How to create your own innovation lab



This document is a summary of some of the thinking, principles &
approaches that underpin the work done as part of the Edinburgh
Festivals Innovation Lab also known as festivalslab. festivalslab is a
pioneering programme of work which explores how to use new thinking
and new tools to make the Edinburgh festivals even better.

Usage license: Creative Commons Attributable Non-Commercial
What learning is best shared?


In the field of innovation, since new projects are by definition often
very exciting and attractive, there can be a tendency to become fixated
on the details of projects. And through our work which to date has
includes projects like Culture Hack Scotland, the Festivals Listings API,
Festival Design DNA and the Edinburgh Festivals Ideas Challenge we
have a number of such great high-profile projects.
Thinking and process (not projects)


But since not everyone is directly like the Edinburgh Festivals, the fine
detail of these projects will only be directly replicable in a small number
of other organisations. Therefore we feel it is much more important to
share process thinking rather than project details (which can be found
elsewhere).

So this guide contains eighteen statements in no particular order that
sum up either a foundational principle of the festivalslab work or
something important we have learnt along the way. Like any good
innovation programme, we have both successes and failures and
whether you’re an individual practitioner, a small organisation or a
national company we are sure that you will find something of use here.
How to use this guide


This document is intended not a step-by-step guidebook but as a
manifesto, a home of inspiration for anyone interested in innovation in
the cultural sector. So please use it in whatever way you find most
useful. That might be by reading it all through at once, jumping all over
the place, dipping back into it over time or just finding one or two
statements that really resonate with where you are right now. Only you
will know how to make the most of what we have shared here.

And remember, like festivalslab itself, this is a work in progress. So pls
email lab@festivalsedinburgh.com to tell us how to make it better.

Thank you.
(v1.0 Dec 18th 2011)
The www.festivalclock.com visualisation by Justin
Quillinan and Stef Posavec was the most beautiful
usage of the Festivals Listings API in 2011
1.Work with digital
 talent as creatives
Work with digital talent as creatives

Too often the only type of relationship that cultural organisations have
with digital talent is transactional...ie we’ll give you £5k and you’ll give
us a website. This is not collaboration, this is a service relationship.
Events like Culture Hack Scotland show us the enormous potential of
what can happen when cultural professionals and organisations meet
digital talent and web developers in a way that is exploratory,
experimental and equitable. If we can engage with technologists with
the same attitudes and processes by which we engage with artists then
we may find out that they are actually more similar than we first
thought.

Simple action: find a web developer who loves your work, buy them a
coffee, tell them what’s on your mind and then listen to what they say
2.Think like
a designer
Think like a designer


As cultural organisations we often think we that what we want is the
same as what people want... but believe it or not this is often not the
case. As we look to find ways to improve the experiences we provide, it
can be very powerful to start with the needs and behaviours of real
people. Design thinking and established design approaches can be
powerful ways to unlock opportunities for innovation and
improvement, especially when they are people-centred.

Simple action: remember a service experience which you have found
frustrating in a domain like banking and transport and think about why
it didn’t work. Do the same for a well-designed service experience
A close-up from our extensive toolkit on cultural
innovation from a design perspective. Visit
design.festivalslab.com to try it for yourself
3.Make more of what
 you’ve already got
Make more of what you’ve already got


One way of defining innovation is taking your existing assets and
discovering new ways to frame them in such a way that creates new
value. In the cultural context, assets typically include things like brand,
reputation, programme, archive, data, content, network, relationships,
cash etc. The Edinburgh Festivals listings data API project does just
that by taking programme data and making it openly available in a web
developer-friendly format time thereby encouraging a new family of
exciting apps and services.

Simple action: make a list of your assets and identify which of them
could be given a new context so as to result in valuable projects.
4.Consider both
need & opportunity
Consider both need and opportunity


Innovation projects come in two types: those based on need (e.g. we
need to attract a younger audience) or those based on opportunity (e.g.
more and more people are using smart-phones). If the portfolio of our
projects isn’t balanced then there can be problems - too much
opportunity-led work can lead to innovation that is shiny and sexy but
not business-critical and too much needs-led work can lead to
innovtion that is functional and not progressive. And of course the
magic happens when need and opportunity match.

Simple action: if you have a list of project ideas, identify which ideas are
needs-led and which are opportunity-led
The mobile site of the Edinburgh Intl Book Festival
started as a Culture Hack Scotland project and the
code is available open source for anyone to use
5.Tell your story
Tell your story



Documents like this is just one of the ways that we share our stories and
ideas. It of course shares our learning and is therefore a important way
of increasing the impact of the investment made in our work. But as
well as that it also allows us to make new connections, lets people tell us
what we’ve got wrong and gives us direction on how to improve.
Therefore we have found that the storytelling we do via the blog and
showcase at festivalslab.com is as important as the projects themselves.

Simple action: find a blog relevant to innovation in your context and
post a comment that shares your own thinking and your experience
v




Sharing our work & thinking via the
festivalslab.com blog has been invaluable to
connecting with people from around the world
6.Uncover your rules
  and assumptions
Uncover your rules and assumptions


Another way of defining innovation is the intentional breaking of rules
that lead to new value. And the more deep-held the view, the more
radical the innovation is. These can be rules about funding, the kind
of work your produce, timelines of production, how you relate to
technology, how you relate to audiences...whatever! The rules of a
cultural organisation are very rarely explicit and so making them so can
be a very powerful jump-off point for innovation

Simple action: write down five things from the basic rule set of how you
and/or your organisation works and order them by how deeply held
they are
7.Break them
Break them


With the Festivals Listing API project we took the rule that “we only
publish listings via our websites, our print programmes” and
systematically broke it in such a way to create a new way for web
developers to engage with the festivals. Breaking rules is by definition
difficult and so modelling out what what the costs and benefits of doing
so is critical

Simple action: take a rule and do a thought-experiment where this is
broken and imagine what that might be like and what the consequences
(good and bad) of that might be. Do it for a deep rule and then for a
light rule.
8.Steal what works
Steal what works



Innovation is not invention. Here at festivalslab we have borrowed
tried and tested approaches from the domains of social and private
sector innovation and just translated them into the cultural context. So
while things like our API project, Culture Hack Scotland, our service
design work and the Ideas Challenge are relatively radical in the
cultural sector, they are not new ideas.

Simple action: think about what your favourite innovation is in the
cultural sector and think about how the thinking behind it could be
applied to your context. Do the same for a non-cultural example.
The inaugural Culture Hack Scotland in May 2011
was a 24 hour event that created 30 amazing
projects thanks to the spirit of collaboration
9.Make it important
Make it important



If your innovation agenda isn’t important enough to you and your team
then it will be difficult to develop the requisite momentum to
implement them and make the different you want to make. Making
innovation important and driving engagement is best done by three
ways - curating projects that matter to your team, communicating why
and what you’re doing effectively and making innovation practice a
valued and measured part of your day job.

Simple action: find out what innovation means to your individual team
members and understand their ambitions and priorities
10.Be realistic
Be realistic




Innovation is hard and actual impacts don’t always match ambition. Be
realistic about what you can achieve within your resources and be wary
of ascribing magical powers to digital technology.

Simple action: outline the basic outputs and outcomes you’re aiming for
and then read them back to someone else the following day and revise
accordingly
11.Open up
Open up



The majority of festivalslab’s work is what’s called open innovation -
making new pathways for other people to work with the festivals in
such a way that leads to mutual benefit. This is based mainly on the
realisation that significant innovation ambitions cannot be realised by
oneself and that - if designed well - allowing the strengths of different
project partners to work together will lead to the best results.

Simple action: write down the ways your organisation is closed and in
which ways it is open
The Edinburgh Festivals Ideas Challenge
sourced 300 ideas from the general public of
how to improve the festival experience
12.Define your limits
Define your limits




This is just sensible project planning. Running innovation projects in
all parts of your work will overextend you and so it is prudent to set a
conservative scope for innovation work and include more as it develops
rather than starting with everything.

