Presented at IBM ConnectED 2015 . Abstract: IBM Connections provides the platform of social tools you need to transform your organization into a social business. IBM Connections enables you to reach your customers and partners faster, drive innovation, share content and expertise, and complete work faster. In this session, we'll describe what's new in IBM Connections and highlight the new features being planned for the next release. See first hand how IBM Connections can work for you!
IBM Connections Cloud & IBM Docs: Working securely and quickly with contentLuis Benitez
Are you struggling to manage your unstructured social content? Imagine combining the power of social and real-time document collaboration with ECM-grade native repositories and document management to help. This session will explore the benefits of online editors like IBM Docs that help to improve productivity and reduce the review and rework cycles associated with team-based business documents. Discover how to extend your content management strategy to include social documents and files by complementing it with a rich enterprise social network provided by IBM Connections Cloud.
IBM Collaboration Mobile Strategy and a New Way To workLuis Benitez
How can your data and analytics platforms and strategies keep up with a workplace that is ever more mobile and social? IBM can support not only your emerging data and analytics strategies, but connect them with the social and mobile tools people use every day. In this session, you will learn how an IBM collaborative mobile strategy can extend and transform your enterprise. You will see how mobile applications like IBM Connections and IBM Verse can drive employee productivity while they are on the go, by enabling them to use mobile social apps that tap into your enterprise data and analytics platforms.
IBM InterConnect 2015 - What is New in IBM Connections 2015Luis Benitez
Presented at IBM InterConnect 2015 #ibminterconnect , this deck summarizes what's available in the latest release of IBM Connections and what's coming in the future. It's inclusive of deliveries in the cloud (following our cloud-first model) and updates to our mobile app and desktop plugins.
IBM Connections Cloud Application Development StrategyLuis Benitez
This session will help you get started building your social applications. IBM Connections Cloud S1 provides easy to access integrated email with IBM Verse, social business capabilities and third party applications. It also provides a solid foundation for social and mail application development through APIs. This session guides users through the application development process for IBM Connections Cloud, from a blank page to a functional application. Attend this session to learn how to use existing services in your own applications and how to deploy to IBM Bluemix. Bluemix developers who haven't used IBM Connections can use a new Bluemix service to get started using these services within minutes.
What's New in IBM Connections Social Cloud - Q2 2015Luis Benitez
This deck summarizes the new features in IBM Connections Social Cloud that were delivered in the Q2 2015 release. For more information, check out http://ibmcloud.com/social
Follow me:
http://twitter.com/lbenitez
http://youtube.com/lbenitez3000
What's New in IBM Connections Social Cloud - Q2 2016Luis Benitez
This deck summarizes the new features in IBM Connections Social Cloud that were delivered in the Q2 2016 release. For more information, check out http://ibmcloud.com/social
Follow me:
http://twitter.com/lbenitez
http://youtube.com/lbenitez3000
What’s New in IBM Connections 4.5 and IBM Connections Content ManagerLuis Benitez
Presentation that I gave at the IBM Collaboration Solutions highlighting the new features of IBM Connections 4.5 and IBM Connections Content Manager 4.5
What's New in IBM Connections Social Cloud - September 2014Luis Benitez
This presentation provides an overview of the new features delivered to IBM Connections Social Cloud, which has the social business tools you need to work with colleagues, customers, and partners, including file sharing, file sync, expertise search, and increased engagement. To learn more, go to http://ibmcloud.com/social
IBM Connections Cloud & IBM Docs: Working securely and quickly with contentLuis Benitez
Are you struggling to manage your unstructured social content? Imagine combining the power of social and real-time document collaboration with ECM-grade native repositories and document management to help. This session will explore the benefits of online editors like IBM Docs that help to improve productivity and reduce the review and rework cycles associated with team-based business documents. Discover how to extend your content management strategy to include social documents and files by complementing it with a rich enterprise social network provided by IBM Connections Cloud.
IBM Collaboration Mobile Strategy and a New Way To workLuis Benitez
How can your data and analytics platforms and strategies keep up with a workplace that is ever more mobile and social? IBM can support not only your emerging data and analytics strategies, but connect them with the social and mobile tools people use every day. In this session, you will learn how an IBM collaborative mobile strategy can extend and transform your enterprise. You will see how mobile applications like IBM Connections and IBM Verse can drive employee productivity while they are on the go, by enabling them to use mobile social apps that tap into your enterprise data and analytics platforms.
IBM InterConnect 2015 - What is New in IBM Connections 2015Luis Benitez
Presented at IBM InterConnect 2015 #ibminterconnect , this deck summarizes what's available in the latest release of IBM Connections and what's coming in the future. It's inclusive of deliveries in the cloud (following our cloud-first model) and updates to our mobile app and desktop plugins.
IBM Connections Cloud Application Development StrategyLuis Benitez
This session will help you get started building your social applications. IBM Connections Cloud S1 provides easy to access integrated email with IBM Verse, social business capabilities and third party applications. It also provides a solid foundation for social and mail application development through APIs. This session guides users through the application development process for IBM Connections Cloud, from a blank page to a functional application. Attend this session to learn how to use existing services in your own applications and how to deploy to IBM Bluemix. Bluemix developers who haven't used IBM Connections can use a new Bluemix service to get started using these services within minutes.
