This module teaches students how to sew a basic collarless sleeveless shirt. It begins with an introduction that explains the purpose and objectives of the module. The document then provides a sample project plan template to guide students in planning their shirt project, including selecting materials, listing steps, and evaluating progress. Subsequent lessons explain how to accurately copy a commercial shirt pattern, select a suitable unisex fabric, and prepare the fabric for cutting out and assembling the shirt.