Simple action: list the different part of your business, identify which are
in scope for innovation and then list them by practicality
13.Find tools that
  work for you
Find tools that work for you



There are so many innovation methodologies, resources and tools out
there which can help your thinking and practice. The ones that have
been most influential to festivalslab have been those to do with open
innovation and service design. And a specific tool we recommend is the
visual business model canvas as explained in the book Business Model
Generation.

Simple action: visit businessmodelgeneration.com and see if you find it
relevant and interesting
14.Make partnerships
       make
Make partnerships make



Every cultural organisation has a rich set of relationships and
partnerships. Many of these however can be conversational and not
result in tangible outputs. Innovation is about making and so it can be
incredibly useful to move past conversations to understand project
opportunities which can result in benefits for you and your partner. At
festivalslab we’re doing this with three target partner types: developer
communities, universities and technology companies.

Simple action: identify your exiting relationships which you’d like to
convert from talking to making
Through the Smart Tourism project, we are able to
collaborate six leading informatics and computer
science academic departments across Scotland
15.Ungeek innovation
Ungeek innovation


Since so much of innovation is digital we can often confuse the two.
And since digital and technology can be a barrier to many people, using
too much technical language or curating too many technical projects
can alienate people from an innovation agenda when it doesn’t need to.
That is why we at festivalslab do as much work on projects around
design as we do on data. We call this ungeeking innovation since it
would be a shame if cultural innovation were to become perceived as
too technical and inaccessible when it needn’t be at all.

Simple action: talk to someone completely non-technical about your
innovation ambitions to test your language and ability to make a case
16.Start
Start




Ideas are easy but implementation is not. Innovation is more about
making than talking and so it is better to start prototyping the ideas
that really speak to your context than going to more events for
inspiration and yet more ideas.

Simple action: work out how to test or prototype an idea quickly and
cheaply and just do it
17.Stop
Stop




In an area like innovation where ideas are bountiful focussing on
project completion projects can be challenging. When the projects have
been chosen in which you will be investing time and energy and money,
make sure they get done.

Simple action: for all projects articulate a clear end point and exit
strategy
18.Don’t stop
Don’t stop




Innovation is an infinitive game and so part of the challenge of
innovation work is ensuring that projects get successfully delivered
while keeping an eye on future opportunities. Central to this is
learning, learning about what worked and what didn’t and using this
intelligence as the fuel for future work.

Simple action: Don’t stop.
How to create your own innovation lab v1
About festivalslab

The Edinburgh Festivals Innovation Lab - festivalslab for short - is the
innovation programme of Festivals Edinburgh - the strategic umbrella
organisation for the twelve major Edinburgh festivals set up in 2007 to
lead on their joint strategic direction and maintain their global
competitive edge.

festivalslab is supported by Creative Scotland and you can find out
more via:

          festivalslab.com
          @festivalslab
          lab@festivalsedinburgh.com

Simple action: visit showcase.festivalslab.com to see our work

More Related Content

What's hot

Lessons in Change and Transformation
Lessons in Change and TransformationLessons in Change and Transformation
Lessons in Change and Transformation
Paul Taylor
 
Why the lean startup changes everything even for business schools and social ...
Why the lean startup changes everything even for business schools and social ...Why the lean startup changes everything even for business schools and social ...
Why the lean startup changes everything even for business schools and social ...
impact100EFG
 
Lean Startup & Corporate Innovation Strategies - April 2015
Lean Startup & Corporate Innovation Strategies - April 2015Lean Startup & Corporate Innovation Strategies - April 2015
Lean Startup & Corporate Innovation Strategies - April 2015
Kevin Shutta
 
Corporate Innovation : developing a lean & curious culture : Michel Duchateau...
Corporate Innovation : developing a lean & curious culture : Michel Duchateau...Corporate Innovation : developing a lean & curious culture : Michel Duchateau...
Corporate Innovation : developing a lean & curious culture : Michel Duchateau...
Michel Duchateau
 
Why Transformation Fails And How To Avoid It
Why Transformation Fails And How To Avoid ItWhy Transformation Fails And How To Avoid It
Why Transformation Fails And How To Avoid It
Paul Taylor
 
Project Management vs Innovation: Friends or Foes?
Project Management vs Innovation: Friends or Foes?Project Management vs Innovation: Friends or Foes?
Project Management vs Innovation: Friends or Foes?
Tathagat Varma
 
2016 Bonn Forum Agenda
2016 Bonn Forum Agenda2016 Bonn Forum Agenda
2016 Bonn Forum Agenda
Jeske Eenink
 
Why Lean Startup changes everything
Why Lean Startup changes everythingWhy Lean Startup changes everything
Why Lean Startup changes everything
pragmatic solutions gmbh
 
SIT Municipalities Portfolio | Innovation Journey TLV
SIT Municipalities Portfolio | Innovation Journey TLVSIT Municipalities Portfolio | Innovation Journey TLV
SIT Municipalities Portfolio | Innovation Journey TLV
SIT - Systematic Inventive Thinking®
 
The Innovation Engine, Andrew Breen, American Express
The Innovation Engine, Andrew Breen, American ExpressThe Innovation Engine, Andrew Breen, American Express
The Innovation Engine, Andrew Breen, American Express
Lean Startup Co.
 
Six Myths of Product Development
Six Myths of Product DevelopmentSix Myths of Product Development
Six Myths of Product Development
Wei Li
 
The innovation catalysts
The innovation catalystsThe innovation catalysts
The innovation catalysts
Wei Li
 
A Strategic Approach to Open Innovation - Jeffrey Phillips
A Strategic Approach to Open Innovation - Jeffrey PhillipsA Strategic Approach to Open Innovation - Jeffrey Phillips
A Strategic Approach to Open Innovation - Jeffrey Phillips
★ Tony Karrer
 
Building Startups: the "3rd co-founder model"
Building Startups: the "3rd co-founder model"Building Startups: the "3rd co-founder model"
Building Startups: the "3rd co-founder model"
eFounders
 
Lean start up primer
Lean start up primerLean start up primer
Lean start up primer
Andrew Hirst
 
Pack & Send Conference 12 Oct 2013 - Craig Rispin Business Futurist & Innovat...
Pack & Send Conference 12 Oct 2013 - Craig Rispin Business Futurist & Innovat...Pack & Send Conference 12 Oct 2013 - Craig Rispin Business Futurist & Innovat...
Pack & Send Conference 12 Oct 2013 - Craig Rispin Business Futurist & Innovat...
Craig Rispin
 
Innovation at Alaska Airlines
Innovation at Alaska AirlinesInnovation at Alaska Airlines
Innovation at Alaska Airlines
PSAMA
 
Design thinking and innovation at apple
Design thinking and innovation at apple Design thinking and innovation at apple
Design thinking and innovation at apple
Wei Li
 
Technology Innovation Project Management- an exploratory study of what projec...
Technology Innovation Project Management- an exploratory study of what projec...Technology Innovation Project Management- an exploratory study of what projec...
Technology Innovation Project Management- an exploratory study of what projec...
Johnny Ryser
 
Project management and innovation strategy
Project management and innovation strategyProject management and innovation strategy
Project management and innovation strategy
Stephen Anthony
 

What's hot (20)

Lessons in Change and Transformation
Lessons in Change and TransformationLessons in Change and Transformation
Lessons in Change and Transformation
 
Why the lean startup changes everything even for business schools and social ...
Why the lean startup changes everything even for business schools and social ...Why the lean startup changes everything even for business schools and social ...
Why the lean startup changes everything even for business schools and social ...
 
