SlideShare a Scribd company logo
1 of 21
Download to read offline
&
ite sampling testingof concrete
A practical guide for site personnel
FORENORD

During the next few years, specifications   will change   An accompanying      publication   entitled 'Site sampling
from using the as 1881 test methods to those given in     and testing of concrete: a site managers guide' has
the series as 12350: Testing fresh concrete and the       also been produced to assist site engineers and
series as 12390: Testing hardened concrete.               managers to ensure that sampling and testing are
Fortunately the tests included on this poster are the     carried out correctly. The guide highlights some of the
same and the only difference is in the reporting of the   potential problems associated with using incorrect
slump and flow values. However on the test certificate,   procedures.
it is necessary to report the standard used.
                                                          Don't   forget   - The test results will be misleading if
                                                          these procedures are not carried out.


                                                          Get it right - Otherwise it's a waste of time and could
                                                          cost your company money.


                                                          For fulldetailsof equipment,testsandrecords
                                                                                                    see:as
                                                          1881: Testing concrete,
                                                          aSEN12350:Tesdngfreshconcret~and
                                                          as EN 12390: Testing hardened concrete.
Safety


When Portland cement is mixed with water, or even becomes damp, alkalis are released which can be harmful to
the skin. The effect depends on the length of contact, any abrasion, the individual, and the part of the body
involved. Suitable protective clothing should be worn. If eyes are affected they should be washed out without
delay and medical attention sought.




All advice or information in this publication is intended for those who will evaluate the significance and limitations
of its contents anCltake responsibility for its use and application. No liability (including that for negligence) for any
loss resulting from such advice or information is accepted. Readers should note that all publications     are subject to
revision from time to time and should therefore ensure that they are in possession of the latest version.
SAMPLING                                           BS1881:Part101or
                                                   BSEN 12350-1
The standard method
To ensure it is representative of the whole load a     Sample as the load is discharged.
standard sample consists of scoopfuls taken from       Scoopfuls must be taken through the moving stream,
four different parts of the load and collected in      sampling the whole width and depth - not just the
buckets.                                               top part.




                      let very first concrete go

                     Take a scoopful from part 1

                     Take a scoopful from part 2

                     Take a scoopful from part 3

                     Take a scoopful from part 4

                       let the last concrete go




Complete a Sampling certificate and record which sampling method was used.
Safety


When Portland cement is mixed with water, or even becomes damp, alkalis are released which can be harmful to
the skin. The effect depends on the length of contact, any abrasion, the individual, and the part of the body
involved. Suitable protective clothing should be worn. If eyes are affected they should be washed out without
delay and medical attention sought.




All advice or information in this publication is intended for those who will evaluate the significance and limitations
of its contents an'd take responsibility for its use and application. No liability (including thatfor negligence) for any
loss resulting from such advice or information is accepted. Readers should note that all publications     are subject to
revision from time to time and should therefore ensure that they are in possession of the latest version.
BS1881:Part 102or
BSEN206-1: 2000, clause5.4. 1
Thealternativemethod
For an early check on the workability of concrete          Sample as the load is discharged.
d€livered in a truckmixer this alternative method of       Scoopfuls must be taken through the moving stream,
sampling for the slump test may be used. Additional        sampling the whole width and depth - not just the
tolerances will be applicable for concrete sampled by      top part.
this alternative method.



                                                             Let very first concrete   go

                                                            Take six scoopfuls from the
                                                                     next 0.3 m3


               '''''-
                                                           Take six scoopfuls after the first 0.3m3 has
                                                           been discharged.




Do not use this sample to make cubes.
BS 1881: Part 101 requires two slump tests when concrete     is sampled by the alternative   method.
THE SLUMP                      TEST                 BS 1881: Part 102 or
                                                    BS EN 12350-2

    Empty the sampling           Flatten the final heap by repeatedly
    buckets onto the mixing      digging-in the shovel vertically
    tray                         Liftthe shovel clear each time
.   Scrape each bucket clean     Ifthe alternative method of
                                 sampling has been used,
                                 divide this heap into two
                                 and test each part




. Thoroughly     remix the        Ensure the slump cone is clean and
    sample shovelling into        damp
    a heap                        Place the metal plate on a solid level
.   Turn the heap over to         base away from vibration or other
                                  disturbance
    form another
.   Do this three times           Place the cone on the plate and
                                  stand on the foot-pieces
Fillthe cone in three equal depth        Carefullycleanoff spillage
    layers                                   from sideand baseplate
    Use the standard slump rod
    Rod each layer 2S times
    Spread the blows evenly over the
    area
    Make sure the rod just penetrates
    the layer below
.   Heap the concrete above the top of
    the cone before rodding the third
    layer




