9 Layout Strategies
PowerPoint presentation to accompany
Heizer and Render
Operations Management, 10e
Principles of Operations Management, 8e
PowerPoint slides by Jeff Heyl
9 - 2© 2011 Pearson Education, Inc. publishing as Prentice Hall
Outline
 Global Company Profile:
McDonald’s
 The Strategic Importance of
Layout Decisions
 Types of Layout
 Office Layout
9 - 3© 2011 Pearson Education, Inc. publishing as Prentice Hall
Outline – Continued
 Retail Layout
 Servicescapes
 Warehousing and Storage Layouts
 Cross-Docking
 Random Docking
 Customizing
 Fixed-Position Layout
9 - 4© 2011 Pearson Education, Inc. publishing as Prentice Hall
Outline – Continued
 Process-Oriented Layout
 Computer Software for Process-
Oriented Layouts
 Work Cells
 Requirements of Work Cells
 Staffing and Balancing Work Cells
 The Focused Work Center and the
Focused Factory
9 - 5© 2011 Pearson Education, Inc. publishing as Prentice Hall
Outline – Continued
 Repetitive and Product-Oriented
Layout
 Assembly-Line Balancing
9 - 6© 2011 Pearson Education, Inc. publishing as Prentice Hall
Learning Objectives
When you complete this chapter, you
should be able to:
1. Discuss important issues in office layout
2. Define the objectives of retail layout
3. Discuss modern warehouse
management and terms such as ASRS,
cross-docking, and random stocking
4. Identify when fixed-position layouts are
appropriate
9 - 7© 2011 Pearson Education, Inc. publishing as Prentice Hall
Learning Objectives
When you complete this chapter, you
should be able to:
5. Explain how to achieve a good process-
oriented facility layout
6. Define work cell and the requirements of
a work cell
7. Define product-oriented layout
8. Explain how to balance production flow
in a repetitive or product-oriented facility
9 - 8© 2011 Pearson Education, Inc. publishing as Prentice Hall
Innovations at McDonald’s
 Indoor seating (1950s)
 Drive-through window (1970s)
 Adding breakfast to the menu
(1980s)
 Adding play areas (late 1980s)
 Redesign of the kitchens (1990s)
 Self-service kiosk (2004)
 Now three separate dining sections
9 - 9© 2011 Pearson Education, Inc. publishing as Prentice Hall
Innovations at McDonald’s
 Indoor seating (1950s)
 Drive-through window (1970s)
 Adding breakfast to the menu
(1980s)
 Adding play areas (late 1980s)
 Redesign of the kitchens (1990s)
 Self-service kiosk (2004)
 Now three separate dining sections
Six out of the
seven are
layout
decisions!
9 - 10© 2011 Pearson Education, Inc. publishing as Prentice Hall
McDonald’s New Layout
 Seventh major innovation
 Redesigning all 30,000 outlets around
the world
 Three separate dining areas
 Linger zone with comfortable chairs and
Wi-Fi connections
 Grab and go zone with tall counters
 Flexible zone for kids and families
 Facility layout is a source of
competitive advantage
9 - 11© 2011 Pearson Education, Inc. publishing as Prentice Hall
Strategic Importance of
Layout Decisions
The objective of layout strategy
is to develop an effective and
efficient layout that will meet the
firm’s competitive requirements
9 - 12© 2011 Pearson Education, Inc. publishing as Prentice Hall
Layout Design
Considerations
 Higher utilization of space, equipment,
and people
 Improved flow of information, materials,
or people
 Improved employee morale and safer
working conditions
 Improved customer/client interaction
 Flexibility
9 - 13© 2011 Pearson Education, Inc. publishing as Prentice Hall
Types of Layout
1. Office layout
2. Retail layout
3. Warehouse layout
4. Fixed-position layout
5. Process-oriented layout
6. Work-cell layout
7. Product-oriented layout
9 - 14© 2011 Pearson Education, Inc. publishing as Prentice Hall
Types of Layout
1. Office layout: Positions workers,
their equipment, and spaces/offices
to provide for movement of
information
2. Retail layout: Allocates shelf space
and responds to customer behavior
3. Warehouse layout: Addresses trade-
offs between space and material
handling
9 - 15© 2011 Pearson Education, Inc. publishing as Prentice Hall
Types of Layout
4. Fixed-position layout: Addresses the
layout requirements of large, bulky
projects such as ships and buildings
5. Process-oriented layout: Deals with
low-volume, high-variety production
(also called job shop or intermittent
production)
9 - 16© 2011 Pearson Education, Inc. publishing as Prentice Hall
Types of Layout
6. Work cell layout: Arranges
machinery and equipment to focus
on production of a single product or
group of related products
7. Product-oriented layout: Seeks the
best personnel and machine
utilizations in repetitive or
continuous production
9 - 17© 2011 Pearson Education, Inc. publishing as Prentice Hall
Layout Strategies
Objectives Examples
Office Locate workers requiring
frequent contact close to one
another
Allstate Insurance
Microsoft Corp.
Retail Expose customer to high-
margin items
Kroger’s Supermarket
Walgreen’s
Bloomingdale’s
Warehouse
(storage)
Balance low cost storage
with low-cost material
handling
Federal-Mogul’s warehouse
The Gap’s distribution center
Project (fixed
position)
Move material to the limited
storage areas around the site
Ingall Ship Building Corp.
Trump Plaza
Pittsburgh Airport
Table 9.1
9 - 18© 2011 Pearson Education, Inc. publishing as Prentice Hall
Layout Strategies
Objectives Examples
Job Shop
(process
oriented)
Manage varied material flow
for each product
Arnold Palmer Hospital
Hard Rock Cafe
Olive Garden
Work Cell
(product
families)
Identify a product family,
build teams, cross train team
members
Hallmark Cards
Wheeled Coach
Standard Aero
Repetitive/
Continuous
(product
oriented)
Equalize the task time at each
workstation
Sony’s TV assembly line
Toyota Scion
Table 9.1
9 - 19© 2011 Pearson Education, Inc. publishing as Prentice Hall
Good Layouts Consider
 Material handling equipment
 Capacity and space requirements
 Environment and aesthetics
 Flows of information
 Cost of moving between various
work areas
9 - 20© 2011 Pearson Education, Inc. publishing as Prentice Hall
Office Layout
 Grouping of workers, their equipment, and
spaces to provide comfort, safety, and
movement of information
 Movement of
information is main
distinction
 Typically in state of
flux due to frequent
technological
changes
9 - 21© 2011 Pearson Education, Inc. publishing as Prentice Hall
Relationship Chart
Figure 9.1
9 - 22© 2011 Pearson Education, Inc. publishing as Prentice Hall
Supermarket Retail Layout
 Objective is to maximize
profitability per square foot of
floor space
 Sales and profitability vary
directly with customer exposure
9 - 23© 2011 Pearson Education, Inc. publishing as Prentice Hall
Five Helpful Ideas for
Supermarket Layout
1. Locate high-draw items around the
periphery of the store
2. Use prominent locations for high-impulse
and high-margin items
3. Distribute power items to both sides of
an aisle and disperse them to increase
viewing of other items
4. Use end-aisle locations
5. Convey mission of store through careful
positioning of lead-off department
9 - 24© 2011 Pearson Education, Inc. publishing as Prentice Hall
Store Layout
Figure 9.2
9 - 25© 2011 Pearson Education, Inc. publishing as Prentice Hall
Retail Slotting
 Manufacturers pay fees to retailers
to get the retailers to display (slot)
their product
 Contributing factors
 Limited shelf space
 An increasing number of new
products
 Better information about sales
through POS data collection
 Closer control of inventory
9 - 26© 2011 Pearson Education, Inc. publishing as Prentice Hall
Retail Store Shelf Space
Planogram
 Computerized
tool for shelf-
space
management
 Generated from
store’s scanner
data on sales
 Often supplied
by manufacturer
5 facings
Shampoo
Shampoo
Shampoo
Shampoo
Shampoo
Conditioner
Conditioner
Shampoo
Shampoo
Shampoo
Shampoo
Conditioner
2 ft.
9 - 27© 2011 Pearson Education, Inc. publishing as Prentice Hall
Servicescapes
1. Ambient conditions - background
characteristics such as lighting, sound,
smell, and temperature
2. Spatial layout and functionality - which
involve customer
circulation path planning,
aisle characteristics, and
product grouping
3. Signs, symbols, and
artifacts - characteristics
of building design that
carry social significance
9 - 28© 2011 Pearson Education, Inc. publishing as Prentice Hall
Warehousing and Storage
Layouts
 Objective is to optimize trade-offs
between handling costs and costs
associated with warehouse space
 Maximize the total “cube” of the
warehouse – utilize its full volume
while maintaining low material
handling costs
9 - 29© 2011 Pearson Education, Inc. publishing as Prentice Hall