Lean Startup & Corporate Innovation Strategies - April 2015
Lean Startup & Corporate Innovation Strategies - April 2015Lean Startup & Corporate Innovation Strategies - April 2015
Lean Startup & Corporate Innovation Strategies - April 2015
 
Corporate Innovation : developing a lean & curious culture : Michel Duchateau...
Corporate Innovation : developing a lean & curious culture : Michel Duchateau...Corporate Innovation : developing a lean & curious culture : Michel Duchateau...
Corporate Innovation : developing a lean & curious culture : Michel Duchateau...
 
Why Transformation Fails And How To Avoid It
Why Transformation Fails And How To Avoid ItWhy Transformation Fails And How To Avoid It
Why Transformation Fails And How To Avoid It
 
Project Management vs Innovation: Friends or Foes?
Project Management vs Innovation: Friends or Foes?Project Management vs Innovation: Friends or Foes?
Project Management vs Innovation: Friends or Foes?
 
2016 Bonn Forum Agenda
2016 Bonn Forum Agenda2016 Bonn Forum Agenda
2016 Bonn Forum Agenda
 
Why Lean Startup changes everything
Why Lean Startup changes everythingWhy Lean Startup changes everything
Why Lean Startup changes everything
 
SIT Municipalities Portfolio | Innovation Journey TLV
SIT Municipalities Portfolio | Innovation Journey TLVSIT Municipalities Portfolio | Innovation Journey TLV
SIT Municipalities Portfolio | Innovation Journey TLV
 
The Innovation Engine, Andrew Breen, American Express
The Innovation Engine, Andrew Breen, American ExpressThe Innovation Engine, Andrew Breen, American Express
The Innovation Engine, Andrew Breen, American Express
 
Six Myths of Product Development
Six Myths of Product DevelopmentSix Myths of Product Development
Six Myths of Product Development
 
The innovation catalysts
The innovation catalystsThe innovation catalysts
The innovation catalysts
 
A Strategic Approach to Open Innovation - Jeffrey Phillips
A Strategic Approach to Open Innovation - Jeffrey PhillipsA Strategic Approach to Open Innovation - Jeffrey Phillips
A Strategic Approach to Open Innovation - Jeffrey Phillips
 
Building Startups: the "3rd co-founder model"
Building Startups: the "3rd co-founder model"Building Startups: the "3rd co-founder model"
Building Startups: the "3rd co-founder model"
 
Lean start up primer
Lean start up primerLean start up primer
Lean start up primer
 
Pack & Send Conference 12 Oct 2013 - Craig Rispin Business Futurist & Innovat...
Pack & Send Conference 12 Oct 2013 - Craig Rispin Business Futurist & Innovat...Pack & Send Conference 12 Oct 2013 - Craig Rispin Business Futurist & Innovat...
Pack & Send Conference 12 Oct 2013 - Craig Rispin Business Futurist & Innovat...
 
Innovation at Alaska Airlines
Innovation at Alaska AirlinesInnovation at Alaska Airlines
Innovation at Alaska Airlines
 
Design thinking and innovation at apple
Design thinking and innovation at apple Design thinking and innovation at apple
Design thinking and innovation at apple
 
Technology Innovation Project Management- an exploratory study of what projec...
Technology Innovation Project Management- an exploratory study of what projec...Technology Innovation Project Management- an exploratory study of what projec...
Technology Innovation Project Management- an exploratory study of what projec...
 
Project management and innovation strategy
Project management and innovation strategyProject management and innovation strategy
Project management and innovation strategy
 

Viewers also liked

Morgenbooster #72 | How to build an innovation lab
Morgenbooster #72 | How to build an innovation labMorgenbooster #72 | How to build an innovation lab
Morgenbooster #72 | How to build an innovation lab
1508 A/S
 
The Innovator´s Dilemma of Innovation Labs and Corporate Accelerators
The Innovator´s Dilemma of Innovation Labs and Corporate AcceleratorsThe Innovator´s Dilemma of Innovation Labs and Corporate Accelerators
The Innovator´s Dilemma of Innovation Labs and Corporate Accelerators
Manuel Funk
 
UNICEF Innovation: Innovation Lab Do-It-Yourself Guide
UNICEF Innovation: Innovation Lab Do-It-Yourself GuideUNICEF Innovation: Innovation Lab Do-It-Yourself Guide
UNICEF Innovation: Innovation Lab Do-It-Yourself Guide
Christopher Fabian
 
Can Innovation Labs Save The World?
Can Innovation Labs Save The World?Can Innovation Labs Save The World?
Can Innovation Labs Save The World?
Paul Taylor
 
Incubating Innovation
Incubating InnovationIncubating Innovation
Incubating Innovation
Fahrenheit 212
 
The Chief Innovation Officer, Redefined
The Chief Innovation Officer, RedefinedThe Chief Innovation Officer, Redefined
The Chief Innovation Officer, Redefined
Fahrenheit 212
 
Lessons From Starting an Innovation Lab
Lessons From Starting an Innovation LabLessons From Starting an Innovation Lab
Lessons From Starting an Innovation Lab
Eric Potter, PMP, CAM
 
Innovation Labs und Corporate Acceleratoren im Innovations-Dilemma
Innovation Labs und Corporate Acceleratoren im Innovations-DilemmaInnovation Labs und Corporate Acceleratoren im Innovations-Dilemma
Innovation Labs und Corporate Acceleratoren im Innovations-Dilemma
Manuel Funk
 
INL From the lab to the market JAN2015
INL From the lab to the market JAN2015INL From the lab to the market JAN2015
INL From the lab to the market JAN2015
Antonio Ornelas
 
Presentatie Dimitri Schuurman
Presentatie Dimitri SchuurmanPresentatie Dimitri Schuurman
Presentatie Dimitri Schuurman
FARO
 
Presentatie Jan van de Poll IT Innovation Day 2014
Presentatie Jan van de Poll IT Innovation Day 2014Presentatie Jan van de Poll IT Innovation Day 2014
Presentatie Jan van de Poll IT Innovation Day 2014
ITInnovationDayNL
 
The Team Canvas: sneak peek for creatives
The Team Canvas: sneak peek for creativesThe Team Canvas: sneak peek for creatives
The Team Canvas: sneak peek for creatives
theteamcanvas
 
Casi di successo nei Venture Capital by Alfonso Riccardi - VERTIS
Casi di successo nei Venture Capital by Alfonso Riccardi - VERTISCasi di successo nei Venture Capital by Alfonso Riccardi - VERTIS
Casi di successo nei Venture Capital by Alfonso Riccardi - VERTIS
Innovation Lab
 
IoT Lab Barcelona
IoT Lab BarcelonaIoT Lab Barcelona
IoT Lab Barcelona
Claro Partners Inc.
 
About Nesta: Meet the Lab
About Nesta: Meet the LabAbout Nesta: Meet the Lab
About Nesta: Meet the Lab
Nesta
 
Open data scotland workshop
Open data scotland workshopOpen data scotland workshop
Open data scotland workshop
Katalin Gallyas
 
Open data round table talk 13 may
Open data round table talk 13 mayOpen data round table talk 13 may
Open data round table talk 13 may
Katalin Gallyas
 
IoT LAB
IoT LABIoT LAB
IoT LAB
DunavNET
 
Big Data Expo 2015 - Schiphol Big Data @ Schiphol
Big Data Expo 2015 - Schiphol Big Data @ SchipholBig Data Expo 2015 - Schiphol Big Data @ Schiphol
Big Data Expo 2015 - Schiphol Big Data @ Schiphol
BigDataExpo
 

Viewers also liked (20)

Morgenbooster #72 | How to build an innovation lab
Morgenbooster #72 | How to build an innovation labMorgenbooster #72 | How to build an innovation lab
Morgenbooster #72 | How to build an innovation lab
 
The Innovator´s Dilemma of Innovation Labs and Corporate Accelerators
The Innovator´s Dilemma of Innovation Labs and Corporate AcceleratorsThe Innovator´s Dilemma of Innovation Labs and Corporate Accelerators
The Innovator´s Dilemma of Innovation Labs and Corporate Accelerators
 
UNICEF Innovation: Innovation Lab Do-It-Yourself Guide
UNICEF Innovation: Innovation Lab Do-It-Yourself GuideUNICEF Innovation: Innovation Lab Do-It-Yourself Guide
UNICEF Innovation: Innovation Lab Do-It-Yourself Guide
 
Can Innovation Labs Save The World?
Can Innovation Labs Save The World?Can Innovation Labs Save The World?
Can Innovation Labs Save The World?
 