. Top up if necessary                      . Carefully lift the cone
    Usethe rod with a sawingand             straight up and clear,
    rolling motion to strikethe concrete    to a count of between 5
    levelwith the top of                    and 10 seconds
    the cone                                Complete steps 5 to 8
                                            within 150 seconds
Laythe rod across the upturned           There are three kinds of slump
    slump cone
    Measure the distance between the
    underside of the rod and the highest
                          -
    point of the concrete the true          Slump
                                                    i
    slump
    Recordthis distance to the nearest              T
    Smm if using BS1881: Part 102 or
    10 mm if using BSEN 123S0-2
    In all cases record the kind of slump
    Checkthe type of slump
    Ifthe slump isn't true, take a new
    sample and repeat the test
.   Ifthe second slump isn't true, get
    advice
                                                          1.True

.   Complete the Sampling and testing
    certificates




                                             2.Collapse             3.Shear
Youwill need thisequipment or the SlumpTest
                         f


Small scoop      cf   Sampling scoop
                                           cP   Steel rule

                                                                       /
Square-mouthed
shovel               Slump rod

                                       /        Slump cone and
                                                rigidmetalplate


                                                                       i}
Buckets   or

wheelbarrow
                 53   Mixing tray
                                       <>       Sampling and
                                                testing certificates   I!l ' '

                                                                           "


Cloth
THE FLON                                   TEST                              BS1881:Part 105or
                                                                              BSEN 12350-5
First, find a suitable location for the flow table. It   Sampling using the standard method is
must be placed on a firm flat surface. It may be         recommended
necessary to prepare an area for the table.




. Empty the sampling buckets                              Ensure the mould and table are clean
  onto the mixing tray                                    and damp
. Scrape each bucket clean                                Place the mould on the centre
                                                          of the table and stand on the
                                                          foot-pieces
                                                          Fillthe mould in two layers,
                                                          tamping each layer ten times with
                                                          the tamping bar
. Thoroughly     remix the sample                         Ifnecessary, add more concrete to
    as described for the slump test                       fill the top layer
                                                          Use the tamping bar to strike the
                                                          concrete level with the top of the
                                                          mould
'   Carefullyclean off spillage from       Carefully stand on the toe
     around the mould and table top         board at the front of the
                                            table




     Wait 30 seconds from striking off
     Carefully lift the mould straight up
     and clear, to a count of between 3
     and 6 seconds
Slowly lift the table top by the
    handle until it reaches the upper
    stop
.   Allow the table to fall freely
    Repeat this cycle to give a total of
    15 drops
    Each cycle should take about 4
    seconds




. Measure     the largest dimension of
    concrete spread in two directions,
    parallel to the table edges
.   Record the two diameters to
    nearest 5mm if using BS 1881: Part
    105 or 10mm if using BS EN
    12350-5
    If there is a ring of cement paste
    several mm beyond the coarse
    aggregate, report that segregation
    has occurred
    Complete the Sampling and testing
    certificates
You will need this equipment for the Flow Test
                 1 .....'r.""__.I   :.r.'8W:IU..-:i .........   (:.8::.l.L!1I818.1::.1..   i. ::.1_....,.




                 d                                                                      cJj
                                                                                                                                   !!l
Smallscoop                                        Sampling scoop                                             Sampling and           ,0:::......
                                                                                                                                        ,
                                                                                                             testingcertificates   '':
                                                                                                                                    "-

Square-mouthed
shovel                                           700mmrule                             /                    Mixing tray


                                                                                                                                   0
Buckets
     or                                                                                                      Flowtable
wheelbarrow
Mixing
     tray        53                               Mould
                                                                                            13
Cloth            rQ9                              Hardwood

                                                  tamping bar
MAKING                          CUBES                                                BS 1881: Part 108 or
                                                                                     BS EN 12390-2
Sample the concrete in the standard   manner.   Concrete    sampled       using the alternative   method   cannot
be used for making cubes.