What's New in IBM Connections Social Cloud - Q2 2015Luis Benitez
This deck summarizes the new features in IBM Connections Social Cloud that were delivered in the Q2 2015 release. For more information, check out http://ibmcloud.com/social
Follow me:
http://twitter.com/lbenitez
http://youtube.com/lbenitez3000
What's New in IBM Connections Social Cloud - Q2 2016Luis Benitez
This deck summarizes the new features in IBM Connections Social Cloud that were delivered in the Q2 2016 release. For more information, check out http://ibmcloud.com/social
Follow me:
http://twitter.com/lbenitez
http://youtube.com/lbenitez3000
What’s New in IBM Connections 4.5 and IBM Connections Content ManagerLuis Benitez
Presentation that I gave at the IBM Collaboration Solutions highlighting the new features of IBM Connections 4.5 and IBM Connections Content Manager 4.5
What's New in IBM Connections Social Cloud - September 2014Luis Benitez
This presentation provides an overview of the new features delivered to IBM Connections Social Cloud, which has the social business tools you need to work with colleagues, customers, and partners, including file sharing, file sync, expertise search, and increased engagement. To learn more, go to http://ibmcloud.com/social
IBM Filenet Content Navigator + IBM Docs screen demoBrian Pearson
A short sample of screens showing how IBM Docs is now integrated into IBM FileNet Content Navigator. IBM Docs brings real time (and asynchronous) multi person browser based editing to the Filenet tools base.
What's New in IBM Connections Social Cloud - Q1 2015Luis Benitez
This presentation covers the new features that were delivered to the IBM Connections Social Cloud offering in the Q1 2015 releases. To learn more, go to http://ibmcloud.com/social
What is new in IBM Connections 5.5 and IBM Docs 2.0Luis Benitez
This deck covers the highlights of the new capabilities introduced in the IBM Docs 2.0 and IBM Connections 5.5 released on December 2015.
To learn more, go to http://ibm.com/social
Follow me:
Twitter: http://twitter.com/lbenitez
LinkedIn: http://pr.linkedin.com/in/luisbenitez
My Blog: http://www.lbenitez.com
IBM Connections – Managing Growth and ExpansionLetsConnect
You are lucky, your Connections platform is experiencing rapid growth – now what? How to you determine when you have grown to where you need to build out the service? How do you grow WebSphere or the File Service Space? How do you add additional Web Servers or is it better to add a proxy server? Learn how to judge and decide what you need to change – and how to then implement it.
Are You Ready for an Alternative in Application Development?LetsConnect
You and I have been developing applications with the Domino Designer for most of their professional lives. Are we ready for an alternative? Have a look at the Forms Experience Builder. See an introduction to FEB and learn how the Forms Experience Builder compares to the Domino Designer with respect to
– Forms
– Notifications
– Approval Workflows
– Access Management
– Views & Reports
– Cross Browser & Mobile Support
– Data Limitations
– Advanced Programming
– Application Management
– Hardware Requirements
– Cloud Availability
The results will be suprising.
A preview of some of the newest features that are now part of IBM Connections 4.0. To watch the recorded session for this, check out this video: http://www.youtube.com/watch?v=Gki2vlfTgyU
ID400 - What's New and Coming in IBM Connections 2014 #IBMConnectLuis Benitez
This presentation was delivered at IBM Connect 2014 and shows what's going to be delivered in IBM Connections in 2014. As usual, things will be delivered to the cloud first and at some point in the year we'll take the cloud base and deliver that to our on premises customers. Content and design subject to change at any time without notice.
What's new for Existing Customers in Connections 5.0Albert Nichols
A presentation that covers new features for existing customers in the newest release of IBM Connections. This deck covers all the social business tools and features in IBM Connections that will take your business to the next leve
How to upload a file to an IBM Connections.Cloud Community using the Plugins ...Gavin Bollard
The IBM Connections plugins for Microsoft Office 2013 were updated in April 2016. Here's an walk-through tutorial of them in action uploading from Excel to an IBM Connections Community.
Even in the Cloud you need to manage your IBM Connections Cloud environment. This presentation will explain the key tasks for IBM Connections Cloud Administration especially around User Management. We will discuss the challenges and the best practices approach to integrate and sync with your enterprise directories using IBM Integration Server.
ICSUG Keynote IBM Collaboration Strategie 2015 and beyondICS User Group
Update zur IBM Collaboration Strategie auf der ICS.UG Konferenz am 26.-27. März 2015 in Bremen. Kramer Reeves berichtet über die aktuellen Themen von der IBM ConnectED
IBM Connections 4.5 CR2 Installation - From Zero To Social Hero - 2.02 - with...Frank Altenburg
IBM Connections 4.5 setup can be fast, smooth and easy when you know what you are doing. And I will show you how.
With this presentation I want to prove, that it is possible to install an IBM Connections 4.5 "Proof-Of-Concept" setup very quickly.
You can install and configure all the new IBM Connections 4.5 components : DB2 Server, IBM Tivoli Directory Integrator, IBM WebSphere Application Server (WAS), IBM HTTP Server, IBM COgnos, IBM Connections Content Manager and IBM Connections. This new version (2.01) does not contain any integration like Social Mail and Sametime. This is now separated in a separate document "IBM Connections 4.5 Integration - From Zero To Social Hero" This document now contains the CR1 update.
This is a place holder only. the full document can be downloaded from IBM Greenhouse (after your registration)
Social Connections VI Keynote - Why IBM Connections 5.0 MattersLuis Benitez
Presented at Prague during the Social Connections VI Keynote. IBM Connections 5.0 is here! This new release of IBM Connections brings new capabilities such as the ability to bring customers and partners into the conversation, work with your files offline, amazing new mobile capabilities, and more. Learn the significance of this release and why you shouldn't wait to upgrade. We'll show demos (yay!!) and walk through all the new capabilities in what promises to be a fun filled session!