Incubating Innovation
Incubating InnovationIncubating Innovation
Incubating Innovation
 
The Chief Innovation Officer, Redefined
The Chief Innovation Officer, RedefinedThe Chief Innovation Officer, Redefined
The Chief Innovation Officer, Redefined
 
Lessons From Starting an Innovation Lab
Lessons From Starting an Innovation LabLessons From Starting an Innovation Lab
Lessons From Starting an Innovation Lab
 
Innovation Labs und Corporate Acceleratoren im Innovations-Dilemma
Innovation Labs und Corporate Acceleratoren im Innovations-DilemmaInnovation Labs und Corporate Acceleratoren im Innovations-Dilemma
Innovation Labs und Corporate Acceleratoren im Innovations-Dilemma
 
INL From the lab to the market JAN2015
INL From the lab to the market JAN2015INL From the lab to the market JAN2015
INL From the lab to the market JAN2015
 
Presentatie Dimitri Schuurman
Presentatie Dimitri SchuurmanPresentatie Dimitri Schuurman
Presentatie Dimitri Schuurman
 
Presentatie Jan van de Poll IT Innovation Day 2014
Presentatie Jan van de Poll IT Innovation Day 2014Presentatie Jan van de Poll IT Innovation Day 2014
Presentatie Jan van de Poll IT Innovation Day 2014
 
The Team Canvas: sneak peek for creatives
The Team Canvas: sneak peek for creativesThe Team Canvas: sneak peek for creatives
The Team Canvas: sneak peek for creatives
 
Casi di successo nei Venture Capital by Alfonso Riccardi - VERTIS
Casi di successo nei Venture Capital by Alfonso Riccardi - VERTISCasi di successo nei Venture Capital by Alfonso Riccardi - VERTIS
Casi di successo nei Venture Capital by Alfonso Riccardi - VERTIS
 
IoT Lab Barcelona
IoT Lab BarcelonaIoT Lab Barcelona
IoT Lab Barcelona
 
About Nesta: Meet the Lab
About Nesta: Meet the LabAbout Nesta: Meet the Lab
About Nesta: Meet the Lab
 
Open data scotland workshop
Open data scotland workshopOpen data scotland workshop
Open data scotland workshop
 
Open data round table talk 13 may
Open data round table talk 13 mayOpen data round table talk 13 may
Open data round table talk 13 may
 
IoT LAB
IoT LABIoT LAB
IoT LAB
 
Big Data Expo 2015 - Schiphol Big Data @ Schiphol
Big Data Expo 2015 - Schiphol Big Data @ SchipholBig Data Expo 2015 - Schiphol Big Data @ Schiphol
Big Data Expo 2015 - Schiphol Big Data @ Schiphol
 
IoT_HSE (2)
IoT_HSE (2)IoT_HSE (2)
IoT_HSE (2)
 

Similar to How to create your own innovation lab v1

Design Thinking & Innovation
Design Thinking & InnovationDesign Thinking & Innovation
Design Thinking & Innovation
Mohammed Saiful Hussain
 
What We’re Learning at the Laboratory of Innovation Sciences at Harvard
What We’re Learning at the Laboratory of Innovation Sciences at HarvardWhat We’re Learning at the Laboratory of Innovation Sciences at Harvard
What We’re Learning at the Laboratory of Innovation Sciences at Harvard
Crowdsourcing Week
 
What We're Learning at the Laboratory of Innovation Sciences at Harvard
What We're Learning at the Laboratory of Innovation Sciences at HarvardWhat We're Learning at the Laboratory of Innovation Sciences at Harvard
What We're Learning at the Laboratory of Innovation Sciences at Harvard
Epi Ludvik Nekaj 宇 赫
 
A Playbook for Corporate Innovation - Explorium HK
A Playbook for Corporate Innovation - Explorium HKA Playbook for Corporate Innovation - Explorium HK
A Playbook for Corporate Innovation - Explorium HK
Yangie Chung
 
NGO project start-up pack
NGO project start-up packNGO project start-up pack
NGO project start-up pack
Yellow Shirts
 
No time, no money, no mandate: User research in the public sector #SXC15
No time, no money, no mandate: User research in the public sector #SXC15No time, no money, no mandate: User research in the public sector #SXC15
No time, no money, no mandate: User research in the public sector #SXC15
Simone Carrier
 
Service Design Network Global Conference 2014 report
Service Design Network Global Conference 2014 reportService Design Network Global Conference 2014 report
Service Design Network Global Conference 2014 report
Erik Roscam Abbing
 
You need NOT be Creative to Ideate
You need NOT be Creative to IdeateYou need NOT be Creative to Ideate
You need NOT be Creative to Ideate
Alpha Catalyst Consulting
 
The power of connecting
The power of connectingThe power of connecting
The power of connecting
Frieda Brioschi
 
Innovation Design Canvas
Innovation Design Canvas Innovation Design Canvas
Innovation Design Canvas
Andrea Gaiardo
 
Where to focus event innovation? - An audience led approach
Where to focus event innovation? - An audience led approachWhere to focus event innovation? - An audience led approach
Where to focus event innovation? - An audience led approach
Live Union
 
The very special, executive summary v4.0
The very special, executive summary v4.0The very special, executive summary v4.0
The very special, executive summary v4.0
Ullash Tiwari
 
Innovation through Experience Design: Designers as Innovators
Innovation through Experience Design: Designers as InnovatorsInnovation through Experience Design: Designers as Innovators
Innovation through Experience Design: Designers as Innovators
Jason Ulaszek
 
Creativity in Danish Businesses - CINC - Web
Creativity in Danish Businesses - CINC - WebCreativity in Danish Businesses - CINC - Web
Creativity in Danish Businesses - CINC - Web
Jacob Lennheden
 
CILIP article pdf
CILIP article pdfCILIP article pdf
Futurice-Companys_Guide_To_Open_Source_And_Social_Impact
Futurice-Companys_Guide_To_Open_Source_And_Social_ImpactFuturice-Companys_Guide_To_Open_Source_And_Social_Impact
Futurice-Companys_Guide_To_Open_Source_And_Social_Impact
Teemu Turunen
 
Innovation in Practice
Innovation in PracticeInnovation in Practice
Innovation in Practice
Kat Wilson
 
How to build a FinTech brand from scratch?
How to build a FinTech brand from scratch?How to build a FinTech brand from scratch?
How to build a FinTech brand from scratch?
Holvi
 
Launch box intro presentation-2018
Launch box   intro presentation-2018Launch box   intro presentation-2018
Launch box intro presentation-2018
L*unchBox Workshop
 
Marketing Your Open Source Project - OSCON 2019_v04.pdf
Marketing Your Open Source Project - OSCON 2019_v04.pdfMarketing Your Open Source Project - OSCON 2019_v04.pdf
Marketing Your Open Source Project - OSCON 2019_v04.pdf
Amazon Web Services
 

Similar to How to create your own innovation lab v1 (20)

Design Thinking & Innovation
Design Thinking & InnovationDesign Thinking & Innovation
Design Thinking & Innovation
 