  Check that the                                           . Fill the   mould with
  moulds are clean and                                       concrete in 50mm layers
 lightly oiled with all                                    . Using the special   tamping
 bolts tightened so                                          bar. compact
 that there will be no                                       the concrete with not less
                                                             than:
. leakage that the
  Ensure                                                        25 tamps for each of
  correct halves of the                                         the two layers in a
  mould are used and                                            100mm mould
  that the corner lining                                        35 tamps for each of
  pins are correctly                                            the three layers in a
  located                                                       150mm mould
. Thoroughly   remix the
 sample as described
 for the slump test
. and smooth overconcrete
  Removesurplus
                  with a
                             Cover each mould with a
                             damp cloth and plastic
 float                       sheet
. Wipe the mould edges
  clean
                             Store inside at normal
                             room temperature (15'C
. Number the moulds for      to 2S'C) e.g. on top of the
 identification and record   curing tank
 details                     Protect the cube moulds at
                             all times from high and
                             low temperatures
                             (especially frost) and
                             drying winds
                             Complete the Sampling
                             and cube making
                             certificates
Youwill need this equipment for Making Cubes


Smallscoop         Sampling scoop       Spanner




Square-mouthed     Damp cloth and       Hide hammer

shovel             plastic sheet

                                    8
                   Buckets or           Cloth

Tamping bar        wheelbarrow
Lightly re-oil the cube moulds with release oil



Cube moulds                                          Mixing tray   Sampling,      cube

                                                                   making and storage

                                                                   certificates




Maximuml                                             Steel float   Curing tank

minimum

thermometer                                                                              ;   .   -',




Felt tip pen or                                      Brush
                                                         and
                                I                    mouldoil
crayon
STORING                           CUBES                                         BS 1881: Part 111 or
                                                                                BS EN 12390-2
The cubes should be taken from the moulds the day after making, numbered        and put in a curing tank.




  Record the
  maximum/minimum
                                                      . Part the sides of the
                                                        mould, tapping gently with
  overnight storage                                     the hide hammer
  temperatures on the                                   lift off carefully
  certificate                  iMAX                   . Remember, new cubes
                                                        are easily damaged
                                                        unless handled carefully
                          MIN lMJ




. Slacken all nuts                                   . Mark each   cube with its
                                                       identification number on
                                                       two of its cast sides
I'
     . Place the cubes in the             For despatch to test
       curing tank                        laboratory, wrap the wet
     . Clean and reassemble the           cubes in damp cloths. and
         moulds                           then plastic bags and pack
                                          in trays
                                      .   Attach the sampling.
                                          testing. cube making and
                                          storage certificates, plus
                                          the order for testing. to
     .   Check that the water             the package
                                                                       ......

         temperature is
         controlled at 20.C :t 2.C
         and the cubes are covered
         by water
     . Make sure the power                        20.C
         supply is not switched off
         day or night
     .   Check the temperature
         range daily using the
         maximum/minimum
         thermometer
     . Keep a record of the
         readings
-
 -
 Ql1ARRY
 PRODUCTS
  ASSOCJ             AT ION



o Quarry Products Association
First published by the British Cement Association
for the Ready-mixed Concrete     Bureau
                                                     National Helpline
                                                      07004 500 500


Publication number 97. 334




                                                                  (~
First published 1993
Revised 2002.    2004
fS8N07210       14704

Produced by Rudkin Design
Telephone: (01327)      301770
                                                                                 )
                                                    The Concrete Centre™
  For further information contact:


                                                               The Concrete Centre
                                                     Riverside House, 4 Meadows Business Park
                                                           Station Approach, Blackwater
                                                           Camberley, Surrey GU17 9AB



                                                                                                I.

More Related Content

What's hot

CBR TEST
CBR TESTCBR TEST
CBR TESTNitesh NIT
 
PQC concrete road
PQC concrete roadPQC concrete road
PQC concrete roadpramodchavan32
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewateringAglaia Connect
 
Softening point test
Softening point testSoftening point test
Softening point testA O
 
Standard test on fresh concrete
Standard test on fresh concreteStandard test on fresh concrete
Standard test on fresh concreteAbhishek Shah
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete testSelva Prakash
 
Compressive strength test on concrete
Compressive strength test on concreteCompressive strength test on concrete
Compressive strength test on concretegayathrysatheesan1
 
Flow test of concrete
Flow test of concreteFlow test of concrete
Flow test of concreteMuhammad Saleem
 
Tensile strength test for concrete
Tensile strength test for concreteTensile strength test for concrete
Tensile strength test for concreteAyaz khan
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road constructionAnitha Jacob
 
BITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPTBITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPTNischay N Gowda
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen Abhijeet Bhosale
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for BitumenShweta Sagar
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concreteGaurang Kakadiya
 
Introduction on aggregate impact testing machine ppt
Introduction on aggregate impact testing machine pptIntroduction on aggregate impact testing machine ppt
Introduction on aggregate impact testing machine pptAbhishek Sagar
 
Waste material concrete ppt
Waste material  concrete pptWaste material  concrete ppt
Waste material concrete pptUday Kakde
 
ppt on construction and design of flexible pavement
ppt on construction and design of flexible pavementppt on construction and design of flexible pavement
ppt on construction and design of flexible pavementSUSMITAMAITY4
 

What's hot (20)

CBR TEST
CBR TESTCBR TEST
CBR TEST
 
PQC concrete road
PQC concrete roadPQC concrete road
PQC concrete road
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
Softening point test
Softening point testSoftening point test
Softening point test
 
Standard test on fresh concrete
Standard test on fresh concreteStandard test on fresh concrete
Standard test on fresh concrete
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete test
 
Compressive strength test on concrete
Compressive strength test on concreteCompressive strength test on concrete
Compressive strength test on concrete
 
Flow test of concrete
Flow test of concreteFlow test of concrete
Flow test of concrete
 
Tensile strength test for concrete
Tensile strength test for concreteTensile strength test for concrete
Tensile strength test for concrete
 
hot and cold weather concreting
hot and cold weather concretinghot and cold weather concreting
hot and cold weather concreting
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
 
Cement test
Cement testCement test
Cement test
 
BITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPTBITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPT
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for Bitumen
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Introduction on aggregate impact testing machine ppt
Introduction on aggregate impact testing machine pptIntroduction on aggregate impact testing machine ppt
Introduction on aggregate impact testing machine ppt
 
Waste material concrete ppt
Waste material  concrete pptWaste material  concrete ppt
Waste material concrete ppt
 
Pile load test
Pile load testPile load test
Pile load test
 
ppt on construction and design of flexible pavement
ppt on construction and design of flexible pavementppt on construction and design of flexible pavement
ppt on construction and design of flexible pavement
 

Viewers also liked

Machine Catalouge
Machine Catalouge Machine Catalouge
Machine Catalouge angelochintu
 
Bs 1881 112 1983
Bs 1881 112 1983Bs 1881 112 1983
Bs 1881 112 1983EPMC TUNISIA
 
Concrete lab s5
Concrete lab s5Concrete lab s5
Concrete lab s5SHAMJITH KM
 
Self Consolidating Concrete-Designing & Tsting
Self Consolidating Concrete-Designing & TstingSelf Consolidating Concrete-Designing & Tsting
Self Consolidating Concrete-Designing & TstingJeewapriya Alahakoon
 
Slump cone test
Slump cone testSlump cone test
Slump cone testShahabaz Banu
 
Mat Foundation-Nirvik-34-Sec-B
Mat Foundation-Nirvik-34-Sec-BMat Foundation-Nirvik-34-Sec-B
Mat Foundation-Nirvik-34-Sec-BArif Abdullah
 
Testing of dry/hardened concrete
Testing of dry/hardened concreteTesting of dry/hardened concrete
Testing of dry/hardened concreteE. O. Ochieng'
 
Lecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition AssessLecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition AssessTeja Ande
 
SOLAR CARS
SOLAR CARSSOLAR CARS
SOLAR CARSaman anand
 
Special concrete and concreting method
Special concrete and concreting methodSpecial concrete and concreting method
Special concrete and concreting methodAditya Mistry
 
Hardened concrete 1
Hardened concrete 1Hardened concrete 1
Hardened concrete 1Nagi Polu
 
Compression test
Compression testCompression test
Compression testSHAMJITH KM
 
Pervious Concrete
Pervious ConcretePervious Concrete
Pervious Concreteshiva prakash
 
Summary of concrete workability test
Summary of concrete workability testSummary of concrete workability test
Summary of concrete workability testDurim Bajrami
 
Material Testing Lab Equipments
Material Testing Lab EquipmentsMaterial Testing Lab Equipments
Material Testing Lab EquipmentsNaveed Hussain
 
Concrete,batc,mix,trans,copaction etc
Concrete,batc,mix,trans,copaction etcConcrete,batc,mix,trans,copaction etc
Concrete,batc,mix,trans,copaction etcZainul Abideen
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001Minh Bui Si
 

Viewers also liked (20)