What's New in IBM SmartCloud Connections - May 2014Luis Benitez
This presentation provides an overview of the new features coming to IBM SmartCloud Connections, which has the social business tools you need to work with colleagues, customers, and partners, including file sharing, file sync, instant messaging, and communities. To learn more, go to http://ibmcloud.com/social
IBM SmartCloud Connections Overview - Q2 2014Luis Benitez
This presentation provides an overview of the features available in IBM SmartCloud Connections, which has the social business tools you need to work with colleagues, customers, and partners, including file sharing, instant messaging, and communities. To learn more, go to http://ibmcloud.com/social
What’s New and Coming in IBM ConnectionsLetsConnect
IBM Connections provides the platform of social tools you need to transform your organization. IBM Connections enables you to reach your customers and partners faster, drive innovation, share content and expertise, and complete work faster. In this session, we’ll describe what’s new in the brand new IBM Connections release and preview a few new features being planned for the next release. See first hand how IBM Connections can work for you and how you can embrace a “New Way To Work”.
What's new with OneDrive for Business - SharePoint Fest DC 2019Drew Madelung
Have you seen all the new features in OneDrive for Business (OD4B) lately? Are you getting ready to roll-out OD4B to your enterprise? Or are you just looking to see what you’re missing if you aren’t on OD4B yet? OneDrive for Business in Office 365 is changing quickly and we as end-users and IT professionals need to try keep up.
Join me as we walk through the newest improvements to the world of OneDrive for Business in Office 365. This session will be demo filled and by the end you will see the investment and dedication that Microsoft has too provide a solid personal file solution.
IBM Filenet Content Navigator + IBM Docs screen demoBrian Pearson
A short sample of screens showing how IBM Docs is now integrated into IBM FileNet Content Navigator. IBM Docs brings real time (and asynchronous) multi person browser based editing to the Filenet tools base.
What's New in IBM Connections Social Cloud - Q1 2015Luis Benitez
This presentation covers the new features that were delivered to the IBM Connections Social Cloud offering in the Q1 2015 releases. To learn more, go to http://ibmcloud.com/social
What is new in IBM Connections 5.5 and IBM Docs 2.0Luis Benitez
This deck covers the highlights of the new capabilities introduced in the IBM Docs 2.0 and IBM Connections 5.5 released on December 2015.
To learn more, go to http://ibm.com/social
Follow me:
Twitter: http://twitter.com/lbenitez
LinkedIn: http://pr.linkedin.com/in/luisbenitez
My Blog: http://www.lbenitez.com
IBM Connections – Managing Growth and ExpansionLetsConnect
You are lucky, your Connections platform is experiencing rapid growth – now what? How to you determine when you have grown to where you need to build out the service? How do you grow WebSphere or the File Service Space? How do you add additional Web Servers or is it better to add a proxy server? Learn how to judge and decide what you need to change – and how to then implement it.
Are You Ready for an Alternative in Application Development?LetsConnect
You and I have been developing applications with the Domino Designer for most of their professional lives. Are we ready for an alternative? Have a look at the Forms Experience Builder. See an introduction to FEB and learn how the Forms Experience Builder compares to the Domino Designer with respect to
– Forms
– Notifications
– Approval Workflows
– Access Management
– Views & Reports
– Cross Browser & Mobile Support
– Data Limitations
– Advanced Programming
– Application Management
– Hardware Requirements
– Cloud Availability
The results will be suprising.
A preview of some of the newest features that are now part of IBM Connections 4.0. To watch the recorded session for this, check out this video: http://www.youtube.com/watch?v=Gki2vlfTgyU
ID400 - What's New and Coming in IBM Connections 2014 #IBMConnectLuis Benitez
This presentation was delivered at IBM Connect 2014 and shows what's going to be delivered in IBM Connections in 2014. As usual, things will be delivered to the cloud first and at some point in the year we'll take the cloud base and deliver that to our on premises customers. Content and design subject to change at any time without notice.
What's new for Existing Customers in Connections 5.0Albert Nichols
A presentation that covers new features for existing customers in the newest release of IBM Connections. This deck covers all the social business tools and features in IBM Connections that will take your business to the next leve
How to upload a file to an IBM Connections.Cloud Community using the Plugins ...Gavin Bollard
The IBM Connections plugins for Microsoft Office 2013 were updated in April 2016. Here's an walk-through tutorial of them in action uploading from Excel to an IBM Connections Community.
Even in the Cloud you need to manage your IBM Connections Cloud environment. This presentation will explain the key tasks for IBM Connections Cloud Administration especially around User Management. We will discuss the challenges and the best practices approach to integrate and sync with your enterprise directories using IBM Integration Server.
ICSUG Keynote IBM Collaboration Strategie 2015 and beyondICS User Group
Update zur IBM Collaboration Strategie auf der ICS.UG Konferenz am 26.-27. März 2015 in Bremen. Kramer Reeves berichtet über die aktuellen Themen von der IBM ConnectED
IBM Connections 4.5 CR2 Installation - From Zero To Social Hero - 2.02 - with...Frank Altenburg
IBM Connections 4.5 setup can be fast, smooth and easy when you know what you are doing. And I will show you how.
With this presentation I want to prove, that it is possible to install an IBM Connections 4.5 "Proof-Of-Concept" setup very quickly.
You can install and configure all the new IBM Connections 4.5 components : DB2 Server, IBM Tivoli Directory Integrator, IBM WebSphere Application Server (WAS), IBM HTTP Server, IBM COgnos, IBM Connections Content Manager and IBM Connections. This new version (2.01) does not contain any integration like Social Mail and Sametime. This is now separated in a separate document "IBM Connections 4.5 Integration - From Zero To Social Hero" This document now contains the CR1 update.