What We’re Learning at the Laboratory of Innovation Sciences at Harvard
What We’re Learning at the Laboratory of Innovation Sciences at HarvardWhat We’re Learning at the Laboratory of Innovation Sciences at Harvard
What We’re Learning at the Laboratory of Innovation Sciences at Harvard
 
What We're Learning at the Laboratory of Innovation Sciences at Harvard
What We're Learning at the Laboratory of Innovation Sciences at HarvardWhat We're Learning at the Laboratory of Innovation Sciences at Harvard
What We're Learning at the Laboratory of Innovation Sciences at Harvard
 
A Playbook for Corporate Innovation - Explorium HK
A Playbook for Corporate Innovation - Explorium HKA Playbook for Corporate Innovation - Explorium HK
A Playbook for Corporate Innovation - Explorium HK
 
NGO project start-up pack
NGO project start-up packNGO project start-up pack
NGO project start-up pack
 
No time, no money, no mandate: User research in the public sector #SXC15
No time, no money, no mandate: User research in the public sector #SXC15No time, no money, no mandate: User research in the public sector #SXC15
No time, no money, no mandate: User research in the public sector #SXC15
 
Service Design Network Global Conference 2014 report
Service Design Network Global Conference 2014 reportService Design Network Global Conference 2014 report
Service Design Network Global Conference 2014 report
 
You need NOT be Creative to Ideate
You need NOT be Creative to IdeateYou need NOT be Creative to Ideate
You need NOT be Creative to Ideate
 
The power of connecting
The power of connectingThe power of connecting
The power of connecting
 
Innovation Design Canvas
Innovation Design Canvas Innovation Design Canvas
Innovation Design Canvas
 
Where to focus event innovation? - An audience led approach
Where to focus event innovation? - An audience led approachWhere to focus event innovation? - An audience led approach
Where to focus event innovation? - An audience led approach
 
The very special, executive summary v4.0
The very special, executive summary v4.0The very special, executive summary v4.0
The very special, executive summary v4.0
 
Innovation through Experience Design: Designers as Innovators
Innovation through Experience Design: Designers as InnovatorsInnovation through Experience Design: Designers as Innovators
Innovation through Experience Design: Designers as Innovators
 
Creativity in Danish Businesses - CINC - Web
Creativity in Danish Businesses - CINC - WebCreativity in Danish Businesses - CINC - Web
Creativity in Danish Businesses - CINC - Web
 
CILIP article pdf
CILIP article pdfCILIP article pdf
CILIP article pdf
 
Futurice-Companys_Guide_To_Open_Source_And_Social_Impact
Futurice-Companys_Guide_To_Open_Source_And_Social_ImpactFuturice-Companys_Guide_To_Open_Source_And_Social_Impact
Futurice-Companys_Guide_To_Open_Source_And_Social_Impact
 
Innovation in Practice
Innovation in PracticeInnovation in Practice
Innovation in Practice
 
How to build a FinTech brand from scratch?
How to build a FinTech brand from scratch?How to build a FinTech brand from scratch?
How to build a FinTech brand from scratch?
 
Launch box intro presentation-2018
Launch box   intro presentation-2018Launch box   intro presentation-2018
Launch box intro presentation-2018
 
Marketing Your Open Source Project - OSCON 2019_v04.pdf
Marketing Your Open Source Project - OSCON 2019_v04.pdfMarketing Your Open Source Project - OSCON 2019_v04.pdf
Marketing Your Open Source Project - OSCON 2019_v04.pdf
 

More from festivalslab

ProjectLab ideation guide version 3.0
ProjectLab ideation guide version 3.0ProjectLab ideation guide version 3.0
ProjectLab ideation guide version 3.0
festivalslab
 
Festivals Only- ProjectLab Guide V3
Festivals Only- ProjectLab Guide V3Festivals Only- ProjectLab Guide V3
Festivals Only- ProjectLab Guide V3
festivalslab
 
ProjectLa
ProjectLaProjectLa
ProjectLa
festivalslab
 
ProjectLab Overview
ProjectLab OverviewProjectLab Overview
ProjectLab Overview
festivalslab
 
Project lab ideation guide version 3.0
Project lab ideation guide  version 3.0Project lab ideation guide  version 3.0
Project lab ideation guide version 3.0
festivalslab
 
festivalslab Project Showreel v1
festivalslab Project Showreel v1festivalslab Project Showreel v1
festivalslab Project Showreel v1
festivalslab
 
Edinburgh festivals accessibility digital project brief v1
Edinburgh festivals accessibility digital project brief v1Edinburgh festivals accessibility digital project brief v1
Edinburgh festivals accessibility digital project brief v1
festivalslab
 
Festivals-only
Festivals-onlyFestivals-only
Festivals-only
festivalslab
 
Festivals-only
Festivals-onlyFestivals-only
Festivals-only
festivalslab
 
Festivals-only
Festivals-onlyFestivals-only
Festivals-only
festivalslab
 
Festival DNA - workshop poster
Festival DNA - workshop posterFestival DNA - workshop poster
Festival DNA - workshop poster
festivalslab
 
Customer journey map - workshop poster
Customer journey map - workshop posterCustomer journey map - workshop poster
Customer journey map - workshop poster
festivalslab
 
Festival customers - workshop poster
Festival customers - workshop posterFestival customers - workshop poster
Festival customers - workshop poster
festivalslab
 
Festival relationships - workshop poster
Festival relationships - workshop posterFestival relationships - workshop poster
Festival relationships - workshop poster
festivalslab
 
Festival touchpoints - workshop poster
Festival touchpoints - workshop posterFestival touchpoints - workshop poster
Festival touchpoints - workshop poster
festivalslab
 
Festivals Design DNA Wheel
Festivals Design DNA WheelFestivals Design DNA Wheel
Festivals Design DNA Wheel
festivalslab
 
Festival Design DNA Wheel
Festival Design DNA WheelFestival Design DNA Wheel
Festival Design DNA Wheel
festivalslab
 
Full Toolset
Full ToolsetFull Toolset
Full Toolset
festivalslab
 
Discovering Old & New Customers
Discovering Old & New CustomersDiscovering Old & New Customers
Discovering Old & New Customers
festivalslab
 
Connecting Festivals To Offer More
Connecting Festivals To Offer MoreConnecting Festivals To Offer More
Connecting Festivals To Offer More
festivalslab
 

More from festivalslab (20)

ProjectLab ideation guide version 3.0
ProjectLab ideation guide version 3.0ProjectLab ideation guide version 3.0
ProjectLab ideation guide version 3.0
 
Festivals Only- ProjectLab Guide V3
Festivals Only- ProjectLab Guide V3Festivals Only- ProjectLab Guide V3
Festivals Only- ProjectLab Guide V3
 
ProjectLa
ProjectLaProjectLa
ProjectLa
 
ProjectLab Overview
ProjectLab OverviewProjectLab Overview
ProjectLab Overview
 
Project lab ideation guide version 3.0
Project lab ideation guide  version 3.0Project lab ideation guide  version 3.0
Project lab ideation guide version 3.0
 
festivalslab Project Showreel v1
festivalslab Project Showreel v1festivalslab Project Showreel v1
festivalslab Project Showreel v1
 
Edinburgh festivals accessibility digital project brief v1
Edinburgh festivals accessibility digital project brief v1Edinburgh festivals accessibility digital project brief v1
Edinburgh festivals accessibility digital project brief v1
 
Festivals-only
Festivals-onlyFestivals-only
Festivals-only
 
Festivals-only
Festivals-onlyFestivals-only
Festivals-only
 
Festivals-only
Festivals-onlyFestivals-only
Festivals-only
 
Festival DNA - workshop poster
Festival DNA - workshop posterFestival DNA - workshop poster
Festival DNA - workshop poster
 
Customer journey map - workshop poster
Customer journey map - workshop posterCustomer journey map - workshop poster
Customer journey map - workshop poster
 
