9d10e5a3dfe (1).ppt
7b81c9dce469f453a809a9d10e5a3dfe (1).ppt7b81c9dce469f453a809a9d10e5a3dfe (1).ppt
7b81c9dce469f453a809a9d10e5a3dfe (1).ppt
 
Comparator.ppt
Comparator.pptComparator.ppt
Comparator.ppt
 
Common_Verniers.pptx
Common_Verniers.pptxCommon_Verniers.pptx
Common_Verniers.pptx
 
forms of buisness man,.pdf
forms of buisness man,.pdfforms of buisness man,.pdf
forms of buisness man,.pdf
 
material man,.pdf
material man,.pdfmaterial man,.pdf
material man,.pdf
 
orgnisational man,.pdf
orgnisational man,.pdforgnisational man,.pdf
orgnisational man,.pdf
 

Recently uploaded

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Recently uploaded (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

work-measurement-ppt.pptx

  • 2. 2 Introduction • Work measurement is the application of techniques designed to establish the time for a qualified worker to carry out specified jobs at a defined level of performance. • We have seen how total time to manufacture a product is increased by:  adding undesirable features to product,  bad operation of the processes, and  ineffective time added because of worker and management. • All this leads to decreased productivity.
  • 3. 3 Introduction • Method study is one of principal techniques by which work content in the product manufacture or process could be decreased. It is a systematic method of investigating and critically examining the existing methods, to develop the improved ones. Method study is, then, a technique to reduce the work content mainly by eliminating unnecessary movements by workers and/or materials and/or equipments. However, even after that, there could be substantial unnecessary time taken for the process because of lack of management control and/or inaction of worker. • • •
  • 4. 4 Introduction • Work measurement (WM) is concerned with investigating, reducing and eliminating ineffective time, whatever may be the cause. WM is the means of measuring the time taken in the performance of an operation or series of operations in such a way that the ineffective time is shown up and can be separated out. In practice, proving existence of the ineffective time is the most difficult task. After existence is proved, nature and extent is easy to see! • • •
  • 5. 5 Introduction • WM is also used to set standard times to carry out the work, so that any ineffective time is not included later. Any addition the standard time would show up as excess time and thus can be brought to attention. Since, standard times are set for all the activities through WM, it has earned bad reputation amongst workers. Major reason for that has been the initial focus of the WM methods, which essentially targeted only the worker controllable ineffective times. Management controllable ineffective times were ignored traditionally. • • • •
  • 6. 6 Introduction Two critical issues in work study: 2. Method study should precede the work measurement, always. 3. Elimination of management controllable ineffective time should precede the elimination of the ineffective time within the control of the workers.
  • 7. 7 Purpose of WM • To reveal the nature and extent of ineffective time, from whatever cause, So that action can be taken to eliminate it; and then, To set standards of performance that are attainable only if all avoidable ineffective time is eliminated and work is performed by the best method available. • •
  • 8. 8 Uses of WM • To compare the efficiency of alternative methods. Other conditions being equal, the method which takes the least time will be the best method. To balance the work of members of teams, in association with the multiple activity charts, so that, as far as possible, each member has tasks taking an equal time. To determine, in association with man and machine multiple activity charts, the number of machines an worker can run. • •
  • 9. 9 Uses of time standards • To provide information on which the planning and scheduling of production can be based, including the plant and labor requirements for carrying out the program of work and utilization of resources. To provide information on which estimates for tenders, selling prices and delivery promises can be based. To set standards of machine utilization and labor performance which can be used for incentive scheme. To provide information for labor-cost control and to enable standard costs to be fixed and maintained. • • •
  • 10. 10 Techniques for WM • • • • • • • Time study Activity sampling; and rated activity sampling Synthesis from standard data Pre-determined motion time system Estimating Analytical estimating Comparative estimating.
  • 11. 11 Time study A WM technique for • Recording the times and rates of working for the elements of a specified job carried out under specified conditions, Analyzing the data so as to obtain the time necessary for carrying out the job at a defined level of performance. •
  • 12. 12 Selecting a job for time study • • The job in question is a new one not previously carried out. A change in material or method of working has been made and a new time standard is required. A complaint has been received about the time standard for an operation. A particular operation appears to be “bottleneck” holding up the subsequent operations and possibly previous operations. Standard times are required prior to the introduction of an incentive scheme. • • •
