INSPECTION /RECORD SHEET FOR FOUNDATION EXCAVATION DIMENTION

NAME OF LINE:
CONSULTANT :
CLIENT              :
CONTRACTOR :


DATE                                                   12-Dec-07

TOWER NO:                                   0                     TOWER TYPE                 0


                                                LEG#1               LEG#2                    LEG#3              LEG#4
LEG EXT:                                          +4                     +2                       +3                +4
CHEMNEY EXT:                                       0                      0                       0                  0


SOIL CLASS:                           3                   DRAWING NUMBER:                        A/SP/7660/P/040


EXCAVATION DETAILS

EXCAVATION DRAWING NO:                                     A/SP/7660/P/040


                                                       LEG#1                  LEG#2                   LEG#3              LEG#4
                                                AS DRNG ACTUEL      AS DRNG      ACTUEL      AS DRNG ACTUEL     AS DRNG      ACTUEL

AVERAGE DEPTH TO CP                              4250      4250          4250         4250       4250    4250      4250          4250
EXCAVATION WIDTH                                 6030      6950          6030         7200       6030    6650      6030          6700
                                 WIDTH            150       150          150          150        150      150      150           150
      UNDER CUT                  HEIGHT           200       200          200          200        200      200      200           200


            SOIL STRATA                           MIXED SOIL             MIXED SOIL              MIXED SOIL         MIXED SOIL
DEWATERING REQUIRED                                    YES/NO              YES/NO                  YES/NO            YES/NO
SHUTERING EMPLOYED                                     YES/NO              YES/NO                  YES/NO            YES/NO

CHANGE OF FOUNDATION CLASS : YES/NO                               IF YES ACCEPTED CLASS:

Remark : Excavation accepted for stub setting and concreting




---------------------------------------------


INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION




                                                                     1
NAME OF LINE:                 0
CONSULTANT :
CLIENT      :
CONTRACTOR :

DATE                                   12-Dec-07

TOWER NO:                     0                 TOWER TYPE              0

                                  LEG#1               LEG#2              LEG#3            LEG#4
LEG EXT:                            +4  M                +2         M      +3  M             +4         M
CHEMNEY EXT:                         0  M                 0         M       0  M              0         M

SOIL CLASS:               3                 DRAWING NUMBER:                 A/SP/7660/P/040

STUB DETAILS

STUB MARK NO:                     H5800-1                           STUB LENGTH               6021

STUB DIMENTIONS

LEVEL LEG#2                                                                               LEVEL LEG#3
T=              0.616                     T=           14015.2                            T=          1.616
A=              0.614                     A=             8053.0                           A=          1.613



                                  T=        20108.0
                                  A=        11344.0
                                                                                  T=          14353.4
                                                                                  A=           7900.0

          T=            14292.7
          A=             8055.0

                                  T=        20272.7
                                  A=        11172.0




LEVEL LEG#1                               T=              14487.0                         LEVEL LEG#4
T=              1.616                     A=               7902.0                         T=          1.616
A=              1.616                                                                     A=          1.615

NOTE: SETTING LEG FOR LEVELL :LEG NO:……………………………….
                                                 1




INSPECTION /RECORD SHEET FOR REINFORCEMENT AND CONCRETING

NAME OF LINE:                 0
CONSULTANT :




                                                      2
CLIENT    :
CONTRACTOR :

DATE                                       12-Dec-07

TOWER NO:                           0                  TOWER TYPE             0

                                    LEG#1                 LEG#2                LEG#3                 LEG#4
LEG EXT:                              +4  M                  +2       M          +3  M                  +4          M
CHEMNEY EXT:                           0  M                   0       M           0  M                   0          M

SOIL CLASS:                   3               DRAWING NUMBER:                     A/SP/7660/P/040

CONCRETE MATERIALS (if as per drawing Y(es):


              ITEM                           OBSERVATION                                 COMMENTS
CEMENT                                              OK                                         N/A
GRAVEL SIZE                                         OK                                         N/A
SAND PROPERTY                                       OK                                         N/A
CONCRETE SUPPLIER
LOADING TIME                                11:43                 7:13                 10:52                 8:45
CONCRETING TIME                             13:10                 9:15                 12:00                 10:40

REINFORCEMENT MATERIALS (if as per drawing Yes):