Machine Catalouge
Machine Catalouge Machine Catalouge
Machine Catalouge
 
Bs 1881 112 1983
Bs 1881 112 1983Bs 1881 112 1983
Bs 1881 112 1983
 
Concrete lab s5
Concrete lab s5Concrete lab s5
Concrete lab s5
 
Self Consolidating Concrete-Designing & Tsting
Self Consolidating Concrete-Designing & TstingSelf Consolidating Concrete-Designing & Tsting
Self Consolidating Concrete-Designing & Tsting
 
Slump cone test
Slump cone testSlump cone test
Slump cone test
 
Mat Foundation-Nirvik-34-Sec-B
Mat Foundation-Nirvik-34-Sec-BMat Foundation-Nirvik-34-Sec-B
Mat Foundation-Nirvik-34-Sec-B
 
Testing of dry/hardened concrete
Testing of dry/hardened concreteTesting of dry/hardened concrete
Testing of dry/hardened concrete
 
Lecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition AssessLecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition Assess
 
SOLAR CARS
SOLAR CARSSOLAR CARS
SOLAR CARS
 
Inovasi makmal (1)
Inovasi makmal (1)Inovasi makmal (1)
Inovasi makmal (1)
 
Special concrete and concreting method
Special concrete and concreting methodSpecial concrete and concreting method
Special concrete and concreting method
 
Hardened concrete 1
Hardened concrete 1Hardened concrete 1
Hardened concrete 1
 
Compression test
Compression testCompression test
Compression test
 
Sieve analysis test of sand (video version check https://www.youtube.com/watc...
Sieve analysis test of sand (video version check https://www.youtube.com/watc...Sieve analysis test of sand (video version check https://www.youtube.com/watc...
Sieve analysis test of sand (video version check https://www.youtube.com/watc...
 
Pervious Concrete
Pervious ConcretePervious Concrete
Pervious Concrete
 
Summary of concrete workability test
Summary of concrete workability testSummary of concrete workability test
Summary of concrete workability test
 
Material Testing Lab Equipments
Material Testing Lab EquipmentsMaterial Testing Lab Equipments
Material Testing Lab Equipments
 
Concrete,batc,mix,trans,copaction etc
Concrete,batc,mix,trans,copaction etcConcrete,batc,mix,trans,copaction etc
Concrete,batc,mix,trans,copaction etc
 
Mat foundation
Mat foundationMat foundation
Mat foundation
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001
 

Similar to Guide to sampling concrete

Bs 1881 121 1983
Bs 1881 121 1983Bs 1881 121 1983
Bs 1881 121 1983EPMC TUNISIA
 
Split tensile strength in concrete
Split tensile strength in concreteSplit tensile strength in concrete
Split tensile strength in concreteSelva Prakash
 
253651195 astm-c939
253651195 astm-c939253651195 astm-c939
253651195 astm-c939Socolap Pham
 
Concrete testing
Concrete testingConcrete testing
Concrete testingAvish singh
 
Civil engineering lab tests pdf
Civil engineering lab tests pdfCivil engineering lab tests pdf
Civil engineering lab tests pdfSaqib Imran
 
VTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
VTU CBCS SCHEME Concrete Technology. Tests on Harden ConcreteVTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
VTU CBCS SCHEME Concrete Technology. Tests on Harden ConcreteSachin dyavappanavar
 
Quality control lab
Quality control labQuality control lab
Quality control labRaja Katoch
 
Properties of concrete
Properties of concrete Properties of concrete
Properties of concrete Salman H. Sindhoo
 
TEST ON HARDENED CONCRETE
TEST ON HARDENED CONCRETETEST ON HARDENED CONCRETE
TEST ON HARDENED CONCRETEJaswanth J
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Vijay Patidar
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Vijay Patidar
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01Engr. Umair Razzaq
 
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Mayur Rahangdale
 
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILDETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILJaptyesh Singh
 
Tri axial test
Tri axial testTri axial test
Tri axial testNatalie Ulza
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technologySunny Saha
 
Sr1 observations-suggestions
Sr1 observations-suggestionsSr1 observations-suggestions
Sr1 observations-suggestions8927641494
 
Friction and wear Measurement
Friction and wear MeasurementFriction and wear Measurement
Friction and wear MeasurementKARTIK PALIWAL
 
Concrete Technology
Concrete TechnologyConcrete Technology
Concrete TechnologyLove Sharma
 

Similar to Guide to sampling concrete (20)