Festival customers - workshop poster
Festival customers - workshop posterFestival customers - workshop poster
Festival customers - workshop poster
 
Festival relationships - workshop poster
Festival relationships - workshop posterFestival relationships - workshop poster
Festival relationships - workshop poster
 
Festival touchpoints - workshop poster
Festival touchpoints - workshop posterFestival touchpoints - workshop poster
Festival touchpoints - workshop poster
 
Festivals Design DNA Wheel
Festivals Design DNA WheelFestivals Design DNA Wheel
Festivals Design DNA Wheel
 
Festival Design DNA Wheel
Festival Design DNA WheelFestival Design DNA Wheel
Festival Design DNA Wheel
 
Full Toolset
Full ToolsetFull Toolset
Full Toolset
 
Discovering Old & New Customers
Discovering Old & New CustomersDiscovering Old & New Customers
Discovering Old & New Customers
 
Connecting Festivals To Offer More
Connecting Festivals To Offer MoreConnecting Festivals To Offer More
Connecting Festivals To Offer More
 

Recently uploaded

Russian Girls Call Navi Mumbai 🎈🔥9920725232 🔥💋🎈 Provide Best And Top Girl Ser...
Russian Girls Call Navi Mumbai 🎈🔥9920725232 🔥💋🎈 Provide Best And Top Girl Ser...Russian Girls Call Navi Mumbai 🎈🔥9920725232 🔥💋🎈 Provide Best And Top Girl Ser...
Russian Girls Call Navi Mumbai 🎈🔥9920725232 🔥💋🎈 Provide Best And Top Girl Ser...
bellared2
 
Sonkoloniya documentation - ONEprojukti.pdf
Sonkoloniya documentation - ONEprojukti.pdfSonkoloniya documentation - ONEprojukti.pdf
Sonkoloniya documentation - ONEprojukti.pdf
SubhamMandal40
 
Vertex AI Agent Builder - GDG Alicante - Julio 2024
Vertex AI Agent Builder - GDG Alicante - Julio 2024Vertex AI Agent Builder - GDG Alicante - Julio 2024
Vertex AI Agent Builder - GDG Alicante - Julio 2024
Nicolás Lopéz
 
Opencast Summit 2024 — Opencast @ University of Münster
Opencast Summit 2024 — Opencast @ University of MünsterOpencast Summit 2024 — Opencast @ University of Münster
Opencast Summit 2024 — Opencast @ University of Münster
Matthias Neugebauer
 
Communications Mining Series - Zero to Hero - Session 3
Communications Mining Series - Zero to Hero - Session 3Communications Mining Series - Zero to Hero - Session 3
Communications Mining Series - Zero to Hero - Session 3
DianaGray10
 
Girls Call Churchgate 9910780858 Provide Best And Top Girl Service And No1 in...
Girls Call Churchgate 9910780858 Provide Best And Top Girl Service And No1 in...Girls Call Churchgate 9910780858 Provide Best And Top Girl Service And No1 in...
Girls Call Churchgate 9910780858 Provide Best And Top Girl Service And No1 in...
maigasapphire
 
Gen AI: Privacy Risks of Large Language Models (LLMs)
Gen AI: Privacy Risks of Large Language Models (LLMs)Gen AI: Privacy Risks of Large Language Models (LLMs)
Gen AI: Privacy Risks of Large Language Models (LLMs)
Debmalya Biswas
 
EuroPython 2024 - Streamlining Testing in a Large Python Codebase
EuroPython 2024 - Streamlining Testing in a Large Python CodebaseEuroPython 2024 - Streamlining Testing in a Large Python Codebase
EuroPython 2024 - Streamlining Testing in a Large Python Codebase
Jimmy Lai
 
Camunda Chapter NY Meetup July 2024.pptx
Camunda Chapter NY Meetup July 2024.pptxCamunda Chapter NY Meetup July 2024.pptx
Camunda Chapter NY Meetup July 2024.pptx
ZachWylie3
 
UX Webinar Series: Essentials for Adopting Passkeys as the Foundation of your...
UX Webinar Series: Essentials for Adopting Passkeys as the Foundation of your...UX Webinar Series: Essentials for Adopting Passkeys as the Foundation of your...
UX Webinar Series: Essentials for Adopting Passkeys as the Foundation of your...
FIDO Alliance
 
Garbage In, Garbage Out: Why poor data curation is killing your AI models (an...
Garbage In, Garbage Out: Why poor data curation is killing your AI models (an...Garbage In, Garbage Out: Why poor data curation is killing your AI models (an...
Garbage In, Garbage Out: Why poor data curation is killing your AI models (an...
Zilliz
 
Feature sql server terbaru performance.pptx
Feature sql server terbaru performance.pptxFeature sql server terbaru performance.pptx
Feature sql server terbaru performance.pptx
ssuser1915fe1
 
Zaitechno Handheld Raman Spectrometer.pdf
Zaitechno Handheld Raman Spectrometer.pdfZaitechno Handheld Raman Spectrometer.pdf
Zaitechno Handheld Raman Spectrometer.pdf
AmandaCheung15
 
LeadMagnet IQ Review: Unlock the Secret to Effortless Traffic and Leads.pdf
LeadMagnet IQ Review:  Unlock the Secret to Effortless Traffic and Leads.pdfLeadMagnet IQ Review:  Unlock the Secret to Effortless Traffic and Leads.pdf
LeadMagnet IQ Review: Unlock the Secret to Effortless Traffic and Leads.pdf
SelfMade bd
 
Redefining Cybersecurity with AI Capabilities
Redefining Cybersecurity with AI CapabilitiesRedefining Cybersecurity with AI Capabilities
Redefining Cybersecurity with AI Capabilities
Priyanka Aash
 
Mastering OnlyFans Clone App Development: Key Strategies for Success
Mastering OnlyFans Clone App Development: Key Strategies for SuccessMastering OnlyFans Clone App Development: Key Strategies for Success
Mastering OnlyFans Clone App Development: Key Strategies for Success
David Wilson
 
Step-By-Step Process to Develop a Mobile App From Scratch
Step-By-Step Process to Develop a Mobile App From ScratchStep-By-Step Process to Develop a Mobile App From Scratch
Step-By-Step Process to Develop a Mobile App From Scratch
softsuave
 
How UiPath Discovery Suite supports identification of Agentic Process Automat...
How UiPath Discovery Suite supports identification of Agentic Process Automat...How UiPath Discovery Suite supports identification of Agentic Process Automat...
How UiPath Discovery Suite supports identification of Agentic Process Automat...
DianaGray10
 
Uncharted Together- Navigating AI's New Frontiers in Libraries
Uncharted Together- Navigating AI's New Frontiers in LibrariesUncharted Together- Navigating AI's New Frontiers in Libraries
Uncharted Together- Navigating AI's New Frontiers in Libraries
Brian Pichman
 
It's your unstructured data: How to get your GenAI app to production (and spe...
It's your unstructured data: How to get your GenAI app to production (and spe...It's your unstructured data: How to get your GenAI app to production (and spe...
It's your unstructured data: How to get your GenAI app to production (and spe...
Zilliz
 

Recently uploaded (20)

Russian Girls Call Navi Mumbai 🎈🔥9920725232 🔥💋🎈 Provide Best And Top Girl Ser...
Russian Girls Call Navi Mumbai 🎈🔥9920725232 🔥💋🎈 Provide Best And Top Girl Ser...Russian Girls Call Navi Mumbai 🎈🔥9920725232 🔥💋🎈 Provide Best And Top Girl Ser...
Russian Girls Call Navi Mumbai 🎈🔥9920725232 🔥💋🎈 Provide Best And Top Girl Ser...
 
