Highway capacity and levels of service
School of C i v i l E n g i n e e r i n g
20/06/2020
D r . S e e l a m S r i k a n t h R e d d y
Unit 3
HIGHWAY CAPACITY AND LEVELS OF
SERVICE
• Often it is required to find out how much a transport facility can
accommodate?
•Capacity analysis helps in answering the question. It is a quantitative
assessment of the ability of a transport facility to handle vehicles or people for
which it is designed.
•Such information is useful in the design of traffic facility.
HIGHWAY CAPACITY AND LEVELS OF
SERVICE
•A related question is, what is the performance level of the system at various
operating conditions. Or in other words, how good is the operation of the
traffic facility.
•Level of Service analysis tries to answer this question which is essentially a
qualitative analysis.
HIGHWAY CAPACITY
Basic Capacity: The basic capacity is the maximum number of vehicles that
can pass a given point on a lane or a roadway during one hour under the
most ideal roadway and traffic conditions that can possibly be attained.
Possible Capacity: The possible capacity is the maximum number of vehicles
that can pass a given point on a lane or a roadway during one hour under the
prevailing roadway and traffic conditions.
HIGHWAY CAPACITY
Practical Capacity:
• Practical capacity is the maximum number of vehicles that can pass a
given point in a lane or roadway during one hour, when traffic density is
not so great as to cause unreasonable delay, hazard or restriction to the
driver’s freedom to manoeuvre under prevailing roadway and traffic
conditions. This is usually considered to be the ‘design capacity
FACTORS INFLUENCING THE HIGHWAY
CAPACITY
•Traffic conditions (vehicle composition, turning movements, etc. )
•Roadway conditions (geometrical characteristics such as lane width, shoulder
width, horizontal alignment, and vertical alignment. )
•Control conditions (traffic signal timings, round-about characteristics etc.)
LEVELS OF SERVICE
Level-of-Service is introduced by HCM to denote the level of quality one can
derive from a road under different operational conditions and traffic
volume.
The level of service is defined as a qualitative measure describing the
operational conditions within traffic stream and their perception by drivers
(motorists) and passengers.
Factors in evaluating LoS:
• Speed and travel time
• Traffic interruptions or restrictions
• Freedom to manoeuvre
• Driving comfort and convenience
• Economy
LEVELS OF SERVICE
i) Travel speed ii) V/C ratio
Six LOS letters are defined by HCM, namely A, B, C, D, E, and F, where A
denote the best quality of service and F denote the worst.
Level of Service A:
• Free flow, with low volumes and high speeds.
• Traffic density is low, with speeds controlled by drivers desired speed
limits and physical roadway conditions.
• Little or no restriction in manoeuvrability due to presence of other
vehicles.
LEVELS OF SERVICE
Level of Service B:
• Zone of stable flow, with operating speeds beginning to be
restricted somewhat by traffic conditions.
• Drivers still have reasonable freedom to select their speed and
lane of operation
• This level of service used in the design of rural highways
LEVELS OF SERVICE
Level of Service C:
• Still in the Zone of stable flow, but speeds and manoeuvrability
are controlled by higher volumes.
• Most of Drivers restricted in the freedom to select their own
speed and lane changing or overtaking.
• This level of service used in the urban design practice
LEVELS OF SERVICE
Level of Service D:
• Approaches unstable flow, with operating speeds considerably
affected by changes in operating conditions.
• Drivers have little freedom to manoeuvre comfort and
convenience are low, but conditions can be tolerated for short
periods of time.
LEVELS OF SERVICE
Level of Service E:
• Flow is unstable, and there may be stoppages of momentary
duration.
• Can described by speed alone, but represents with lower
operating speeds than in level D and with volumes at or near
the capacity of the highway.
LEVELS OF SERVICE
Level of Service F:
• Forced flow conditions at lower speeds, where volumes are just
below capacity.
• Speeds are reduced substantially and stoppage may occur for
short or long periods of time because of congestion.
• In the extreme, both speed and volume can drop to zero
LEVELS OF SERVICE

More Related Content

What's hot

Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)
Civil Zone
 
L1 Traffic Flow Parameters
L1 Traffic Flow ParametersL1 Traffic Flow Parameters
L1 Traffic Flow Parameters
Hossam Shafiq I
 
He final ppt
He final pptHe final ppt
He final ppt
ShahIshani1996
 
PCU Estimation.pptx
PCU Estimation.pptxPCU Estimation.pptx
PCU Estimation.pptx
AbdullahRafeek2
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
Abontee
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topics
Shubham Sadh
 
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
VATSAL PATEL
 
Traffic enginering highway capacity and los print mood publish
Traffic enginering highway capacity and los print mood publishTraffic enginering highway capacity and los print mood publish
Traffic enginering highway capacity and los print mood publish
Gizaw Mekonnen
 
Report on rsa for rural road
Report on rsa for rural roadReport on rsa for rural road
Report on rsa for rural road
Pawan Kumar
 
Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308
saibabu48
 
Urban Transportation System
Urban Transportation SystemUrban Transportation System
Urban Transportation System
kishan korat
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
Sai Santosh Yakkali
 