Bs 1881 121 1983
Bs 1881 121 1983Bs 1881 121 1983
Bs 1881 121 1983
 
Split tensile strength in concrete
Split tensile strength in concreteSplit tensile strength in concrete
Split tensile strength in concrete
 
253651195 astm-c939
253651195 astm-c939253651195 astm-c939
253651195 astm-c939
 
Concrete testing
Concrete testingConcrete testing
Concrete testing
 
Civil engineering lab tests pdf
Civil engineering lab tests pdfCivil engineering lab tests pdf
Civil engineering lab tests pdf
 
VTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
VTU CBCS SCHEME Concrete Technology. Tests on Harden ConcreteVTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
VTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
 
Quality control lab
Quality control labQuality control lab
Quality control lab
 
Properties of concrete
Properties of concrete Properties of concrete
Properties of concrete
 
TEST ON HARDENED CONCRETE
TEST ON HARDENED CONCRETETEST ON HARDENED CONCRETE
TEST ON HARDENED CONCRETE
 
Slump Test - Report
Slump Test - ReportSlump Test - Report
Slump Test - Report
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
Sampling of cement ,Consistency test no cement ,Initial and final setting tim...
 
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILDETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
 
Tri axial test
Tri axial testTri axial test
Tri axial test
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technology
 
Sr1 observations-suggestions
Sr1 observations-suggestionsSr1 observations-suggestions
Sr1 observations-suggestions
 
Friction and wear Measurement
Friction and wear MeasurementFriction and wear Measurement
Friction and wear Measurement
 
Concrete Technology
Concrete TechnologyConcrete Technology
Concrete Technology
 

More from Lahmeyer International, UAE

Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Lahmeyer International, UAE
 
Design of transmission lines in india a review of multiple swing angle
Design of transmission lines in india  a review of multiple swing angleDesign of transmission lines in india  a review of multiple swing angle
Design of transmission lines in india a review of multiple swing angleLahmeyer International, UAE
 
Counter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlCounter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlLahmeyer International, UAE
 

More from Lahmeyer International, UAE (20)

Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01
 
AP88 & AP91 shifting proposal
AP88 & AP91 shifting proposalAP88 & AP91 shifting proposal
AP88 & AP91 shifting proposal
 
Design of transmission lines in india a review of multiple swing angle
Design of transmission lines in india  a review of multiple swing angleDesign of transmission lines in india  a review of multiple swing angle
Design of transmission lines in india a review of multiple swing angle
 
Guide to sampling concrete
Guide to sampling concreteGuide to sampling concrete
Guide to sampling concrete
 
Use of bentonite
Use of bentoniteUse of bentonite
Use of bentonite
 
Gb137
Gb137Gb137
Gb137
 
Ohl project risk register
Ohl project risk registerOhl project risk register
Ohl project risk register
 
Ohl project risk register
Ohl project risk registerOhl project risk register
Ohl project risk register
 
Counter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlCounter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohl
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 2
Copy of stub setting 2Copy of stub setting 2
Copy of stub setting 2
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 3
Copy of stub setting 3Copy of stub setting 3
Copy of stub setting 3
 
Copy of stub setting 1
Copy of stub setting 1Copy of stub setting 1
Copy of stub setting 1
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 1
Copy of stub setting 1Copy of stub setting 1
Copy of stub setting 1
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 

Recently uploaded

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 

Recently uploaded (20)