REINFORCEMENT WEIGHT

                                  LEG#1                LEG#2                LEG#3                LEG#4
        PER LEG                1768.31                 1768.31              1768.31             1768.31
  TOTAL WEIGHT                                                    7073.24

CONCRETING

                 DATE OF                  DATE OF                CONCRETING VOLUME                        SLUMP
               CONCRETING               CONCRETING
   LEG           PYRAMID                 CHIMNEY          AS PER DRAWING              ACTUEL                 MM
    1             11/1/2007               11/1/2007               33.23                 46                    85
    2             28/2/2007               28/2/2007               33.23                 50                    90
    3             19/1/2007               25/1/2007               33.23                42.5                   90
    4             11/12/2006              11/12/2006              33.23                 42                   100
            TOTAL CONCRETING VOLUME                              132.91                180.5




INSPECTION /RECORD SHEET FOR REINFORCEMENT AND CONCRETING

NAME OF LINE:
CONSULTANT :
CLIENT      :
CONTRACTOR :




                                                          3
DATE                                  12-Dec-07

TOWER NO:                       0                 TOWER TYPE         0

                                LEG#1               LEG#2            LEG#3              LEG#4
LEG EXT:                          +4  M                +2      M       +3  M               +4   M
CHEMNEY EXT:                       0  M                 0      M        0  M                0   M

SOIL CLASS:                 3            DRAWING NUMBER:                  A/SP/7660/P/040

CUBES CYLINDRES TAKEN (ID=Mark identification )S for slab,C for chimney

    ID            DATE          LEG             DATE           LEG
     S          11/1/2007         1           19/1/2007          3
     C          28/2/2007         2          11/12/2006          4

FORM WORK REMOVED


   LEG            DATE                     OBSERVATION
     1          13/1/2007                          OK
     2           2/3/2007                          OK
     3          27/1/2007                          OK
     4          13/12/2006                         OK

REMARK: ACCEPTED FOR BACK FILLING
         FOUNDATION ACCEPTED FOR PAYMENT:




INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION

NAME OF LINE:
CONSULTANT :
CLIENT      :
CONTRACTOR :

DATE                                  12-Dec-07



                                                     4
TOWER NO:                 0                  TOWER TYPE             0

                          LEG#1                 LEG#2               LEG#3             LEG#4
LEG EXT:                    +4  M                  +2      M          +3  M              +4           M
CHEMNEY EXT:                 0  M                   0      M           0  M               0           M

SOIL CLASS:           3                 DRAWING NUMBER:                 A/SP/7660/P/040

STUB DETAILS

STUB MARK NO:                 H5800-1                      STUB LENGTH                    6021


CLEATS/STUB                     12                         CLEAT BOLTS/STUB                      24


STUB DIMENTIONS



                                                                LEG#1                LEG#2
                                           STUB SLOPE      WING1 WING2 WING1 WING2
                                          THEORETICAL          90       90      90         90
                                          ACTUAL AT SITE       90       90      89         90
1MTR

                  A                                             LEG#3                LEG#4
                                           STUB SLOPE      WING1 WING2 WING1 WING2
                                          THEORETICAL          90       90      90         90
                                          ACTUAL AT SITE       91       90      90         90




          STUB SETTING IS ACCEPTED FOR CONCRETING




INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION



NAME OF LINE:
CONSULTANT :
CLIENT      :
CONTRACTOR :




                                                 5
DATE                                12-Dec-07

TOWER NO:                    0                 TOWER TYPE            0


                    2                                                    3




                    1                                                    4

                          SLOPE IN 50CM    LEVEL
  LEG     LEG EXT CHI.EXT WING1 WING2 TOP OF STUB
   1         +4      0      45      45      1.616
   2         +2      0     44.5     45      0.614
   3         +3      0     45.5     45      1.613
   4         +4      0      45      45      1.615                        SIDE SLOPE IN 50CM=45

REFERENCE LEG FOR LEVEL                    1
                                                                                            -b


                                                                                            +b

                                           a



                         1-2      1-4     2-1          2-3       3-2       3-4      4-1          4-3
  DISTANCE"a"cm         1429.3   1448.7   1429.3       1401.5   1401.5    1435.3   1448.7         1435.3
    VALUE"b"cm            -4       6       0            0         0        2.5       -2           6
  (b/a)x100%value       -0.280    0.414    0.000        0.000    0.000     0.174   -0.138          0.418