This is a place holder only. the full document can be downloaded from IBM Greenhouse (after your registration)
Social Connections VI Keynote - Why IBM Connections 5.0 MattersLuis Benitez
Presented at Prague during the Social Connections VI Keynote. IBM Connections 5.0 is here! This new release of IBM Connections brings new capabilities such as the ability to bring customers and partners into the conversation, work with your files offline, amazing new mobile capabilities, and more. Learn the significance of this release and why you shouldn't wait to upgrade. We'll show demos (yay!!) and walk through all the new capabilities in what promises to be a fun filled session!
What's New in IBM SmartCloud Connections - May 2014Luis Benitez
This presentation provides an overview of the new features coming to IBM SmartCloud Connections, which has the social business tools you need to work with colleagues, customers, and partners, including file sharing, file sync, instant messaging, and communities. To learn more, go to http://ibmcloud.com/social
IBM SmartCloud Connections Overview - Q2 2014Luis Benitez
This presentation provides an overview of the features available in IBM SmartCloud Connections, which has the social business tools you need to work with colleagues, customers, and partners, including file sharing, instant messaging, and communities. To learn more, go to http://ibmcloud.com/social
What’s New and Coming in IBM ConnectionsLetsConnect
IBM Connections provides the platform of social tools you need to transform your organization. IBM Connections enables you to reach your customers and partners faster, drive innovation, share content and expertise, and complete work faster. In this session, we’ll describe what’s new in the brand new IBM Connections release and preview a few new features being planned for the next release. See first hand how IBM Connections can work for you and how you can embrace a “New Way To Work”.
What's new with OneDrive for Business - SharePoint Fest DC 2019Drew Madelung
Have you seen all the new features in OneDrive for Business (OD4B) lately? Are you getting ready to roll-out OD4B to your enterprise? Or are you just looking to see what you’re missing if you aren’t on OD4B yet? OneDrive for Business in Office 365 is changing quickly and we as end-users and IT professionals need to try keep up.
Join me as we walk through the newest improvements to the world of OneDrive for Business in Office 365. This session will be demo filled and by the end you will see the investment and dedication that Microsoft has too provide a solid personal file solution.
What's New with OneDrive for Business - SPFestSeattleDrew Madelung
Have you seen all the new features in OneDrive for Business lately? Are you getting ready to roll-out OneDrive to your enterprise? Or are you just looking to see what you’re missing if you aren’t on OneDrive yet? OneDrive for Business in Office 365 is changing quickly and we as end-users and IT professionals need to try keep up.
Join me as we walk through the newest improvements to the world of OneDrive for Business in Office 365. This session will be demo filled and by the end you will see the investment and dedication that Microsoft has too provide a solid personal file solution.
Have you seen all the new features in OneDrive for Business lately? Are you getting ready to roll-out OneDrive to your enterprise? Or are you just looking to see what you’re missing if you aren’t on OneDrive yet? OneDrive for Business in Office 365 is changing quickly and we as end-users and IT professionals need to try keep up.
In our monthly webinar series we review the pros and cons of Dropbox as a replacement for the file server. We focus specifically on small and medium size nonprofit environments.
What's New with OneDrive for Business - SPFestSeattleDrew Madelung
Have you seen all the new features in OneDrive for Business (OD4B) lately? Are you getting ready to roll-out OD4B to your enterprise? Or are you just looking to see what you’re missing if you aren’t on OD4B yet? OneDrive for Business in Office 365 is changing quickly and we as end-users and IT professionals need to try keep up. Join me as we walk through the newest improvements to the world of OneDrive for Business in Office 365.
Have you seen all the new features in OneDrive for Business lately? Are you getting ready to roll-out OneDrive to your enterprise? Or are you just looking to see what you’re missing if you aren’t on OneDrive yet? OneDrive for Business in Office 365 is changing quickly and we as end-users and IT professionals need to try keep up.
What's New with OneDrive for Business - SharePoint Fest ChicagoDrew Madelung
Have you seen all the new features in OneDrive for Business (OD4B) lately? Are you getting ready to roll-out OD4B to your enterprise? Or are you just looking to see what you’re missing if you aren’t on OD4B yet?
OneDrive for Business in Office 365 is changing quickly and we as end-users and IT professionals need to try keep up. Join me as we walk through the newest improvements to the world of OneDrive for Business in Office 365.
This session will be demo filled and by the end you will see the investment and dedication that Microsoft has too provide a solid personal file solution.
Explanation of Connectiosn functionality + add-ons from the user perspective. 4 Types of users: Files and Folder worker, Content worker, Mobile worker, Project worker.
Overview of the complete Connections eco-system, consisting of Connections 5, Reverso translate, Wordpress links, Kudos Boards, Ephox Editlive!, Mail, Hootsuite links.
30 on Thursday - Your Digitial Workplace: Store, Share & Sync with Microsoft ...Drew Madelung
A digital workplace can change how your people work and influence your business. It can increase employee engagement, skills, and satisfaction by helping your employees connect swiftly with customers, co-workers and partners. Microsoft OneDrive for Business, a key workload in Microsoft Office 365, can be an integral part of your digital workplace and collaboration strategy. OneDrive provides a cloud location to store, share, and sync your work files and then work with them from any device.
During this '30 on Thursday' Webinar, 3-Time Microsoft MVP Drew Madelung will discuss how to make Microsoft OneDrive a part of your organization’s digital workplace. We will also cover the basics of managing and securing OneDrive, including:
Managing external sharing
Enabling data loss prevention
Handling lifecycle, retention and administrative access
Securing sync basics
Reporting & alerting
Unlike other mobile file access and collaborative file sharing solutions, Micro Focus Filr (formerly Novell Filr) has been designed with the enterprise in mind, resulting in less administration, better security, and more productive users.