  • 13. 13 Selecting a job for time study • To investigate the utilization of a piece of plant, the output of which is low, or which appears to be idle for an excessive time. As a preliminary to making a method study, or to compare the efficiency of two proposed methods. When the costs of a particular job appears to be excessive. • •
  • 14. 14 Qualified worker • One who is accepted as having the necessary physical attributes, who possesses the required intelligence, education, and has acquired the necessary skill and knowledge to carry out the work in hand to satisfactory standard of safety, quantity and quality. In setting the time standards, specially when they are to be used for incentives, the standard to aimed at is one which can be attained by the qualified worker. A representative worker is one whose skill and performance is the average of the group under consideration. (S/)He may not necessarily be a qualified worker. • •
  • 15. 15 Steps in making a time study • Obtaining and recording all the information about the job, the operator and the surrounding conditions, which is likely to affect the carrying out of the work. Recording a complete description of the method, breaking down the operation into “elements.” Examining the detailed breakdown to ensure that the most effective method and motions are being used. Measuring and recording the time taken by the operator to perform each “element” of the operation. • • •
  • 16. 16 Steps in making a time study • At the same time assessing the effective speed of the working of the operative in relation to the observer’s concept of the rate corresponding to standard rating. Extending the observed times to “basic times.” Determining the allowances to be made over and above the basic time for operation. Determining the “standard time” for the operation. • • •
  • 17. 17 Breaking the job into elements • An element is an distinct part of a specified job selected for convenience of observation, measurement and analysis. A work cycle is the sequence of elements which are required to perform a job or yield a unit of production. The sequence may sometimes include occasional elements. For each job, a detailed breakdown of the complete job into elements is necessary. Because…. • •
  • 18. 18 Reasons for breakdown of job • To ensure that productive work (or effective time) is separated from unproductive activity (or ineffective time). To permit the rate of working to be assessed more accurately than would be possible if the assessment were made over a complete cycle. To enable different types of elements to be identified and distinguished, so that each may be accorded the treatment appropriate. To enable elements involving high fatigue to be isolated and to make the allocation of fatigue allowances more accurate. • • •
  • 19. 19 Reasons for breakdown of job • To facilitate checking the method and so that subsequent omission or insertion of elements may be detected quickly. To enable a detailed work specification to be prepared. The enable time values for frequently recurring elements, such as the operation of machine control or loading and unloading work-pieces from fixtures, to be extracted and used in compilation of the synthetic data. • •
  • 20. 20 Types of elements • A repetitive element is an element which occurs in every work cycle of the job. An occasional element does not occur in each work cycle of the job, but which may occur at regular or irregular intervals. e.g. machine setting. For a constant element, the basic time remains constant whenever it is performed. e.g. switch the machine on. A variable element is an element for which the basic time varies in relation to some characteristics of the product, equipment or process, e.g. dimensions, weight, quality etc. e.g. push trolley of parts to next shop. • • •
  • 21. 21 Types of elements • • A manual element is an element performed by a worker. A machine element is automatically performed by a power- driven machine (or process). A governing element occupies a longer time than any of the other elements which are being performed concurrently. e.g. boil kettle of water, while setting out teapot and cups. A foreign element is observed during a study which, after analysis, is not found to be necessary part of the job. e.g. degreasing a part that has still to be machined further. • •
  • 22. 22 Recording time for activities Cumulative timing • • • The watch runs continuously throughout the study. At the end of each element the watch reading is recorded. The individual element times are obtained by subsequent subtractions. The purpose of this procedure is to ensure that all the time during which the job is observed is recorded in the study. Typically, most work-study persons attain fair degree of accuracy quickly when using the cumulative method. • •