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 

Guide to sampling concrete

  • 1. & ite sampling testingof concrete A practical guide for site personnel
  • 2. FORENORD During the next few years, specifications will change An accompanying publication entitled 'Site sampling from using the as 1881 test methods to those given in and testing of concrete: a site managers guide' has the series as 12350: Testing fresh concrete and the also been produced to assist site engineers and series as 12390: Testing hardened concrete. managers to ensure that sampling and testing are Fortunately the tests included on this poster are the carried out correctly. The guide highlights some of the same and the only difference is in the reporting of the potential problems associated with using incorrect slump and flow values. However on the test certificate, procedures. it is necessary to report the standard used. Don't forget - The test results will be misleading if these procedures are not carried out. Get it right - Otherwise it's a waste of time and could cost your company money. For fulldetailsof equipment,testsandrecords see:as 1881: Testing concrete, aSEN12350:Tesdngfreshconcret~and as EN 12390: Testing hardened concrete.
  • 3. Safety When Portland cement is mixed with water, or even becomes damp, alkalis are released which can be harmful to the skin. The effect depends on the length of contact, any abrasion, the individual, and the part of the body involved. Suitable protective clothing should be worn. If eyes are affected they should be washed out without delay and medical attention sought. All advice or information in this publication is intended for those who will evaluate the significance and limitations of its contents anCltake responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice or information is accepted. Readers should note that all publications are subject to revision from time to time and should therefore ensure that they are in possession of the latest version.
  • 4. SAMPLING BS1881:Part101or BSEN 12350-1 The standard method To ensure it is representative of the whole load a Sample as the load is discharged. standard sample consists of scoopfuls taken from Scoopfuls must be taken through the moving stream, four different parts of the load and collected in sampling the whole width and depth - not just the buckets. top part. let very first concrete go Take a scoopful from part 1 Take a scoopful from part 2 Take a scoopful from part 3 Take a scoopful from part 4 let the last concrete go Complete a Sampling certificate and record which sampling method was used.
  • 5. Safety When Portland cement is mixed with water, or even becomes damp, alkalis are released which can be harmful to the skin. The effect depends on the length of contact, any abrasion, the individual, and the part of the body involved. Suitable protective clothing should be worn. If eyes are affected they should be washed out without delay and medical attention sought. All advice or information in this publication is intended for those who will evaluate the significance and limitations of its contents an'd take responsibility for its use and application. No liability (including thatfor negligence) for any loss resulting from such advice or information is accepted. Readers should note that all publications are subject to revision from time to time and should therefore ensure that they are in possession of the latest version.
  • 6. BS1881:Part 102or BSEN206-1: 2000, clause5.4. 1 Thealternativemethod For an early check on the workability of concrete Sample as the load is discharged. d€livered in a truckmixer this alternative method of Scoopfuls must be taken through the moving stream, sampling for the slump test may be used. Additional sampling the whole width and depth - not just the tolerances will be applicable for concrete sampled by top part. this alternative method. Let very first concrete go Take six scoopfuls from the next 0.3 m3 '''''- Take six scoopfuls after the first 0.3m3 has been discharged. Do not use this sample to make cubes. BS 1881: Part 101 requires two slump tests when concrete is sampled by the alternative method.
  • 7. THE SLUMP TEST BS 1881: Part 102 or BS EN 12350-2 Empty the sampling Flatten the final heap by repeatedly buckets onto the mixing digging-in the shovel vertically tray Liftthe shovel clear each time . Scrape each bucket clean Ifthe alternative method of sampling has been used, divide this heap into two and test each part . Thoroughly remix the Ensure the slump cone is clean and sample shovelling into damp a heap Place the metal plate on a solid level . Turn the heap over to base away from vibration or other disturbance form another . Do this three times Place the cone on the plate and stand on the foot-pieces
  • 8. Fillthe cone in three equal depth Carefullycleanoff spillage layers from sideand baseplate Use the standard slump rod Rod each layer 2S times Spread the blows evenly over the area Make sure the rod just penetrates the layer below . Heap the concrete above the top of the cone before rodding the third layer . Top up if necessary . Carefully lift the cone Usethe rod with a sawingand straight up and clear, rolling motion to strikethe concrete to a count of between 5 levelwith the top of and 10 seconds the cone Complete steps 5 to 8 within 150 seconds