Sonkoloniya documentation - ONEprojukti.pdf
Sonkoloniya documentation - ONEprojukti.pdfSonkoloniya documentation - ONEprojukti.pdf
Sonkoloniya documentation - ONEprojukti.pdf
 
Vertex AI Agent Builder - GDG Alicante - Julio 2024
Vertex AI Agent Builder - GDG Alicante - Julio 2024Vertex AI Agent Builder - GDG Alicante - Julio 2024
Vertex AI Agent Builder - GDG Alicante - Julio 2024
 
Opencast Summit 2024 — Opencast @ University of Münster
Opencast Summit 2024 — Opencast @ University of MünsterOpencast Summit 2024 — Opencast @ University of Münster
Opencast Summit 2024 — Opencast @ University of Münster
 
Communications Mining Series - Zero to Hero - Session 3
Communications Mining Series - Zero to Hero - Session 3Communications Mining Series - Zero to Hero - Session 3
Communications Mining Series - Zero to Hero - Session 3
 
Girls Call Churchgate 9910780858 Provide Best And Top Girl Service And No1 in...
Girls Call Churchgate 9910780858 Provide Best And Top Girl Service And No1 in...Girls Call Churchgate 9910780858 Provide Best And Top Girl Service And No1 in...
Girls Call Churchgate 9910780858 Provide Best And Top Girl Service And No1 in...
 
Gen AI: Privacy Risks of Large Language Models (LLMs)
Gen AI: Privacy Risks of Large Language Models (LLMs)Gen AI: Privacy Risks of Large Language Models (LLMs)
Gen AI: Privacy Risks of Large Language Models (LLMs)
 
EuroPython 2024 - Streamlining Testing in a Large Python Codebase
EuroPython 2024 - Streamlining Testing in a Large Python CodebaseEuroPython 2024 - Streamlining Testing in a Large Python Codebase
EuroPython 2024 - Streamlining Testing in a Large Python Codebase
 
Camunda Chapter NY Meetup July 2024.pptx
Camunda Chapter NY Meetup July 2024.pptxCamunda Chapter NY Meetup July 2024.pptx
Camunda Chapter NY Meetup July 2024.pptx
 
UX Webinar Series: Essentials for Adopting Passkeys as the Foundation of your...
UX Webinar Series: Essentials for Adopting Passkeys as the Foundation of your...UX Webinar Series: Essentials for Adopting Passkeys as the Foundation of your...
UX Webinar Series: Essentials for Adopting Passkeys as the Foundation of your...
 
Garbage In, Garbage Out: Why poor data curation is killing your AI models (an...
Garbage In, Garbage Out: Why poor data curation is killing your AI models (an...Garbage In, Garbage Out: Why poor data curation is killing your AI models (an...
Garbage In, Garbage Out: Why poor data curation is killing your AI models (an...
 
Feature sql server terbaru performance.pptx
Feature sql server terbaru performance.pptxFeature sql server terbaru performance.pptx
Feature sql server terbaru performance.pptx
 
Zaitechno Handheld Raman Spectrometer.pdf
Zaitechno Handheld Raman Spectrometer.pdfZaitechno Handheld Raman Spectrometer.pdf
Zaitechno Handheld Raman Spectrometer.pdf
 
LeadMagnet IQ Review: Unlock the Secret to Effortless Traffic and Leads.pdf
LeadMagnet IQ Review:  Unlock the Secret to Effortless Traffic and Leads.pdfLeadMagnet IQ Review:  Unlock the Secret to Effortless Traffic and Leads.pdf
LeadMagnet IQ Review: Unlock the Secret to Effortless Traffic and Leads.pdf
 
Redefining Cybersecurity with AI Capabilities
Redefining Cybersecurity with AI CapabilitiesRedefining Cybersecurity with AI Capabilities
Redefining Cybersecurity with AI Capabilities
 
Mastering OnlyFans Clone App Development: Key Strategies for Success
Mastering OnlyFans Clone App Development: Key Strategies for SuccessMastering OnlyFans Clone App Development: Key Strategies for Success
Mastering OnlyFans Clone App Development: Key Strategies for Success
 
Step-By-Step Process to Develop a Mobile App From Scratch
Step-By-Step Process to Develop a Mobile App From ScratchStep-By-Step Process to Develop a Mobile App From Scratch
Step-By-Step Process to Develop a Mobile App From Scratch
 
How UiPath Discovery Suite supports identification of Agentic Process Automat...
How UiPath Discovery Suite supports identification of Agentic Process Automat...How UiPath Discovery Suite supports identification of Agentic Process Automat...
How UiPath Discovery Suite supports identification of Agentic Process Automat...
 
Uncharted Together- Navigating AI's New Frontiers in Libraries
Uncharted Together- Navigating AI's New Frontiers in LibrariesUncharted Together- Navigating AI's New Frontiers in Libraries
Uncharted Together- Navigating AI's New Frontiers in Libraries
 
It's your unstructured data: How to get your GenAI app to production (and spe...
It's your unstructured data: How to get your GenAI app to production (and spe...It's your unstructured data: How to get your GenAI app to production (and spe...
It's your unstructured data: How to get your GenAI app to production (and spe...
 