Chapter 7
Chapter 7Chapter 7
Chapter 7
EWIT
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
Sowjanya Gannoju
 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
SoKhit1
 
Importance and Classification of Road
Importance and Classification of RoadImportance and Classification of Road
Importance and Classification of Road
Shrikant Ingale
 
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Hossam Shafiq I
 
Travel demand management
Travel demand managementTravel demand management
Travel demand management
Presi
 
Road user characteristics
Road user characteristicsRoad user characteristics
Road user characteristics
Chockalingam T
 
Spot speed study, transport planning
Spot speed study, transport planningSpot speed study, transport planning
Spot speed study, transport planning
Pratyush Kumar
 

What's hot (20)

Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)
 
L1 Traffic Flow Parameters
L1 Traffic Flow ParametersL1 Traffic Flow Parameters
L1 Traffic Flow Parameters
 
He final ppt
He final pptHe final ppt
He final ppt
 
PCU Estimation.pptx
PCU Estimation.pptxPCU Estimation.pptx
PCU Estimation.pptx
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topics
 
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
 
Traffic enginering highway capacity and los print mood publish
Traffic enginering highway capacity and los print mood publishTraffic enginering highway capacity and los print mood publish
Traffic enginering highway capacity and los print mood publish
 
Report on rsa for rural road
Report on rsa for rural roadReport on rsa for rural road
Report on rsa for rural road
 
Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308
 
Urban Transportation System
Urban Transportation SystemUrban Transportation System
Urban Transportation System
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
 
Chapter 7
Chapter 7Chapter 7
Chapter 7
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
 
Importance and Classification of Road
Importance and Classification of RoadImportance and Classification of Road
Importance and Classification of Road
 
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
 
Travel demand management
Travel demand managementTravel demand management
Travel demand management
 
Road user characteristics
Road user characteristicsRoad user characteristics
Road user characteristics
 
Spot speed study, transport planning
Spot speed study, transport planningSpot speed study, transport planning
Spot speed study, transport planning
 

Similar to Highway capacity and level of service.pptx

IRJET- Capacity and Level of Service for Highways Segments in Nigeria
IRJET- Capacity and Level of Service for Highways Segments in NigeriaIRJET- Capacity and Level of Service for Highways Segments in Nigeria
IRJET- Capacity and Level of Service for Highways Segments in Nigeria
IRJET Journal
 
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Newton Montano
 
traffic engineering management presentation.pptx
traffic engineering management presentation.pptxtraffic engineering management presentation.pptx
traffic engineering management presentation.pptx
gnanarahul1
 
Traffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentationTraffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentation
Danilign Mekonnen
 
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
YAHAMPATHARACHCHIGEP
 
4 bombay cete 24
4 bombay cete 244 bombay cete 24
4 bombay cete 24
Sierra Francisco Justo
 
Traffic impact assessment
Traffic impact assessmentTraffic impact assessment
Traffic impact assessment
Vivek Pai
 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.ppt
mihiretuTefera
 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.ppt
mihiretuTefera
 
Level of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation MethodLevel of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation Method
Md. Abdul Kader
 
Definitions of lifts
Definitions of liftsDefinitions of lifts
Definitions of lifts
Gauri Singh
 
Geometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptxGeometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptx
CHETTIKULAMNATHAMpro
 
Conen 442 module1c: Capacity analysis and Level of Service
Conen  442 module1c: Capacity analysis and Level of ServiceConen  442 module1c: Capacity analysis and Level of Service
Conen 442 module1c: Capacity analysis and Level of Service
Wael ElDessouki
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1
Syafiqah Jamian
 
2 service standards gn final
2 service standards gn final2 service standards gn final
2 service standards gn final
Indonesia Infrastructure Initiative
 
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Hossam Shafiq I
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Hossam Shafiq I
 
Unit 3 ii ppt
Unit 3 ii pptUnit 3 ii ppt
Unit 3 ii ppt
PALURUUMASAI
 
Traffic volume count .pptx
Traffic volume count                             .pptxTraffic volume count                             .pptx
Traffic volume count .pptx
AshishGahlawat9
 
Public transportation planning
Public transportation planningPublic transportation planning
Public transportation planning
NEENA VS
 

Similar to Highway capacity and level of service.pptx (20)

IRJET- Capacity and Level of Service for Highways Segments in Nigeria
IRJET- Capacity and Level of Service for Highways Segments in NigeriaIRJET- Capacity and Level of Service for Highways Segments in Nigeria
IRJET- Capacity and Level of Service for Highways Segments in Nigeria
 
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
 
traffic engineering management presentation.pptx
traffic engineering management presentation.pptxtraffic engineering management presentation.pptx
traffic engineering management presentation.pptx
 
Traffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentationTraffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentation
 
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
Headway distribution on urban roads under heterogeneous traffic-revision 3 10...
 