  • 23. 23 Recording time for activities Flyback time • • The hands of the stopwatch is returned to zero at the end of each element and are allowed to start immediately, the time for each element being obtained directly. In a comparative study of two methods carried out the Purdue University, the average error in reading the watch using the cumulative method was +0.000097 min per reading and using the flyback method was -0.00082 min per reading.
  • 24. 24 Recording time for activities Cumulative time recording is preferred, because: • • Trainees achieve reasonable accuracy more quickly. It does not matter if element times are occasionally missed by observed; the over-all time of the study will not be affected. Foreign elements and interruptions are automatically included since the watch is never stopped. Temptation to adjust the element time to rating is less compared to flyback time. Workers have greater faith in the fairness as they see that no time can have been omitted. Flyback method can have slight delays when the stopwatch is snapped back to zero at the end of each element. • • • •
  • 25. 25 Recording time for activities Differential timing • • • The elements are timed in groups, first including and then excluding each small element. Typically used for short element short cycle work, where elements are so short that there is not enough time for study- person to look at the watch and make a recording. In this process, either the cumulative or the flyback method of watch manipulation may be used.
  • 26. 26 Time study: Rating • Rating is the assessment of the worker’s rate of working relative to the observer’s concept of the rate corresponding to the standard pace. It is a comparison of rate of working observed by the work- study person with a picture of some standard level. The standard level is the average rate at which qualified workers will naturally work at a job, when using the correct method and when motivated to apply themselves to their work. This rate of working is called standard rating. • • •
  • 27. 27 Time study: Rating • If the standard pace is maintained and the appropriate relaxation is taken, a worker will achieve standard performance over the working day. Standard performance is the rate of output which qualified workers will naturally achieve without over-exertion as an average over the working shift provided they know and adhere to the specified method and, they are motivated to apply themselves to their work. This performance is denoted as 100 on the standard rating and performance scales. • •
  • 28. 28 Time study: Rating • It should be noted though that the “standard pace” applies to particular workers (with good physique, physical conditioning) working in appropriate environment. In practice, because of the inherent dissimilarities amongst workers, the rate of work is never the same throughout the working day. It is not uncommon for workers to work faster at some periods of the day than they do during others. So standard performance is achieved on average over a period of time with in-built standard deviation. In fact, working at the standard rate will not always mean moving the limbs with the same speed. • • •
  • 29. 29 Time study: Rating • The purpose of rating is to determine from the time actually taken by the operator being observed the standard time which can be maintained by the average qualified worker and which can be used as a realistic basis for planning, and incentive schemes. Time study is concerned with speed at which operator carries out the work, in relation to the concept of normal speed. “Speed” here means the effective speed of operation. • •
  • 30. 30 Factors affecting rate of working Factors outside the control of workers include: • • • • • Variation in the quality or other characteristics of the material used, although they be within the prescribed tolerance limit. Changes in the operating efficiency of tools or equipment within their normal life. Minor and unavoidable changes in methods or conditions of operations. Variation in the mental attention for the performance of elements. Changes in the climatic and other conditions.
  • 31. 31 Factors affecting rate of working Factors within worker’s control: • • • Acceptable variation in the quality of the process/product. Variation due to worker’s ability. Variation due to ability of mind, specifically attitude. Optimum pace at which the worker will work depends on – • • • The physical effort demanded by the work. The care required on the part of the worker. Training and experience.
  • 32. 32 Rating factor • • The figure 100 represents standard performance. If the operator is apparently performing with less effective speed, than the assigned factor is less than 100. If, on the other hand, the effective rate of working is above standard, the operator gets a factor above hundred. Essential idea being: • • Observed time x Rating = Constant
  • 33. Rating factor • This constant is known as the basic time: • So, depending on the rating assigned for the operator, the basic time can either be less than or greater than the observed time.  BasicTime 33 Standard Rating Rating Observed time x