Warehousing and Storage
Layouts
 All costs associated with the transaction
 Incoming transport
 Storage
 Finding and moving material
 Outgoing transport
 Equipment, people, material, supervision,
insurance, depreciation
 Minimize damage and spoilage
Material Handling Costs
9 - 30© 2011 Pearson Education, Inc. publishing as Prentice Hall
Warehousing and Storage
Layouts
 Warehouse density tends to vary
inversely with the number of different
items stored
 Automated Storage and
Retrieval Systems (ASRSs)
can significantly improve
warehouse productivity by
an estimated 500%
 Dock location is a key
design element
9 - 31© 2011 Pearson Education, Inc. publishing as Prentice Hall
Cross-Docking
 Materials are moved directly from
receiving to shipping and are not placed
in storage in the warehouse
 Requires tight
scheduling and
accurate shipments,
bar code or RFID
identification used for
advanced shipment
notification as
materials
are unloaded
9 - 32© 2011 Pearson Education, Inc. publishing as Prentice Hall
Random Stocking
 Typically requires automatic identification
systems (AISs) and effective information
systems
 Random assignment of stocking locations
allows more efficient use of space
 Key tasks
1. Maintain list of open locations
2. Maintain accurate records
3. Sequence items to minimize travel, pick time
4. Combine picking orders
5. Assign classes of items to particular areas
9 - 33© 2011 Pearson Education, Inc. publishing as Prentice Hall
Customizing
 Value-added activities performed at
the warehouse
 Enable low cost and rapid response
strategies
 Assembly of components
 Loading software
 Repairs
 Customized labeling and packaging
9 - 34© 2011 Pearson Education, Inc. publishing as Prentice Hall
Shipping and receiving docks
Office
Customization
Conveyor
Storage racks
Staging
Warehouse Layout
Traditional Layout
9 - 35© 2011 Pearson Education, Inc. publishing as Prentice Hall
Warehouse Layout
Cross-Docking Layout
Shipping and receiving docks
Office
Shipping and receiving docks
9 - 36© 2011 Pearson Education, Inc. publishing as Prentice Hall
Fixed-Position Layout
 Product remains in one place
 Workers and equipment come to site
 Complicating factors
 Limited space at site
 Different materials
required at different
stages of the project
 Volume of materials
needed is dynamic
9 - 37© 2011 Pearson Education, Inc. publishing as Prentice Hall
Alternative Strategy
 As much of the project as possible
is completed off-site in a product-
oriented facility
 This can
significantly
improve
efficiency but
is only possible
when multiple
similar units need to be created
9 - 38© 2011 Pearson Education, Inc. publishing as Prentice Hall
Process-Oriented Layout
 Like machines and equipment are
grouped together
 Flexible and capable of handling a
wide variety of products or
services
 Scheduling can be difficult and
setup, material handling, and
labor costs can be high
9 - 39© 2011 Pearson Education, Inc. publishing as Prentice Hall
Surgery
Radiology
ER
triage
room
ER Beds Pharmacy
Emergency room admissions
Billing/exit
Laboratories
Process-Oriented Layout
Patient A - broken leg
Patient B - erratic heart
pacemaker
Figure 9.3
9 - 40© 2011 Pearson Education, Inc. publishing as Prentice Hall
Layout at Arnold Palmer Hospital
Central break
and medical
supply rooms
Local linen
supply
Local
nursing pod
Pie-shaped
rooms
Central nurses
station
9 - 41© 2011 Pearson Education, Inc. publishing as Prentice Hall
Process-Oriented Layout
 Arrange work centers so as to
minimize the costs of material
handling
 Basic cost elements are
 Number of loads (or people)
moving between centers
 Distance loads (or people) move
between centers
9 - 42© 2011 Pearson Education, Inc. publishing as Prentice Hall
Process-Oriented Layout
Minimize cost = ∑ ∑ Xij Cij
n
i = 1
n
j = 1
where n = total number of work centers or
departments
i, j = individual departments
Xij = number of loads moved from
department i to department j
Cij = cost to move a load between
department i and department j
9 - 43© 2011 Pearson Education, Inc. publishing as Prentice Hall
Process Layout Example
1. Construct a “from-to matrix”
2. Determine the space requirements
3. Develop an initial schematic diagram
4. Determine the cost of this layout
5. Try to improve the layout
6. Prepare a detailed plan
Arrange six departments in a factory to
minimize the material handling costs.
Each department is 20 x 20 feet and the
building is 60 feet long and 40 feet wide.
9 - 44© 2011 Pearson Education, Inc. publishing as Prentice Hall
Department Assembly Painting Machine Receiving Shipping Testing
(1) (2) Shop (3) (4) (5) (6)
Assembly (1)
Painting (2)
Machine Shop (3)
Receiving (4)
Shipping (5)
Testing (6)
Number of loads per week
50 100 0 0 20
30 50 10 0
20 0 100
50 0
0
Process Layout Example
Figure 9.4
9 - 45© 2011 Pearson Education, Inc. publishing as Prentice Hall
Area 1 Area 2 Area 3
Area 4 Area 5 Area 6
60’
40’
Process Layout Example
Receiving Shipping Testing
Department Department Department
(4) (5) (6)
Figure 9.5
Assembly Painting Machine Shop
Department Department Department
(1) (2) (3)
9 - 46© 2011 Pearson Education, Inc. publishing as Prentice Hall
Process Layout Example
Interdepartmental Flow Graph
Figure 9.6
100
50
50
10
100
30 Machine
Shop (3)
Testing
(6)
Shipping
(5)
Receiving
(4)
Assembly
(1)
Painting
(2)
9 - 47© 2011 Pearson Education, Inc. publishing as Prentice Hall
Process Layout Example
Cost = $50 + $200 + $40
(1 and 2) (1 and 3) (1 and 6)
+ $30 + $50 + $10
(2 and 3) (2 and 4) (2 and 5)
+ $40 + $100 + $50
(3 and 4) (3 and 6) (4 and 5)
= $570
Cost = ∑ ∑ Xij Cij
n
i = 1
n
j = 1
9 - 48© 2011 Pearson Education, Inc. publishing as Prentice Hall
Process Layout Example
Revised Interdepartmental Flow Graph
Figure 9.7
30
50
50
50 100
100 Machine
Shop (3)
Testing
(6)
Shipping
(5)
Receiving
(4)
Painting
(2)
Assembly
(1)
9 - 49© 2011 Pearson Education, Inc. publishing as Prentice Hall
Process Layout Example
Cost = $50 + $100 + $20
(1 and 2) (1 and 3) (1 and 6)
+ $60 + $50 + $10
(2 and 3) (2 and 4) (2 and 5)
+ $40 + $100 + $50
(3 and 4) (3 and 6) (4 and 5)
= $480
Cost = ∑ ∑ Xij Cij
n
i = 1
n
j = 1
9 - 50© 2011 Pearson Education, Inc. publishing as Prentice Hall
Area 1 Area 2 Area 3
Area 4 Area 5 Area 6
60’
40’
Process Layout Example
Receiving Shipping Testing
Department Department Department
(4) (5) (6)
Figure 9.8
Painting Assembly Machine Shop
Department Department Department
(2) (1) (3)
9 - 51© 2011 Pearson Education, Inc. publishing as Prentice Hall
Computer Software
 Graphical approach only works for
small problems
 Computer programs are available to
solve bigger problems
 CRAFT
 ALDEP
 CORELAP
 Factory Flow
9 - 52© 2011 Pearson Education, Inc. publishing as Prentice Hall
CRAFT Example
Figure 9.9
TOTAL COST 20,100
EST. COST REDUCTION .00
ITERATION 0
(a)
A A A A B B
A A A A B B
D D D D D D
C C D D D D
F F F F F D
E E E E E D
TOTAL COST 14,390
EST. COST REDUCTION 70
ITERATION 3
(b)
D D D D B B
D D D D B B
D D D E E E
C C D E E F
A A A A A F
A A A F F F
9 - 53© 2011 Pearson Education, Inc. publishing as Prentice Hall
Computer Software
 Three dimensional visualization
software allows managers to view
possible layouts and assess process,
material
handling,
efficiency,
and safety
issues
9 - 54© 2011 Pearson Education, Inc. publishing as Prentice Hall
Work Cells
 Reorganizes people and machines
into groups to focus on single
products or product groups
 Group technology identifies
products that have similar
characteristics for particular cells
 Volume must justify cells
 Cells can be reconfigured as
designs or volume changes
9 - 55© 2011 Pearson Education, Inc. publishing as Prentice Hall
Advantages of Work Cells
1. Reduced work-in-process inventory
2. Less floor space required
3. Reduced raw material and finished
goods inventory
4. Reduced direct labor
5. Heightened sense of employee
participation
6. Increased use of equipment and
machinery
7. Reduced investment in machinery and
equipment
9 - 56© 2011 Pearson Education, Inc. publishing as Prentice Hall
Requirements of Work Cells
1. Identification of families of products
2. A high level of training, flexibility
and empowerment of employees
3. Being self-contained, with its own
equipment and resources
4. Test (poka-yoke) at each station in
the cell
9 - 57© 2011 Pearson Education, Inc. publishing as Prentice Hall
Improving Layouts Using
Work Cells
Current layout - workers
in small closed areas.
Improved layout - cross-trained
workers can assist each other.
May be able to add a third worker