How to create your own innovation lab v1

  • 1. How to create your own innovation lab Thinking & approaches from festivalslab a work-in-progress guide written by and written for
  • 2. How to create your own innovation lab This document is a summary of some of the thinking, principles & approaches that underpin the work done as part of the Edinburgh Festivals Innovation Lab also known as festivalslab. festivalslab is a pioneering programme of work which explores how to use new thinking and new tools to make the Edinburgh festivals even better. Usage license: Creative Commons Attributable Non-Commercial
  • 3. What learning is best shared? In the field of innovation, since new projects are by definition often very exciting and attractive, there can be a tendency to become fixated on the details of projects. And through our work which to date has includes projects like Culture Hack Scotland, the Festivals Listings API, Festival Design DNA and the Edinburgh Festivals Ideas Challenge we have a number of such great high-profile projects.
  • 4. Thinking and process (not projects) But since not everyone is directly like the Edinburgh Festivals, the fine detail of these projects will only be directly replicable in a small number of other organisations. Therefore we feel it is much more important to share process thinking rather than project details (which can be found elsewhere). So this guide contains eighteen statements in no particular order that sum up either a foundational principle of the festivalslab work or something important we have learnt along the way. Like any good innovation programme, we have both successes and failures and whether you’re an individual practitioner, a small organisation or a national company we are sure that you will find something of use here.
  • 5. How to use this guide This document is intended not a step-by-step guidebook but as a manifesto, a home of inspiration for anyone interested in innovation in the cultural sector. So please use it in whatever way you find most useful. That might be by reading it all through at once, jumping all over the place, dipping back into it over time or just finding one or two statements that really resonate with where you are right now. Only you will know how to make the most of what we have shared here. And remember, like festivalslab itself, this is a work in progress. So pls email lab@festivalsedinburgh.com to tell us how to make it better. Thank you. (v1.0 Dec 18th 2011)
  • 6. The www.festivalclock.com visualisation by Justin Quillinan and Stef Posavec was the most beautiful usage of the Festivals Listings API in 2011
  • 7. 1.Work with digital talent as creatives
  • 8. Work with digital talent as creatives Too often the only type of relationship that cultural organisations have with digital talent is transactional...ie we’ll give you £5k and you’ll give us a website. This is not collaboration, this is a service relationship. Events like Culture Hack Scotland show us the enormous potential of what can happen when cultural professionals and organisations meet digital talent and web developers in a way that is exploratory, experimental and equitable. If we can engage with technologists with the same attitudes and processes by which we engage with artists then we may find out that they are actually more similar than we first thought. Simple action: find a web developer who loves your work, buy them a coffee, tell them what’s on your mind and then listen to what they say
  • 10. Think like a designer As cultural organisations we often think we that what we want is the same as what people want... but believe it or not this is often not the case. As we look to find ways to improve the experiences we provide, it can be very powerful to start with the needs and behaviours of real people. Design thinking and established design approaches can be powerful ways to unlock opportunities for innovation and improvement, especially when they are people-centred. Simple action: remember a service experience which you have found frustrating in a domain like banking and transport and think about why it didn’t work. Do the same for a well-designed service experience
  • 11. A close-up from our extensive toolkit on cultural innovation from a design perspective. Visit design.festivalslab.com to try it for yourself
  • 12. 3.Make more of what you’ve already got
  • 13. Make more of what you’ve already got One way of defining innovation is taking your existing assets and discovering new ways to frame them in such a way that creates new value. In the cultural context, assets typically include things like brand, reputation, programme, archive, data, content, network, relationships, cash etc. The Edinburgh Festivals listings data API project does just that by taking programme data and making it openly available in a web developer-friendly format time thereby encouraging a new family of exciting apps and services. Simple action: make a list of your assets and identify which of them could be given a new context so as to result in valuable projects.
  • 14. 4.Consider both need & opportunity
  • 15. Consider both need and opportunity Innovation projects come in two types: those based on need (e.g. we need to attract a younger audience) or those based on opportunity (e.g. more and more people are using smart-phones). If the portfolio of our projects isn’t balanced then there can be problems - too much opportunity-led work can lead to innovation that is shiny and sexy but not business-critical and too much needs-led work can lead to innovtion that is functional and not progressive. And of course the magic happens when need and opportunity match. Simple action: if you have a list of project ideas, identify which ideas are needs-led and which are opportunity-led
  • 16. The mobile site of the Edinburgh Intl Book Festival started as a Culture Hack Scotland project and the code is available open source for anyone to use
  • 18. Tell your story Documents like this is just one of the ways that we share our stories and ideas. It of course shares our learning and is therefore a important way of increasing the impact of the investment made in our work. But as well as that it also allows us to make new connections, lets people tell us what we’ve got wrong and gives us direction on how to improve. Therefore we have found that the storytelling we do via the blog and showcase at festivalslab.com is as important as the projects themselves. Simple action: find a blog relevant to innovation in your context and post a comment that shares your own thinking and your experience
  • 19. v Sharing our work & thinking via the festivalslab.com blog has been invaluable to connecting with people from around the world
  • 20. 6.Uncover your rules and assumptions
  • 21. Uncover your rules and assumptions Another way of defining innovation is the intentional breaking of rules that lead to new value. And the more deep-held the view, the more radical the innovation is. These can be rules about funding, the kind of work your produce, timelines of production, how you relate to technology, how you relate to audiences...whatever! The rules of a cultural organisation are very rarely explicit and so making them so can be a very powerful jump-off point for innovation Simple action: write down five things from the basic rule set of how you and/or your organisation works and order them by how deeply held they are
  • 23. Break them With the Festivals Listing API project we took the rule that “we only publish listings via our websites, our print programmes” and systematically broke it in such a way to create a new way for web developers to engage with the festivals. Breaking rules is by definition difficult and so modelling out what what the costs and benefits of doing so is critical Simple action: take a rule and do a thought-experiment where this is broken and imagine what that might be like and what the consequences (good and bad) of that might be. Do it for a deep rule and then for a light rule.
  • 25. Steal what works Innovation is not invention. Here at festivalslab we have borrowed tried and tested approaches from the domains of social and private sector innovation and just translated them into the cultural context. So while things like our API project, Culture Hack Scotland, our service design work and the Ideas Challenge are relatively radical in the cultural sector, they are not new ideas. Simple action: think about what your favourite innovation is in the cultural sector and think about how the thinking behind it could be applied to your context. Do the same for a non-cultural example.
  • 26. The inaugural Culture Hack Scotland in May 2011 was a 24 hour event that created 30 amazing projects thanks to the spirit of collaboration
  • 28. Make it important If your innovation agenda isn’t important enough to you and your team then it will be difficult to develop the requisite momentum to implement them and make the different you want to make. Making innovation important and driving engagement is best done by three ways - curating projects that matter to your team, communicating why and what you’re doing effectively and making innovation practice a valued and measured part of your day job. Simple action: find out what innovation means to your individual team members and understand their ambitions and priorities
  • 30. Be realistic Innovation is hard and actual impacts don’t always match ambition. Be realistic about what you can achieve within your resources and be wary of ascribing magical powers to digital technology. Simple action: outline the basic outputs and outcomes you’re aiming for and then read them back to someone else the following day and revise accordingly
  • 32. Open up The majority of festivalslab’s work is what’s called open innovation - making new pathways for other people to work with the festivals in such a way that leads to mutual benefit. This is based mainly on the realisation that significant innovation ambitions cannot be realised by oneself and that - if designed well - allowing the strengths of different project partners to work together will lead to the best results. Simple action: write down the ways your organisation is closed and in which ways it is open
  • 33. The Edinburgh Festivals Ideas Challenge sourced 300 ideas from the general public of how to improve the festival experience
  • 35. Define your limits This is just sensible project planning. Running innovation projects in all parts of your work will overextend you and so it is prudent to set a conservative scope for innovation work and include more as it develops rather than starting with everything. Simple action: list the different part of your business, identify which are in scope for innovation and then list them by practicality
  • 36. 13.Find tools that work for you
  • 37. Find tools that work for you There are so many innovation methodologies, resources and tools out there which can help your thinking and practice. The ones that have been most influential to festivalslab have been those to do with open innovation and service design. And a specific tool we recommend is the visual business model canvas as explained in the book Business Model Generation. Simple action: visit businessmodelgeneration.com and see if you find it relevant and interesting
  • 39. Make partnerships make Every cultural organisation has a rich set of relationships and partnerships. Many of these however can be conversational and not result in tangible outputs. Innovation is about making and so it can be incredibly useful to move past conversations to understand project opportunities which can result in benefits for you and your partner. At festivalslab we’re doing this with three target partner types: developer communities, universities and technology companies. Simple action: identify your exiting relationships which you’d like to convert from talking to making
  • 40. Through the Smart Tourism project, we are able to collaborate six leading informatics and computer science academic departments across Scotland
  • 42. Ungeek innovation Since so much of innovation is digital we can often confuse the two. And since digital and technology can be a barrier to many people, using too much technical language or curating too many technical projects can alienate people from an innovation agenda when it doesn’t need to. That is why we at festivalslab do as much work on projects around design as we do on data. We call this ungeeking innovation since it would be a shame if cultural innovation were to become perceived as too technical and inaccessible when it needn’t be at all. Simple action: talk to someone completely non-technical about your innovation ambitions to test your language and ability to make a case
  • 44. Start Ideas are easy but implementation is not. Innovation is more about making than talking and so it is better to start prototyping the ideas that really speak to your context than going to more events for inspiration and yet more ideas. Simple action: work out how to test or prototype an idea quickly and cheaply and just do it
  • 46. Stop In an area like innovation where ideas are bountiful focussing on project completion projects can be challenging. When the projects have been chosen in which you will be investing time and energy and money, make sure they get done. Simple action: for all projects articulate a clear end point and exit strategy
  • 48. Don’t stop Innovation is an infinitive game and so part of the challenge of innovation work is ensuring that projects get successfully delivered while keeping an eye on future opportunities. Central to this is learning, learning about what worked and what didn’t and using this intelligence as the fuel for future work. Simple action: Don’t stop.
  • 50. About festivalslab The Edinburgh Festivals Innovation Lab - festivalslab for short - is the innovation programme of Festivals Edinburgh - the strategic umbrella organisation for the twelve major Edinburgh festivals set up in 2007 to lead on their joint strategic direction and maintain their global competitive edge. festivalslab is supported by Creative Scotland and you can find out more via: festivalslab.com @festivalslab lab@festivalsedinburgh.com Simple action: visit showcase.festivalslab.com to see our work