This 1 hour class highlights some of the more useful features available in SharePoint and is meant to spark ideas for supervisors wishing to improve collaboration, sharing, reporting and/or communication within their team.
Topics
Getting started
o Organization & Layout
o Content strategy including archiving/retention
Collaboration
o Co-authoring
o File sharing
Projects & Communication
o Forms
o Approvals
o Task tracking
o Social/Conversations/Forums
o Automation with workflow
o Dashboard reports in SharePoint with Power BI
SharePoint vs OneDrive – Differences and SimilaritiesDynamics Square
The primary difference between SharePoint and oneDrive is that SharePoint exists within the Microsoft application ecosystem. It is just one tool in a much larger toolbox that helps drive organizational collaboration and productivity. Users are able manage content and documents using the Microsoft 365 platform. Read More here: https://www.dynamicssquare.com.au/blog/sharepoint-vs-onedrive/
From Traditional ECM to Content Services: Modernizing Content Management with...Joel Oleson
Modernizing Enterprise Content Management with Microsoft Content Services
SharePoint content services (ECM): What's new and what's coming
See firsthand how we continue to push Enterprise Content Management (ECM) forward into the modern content services world. SharePoint in the cloud is far more performant than classic server-based platforms. In this session, get a tour of our latest and upcoming innovations for reusing, creating, collaborating, and protecting information through its lifecycle. SharePoint has numerous key ECM capabilities (intake, content types, bulk edits, retention, data governance labels) across each of these scenarios to make content management easier and more manageable.
More info on this topic at: https://resources.techcommunity.microsoft.com/content-services/
Understanding the Office 365 Collaboration ToolkitChris Bortlik
With the many different methods of collaboration within Office 365, it’s important to distinguish between me-work, we-work and team-work. In this session, we will look at the appropriate ways to use OneDrive, SharePoint Team Sites, Office 365 Groups, Teams, and Yammer to help you establish the best governance strategy for your organization.
ComConnect provides file sync between PCs and mobile devices. ComConnect enables business users to sync sensitive corporate files between laptops, desktops, smartphones, tablets, and the web. ComConnect makes it possible for users to access all of their files on any device and to collaborate with colleagues, clients, and business partners.
ComConnect unleashes the power of mobility and maximizes the BYOD trend. Even in a diverse and dispersed computing environment, ComConnect lets users be productive with their files, while giving essential control and visibility to administrators and business owners.
Unlike most consumer-grade file sync services, such as Dropbox, ComConnect keeps business files safe by arming administrators with robust security and control features. Organizations can limit or control which devices are permitted to sync; completely audit file syncs and changes; remotely wipe the data from devices that are lost or stolen; and monitor and manage how employees are using their mobile devices.
Similar to IDI103 - What is New in IBM Connections - IBM ConnectED 2015 (20)
Bank AI - Popular's Journey to Intelligent AutomationLuis Benitez
Presentation delivered at Bank AI 2018 in Austin, TX. Banco Popular, the largest bank in Puerto Rico, is on a journey to leverage intelligent automation. The first building block was starting with Robotics Process Automation (RPA), setting up the proper governance and controls. From there, we've incorporated other innovations such as Natural Language Processing. This is what what we've learned, how we did it, what has worked for us, and what didn't.
IBM Insight 2015 - Social Business FlyerLuis Benitez
Those who Lead in the Insight Economy are applying insights to uncover trends, discover patterns, recognize opportunities, create markets and change their industry. At Insight 2015 explore the newest innovations, industry breakthroughs and hottest trends in analytics, social business, cloud, mobile, the Internet of Things and Watson that you won't find anywhere else.
Social Connections VIII - Innovation and Communications Drive Business ValueLuis Benitez
Presentation that I delivered at Social Connections 8 in Boston, Ma on April 16, 2015. It talks about how team collaboration and social business drives value for business small and large. For more information, check out http://ibmcloud.com/social
Follow me:
http://twitter.com/lbenitez
http://youtube.com/lbenitez3000
This Reviewer's Guide provides a brief summary of the applications that are included in IBM Connections 4.5. It is important to note that these applications can be used within an organization as needed—all together or as individual applications. Capitalizing on a flexible and modular architecture, organizations may start with a single application and add other applications when they choose. As in previous releases of IBM Connections, applications can be installed easily and naturally fit into the user experience, so it is easy to expand as needed.
Enterprise Social Media: 5 Emerging TrendsLuis Benitez
From SXSW 2012 -- Social media has gone mainstream! But it's not everywhere yet. In this session, we'll focus on the five emerging trends on how enterprises are leveraging social media. Patterns have emerged among social businesses and we'll review how organizations are leveraging these new capabilities to deliver bottom-line results. Specifically, in this session we will look into the technologies that enable organizations to generate new ideas, accelerate innovation, increase customer satisfaction, increase productivity, and gain a competitive edge. Presented by @Lbenitez & @heidi_ambler .
El Impacto de las Redes Sociales en los Procesos DemocráticosLuis Benitez
Está es la combinación de presentaciones que se usaron en la conferencia de hoy del Social Media Club de Puerto Rico ( http://twitter.com/smcpr o http://facebook.com/smcpr ) . En este evento discutimos como las Redes Sociales han tenido un impacto significativo en los procesos democráticos y como podrían ser un vehículo de cambio en futuras elecciones. Gracias a los panelistas y a todos los que fueron a la activididad.
Social Media Club Puerto Rico en Twitter 360Luis Benitez
Presentación que di en la conferencia de Twitter 360 que auspició la Red EducaPR. En mi presentación hablé del Social Media Club de Puerto Rico y como aumentar el número de seguidores en Twitter.