as additional output is needed.
Figure 9.10 (a)
9 - 58© 2011 Pearson Education, Inc. publishing as Prentice Hall
Improving Layouts Using
Work Cells
Current layout - straight
lines make it hard to balance
tasks because work may not
be divided evenly
Improved layout - in U
shape, workers have better
access. Four cross-trained
workers were reduced.
Figure 9.10 (b)
U-shaped line may reduce employee movement
and space requirements while enhancing
communication, reducing the number of
workers, and facilitating inspection
9 - 59© 2011 Pearson Education, Inc. publishing as Prentice Hall
Staffing and Balancing
Work Cells
Determine the takt time
Takt time =
Total work time available
Units required
Determine the number
of operators required
Workers required =
Total operation time required
Takt time
9 - 60© 2011 Pearson Education, Inc. publishing as Prentice Hall
Staffing Work Cells Example
600 Mirrors per day required
Mirror production scheduled for 8 hours per day
From a work balance
chart total
operation time
= 140 seconds
Standardtimerequired
Operations
Assemble Paint Test Label Pack for
shipment
60
50
40
30
20
10
0
9 - 61© 2011 Pearson Education, Inc. publishing as Prentice Hall
Staffing Work Cells Example
600 Mirrors per day required
Mirror production scheduled for 8 hours per day
From a work balance
chart total
operation time
= 140 seconds
Takt time = (8 hrs x 60 mins) / 600 units
= .8 mins = 48 seconds
Workers required =
Total operation time required
Takt time
= 140 / 48 = 2.91
9 - 62© 2011 Pearson Education, Inc. publishing as Prentice Hall
Work Balance Charts
 Used for evaluating operation
times in work cells
 Can help identify bottleneck
operations
 Flexible, cross-trained employees
can help address labor bottlenecks
 Machine bottlenecks may require
other approaches
9 - 63© 2011 Pearson Education, Inc. publishing as Prentice Hall
Focused Work Center and
Focused Factory
 Focused Work Center
 Identify a large family of similar products
that have a large and stable demand
 Moves production from a general-purpose,
process-oriented facility to a large work cell
 Focused Factory
 A focused work cell in a separate facility
 May be focused by product line, layout,
quality, new product introduction, flexibility,
or other requirements
9 - 64© 2011 Pearson Education, Inc. publishing as Prentice Hall
Focused Work Center and
Focused Factory
Table 9.2
Work Cell Focused Work Center Focused Factory
Description: Work cell
is a temporary
product-oriented
arrangement of
machines and
personnel in what is
ordinarily a process-
oriented facility
A focused work center is
a permanent product-
oriented arrangement
of machines and
personnel in what is
ordinarily a process-
oriented facility
A focused factory is a
permanent facility to
produce a product or
component in a
product-oriented
facility. Many focused
factories currently
being built were
originally part of a
process-oriented
facility
Example: A job shop
with machinery and
personnel rearranged
to produce 300 unique
control panels
Example: Pipe bracket
manufacturing at a
shipyard
Example: A plant to
produce window
mechanism for
automobiles
9 - 65© 2011 Pearson Education, Inc. publishing as Prentice Hall
Repetitive and Product-
Oriented Layout
1. Volume is adequate for high equipment
utilization
2. Product demand is stable enough to justify high
investment in specialized equipment
3. Product is standardized or approaching a phase
of life cycle that justifies investment
4. Supplies of raw materials and components are
adequate and of uniform quality
Organized around products or families of
similar high-volume, low-variety products
9 - 66© 2011 Pearson Education, Inc. publishing as Prentice Hall
Product-Oriented Layouts
 Fabrication line
 Builds components on a series of machines
 Machine-paced
 Require mechanical or engineering changes
to balance
 Assembly line
 Puts fabricated parts together at a series of
workstations
 Paced by work tasks
 Balanced by moving tasks
Both types of lines must be balanced so that the
time to perform the work at each station is the same
9 - 67© 2011 Pearson Education, Inc. publishing as Prentice Hall
Product-Oriented Layouts
1. Low variable cost per unit
2. Low material handling costs
3. Reduced work-in-process inventories
4. Easier training and supervision
5. Rapid throughput
Advantages
1. High volume is required
2. Work stoppage at any point ties up the
whole operation
3. Lack of flexibility in product or production
rates
Disadvantages
9 - 68© 2011 Pearson Education, Inc. publishing as Prentice Hall
McDonald’s Assembly Line
Figure 9.12
9 - 69© 2011 Pearson Education, Inc. publishing as Prentice Hall
Disassembly Lines
 Disassembly is being considered in new
product designs
 “Green” issues and recycling standards are
important consideration
 Automotive
disassembly
is the 16th
largest
industry in
the US
9 - 70© 2011 Pearson Education, Inc. publishing as Prentice Hall
Assembly-Line Balancing
 Objective is to minimize the imbalance
between machines or personnel while
meeting required output
 Starts with the precedence
relationships
 Determine cycle time
 Calculate theoretical
minimum number of
workstations
 Balance the line by
assigning specific
tasks to workstations
9 - 71© 2011 Pearson Education, Inc. publishing as Prentice Hall
Wing Component Example
This means that
tasks B and E
cannot be done
until task A has
been completed
Performance Task Must Follow
Time Task Listed
Task (minutes) Below
A 10 —
B 11 A
C 5 B
D 4 B
E 12 A
F 3 C, D
G 7 F
H 11 E
I 3 G, H
Total time 66
9 - 72© 2011 Pearson Education, Inc. publishing as Prentice Hall
Wing Component Example
Performance Task Must Follow
Time Task Listed
Task (minutes) Below
A 10 —
B 11 A
C 5 B
D 4 B
E 12 A
F 3 C, D
G 7 F
H 11 E
I 3 G, H
Total time 66 I
GF
C
D
H
B
E
A
10
1112
5
4
3
711 3
Figure 9.13
9 - 73© 2011 Pearson Education, Inc. publishing as Prentice Hall
I
GF
C
D
H
B
E
A
10
1112
5
4
3
711 3
Figure 9.13
Performance Task Must Follow
Time Task Listed
Task (minutes) Below
A 10 —
B 11 A
C 5 B
D 4 B
E 12 A
F 3 C, D
G 7 F
H 11 E
I 3 G, H
Total time 66
Wing Component Example
480 available
mins per day
40 units required
Cycle time =
Production time
available per day
Units required per day
= 480 / 40
= 12 minutes per unit
Minimum
number of
workstations
=
∑ Time for task i
Cycle time
n
i = 1
= 66 / 12
= 5.5 or 6 stations
9 - 74© 2011 Pearson Education, Inc. publishing as Prentice Hall
Wing Component Example
I
GF
C
D
H
B
E
A
10
1112
5
4
3
711 3
Figure 9.13
Performance Task Must Follow
Time Task Listed
Task (minutes) Below
A 10 —
B 11 A
C 5 B
D 4 B
E 12 A
F 3 C, D
G 7 F
H 11 E
I 3 G, H
Total time 66
480 available
mins per day
40 units required
Cycle time = 12 mins
Minimum
workstations = 5.5 or 6
Line-Balancing Heuristics
1. Longest task time Choose the available task
with the longest task time
2. Most following tasks Choose the available task
with the largest number of
following tasks
3. Ranked positional
weight
Choose the available task for
which the sum of following
task times is the longest
4. Shortest task time Choose the available task
with the shortest task time
5. Least number of
following tasks
Choose the available task
with the least number of
following tasks
Table 9.4
9 - 75© 2011 Pearson Education, Inc. publishing as Prentice Hall
480 available
mins per day
40 units required
Cycle time = 12 mins
Minimum
workstations = 5.5 or 6
Performance Task Must Follow
Time Task Listed
Task (minutes) Below
A 10 —
B 11 A
C 5 B
D 4 B
E 12 A
F 3 C, D
G 7 F
H 11 E
I 3 G, H
Total time 66Station
1
Wing Component Example
Station
2
Station 3
Station 3
Station
4
Station
5
Station 6Station 6
I
GF
H
C
D
B
E
A
10 11
12
5
4
3 7
11
3
Figure 9.14
9 - 76© 2011 Pearson Education, Inc. publishing as Prentice Hall
Performance Task Must Follow
Time Task Listed
Task (minutes) Below
A 10 —
B 11 A
C 5 B
D 4 B
E 12 A
F 3 C, D
G 7 F
H 11 E
I 3 G, H
Total time 66
Wing Component Example
480 available
mins per day
40 units required
Cycle time = 12 mins
Minimum
workstations = 5.5 or 6
Efficiency =
∑ Task times
(Actual number of workstations) x (Largest cycle time)
= 66 minutes / (6 stations) x (12 minutes)
= 91.7%
9 - 77© 2011 Pearson Education, Inc. publishing as Prentice Hall
All rights reserved. No part of this publication may be reproduced, stored in a retrieval
system, or transmitted, in any form or by any means, electronic, mechanical, photocopying,
recording, or otherwise, without the prior written permission of the publisher.
Printed in the United States of America.