  • 9. Laythe rod across the upturned There are three kinds of slump slump cone Measure the distance between the underside of the rod and the highest - point of the concrete the true Slump i slump Recordthis distance to the nearest T Smm if using BS1881: Part 102 or 10 mm if using BSEN 123S0-2 In all cases record the kind of slump Checkthe type of slump Ifthe slump isn't true, take a new sample and repeat the test . Ifthe second slump isn't true, get advice 1.True . Complete the Sampling and testing certificates 2.Collapse 3.Shear
  • 10. Youwill need thisequipment or the SlumpTest f Small scoop cf Sampling scoop cP Steel rule / Square-mouthed shovel Slump rod / Slump cone and rigidmetalplate i} Buckets or wheelbarrow 53 Mixing tray <> Sampling and testing certificates I!l ' ' " Cloth
  • 11. THE FLON TEST BS1881:Part 105or BSEN 12350-5 First, find a suitable location for the flow table. It Sampling using the standard method is must be placed on a firm flat surface. It may be recommended necessary to prepare an area for the table. . Empty the sampling buckets Ensure the mould and table are clean onto the mixing tray and damp . Scrape each bucket clean Place the mould on the centre of the table and stand on the foot-pieces Fillthe mould in two layers, tamping each layer ten times with the tamping bar . Thoroughly remix the sample Ifnecessary, add more concrete to as described for the slump test fill the top layer Use the tamping bar to strike the concrete level with the top of the mould
  • 12. ' Carefullyclean off spillage from Carefully stand on the toe around the mould and table top board at the front of the table Wait 30 seconds from striking off Carefully lift the mould straight up and clear, to a count of between 3 and 6 seconds
  • 13. Slowly lift the table top by the handle until it reaches the upper stop . Allow the table to fall freely Repeat this cycle to give a total of 15 drops Each cycle should take about 4 seconds . Measure the largest dimension of concrete spread in two directions, parallel to the table edges . Record the two diameters to nearest 5mm if using BS 1881: Part 105 or 10mm if using BS EN 12350-5 If there is a ring of cement paste several mm beyond the coarse aggregate, report that segregation has occurred Complete the Sampling and testing certificates
  • 14. You will need this equipment for the Flow Test 1 .....'r.""__.I :.r.'8W:IU..-:i ......... (:.8::.l.L!1I818.1::.1.. i. ::.1_....,. d cJj !!l Smallscoop Sampling scoop Sampling and ,0:::...... , testingcertificates '': "- Square-mouthed shovel 700mmrule / Mixing tray 0 Buckets or Flowtable wheelbarrow Mixing tray 53 Mould 13 Cloth rQ9 Hardwood tamping bar
  • 15. MAKING CUBES BS 1881: Part 108 or BS EN 12390-2 Sample the concrete in the standard manner. Concrete sampled using the alternative method cannot be used for making cubes. Check that the . Fill the mould with moulds are clean and concrete in 50mm layers lightly oiled with all . Using the special tamping bolts tightened so bar. compact that there will be no the concrete with not less than: . leakage that the Ensure 25 tamps for each of correct halves of the the two layers in a mould are used and 100mm mould that the corner lining 35 tamps for each of pins are correctly the three layers in a located 150mm mould . Thoroughly remix the sample as described for the slump test
  • 16. . and smooth overconcrete Removesurplus with a Cover each mould with a damp cloth and plastic float sheet . Wipe the mould edges clean Store inside at normal room temperature (15'C . Number the moulds for to 2S'C) e.g. on top of the identification and record curing tank details Protect the cube moulds at all times from high and low temperatures (especially frost) and drying winds Complete the Sampling and cube making certificates
  • 17. Youwill need this equipment for Making Cubes Smallscoop Sampling scoop Spanner Square-mouthed Damp cloth and Hide hammer shovel plastic sheet 8 Buckets or Cloth Tamping bar wheelbarrow
  • 18. Lightly re-oil the cube moulds with release oil Cube moulds Mixing tray Sampling, cube making and storage certificates Maximuml Steel float Curing tank minimum thermometer ; . -', Felt tip pen or Brush and I mouldoil crayon
  • 19. STORING CUBES BS 1881: Part 111 or BS EN 12390-2 The cubes should be taken from the moulds the day after making, numbered and put in a curing tank. Record the maximum/minimum . Part the sides of the mould, tapping gently with overnight storage the hide hammer temperatures on the lift off carefully certificate iMAX . Remember, new cubes are easily damaged unless handled carefully MIN lMJ . Slacken all nuts . Mark each cube with its identification number on two of its cast sides
  • 20. I' . Place the cubes in the For despatch to test curing tank laboratory, wrap the wet . Clean and reassemble the cubes in damp cloths. and moulds then plastic bags and pack in trays . Attach the sampling. testing. cube making and storage certificates, plus the order for testing. to . Check that the water the package ...... temperature is controlled at 20.C :t 2.C and the cubes are covered by water . Make sure the power 20.C supply is not switched off day or night . Check the temperature range daily using the maximum/minimum thermometer . Keep a record of the readings
  • 21. - - Ql1ARRY PRODUCTS ASSOCJ AT ION o Quarry Products Association First published by the British Cement Association for the Ready-mixed Concrete Bureau National Helpline 07004 500 500 Publication number 97. 334 (~ First published 1993 Revised 2002. 2004 fS8N07210 14704 Produced by Rudkin Design Telephone: (01327) 301770 ) The Concrete Centre™ For further information contact: The Concrete Centre Riverside House, 4 Meadows Business Park Station Approach, Blackwater Camberley, Surrey GU17 9AB I.