4 bombay cete 24
4 bombay cete 244 bombay cete 24
4 bombay cete 24
 
Traffic impact assessment
Traffic impact assessmentTraffic impact assessment
Traffic impact assessment
 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.ppt
 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.ppt
 
Level of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation MethodLevel of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation Method
 
Definitions of lifts
Definitions of liftsDefinitions of lifts
Definitions of lifts
 
Geometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptxGeometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptx
 
Conen 442 module1c: Capacity analysis and Level of Service
Conen  442 module1c: Capacity analysis and Level of ServiceConen  442 module1c: Capacity analysis and Level of Service
Conen 442 module1c: Capacity analysis and Level of Service
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1
 
2 service standards gn final
2 service standards gn final2 service standards gn final
2 service standards gn final
 
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
 
Unit 3 ii ppt
Unit 3 ii pptUnit 3 ii ppt
Unit 3 ii ppt
 
Traffic volume count .pptx
Traffic volume count                             .pptxTraffic volume count                             .pptx
Traffic volume count .pptx
 
Public transportation planning
Public transportation planningPublic transportation planning
Public transportation planning
 

Recently uploaded

DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
introduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdfintroduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdf
ravindarpurohit26
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
obonagu
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 

Recently uploaded (20)

DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
introduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdfintroduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 

Highway capacity and level of service.pptx

  • 1. Established as per the Section 2(f) of the UGC Act, 1956 Approved by AICTE, COA and BCI, New Delhi Highway capacity and levels of service School of C i v i l E n g i n e e r i n g 20/06/2020 D r . S e e l a m S r i k a n t h R e d d y Unit 3
  • 2. HIGHWAY CAPACITY AND LEVELS OF SERVICE • Often it is required to find out how much a transport facility can accommodate? •Capacity analysis helps in answering the question. It is a quantitative assessment of the ability of a transport facility to handle vehicles or people for which it is designed. •Such information is useful in the design of traffic facility.
  • 3. HIGHWAY CAPACITY AND LEVELS OF SERVICE •A related question is, what is the performance level of the system at various operating conditions. Or in other words, how good is the operation of the traffic facility. •Level of Service analysis tries to answer this question which is essentially a qualitative analysis.
  • 4. HIGHWAY CAPACITY Basic Capacity: The basic capacity is the maximum number of vehicles that can pass a given point on a lane or a roadway during one hour under the most ideal roadway and traffic conditions that can possibly be attained. Possible Capacity: The possible capacity is the maximum number of vehicles that can pass a given point on a lane or a roadway during one hour under the prevailing roadway and traffic conditions.
  • 5. HIGHWAY CAPACITY Practical Capacity: • Practical capacity is the maximum number of vehicles that can pass a given point in a lane or roadway during one hour, when traffic density is not so great as to cause unreasonable delay, hazard or restriction to the driver’s freedom to manoeuvre under prevailing roadway and traffic conditions. This is usually considered to be the ‘design capacity
  • 6. FACTORS INFLUENCING THE HIGHWAY CAPACITY •Traffic conditions (vehicle composition, turning movements, etc. ) •Roadway conditions (geometrical characteristics such as lane width, shoulder width, horizontal alignment, and vertical alignment. ) •Control conditions (traffic signal timings, round-about characteristics etc.)
  • 7. LEVELS OF SERVICE Level-of-Service is introduced by HCM to denote the level of quality one can derive from a road under different operational conditions and traffic volume. The level of service is defined as a qualitative measure describing the operational conditions within traffic stream and their perception by drivers (motorists) and passengers. Factors in evaluating LoS: • Speed and travel time • Traffic interruptions or restrictions • Freedom to manoeuvre • Driving comfort and convenience • Economy
  • 8. LEVELS OF SERVICE i) Travel speed ii) V/C ratio Six LOS letters are defined by HCM, namely A, B, C, D, E, and F, where A denote the best quality of service and F denote the worst. Level of Service A: • Free flow, with low volumes and high speeds. • Traffic density is low, with speeds controlled by drivers desired speed limits and physical roadway conditions. • Little or no restriction in manoeuvrability due to presence of other vehicles.
  • 9. LEVELS OF SERVICE Level of Service B: • Zone of stable flow, with operating speeds beginning to be restricted somewhat by traffic conditions. • Drivers still have reasonable freedom to select their speed and lane of operation • This level of service used in the design of rural highways
  • 10. LEVELS OF SERVICE Level of Service C: • Still in the Zone of stable flow, but speeds and manoeuvrability are controlled by higher volumes. • Most of Drivers restricted in the freedom to select their own speed and lane changing or overtaking. • This level of service used in the urban design practice
  • 11. LEVELS OF SERVICE Level of Service D: • Approaches unstable flow, with operating speeds considerably affected by changes in operating conditions. • Drivers have little freedom to manoeuvre comfort and convenience are low, but conditions can be tolerated for short periods of time.
  • 12. LEVELS OF SERVICE Level of Service E: • Flow is unstable, and there may be stoppages of momentary duration. • Can described by speed alone, but represents with lower operating speeds than in level D and with volumes at or near the capacity of the highway.
  • 13. LEVELS OF SERVICE Level of Service F: • Forced flow conditions at lower speeds, where volumes are just below capacity. • Speeds are reduced substantially and stoppage may occur for short or long periods of time because of congestion. • In the extreme, both speed and volume can drop to zero