Los Medios Sociales y el Futuro de la Televisión - Social Media Club Puerto RicoLuis Benitez
Presentación que use en el evento del Social Media Club de Puerto Rico donde discutimos los Medios Sociales y su impacto en el Futuro de la Televisión.
Pushing the limits of ePRTC: 100ns holdover for 100 daysAdtran
At WSTS 2024, Alon Stern explored the topic of parametric holdover and explained how recent research findings can be implemented in real-world PNT networks to achieve 100 nanoseconds of accuracy for up to 100 days.
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Albert Hoitingh
In this session I delve into the encryption technology used in Microsoft 365 and Microsoft Purview. Including the concepts of Customer Key and Double Key Encryption.
The Metaverse and AI: how can decision-makers harness the Metaverse for their...Jen Stirrup
The Metaverse is popularized in science fiction, and now it is becoming closer to being a part of our daily lives through the use of social media and shopping companies. How can businesses survive in a world where Artificial Intelligence is becoming the present as well as the future of technology, and how does the Metaverse fit into business strategy when futurist ideas are developing into reality at accelerated rates? How do we do this when our data isn't up to scratch? How can we move towards success with our data so we are set up for the Metaverse when it arrives?
How can you help your company evolve, adapt, and succeed using Artificial Intelligence and the Metaverse to stay ahead of the competition? What are the potential issues, complications, and benefits that these technologies could bring to us and our organizations? In this session, Jen Stirrup will explain how to start thinking about these technologies as an organisation.
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...SOFTTECHHUB
The choice of an operating system plays a pivotal role in shaping our computing experience. For decades, Microsoft's Windows has dominated the market, offering a familiar and widely adopted platform for personal and professional use. However, as technological advancements continue to push the boundaries of innovation, alternative operating systems have emerged, challenging the status quo and offering users a fresh perspective on computing.
One such alternative that has garnered significant attention and acclaim is Nitrux Linux 3.5.0, a sleek, powerful, and user-friendly Linux distribution that promises to redefine the way we interact with our devices. With its focus on performance, security, and customization, Nitrux Linux presents a compelling case for those seeking to break free from the constraints of proprietary software and embrace the freedom and flexibility of open-source computing.
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
DevOps and Testing slides at DASA ConnectKari Kakkonen
My and Rik Marselis slides at 30.5.2024 DASA Connect conference. We discuss about what is testing, then what is agile testing and finally what is Testing in DevOps. Finally we had lovely workshop with the participants trying to find out different ways to think about quality and testing in different parts of the DevOps infinity loop.
Elevating Tactical DDD Patterns Through Object CalisthenicsDorra BARTAGUIZ
After immersing yourself in the blue book and its red counterpart, attending DDD-focused conferences, and applying tactical patterns, you're left with a crucial question: How do I ensure my design is effective? Tactical patterns within Domain-Driven Design (DDD) serve as guiding principles for creating clear and manageable domain models. However, achieving success with these patterns requires additional guidance. Interestingly, we've observed that a set of constraints initially designed for training purposes remarkably aligns with effective pattern implementation, offering a more ‘mechanical’ approach. Let's explore together how Object Calisthenics can elevate the design of your tactical DDD patterns, offering concrete help for those venturing into DDD for the first time!
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfPeter Spielvogel
Building better applications for business users with SAP Fiori.
• What is SAP Fiori and why it matters to you
• How a better user experience drives measurable business benefits
• How to get started with SAP Fiori today
• How SAP Fiori elements accelerates application development
• How SAP Build Code includes SAP Fiori tools and other generative artificial intelligence capabilities
• How SAP Fiori paves the way for using AI in SAP apps
In his public lecture, Christian Timmerer provides insights into the fascinating history of video streaming, starting from its humble beginnings before YouTube to the groundbreaking technologies that now dominate platforms like Netflix and ORF ON. Timmerer also presents provocative contributions of his own that have significantly influenced the industry. He concludes by looking at future challenges and invites the audience to join in a discussion.
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...UiPathCommunity
💥 Speed, accuracy, and scaling – discover the superpowers of GenAI in action with UiPath Document Understanding and Communications Mining™:
See how to accelerate model training and optimize model performance with active learning
Learn about the latest enhancements to out-of-the-box document processing – with little to no training required
Get an exclusive demo of the new family of UiPath LLMs – GenAI models specialized for processing different types of documents and messages
This is a hands-on session specifically designed for automation developers and AI enthusiasts seeking to enhance their knowledge in leveraging the latest intelligent document processing capabilities offered by UiPath.
Speakers:
👨🏫 Andras Palfi, Senior Product Manager, UiPath
👩🏫 Lenka Dulovicova, Product Program Manager, UiPath
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
Free Complete Python - A step towards Data Science
IDI103 - What is New in IBM Connections - IBM ConnectED 2015
1.