  • 34. 34 Selected time • The selected time is the time chosen as being representative of a group of times for which an element or group of elements. These times may be either observed or basic times; and should be denoted as selected observed or selected basic times. • • Theoretically, the results of all the computations of the basic time for any single constant element should be same. However, because of inherent process variations, it happens rarely! •
  • 35. 35 Selected time • It becomes necessary to select a representative time for each element from all the basic times which have been entered into the time study. Multiple ways to pick a representative selected time from the available ones. Statistics suggests….. Taking averages! There are other ways though! Before the selected time is decided, the anomalies in the sample should be noted. Exceptionally high or low points should get some attention. • • • • •
  • 36. 36 Selected time Constant element • • • • A very high or short observed time for a given element of job should be treated with caution. An exceptionally high observed time could be due to incorrect recording, but most common reason is material or environment variation. In such as case, it should be checked whether such a variation is frequent or rare. Excess observed time because of rarely occurring events is typically not included as a representative.
  • 37. 37 Selected time • The average time calculations should exclude this observation. But, the excess-over-average time is added to the contingency allowance. Frequent large variations indicate that the element is not a constant one but a variable element. Excessively large time for this element could be detected by corresponding reduction in time for the immediate element. Exceptionally short times could be due to human error. A rare reason of observation of such short times could also be a last-minute-process-improvement. In such as case, the job should be studied again with more detailed attention. • • • •
  • 38. 38 Selected time Variable element • • • • In general more observations will be necessary of a variable element than of a constant element before reliable representative basic times can be established. The analysis of factors affecting the time to complete the element should be closely studied. Some relationship should be established between the observed time and the variable factors. Multiple factors could be affecting the observed time variation and establishing relationships amongst multiple factors is difficult
  • 39. 39 Work content • The work content of a job or operation is defined as: basic time+ relaxation allowance+ any allowance for additional work (e.g. the part of relaxation allowance that is work related). Standard time is the total time in which a job should be completed at standard performance – i.e. work content, contingency allowance for delay, unoccupied time and interference allowance. Allowance for unoccupied time and interference may not be frequently included in the standard time calculations; however, the relaxation allowance is. • •
  • 40. 40 Standard time constituents • A contingency allowance is a small allowance of time which may be included in a standard time to meet legitimate and expected items of work or delays, precise measurement of which is uneconomical because of their infrequent or irregular occurrence. Contingency allowance for work should include fatigue allowance; whereas the allowance for delay should be dependent on the workers. Typically contingency allowances are very small and are generally expressed as percentage of the total repetitive minutes of the job. • •
  • 41. 41 Standard time constituents • Contingency allowance should not be more than 5%, and should only be given where the contingencies cannot be eliminated and are justified.
  • 42. 42 Standard time constituents • Relaxation allowance is an addition to the basic time intended to provide the worker with the opportunity to recover from the physiological and psychological effects of carrying out specified work under specified conditions and to allow attention to personal needs. The amount of the allowance will depend on the nature of the job. One of the major additions to the basic time. Industrial fatigue allowance, in turn, forms a major portion of the relaxation allowance. Relaxation allowances are also given as percentages of the basic times. • • • •
  • 43. 43 Standard time constituents • • Typical values of relaxation allowance are 12-20%. In addition to including relaxation allowances, short rest pauses could be added over the period of work for an operator.
  • 44. 44 Other allowances • • • • • • • Start-up / shut-down allowance Cleaning allowance Tooling allowance Set-up / change-over allowance Reject / excess production allowance Learning / training allowance Policy allowance is an increment, other than the bonus increment, applied to standard time to provide a satisfactory level of earning for certain level of performances under exceptional conditions.
  • 45. 45 Standard time • Now, we can add all the constituents to arrive at the standard time for a job. Standard time = observed time + rating factor + relaxation allowance + work related contingency allowance + delay related contingency allowance.