More Related Content

What's hot

Heizer om10 ch10
Heizer om10 ch10Heizer om10 ch10
Heizer om10 ch10ryaekle
 
Heizer om10 ch07
Heizer om10 ch07Heizer om10 ch07
Heizer om10 ch07ryaekle
 
Chapter 10 Human Resources and Job Design.ppt
Chapter 10 Human Resources and Job Design.pptChapter 10 Human Resources and Job Design.ppt
Chapter 10 Human Resources and Job Design.ppt
ssuser7d3776
 
Chapter 03 essentials final
Chapter 03 essentials finalChapter 03 essentials final
Chapter 03 essentials final
Yan Li
 
Chapter 8 Location Strategy.ppt
Chapter 8 Location Strategy.pptChapter 8 Location Strategy.ppt
Chapter 8 Location Strategy.ppt
ssuser7d3776
 
Dessler hrm12e ppt_03
Dessler hrm12e ppt_03Dessler hrm12e ppt_03
Dessler hrm12e ppt_03obeden
 
Ch 7(sm)
Ch 7(sm)Ch 7(sm)
Ch 7(sm)
Waseem Sadiq
 
Dessler ch 10-managing careers
Dessler ch 10-managing careersDessler ch 10-managing careers
Dessler ch 10-managing careersShamsil Arefin
 
Heizer Chapter ch02
Heizer Chapter  ch02Heizer Chapter  ch02
Heizer Chapter ch02
Yesica Adicondro
 
Kotler mm 14e 13 ippt
Kotler mm 14e 13 ipptKotler mm 14e 13 ippt
Kotler mm 14e 13 ippt
Ehab Yousry
 

What's hot (20)

Heizer 05
Heizer 05Heizer 05
Heizer 05
 
Heizer 11
Heizer 11Heizer 11
Heizer 11
 
Chapter 9 layout strategies
Chapter 9 layout strategiesChapter 9 layout strategies
Chapter 9 layout strategies
 
Heizer om10 ch10
Heizer om10 ch10Heizer om10 ch10
Heizer om10 ch10
 
Heizer 03
Heizer 03Heizer 03
Heizer 03
 
Heizer 13
Heizer 13Heizer 13
Heizer 13
 
Heizer 04
Heizer 04Heizer 04
Heizer 04
 
Heizer 07
Heizer 07Heizer 07
Heizer 07
 
Heizer om10 ch07
Heizer om10 ch07Heizer om10 ch07
Heizer om10 ch07
 
Chapter 10 Human Resources and Job Design.ppt
Chapter 10 Human Resources and Job Design.pptChapter 10 Human Resources and Job Design.ppt
Chapter 10 Human Resources and Job Design.ppt
 
Heizer 17
Heizer 17Heizer 17
Heizer 17
 
Chapter 03 essentials final
Chapter 03 essentials finalChapter 03 essentials final
Chapter 03 essentials final
 
Heizer supp 07
Heizer supp 07Heizer supp 07
Heizer supp 07
 
Chapter 8 Location Strategy.ppt
Chapter 8 Location Strategy.pptChapter 8 Location Strategy.ppt
Chapter 8 Location Strategy.ppt
 
Heizer mod a
Heizer mod aHeizer mod a
Heizer mod a
 
Dessler hrm12e ppt_03
Dessler hrm12e ppt_03Dessler hrm12e ppt_03
Dessler hrm12e ppt_03
 
Ch 7(sm)
Ch 7(sm)Ch 7(sm)
Ch 7(sm)
 
Dessler ch 10-managing careers
Dessler ch 10-managing careersDessler ch 10-managing careers
Dessler ch 10-managing careers
 
Heizer Chapter ch02
Heizer Chapter  ch02Heizer Chapter  ch02
Heizer Chapter ch02
 
Kotler mm 14e 13 ippt
Kotler mm 14e 13 ipptKotler mm 14e 13 ippt
Kotler mm 14e 13 ippt
 

Similar to Heizer om10 ch09

layout strategy.ppt
layout strategy.pptlayout strategy.ppt
layout strategy.ppt
osamaahmed865346
 
layout-strategy. Credits to the owner pl
layout-strategy. Credits to the owner  pllayout-strategy. Credits to the owner  pl
layout-strategy. Credits to the owner pl
MonicaTeofilo
 
Chapter 09 layout_strategies
Chapter 09 layout_strategiesChapter 09 layout_strategies
Chapter 09 layout_strategies
Nên Trần Ngọc
 
Layout Strategies.ppt
Layout Strategies.pptLayout Strategies.ppt
Layout Strategies.ppt
GouravKumar987308
 
Heizer om10 ch12
Heizer om10 ch12Heizer om10 ch12
Heizer om10 ch12ryaekle
 
Heizer om10 ch16
Heizer om10 ch16Heizer om10 ch16
Heizer om10 ch16ryaekle
 
Heizer om10 ch14
Heizer om10 ch14Heizer om10 ch14
Heizer om10 ch14ryaekle
 
dataware house
dataware housedataware house
dataware house
Shagufta shaheen
 
Ch09(2)
Ch09(2)Ch09(2)
Ch09(2)
FNian
 
Ch09
Ch09Ch09
Ch09FNian
 
4 Chapter 6 Facility layout.ppt
4 Chapter 6 Facility layout.ppt4 Chapter 6 Facility layout.ppt
4 Chapter 6 Facility layout.ppt
DemekeChimdessa1
 
heizer_om10_ch01.ppt
heizer_om10_ch01.pptheizer_om10_ch01.ppt
heizer_om10_ch01.ppt
MuhammadAmanAzam
 