2. ID103: What’s New In IBM
Connections and
IBM Connections Mobile
David Brooks, Lead Architect, IBM Connections, @brooksda
Luis Benitez, Sr. Product Manager, IBM Connections, @Lbenitez
4. Cloud First Development
1 Clients who elected to participate in early disclosure of feature, usually our sponsor for the capability
• Design, implement and deliver on Cloud First
• Adopt Softlayer to simplify and strengthen operational agility, elasticity and
resiliency
• Frequent and small updates, 48 weeks of the year
• Progressive disclosure: feature introduction to selected clients first
• Instrument rollback capability on a feature and component level
• Capabilities iterated with usage data over time
• Continuous Delivery & Integration (CD/CI)
• Instrumentation for Monitoring to enable early detection
• On-premises delivery on a predictable schedule
5. 5
IBM Cloud
Q1 Cloud Update
● Social Contacts
Q2 Cloud Update
● Mobile Redesign
● Thumbnails and Gallery for Files
● Attention Management
IBM Connections 4.5 IFR2
● Ephox EditLive! Support
Q3 Cloud Update
● Rebranding Designs
● Windows File Sync Plug-in
● Additional @mentions support
● Typeahead Search for People
Q4 Cloud Update
● Mac File Sync Plug-in
● Personal/Community File
Storage Increases
● Mobile Updates
● Activities Navigation Update
● Report-to Chain
● WebSphere Portal support
On-Premises
Q1 2014 Q2 2014 Q3 2014 Q4 2014
IBM Connections 4.5 CR5
● File Sync Mobile
IBM Connections 5.0
● External Collaboration
● File Thumbnails
● Attention Management
● Mobile Redesign
● File Sync on Windows
Websphere Portal Portlets
● Support for WSP 8.5
IBM Connections 5.0 CR1
● Sharepoint 2013 Support
● IBMi and Power 8 Support
● SiteMinder 12.5.1 Support
● CCM Metrics
● IBM Pure Systems Support for IBM
Connections and CCM 5.x
2014 IBM Connections Social
9. Share a file with anyone in the world
Work with anyone
in less than a
minute
10. …and start collaborating with
the rest of the team
External users have
the same capabilities
as members
All community content
is available to the
external user
11. Focus on what’s important to get what you
need
One-tap access to the
content that matters to
you
View and manage
community events
Personalized
navigation
12. Easy access to recent collaboration spaces
One-tap access to
recently visited
content
13. Take your files with you
Lock the file to
prevent others from
editing
Mark files to sync
to desktop via
plug-in
14. Create, review, edit and work with your
files anytime, anywhere
Access to the latest
version at all times
Local changes
updated
automatically
Save directly to
Connections from
any desktop app
15. Review, co-edit and present files anytime,
anywhere
Sync files with
native app
Secure access
18. IBM Connections
5.0 CR1 and more!
• Copy/paste into Activities
• Link to file consistency in Activities
• Updated file preview design in stream
• View full file from thumbnail
• Monthly repeat of community events
• Answered/Unanswered questions in Forums
• Switch external communities to internal
• Faster load of search results page
• @mentions in CCM
• Metrics for CCM
• Support for IBM i and Power 8
• Support for Siteminder 12.5.1
• PureSystems Pattern
19. IBM Connections
Cloud Deliveries
• Increased personal file space to 1TB
• Increased community file space to 50GB
• Increased wikis attachment space to 5GB
• Ability to turn off Mail Community
• Boost your content in search
• Support for Czech, Hungarian, Slovanian
20. IBM Connections
Shipped in 2H 2014
Apps / plugins
• Lock/unlock directly from Office
• View comments directly from Office
• Copy/send smart links directly from Office
• Publish / save drafts directly from Office
• Mac File Sync plug-in for Cloud
• Round trip editing for CCM
• Portlet support for cloud
• Support for SharePoint 2013
• Mobile:
• Thumbnail view
• @mention everywhere
• Additional MDM support
22. Connections on your Mac
Sync and share files directly from Finder
Sync’ed files appear as a
folder under Finder’s Favorites
Push notifications on
desktop alert you when a
file has been modified and
is ready for review
Delivered in November!
23. Connections on your Mac
Sync and share files directly from Finder
Modify file
properties and
share with your
team directly from
your desktop
Lock a file to prevent
others from editing
while you are offline
Delivered in November!
24. Smarter People Search
Find the experts that you need and don’t know who they are
See who you’ve
invited as a guest,
and Invitations
that need your
attention
Delivered in November!
25. My Profile (planned)
Report to chain
Delivered in November!
Smarter People Search
Find the experts that you need and don’t know who they are
26. Focus on your Work
Not how much space you have left
1TB of storage for
your personal library
Each file can be up to
2GB in size*
Delivered in November!
27. Focus on your Work
Not how much space you have left
50GB of storage per
community
Delivered in November!
28. Focus on your Work
More control on the placement of your apps
Create a specialized
landing page by
moving or hiding the
Members,
Bookmarks &
Description apps
Delivered in November!
29. Focus on your Work
Control email notifications
Control whether
members can mail
each other or only
owners
Delivered in November!
30. Find your content, faster
Your content is boosted in search results
Your content is higher
in the list so you can
find it faster
Delivered in November!
31. Focus on your Work
New user experience theme
Admins can select this
new theme for users
Delivered in November!
32. Collaborate In Your Language
User interface available in new languages
Now translated into
Czech, Hungarian,
and Slovenian
Delivered in November!
33. Chat Alongside Document Editing
Have conversations inside the editor
Delivered in November!
New sidebar lets you
chat with co-editors and
features better
commenting
36. Mobile Updates - Cloud
The power of your business in the palm of your hand
• NEW user experience for Files
• Multi Photo Upload
• @mention support throughout the app
Delivered in December!
37. Mobile Update
Quick and easy access to Files
Quickly access files with
the new grid view
Delivered in December!
Preview Files and
content directly
from the view
38. Comments and
information about
the file are easy to
find and view
Full screen tablet
experience allows
you view more
content on your
screen
Mobile Update
Customized user experience for enhanced viewing
Delivered in December!
39. Mobile Update
Find people in your network faster
Newly designed
Profiles provide a
modern view
making it easy to
find information.
User actions
are easier
and faster
Delivered in December!
40. Mobile Update
Find and exchange information faster
Quickly take action to
contact people in your
network
New design provides
a sleek and easy
way to find contacts
Delivered in December!