Heizer om10 ch01
Heizer om10 ch01Heizer om10 ch01
Heizer om10 ch01ryaekle
 
Technology and Operation Management_CHP1.pdf
Technology and Operation Management_CHP1.pdfTechnology and Operation Management_CHP1.pdf
Technology and Operation Management_CHP1.pdf
meilanipelu1
 
heizer_om10_ch01.ppt
heizer_om10_ch01.pptheizer_om10_ch01.ppt
heizer_om10_ch01.ppt
Muhammadnadim12
 
Supply-Chain Management
Supply-Chain ManagementSupply-Chain Management
Supply-Chain Management
Behzad Hakimian
 
Heizer om10 ch01
Heizer om10 ch01Heizer om10 ch01
Heizer om10 ch01
mkirtapm
 
The strategy of international business
The strategy of international businessThe strategy of international business
The strategy of international business
sarah101
 
The strategy of international business
The strategy of international businessThe strategy of international business
The strategy of international business
sarah101
 

Similar to Heizer om10 ch09 (20)

layout strategy.ppt
layout strategy.pptlayout strategy.ppt
layout strategy.ppt
 
layout-strategy. Credits to the owner pl
layout-strategy. Credits to the owner  pllayout-strategy. Credits to the owner  pl
layout-strategy. Credits to the owner pl
 
Chapter 09 layout_strategies
Chapter 09 layout_strategiesChapter 09 layout_strategies
Chapter 09 layout_strategies
 
Layout.ppt
Layout.pptLayout.ppt
Layout.ppt
 
Layout Strategies.ppt
Layout Strategies.pptLayout Strategies.ppt
Layout Strategies.ppt
 
Heizer om10 ch12
Heizer om10 ch12Heizer om10 ch12
Heizer om10 ch12
 
Heizer om10 ch16
Heizer om10 ch16Heizer om10 ch16
Heizer om10 ch16
 
Heizer om10 ch14
Heizer om10 ch14Heizer om10 ch14
Heizer om10 ch14
 
dataware house
dataware housedataware house
dataware house
 
Ch09(2)
Ch09(2)Ch09(2)
Ch09(2)
 
Ch09
Ch09Ch09
Ch09
 
4 Chapter 6 Facility layout.ppt
4 Chapter 6 Facility layout.ppt4 Chapter 6 Facility layout.ppt
4 Chapter 6 Facility layout.ppt
 
heizer_om10_ch01.ppt
heizer_om10_ch01.pptheizer_om10_ch01.ppt
heizer_om10_ch01.ppt
 
Heizer om10 ch01
Heizer om10 ch01Heizer om10 ch01
Heizer om10 ch01
 
Technology and Operation Management_CHP1.pdf
Technology and Operation Management_CHP1.pdfTechnology and Operation Management_CHP1.pdf
Technology and Operation Management_CHP1.pdf
 
heizer_om10_ch01.ppt
heizer_om10_ch01.pptheizer_om10_ch01.ppt
heizer_om10_ch01.ppt
 
Supply-Chain Management
Supply-Chain ManagementSupply-Chain Management
Supply-Chain Management
 
Heizer om10 ch01
Heizer om10 ch01Heizer om10 ch01
Heizer om10 ch01
 
The strategy of international business
The strategy of international businessThe strategy of international business
The strategy of international business
 
The strategy of international business
The strategy of international businessThe strategy of international business
The strategy of international business
 

More from ryaekle

Bad410 business law
Bad410 business lawBad410 business law
Bad410 business lawryaekle
 
Meet your professor
Meet your professorMeet your professor
Meet your professorryaekle
 
Human resources assignment
Human resources assignmentHuman resources assignment
Human resources assignmentryaekle
 
Bad360 operations management online
Bad360 operations management onlineBad360 operations management online
Bad360 operations management onlineryaekle
 
Heizer om10 mod_f
Heizer om10 mod_fHeizer om10 mod_f
Heizer om10 mod_fryaekle
 
Heizer om10 mod_e
Heizer om10 mod_eHeizer om10 mod_e
Heizer om10 mod_eryaekle
 
Heizer om10 mod_d
Heizer om10 mod_dHeizer om10 mod_d
Heizer om10 mod_dryaekle
 
Heizer om10 mod_c
Heizer om10 mod_cHeizer om10 mod_c
Heizer om10 mod_cryaekle
 
Heizer om10 mod_b
Heizer om10 mod_bHeizer om10 mod_b
Heizer om10 mod_bryaekle
 
Heizer om10 mod_a
Heizer om10 mod_aHeizer om10 mod_a
Heizer om10 mod_aryaekle
 
Heizer om10 ch17
Heizer om10 ch17Heizer om10 ch17
Heizer om10 ch17ryaekle
 
Heizer om10 ch15
Heizer om10 ch15Heizer om10 ch15
Heizer om10 ch15ryaekle
 
Heizer om10 ch13
Heizer om10 ch13Heizer om10 ch13
Heizer om10 ch13ryaekle
 
Heizer om10 ch11
Heizer om10 ch11Heizer om10 ch11
Heizer om10 ch11ryaekle
 
Heizer om10 ch06
Heizer om10 ch06Heizer om10 ch06
Heizer om10 ch06ryaekle
 
Heizer om10 ch05
Heizer om10 ch05Heizer om10 ch05
Heizer om10 ch05ryaekle
 
p305_pp12
p305_pp12p305_pp12
p305_pp12ryaekle
 
p305_pp11
p305_pp11p305_pp11
p305_pp11ryaekle
 
p305_pp10
p305_pp10p305_pp10
p305_pp10ryaekle
 
0132886391 pp09
0132886391 pp090132886391 pp09
0132886391 pp09ryaekle
 

More from ryaekle (20)

Bad410 business law
Bad410 business lawBad410 business law
Bad410 business law
 
Meet your professor
Meet your professorMeet your professor
Meet your professor
 
Human resources assignment
Human resources assignmentHuman resources assignment
Human resources assignment
 
Bad360 operations management online
Bad360 operations management onlineBad360 operations management online
Bad360 operations management online
 
Heizer om10 mod_f
Heizer om10 mod_fHeizer om10 mod_f
Heizer om10 mod_f
 
Heizer om10 mod_e
Heizer om10 mod_eHeizer om10 mod_e
Heizer om10 mod_e
 
Heizer om10 mod_d
Heizer om10 mod_dHeizer om10 mod_d
Heizer om10 mod_d
 
Heizer om10 mod_c
Heizer om10 mod_cHeizer om10 mod_c
Heizer om10 mod_c
 
Heizer om10 mod_b
Heizer om10 mod_bHeizer om10 mod_b
Heizer om10 mod_b
 
Heizer om10 mod_a
Heizer om10 mod_aHeizer om10 mod_a
Heizer om10 mod_a
 
Heizer om10 ch17
Heizer om10 ch17Heizer om10 ch17
Heizer om10 ch17
 
Heizer om10 ch15
Heizer om10 ch15Heizer om10 ch15
Heizer om10 ch15
 
Heizer om10 ch13
Heizer om10 ch13Heizer om10 ch13
Heizer om10 ch13
 
Heizer om10 ch11
Heizer om10 ch11Heizer om10 ch11
Heizer om10 ch11
 
Heizer om10 ch06
Heizer om10 ch06Heizer om10 ch06
Heizer om10 ch06
 
Heizer om10 ch05
Heizer om10 ch05Heizer om10 ch05
Heizer om10 ch05
 
p305_pp12
p305_pp12p305_pp12
p305_pp12
 
p305_pp11
p305_pp11p305_pp11
p305_pp11
 
p305_pp10
p305_pp10p305_pp10
p305_pp10
 
0132886391 pp09
0132886391 pp090132886391 pp09
0132886391 pp09
 

Recently uploaded

UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 

Recently uploaded (20)

UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 

Heizer om10 ch09

  • 1. 9 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 9 Layout Strategies PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl
  • 2. 9 - 2© 2011 Pearson Education, Inc. publishing as Prentice Hall Outline  Global Company Profile: McDonald’s  The Strategic Importance of Layout Decisions  Types of Layout  Office Layout
  • 3. 9 - 3© 2011 Pearson Education, Inc. publishing as Prentice Hall Outline – Continued  Retail Layout  Servicescapes  Warehousing and Storage Layouts  Cross-Docking  Random Docking  Customizing  Fixed-Position Layout
  • 4. 9 - 4© 2011 Pearson Education, Inc. publishing as Prentice Hall Outline – Continued  Process-Oriented Layout  Computer Software for Process- Oriented Layouts  Work Cells  Requirements of Work Cells  Staffing and Balancing Work Cells  The Focused Work Center and the Focused Factory
  • 5. 9 - 5© 2011 Pearson Education, Inc. publishing as Prentice Hall Outline – Continued  Repetitive and Product-Oriented Layout  Assembly-Line Balancing
  • 6. 9 - 6© 2011 Pearson Education, Inc. publishing as Prentice Hall Learning Objectives When you complete this chapter, you should be able to: 1. Discuss important issues in office layout 2. Define the objectives of retail layout 3. Discuss modern warehouse management and terms such as ASRS, cross-docking, and random stocking 4. Identify when fixed-position layouts are appropriate
  • 7. 9 - 7© 2011 Pearson Education, Inc. publishing as Prentice Hall Learning Objectives When you complete this chapter, you should be able to: 5. Explain how to achieve a good process- oriented facility layout 6. Define work cell and the requirements of a work cell 7. Define product-oriented layout 8. Explain how to balance production flow in a repetitive or product-oriented facility
  • 8. 9 - 8© 2011 Pearson Education, Inc. publishing as Prentice Hall Innovations at McDonald’s  Indoor seating (1950s)  Drive-through window (1970s)  Adding breakfast to the menu (1980s)  Adding play areas (late 1980s)  Redesign of the kitchens (1990s)  Self-service kiosk (2004)  Now three separate dining sections
  • 9. 9 - 9© 2011 Pearson Education, Inc. publishing as Prentice Hall Innovations at McDonald’s  Indoor seating (1950s)  Drive-through window (1970s)  Adding breakfast to the menu (1980s)  Adding play areas (late 1980s)  Redesign of the kitchens (1990s)  Self-service kiosk (2004)  Now three separate dining sections Six out of the seven are layout decisions!
  • 10. 9 - 10© 2011 Pearson Education, Inc. publishing as Prentice Hall McDonald’s New Layout  Seventh major innovation  Redesigning all 30,000 outlets around the world  Three separate dining areas  Linger zone with comfortable chairs and Wi-Fi connections  Grab and go zone with tall counters  Flexible zone for kids and families  Facility layout is a source of competitive advantage
  • 11. 9 - 11© 2011 Pearson Education, Inc. publishing as Prentice Hall Strategic Importance of Layout Decisions The objective of layout strategy is to develop an effective and efficient layout that will meet the firm’s competitive requirements
  • 12. 9 - 12© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout Design Considerations  Higher utilization of space, equipment, and people  Improved flow of information, materials, or people  Improved employee morale and safer working conditions  Improved customer/client interaction  Flexibility
  • 13. 9 - 13© 2011 Pearson Education, Inc. publishing as Prentice Hall Types of Layout 1. Office layout 2. Retail layout 3. Warehouse layout 4. Fixed-position layout 5. Process-oriented layout 6. Work-cell layout 7. Product-oriented layout
  • 14. 9 - 14© 2011 Pearson Education, Inc. publishing as Prentice Hall Types of Layout 1. Office layout: Positions workers, their equipment, and spaces/offices to provide for movement of information 2. Retail layout: Allocates shelf space and responds to customer behavior 3. Warehouse layout: Addresses trade- offs between space and material handling
  • 15. 9 - 15© 2011 Pearson Education, Inc. publishing as Prentice Hall Types of Layout 4. Fixed-position layout: Addresses the layout requirements of large, bulky projects such as ships and buildings 5. Process-oriented layout: Deals with low-volume, high-variety production (also called job shop or intermittent production)
  • 16. 9 - 16© 2011 Pearson Education, Inc. publishing as Prentice Hall Types of Layout 6. Work cell layout: Arranges machinery and equipment to focus on production of a single product or group of related products 7. Product-oriented layout: Seeks the best personnel and machine utilizations in repetitive or continuous production
  • 17. 9 - 17© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout Strategies Objectives Examples Office Locate workers requiring frequent contact close to one another Allstate Insurance Microsoft Corp. Retail Expose customer to high- margin items Kroger’s Supermarket Walgreen’s Bloomingdale’s Warehouse (storage) Balance low cost storage with low-cost material handling Federal-Mogul’s warehouse The Gap’s distribution center Project (fixed position) Move material to the limited storage areas around the site Ingall Ship Building Corp. Trump Plaza Pittsburgh Airport Table 9.1
  • 18. 9 - 18© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout Strategies Objectives Examples Job Shop (process oriented) Manage varied material flow for each product Arnold Palmer Hospital Hard Rock Cafe Olive Garden Work Cell (product families) Identify a product family, build teams, cross train team members Hallmark Cards Wheeled Coach Standard Aero Repetitive/ Continuous (product oriented) Equalize the task time at each workstation Sony’s TV assembly line Toyota Scion Table 9.1
  • 19. 9 - 19© 2011 Pearson Education, Inc. publishing as Prentice Hall Good Layouts Consider  Material handling equipment  Capacity and space requirements  Environment and aesthetics  Flows of information  Cost of moving between various work areas
  • 20. 9 - 20© 2011 Pearson Education, Inc. publishing as Prentice Hall Office Layout  Grouping of workers, their equipment, and spaces to provide comfort, safety, and movement of information  Movement of information is main distinction  Typically in state of flux due to frequent technological changes
  • 21. 9 - 21© 2011 Pearson Education, Inc. publishing as Prentice Hall Relationship Chart Figure 9.1
  • 22. 9 - 22© 2011 Pearson Education, Inc. publishing as Prentice Hall Supermarket Retail Layout  Objective is to maximize profitability per square foot of floor space  Sales and profitability vary directly with customer exposure
  • 23. 9 - 23© 2011 Pearson Education, Inc. publishing as Prentice Hall Five Helpful Ideas for Supermarket Layout 1. Locate high-draw items around the periphery of the store 2. Use prominent locations for high-impulse and high-margin items 3. Distribute power items to both sides of an aisle and disperse them to increase viewing of other items 4. Use end-aisle locations 5. Convey mission of store through careful positioning of lead-off department
  • 24. 9 - 24© 2011 Pearson Education, Inc. publishing as Prentice Hall Store Layout Figure 9.2
  • 25. 9 - 25© 2011 Pearson Education, Inc. publishing as Prentice Hall Retail Slotting  Manufacturers pay fees to retailers to get the retailers to display (slot) their product  Contributing factors  Limited shelf space  An increasing number of new products  Better information about sales through POS data collection  Closer control of inventory
  • 26. 9 - 26© 2011 Pearson Education, Inc. publishing as Prentice Hall Retail Store Shelf Space Planogram  Computerized tool for shelf- space management  Generated from store’s scanner data on sales  Often supplied by manufacturer 5 facings Shampoo Shampoo Shampoo Shampoo Shampoo Conditioner Conditioner Shampoo Shampoo Shampoo Shampoo Conditioner 2 ft.
  • 27. 9 - 27© 2011 Pearson Education, Inc. publishing as Prentice Hall Servicescapes 1. Ambient conditions - background characteristics such as lighting, sound, smell, and temperature 2. Spatial layout and functionality - which involve customer circulation path planning, aisle characteristics, and product grouping 3. Signs, symbols, and artifacts - characteristics of building design that carry social significance
  • 28. 9 - 28© 2011 Pearson Education, Inc. publishing as Prentice Hall Warehousing and Storage Layouts  Objective is to optimize trade-offs between handling costs and costs associated with warehouse space  Maximize the total “cube” of the warehouse – utilize its full volume while maintaining low material handling costs
  • 29. 9 - 29© 2011 Pearson Education, Inc. publishing as Prentice Hall Warehousing and Storage Layouts  All costs associated with the transaction  Incoming transport  Storage  Finding and moving material  Outgoing transport  Equipment, people, material, supervision, insurance, depreciation  Minimize damage and spoilage Material Handling Costs
  • 30. 9 - 30© 2011 Pearson Education, Inc. publishing as Prentice Hall Warehousing and Storage Layouts  Warehouse density tends to vary inversely with the number of different items stored  Automated Storage and Retrieval Systems (ASRSs) can significantly improve warehouse productivity by an estimated 500%  Dock location is a key design element
  • 31. 9 - 31© 2011 Pearson Education, Inc. publishing as Prentice Hall Cross-Docking  Materials are moved directly from receiving to shipping and are not placed in storage in the warehouse  Requires tight scheduling and accurate shipments, bar code or RFID identification used for advanced shipment notification as materials are unloaded
  • 32. 9 - 32© 2011 Pearson Education, Inc. publishing as Prentice Hall Random Stocking  Typically requires automatic identification systems (AISs) and effective information systems  Random assignment of stocking locations allows more efficient use of space  Key tasks 1. Maintain list of open locations 2. Maintain accurate records 3. Sequence items to minimize travel, pick time 4. Combine picking orders 5. Assign classes of items to particular areas
  • 33. 9 - 33© 2011 Pearson Education, Inc. publishing as Prentice Hall Customizing  Value-added activities performed at the warehouse  Enable low cost and rapid response strategies  Assembly of components  Loading software  Repairs  Customized labeling and packaging
  • 34. 9 - 34© 2011 Pearson Education, Inc. publishing as Prentice Hall Shipping and receiving docks Office Customization Conveyor Storage racks Staging Warehouse Layout Traditional Layout
  • 35. 9 - 35© 2011 Pearson Education, Inc. publishing as Prentice Hall Warehouse Layout Cross-Docking Layout Shipping and receiving docks Office Shipping and receiving docks
  • 36. 9 - 36© 2011 Pearson Education, Inc. publishing as Prentice Hall Fixed-Position Layout  Product remains in one place  Workers and equipment come to site  Complicating factors  Limited space at site  Different materials required at different stages of the project  Volume of materials needed is dynamic
  • 37. 9 - 37© 2011 Pearson Education, Inc. publishing as Prentice Hall Alternative Strategy  As much of the project as possible is completed off-site in a product- oriented facility  This can significantly improve efficiency but is only possible when multiple similar units need to be created
  • 38. 9 - 38© 2011 Pearson Education, Inc. publishing as Prentice Hall Process-Oriented Layout  Like machines and equipment are grouped together  Flexible and capable of handling a wide variety of products or services  Scheduling can be difficult and setup, material handling, and labor costs can be high
  • 39. 9 - 39© 2011 Pearson Education, Inc. publishing as Prentice Hall Surgery Radiology ER triage room ER Beds Pharmacy Emergency room admissions Billing/exit Laboratories Process-Oriented Layout Patient A - broken leg Patient B - erratic heart pacemaker Figure 9.3
  • 40. 9 - 40© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout at Arnold Palmer Hospital Central break and medical supply rooms Local linen supply Local nursing pod Pie-shaped rooms Central nurses station
  • 41. 9 - 41© 2011 Pearson Education, Inc. publishing as Prentice Hall Process-Oriented Layout  Arrange work centers so as to minimize the costs of material handling  Basic cost elements are  Number of loads (or people) moving between centers  Distance loads (or people) move between centers
  • 42. 9 - 42© 2011 Pearson Education, Inc. publishing as Prentice Hall Process-Oriented Layout Minimize cost = ∑ ∑ Xij Cij n i = 1 n j = 1 where n = total number of work centers or departments i, j = individual departments Xij = number of loads moved from department i to department j Cij = cost to move a load between department i and department j
  • 43. 9 - 43© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example 1. Construct a “from-to matrix” 2. Determine the space requirements 3. Develop an initial schematic diagram 4. Determine the cost of this layout 5. Try to improve the layout 6. Prepare a detailed plan Arrange six departments in a factory to minimize the material handling costs. Each department is 20 x 20 feet and the building is 60 feet long and 40 feet wide.
  • 44. 9 - 44© 2011 Pearson Education, Inc. publishing as Prentice Hall Department Assembly Painting Machine Receiving Shipping Testing (1) (2) Shop (3) (4) (5) (6) Assembly (1) Painting (2) Machine Shop (3) Receiving (4) Shipping (5) Testing (6) Number of loads per week 50 100 0 0 20 30 50 10 0 20 0 100 50 0 0 Process Layout Example Figure 9.4
  • 45. 9 - 45© 2011 Pearson Education, Inc. publishing as Prentice Hall Area 1 Area 2 Area 3 Area 4 Area 5 Area 6 60’ 40’ Process Layout Example Receiving Shipping Testing Department Department Department (4) (5) (6) Figure 9.5 Assembly Painting Machine Shop Department Department Department (1) (2) (3)
  • 46. 9 - 46© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example Interdepartmental Flow Graph Figure 9.6 100 50 50 10 100 30 Machine Shop (3) Testing (6) Shipping (5) Receiving (4) Assembly (1) Painting (2)
  • 47. 9 - 47© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example Cost = $50 + $200 + $40 (1 and 2) (1 and 3) (1 and 6) + $30 + $50 + $10 (2 and 3) (2 and 4) (2 and 5) + $40 + $100 + $50 (3 and 4) (3 and 6) (4 and 5) = $570 Cost = ∑ ∑ Xij Cij n i = 1 n j = 1
  • 48. 9 - 48© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example Revised Interdepartmental Flow Graph Figure 9.7 30 50 50 50 100 100 Machine Shop (3) Testing (6) Shipping (5) Receiving (4) Painting (2) Assembly (1)
  • 49. 9 - 49© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example Cost = $50 + $100 + $20 (1 and 2) (1 and 3) (1 and 6) + $60 + $50 + $10 (2 and 3) (2 and 4) (2 and 5) + $40 + $100 + $50 (3 and 4) (3 and 6) (4 and 5) = $480 Cost = ∑ ∑ Xij Cij n i = 1 n j = 1
  • 50. 9 - 50© 2011 Pearson Education, Inc. publishing as Prentice Hall Area 1 Area 2 Area 3 Area 4 Area 5 Area 6 60’ 40’ Process Layout Example Receiving Shipping Testing Department Department Department (4) (5) (6) Figure 9.8 Painting Assembly Machine Shop Department Department Department (2) (1) (3)
  • 51. 9 - 51© 2011 Pearson Education, Inc. publishing as Prentice Hall Computer Software  Graphical approach only works for small problems  Computer programs are available to solve bigger problems  CRAFT  ALDEP  CORELAP  Factory Flow
  • 52. 9 - 52© 2011 Pearson Education, Inc. publishing as Prentice Hall CRAFT Example Figure 9.9 TOTAL COST 20,100 EST. COST REDUCTION .00 ITERATION 0 (a) A A A A B B A A A A B B D D D D D D C C D D D D F F F F F D E E E E E D TOTAL COST 14,390 EST. COST REDUCTION 70 ITERATION 3 (b) D D D D B B D D D D B B D D D E E E C C D E E F A A A A A F A A A F F F
  • 53. 9 - 53© 2011 Pearson Education, Inc. publishing as Prentice Hall Computer Software  Three dimensional visualization software allows managers to view possible layouts and assess process, material handling, efficiency, and safety issues
  • 54. 9 - 54© 2011 Pearson Education, Inc. publishing as Prentice Hall Work Cells  Reorganizes people and machines into groups to focus on single products or product groups  Group technology identifies products that have similar characteristics for particular cells  Volume must justify cells  Cells can be reconfigured as designs or volume changes
  • 55. 9 - 55© 2011 Pearson Education, Inc. publishing as Prentice Hall Advantages of Work Cells 1. Reduced work-in-process inventory 2. Less floor space required 3. Reduced raw material and finished goods inventory 4. Reduced direct labor 5. Heightened sense of employee participation 6. Increased use of equipment and machinery 7. Reduced investment in machinery and equipment
  • 56. 9 - 56© 2011 Pearson Education, Inc. publishing as Prentice Hall Requirements of Work Cells 1. Identification of families of products 2. A high level of training, flexibility and empowerment of employees 3. Being self-contained, with its own equipment and resources 4. Test (poka-yoke) at each station in the cell