41. Mobile Update – On-premises
The power of your business in the palm of your hand
• NEW user experience for Profiles, Files and
Connections Content Manager (CCM)
• Upload new version of CCM files and edit
their metadata
• External users are highlighted in the app
• iOS 8 support
Delivered in December!
43. Users know best.
Get their ideas.
https://greenhouse.lotus.com/blogs/We047f6e69323_42ff_8db6_8bd4fe32a841/?openIdeas=true
709ideas since 2011
170ideas this year
168ideas graduated since 2011
60ideas graduated in 2014
13,000+votes
2,100+members
44. IBM Connections
Coming in 5.0 CR2
Q1 2015
• External user support in CCM
• File thumbnail view in CCM
• File viewing in CCM
• Mac file sync plug-in for on-premises
* Plans / Designs are subject to change
45. Organize Your Content
Create a hierarchy of your content
Designs subject to change
Nested folder tree
allows quickly
switching between
folders
Quickly share files
with your team
46. New File Details Page
Review files faster without having to download
Designs subject to change
Flip through files in
a folder
Scroll through slides/
pages and comment
in-line
48. Real-time Alerts
Help you focus on items that need your attention
Designs subject to change
Stay up to date with
things that require
your attention
49. Community Customization
Team Communications made easy
Designs subject to change
Collapsed left
navigation to help
users understand
where they are
Drag-n-drop apps
between columns in 1
step
Rename apps to
provide a descriptive
name specific for the
team
51. Type Ahead Search For All Content
Find what you need faster
Designs subject to change
Your history appears
along type-ahead
search results to
quickly go back to
recently visited
content
52. Rich Text Editor Improvements
Work faster with your content
Designs subject to change
- Sort table data
- New theme / buttons
- Permanent Pen
- Drag-n-drop images
- Base64 images
53. Mobile Updates
The power of your business in the palm of your hand
• Mobile app for BlackBerry 10 – delivered Jan 2015
• Activities support for Cloud
• Notification Center
• Custom Streams
• MobileIron Support for Android
61. Check Out These Sessions
ID Title Date/Time Location
MAS201 What You Need To Know About Social Software Adoption Sunday 2:15pm Swan Mockingbird 1-2
ID103 What’s New with IBM Connections and IBM Connections Mobile Monday 10:45am Dolphin S. Hemisphere 2
ID103 What’s New with IBM Connections and IBM Connections Mobile Monday 2:15pm Swan 5-6
INV101 Understanding Social Software Adoption and Impact Monday 1pm Swan 7-10
AD105 Integrating IBM Connections and IBM Digital Experience Solutions Monday 2:15pm Swan Toucan 1-2
AD102 Mastering the IBM Connections Developers Experience Monday 3:45pm Swan 5-6
CHALK105 IBM Connections and Cognitive Analytics Tuesday 7:00am Swan Mockingbird 1-2
INV303 IBM’s Mobile Strategy and a Social Way to Work Tuesday 11:15am Swan 7-10
SPOT105 Compliance for Cloud and On-Premises: Vantage for IBM Connections Wednesday 8:30am Swan Toucan 1-2
ID104 Take IBM Connections Across Your Enterprise – With Plugins! Wednesday 11:45am Swan 1-2
62. Help shape the future of work: Visit the Design Studio in Lark 1
▪ Give feedback on designs for IBM Verse, IBM Connections, and more.
▪ Don’t just talk, but ideate with designers on new ways of working.
▪ Plus photo booth, graffiti wall, & legos.
Open:
▪ Mon, Jan 26 10:45am-6:00pm
▪ Tues, Jan 27 8:30am-600pm
▪ Wed, Jan 28 8:30am-11:30am & 1:00-3:00pm
(closed during Meet the Developers session)
63. An event not to be missed! Attend the 8th conference organized by international IBM Connections user group
which will be held for the first time in the USA. Meet experts, hear insights, discuss with leaders, share your
experience, get connected, make friends around the world! More information at socialconnections.info
SOCIAL
CONNECTIONS
8
REGISTER NOW SUBMIT ABSTRACT BECOME SPONSOR
64. Engage Online
▪ SocialBiz User Group socialbizug.org
– Join the epicenter of Notes and Collaboration user groups
▪ Social Business Insights blog ibm.com/blogs/socialbusiness
– Read and engage with our bloggers
▪ Follow us on Twitter
– @IBMConnect and @IBMSocialBiz
▪ LinkedIn http://bit.ly/SBComm
– Participate in the IBM Social Business group on LinkedIn
▪ Facebook https://www.facebook.com/IBMConnected
– Like IBM Social Business on Facebook
65. Subscription and Support Value
2014 U.S. Patent Leaders*
1. IBM 7,534
2. Samsung 4,952
3. Canon 4,055
4. Sony 3,224
5. Microsoft 2,829
6. Toshiba 2,608
7. Qualcomm 2,590
8. Google 2,566
http://www-03.ibm.com/press/us/en/pressrelease/45793.wss
▪Protects Software Investment
– New Releases, Upgrade and Fixes
– Support Access
– Security Updates
▪Access to latest Innovations & Resources
– $6B+ R&D annually
– New Enhanced Support Portal
– 85 Development Labs
▪Minimizes Risk to your Business
– Revenue Exposure
– Client Satisfaction
– Cost of downtime
▪Access to 24x7 online & phone technical support
– Access to technical experts and support
professionals in 140 languages
– Diagnostic tools, fixes, forums, self-help,
Redbooks, security alerts and technical
documentation
– Rapid response to severity 1 service requestsVisit IBM S&S