  • 57. 9 - 57© 2011 Pearson Education, Inc. publishing as Prentice Hall Improving Layouts Using Work Cells Current layout - workers in small closed areas. Improved layout - cross-trained workers can assist each other. May be able to add a third worker as additional output is needed. Figure 9.10 (a)
  • 58. 9 - 58© 2011 Pearson Education, Inc. publishing as Prentice Hall Improving Layouts Using Work Cells Current layout - straight lines make it hard to balance tasks because work may not be divided evenly Improved layout - in U shape, workers have better access. Four cross-trained workers were reduced. Figure 9.10 (b) U-shaped line may reduce employee movement and space requirements while enhancing communication, reducing the number of workers, and facilitating inspection
  • 59. 9 - 59© 2011 Pearson Education, Inc. publishing as Prentice Hall Staffing and Balancing Work Cells Determine the takt time Takt time = Total work time available Units required Determine the number of operators required Workers required = Total operation time required Takt time
  • 60. 9 - 60© 2011 Pearson Education, Inc. publishing as Prentice Hall Staffing Work Cells Example 600 Mirrors per day required Mirror production scheduled for 8 hours per day From a work balance chart total operation time = 140 seconds Standardtimerequired Operations Assemble Paint Test Label Pack for shipment 60 50 40 30 20 10 0
  • 61. 9 - 61© 2011 Pearson Education, Inc. publishing as Prentice Hall Staffing Work Cells Example 600 Mirrors per day required Mirror production scheduled for 8 hours per day From a work balance chart total operation time = 140 seconds Takt time = (8 hrs x 60 mins) / 600 units = .8 mins = 48 seconds Workers required = Total operation time required Takt time = 140 / 48 = 2.91
  • 62. 9 - 62© 2011 Pearson Education, Inc. publishing as Prentice Hall Work Balance Charts  Used for evaluating operation times in work cells  Can help identify bottleneck operations  Flexible, cross-trained employees can help address labor bottlenecks  Machine bottlenecks may require other approaches
  • 63. 9 - 63© 2011 Pearson Education, Inc. publishing as Prentice Hall Focused Work Center and Focused Factory  Focused Work Center  Identify a large family of similar products that have a large and stable demand  Moves production from a general-purpose, process-oriented facility to a large work cell  Focused Factory  A focused work cell in a separate facility  May be focused by product line, layout, quality, new product introduction, flexibility, or other requirements
  • 64. 9 - 64© 2011 Pearson Education, Inc. publishing as Prentice Hall Focused Work Center and Focused Factory Table 9.2 Work Cell Focused Work Center Focused Factory Description: Work cell is a temporary product-oriented arrangement of machines and personnel in what is ordinarily a process- oriented facility A focused work center is a permanent product- oriented arrangement of machines and personnel in what is ordinarily a process- oriented facility A focused factory is a permanent facility to produce a product or component in a product-oriented facility. Many focused factories currently being built were originally part of a process-oriented facility Example: A job shop with machinery and personnel rearranged to produce 300 unique control panels Example: Pipe bracket manufacturing at a shipyard Example: A plant to produce window mechanism for automobiles
  • 65. 9 - 65© 2011 Pearson Education, Inc. publishing as Prentice Hall Repetitive and Product- Oriented Layout 1. Volume is adequate for high equipment utilization 2. Product demand is stable enough to justify high investment in specialized equipment 3. Product is standardized or approaching a phase of life cycle that justifies investment 4. Supplies of raw materials and components are adequate and of uniform quality Organized around products or families of similar high-volume, low-variety products
  • 66. 9 - 66© 2011 Pearson Education, Inc. publishing as Prentice Hall Product-Oriented Layouts  Fabrication line  Builds components on a series of machines  Machine-paced  Require mechanical or engineering changes to balance  Assembly line  Puts fabricated parts together at a series of workstations  Paced by work tasks  Balanced by moving tasks Both types of lines must be balanced so that the time to perform the work at each station is the same
  • 67. 9 - 67© 2011 Pearson Education, Inc. publishing as Prentice Hall Product-Oriented Layouts 1. Low variable cost per unit 2. Low material handling costs 3. Reduced work-in-process inventories 4. Easier training and supervision 5. Rapid throughput Advantages 1. High volume is required 2. Work stoppage at any point ties up the whole operation 3. Lack of flexibility in product or production rates Disadvantages
  • 68. 9 - 68© 2011 Pearson Education, Inc. publishing as Prentice Hall McDonald’s Assembly Line Figure 9.12
  • 69. 9 - 69© 2011 Pearson Education, Inc. publishing as Prentice Hall Disassembly Lines  Disassembly is being considered in new product designs  “Green” issues and recycling standards are important consideration  Automotive disassembly is the 16th largest industry in the US
  • 70. 9 - 70© 2011 Pearson Education, Inc. publishing as Prentice Hall Assembly-Line Balancing  Objective is to minimize the imbalance between machines or personnel while meeting required output  Starts with the precedence relationships  Determine cycle time  Calculate theoretical minimum number of workstations  Balance the line by assigning specific tasks to workstations
  • 71. 9 - 71© 2011 Pearson Education, Inc. publishing as Prentice Hall Wing Component Example This means that tasks B and E cannot be done until task A has been completed Performance Task Must Follow Time Task Listed Task (minutes) Below A 10 — B 11 A C 5 B D 4 B E 12 A F 3 C, D G 7 F H 11 E I 3 G, H Total time 66
  • 72. 9 - 72© 2011 Pearson Education, Inc. publishing as Prentice Hall Wing Component Example Performance Task Must Follow Time Task Listed Task (minutes) Below A 10 — B 11 A C 5 B D 4 B E 12 A F 3 C, D G 7 F H 11 E I 3 G, H Total time 66 I GF C D H B E A 10 1112 5 4 3 711 3 Figure 9.13
  • 73. 9 - 73© 2011 Pearson Education, Inc. publishing as Prentice Hall I GF C D H B E A 10 1112 5 4 3 711 3 Figure 9.13 Performance Task Must Follow Time Task Listed Task (minutes) Below A 10 — B 11 A C 5 B D 4 B E 12 A F 3 C, D G 7 F H 11 E I 3 G, H Total time 66 Wing Component Example 480 available mins per day 40 units required Cycle time = Production time available per day Units required per day = 480 / 40 = 12 minutes per unit Minimum number of workstations = ∑ Time for task i Cycle time n i = 1 = 66 / 12 = 5.5 or 6 stations
  • 74. 9 - 74© 2011 Pearson Education, Inc. publishing as Prentice Hall Wing Component Example I GF C D H B E A 10 1112 5 4 3 711 3 Figure 9.13 Performance Task Must Follow Time Task Listed Task (minutes) Below A 10 — B 11 A C 5 B D 4 B E 12 A F 3 C, D G 7 F H 11 E I 3 G, H Total time 66 480 available mins per day 40 units required Cycle time = 12 mins Minimum workstations = 5.5 or 6 Line-Balancing Heuristics 1. Longest task time Choose the available task with the longest task time 2. Most following tasks Choose the available task with the largest number of following tasks 3. Ranked positional weight Choose the available task for which the sum of following task times is the longest 4. Shortest task time Choose the available task with the shortest task time 5. Least number of following tasks Choose the available task with the least number of following tasks Table 9.4
  • 75. 9 - 75© 2011 Pearson Education, Inc. publishing as Prentice Hall 480 available mins per day 40 units required Cycle time = 12 mins Minimum workstations = 5.5 or 6 Performance Task Must Follow Time Task Listed Task (minutes) Below A 10 — B 11 A C 5 B D 4 B E 12 A F 3 C, D G 7 F H 11 E I 3 G, H Total time 66Station 1 Wing Component Example Station 2 Station 3 Station 3 Station 4 Station 5 Station 6Station 6 I GF H C D B E A 10 11 12 5 4 3 7 11 3 Figure 9.14
  • 76. 9 - 76© 2011 Pearson Education, Inc. publishing as Prentice Hall Performance Task Must Follow Time Task Listed Task (minutes) Below A 10 — B 11 A C 5 B D 4 B E 12 A F 3 C, D G 7 F H 11 E I 3 G, H Total time 66 Wing Component Example 480 available mins per day 40 units required Cycle time = 12 mins Minimum workstations = 5.5 or 6 Efficiency = ∑ Task times (Actual number of workstations) x (Largest cycle time) = 66 minutes / (6 stations) x (12 minutes) = 91.7%
  • 77. 9 - 77© 2011 Pearson Education, Inc. publishing as Prentice Hall All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America.