INSPECTION /RECORD SHEET FOR EARTHING MEASURMENTS



NAME OF LINE:
CONSULTANT :
CLIENT      :
CONTRACTOR :


DATE                                12-Dec-07



                                                   6
TOWER NO:                   0             TOWER TYPE          0


                            LEG#1            LEG#2             LEG#3           LEG#4
LEG EXT:                      +4  M             +2      M        +3  M            +4      M
CHEMNEY EXT:                   0  M              0      M         0  M             0      M


BASIC EARTHING CONNECTED TO LEG NO:               1               3


DATE       EARTH RESISTANCE (OHM) WITH BASIC EARTHING
12/12/2007             1.8 OHM




NOTE: IF TOWER FOOTING RESISTANCE IS GREATER THAN 15 OHM ADDITIONAL EARTHING MAY BE REQUIRED
,SUBJECT TO THE APPROVAL OF ENGINEER



  AGREED FOR ADDITIONAL
 EARTHING TO BE INSTALLED       FOR EDF               FOR CONTRACTOR




DATE      EARTH RESISTANCE (OHM) WITH ADDITIONAL EARTHING
                         OHM


   EARTHING INSTALLATION
         ACCEPTED               FOR EDF               FOR CONTRACTOR




                                              7

More Related Content

Similar to Copy of stub setting

Trilogy test cma
Trilogy test cmaTrilogy test cma
Trilogy test cmaKen Schmidt
 
Trilogy test cma
Trilogy test cmaTrilogy test cma
Trilogy test cmaKen Schmidt
 
Keynote Kung-Fu: Streamlining Your Design Workflow With Keynote
Keynote Kung-Fu: Streamlining Your Design Workflow With KeynoteKeynote Kung-Fu: Streamlining Your Design Workflow With Keynote
Keynote Kung-Fu: Streamlining Your Design Workflow With KeynoteTravis Isaacs
 
Datos presentacion ag olazo dic 09
Datos presentacion ag olazo dic 09Datos presentacion ag olazo dic 09
Datos presentacion ag olazo dic 09tpsarmiento27
 
Fanuc Ot Cnc Training Manual
Fanuc Ot Cnc Training ManualFanuc Ot Cnc Training Manual
Fanuc Ot Cnc Training Manualout2thow
 
Flujo de caja hidrosoft
Flujo de caja hidrosoftFlujo de caja hidrosoft
Flujo de caja hidrosoftAldo Uribe
 
Highrisesummaryjun2011
Highrisesummaryjun2011Highrisesummaryjun2011
Highrisesummaryjun2011gfous
 

Similar to Copy of stub setting (16)

Trilogy test cma
Trilogy test cmaTrilogy test cma
Trilogy test cma
 
Trilogy test cma
Trilogy test cmaTrilogy test cma
Trilogy test cma
 
Footing
FootingFooting
Footing
 
Keynote Kung-Fu: Streamlining Your Design Workflow With Keynote
Keynote Kung-Fu: Streamlining Your Design Workflow With KeynoteKeynote Kung-Fu: Streamlining Your Design Workflow With Keynote
Keynote Kung-Fu: Streamlining Your Design Workflow With Keynote
 
Datos presentacion ag olazo dic 09
Datos presentacion ag olazo dic 09Datos presentacion ag olazo dic 09
Datos presentacion ag olazo dic 09
 
Fanuc Ot Cnc Training Manual
Fanuc Ot Cnc Training ManualFanuc Ot Cnc Training Manual
Fanuc Ot Cnc Training Manual
 
108 ts
108 ts108 ts
108 ts
 
3D Drawing Samples
3D Drawing Samples3D Drawing Samples
3D Drawing Samples
 
Anomoligies 19 03 10
Anomoligies 19 03 10Anomoligies 19 03 10
Anomoligies 19 03 10
 
6.pdf
6.pdf6.pdf
6.pdf
 
Flujo de caja hidrosoft
Flujo de caja hidrosoftFlujo de caja hidrosoft
Flujo de caja hidrosoft
 
1 N4733
1 N47331 N4733
1 N4733
 
Projects
ProjectsProjects
Projects
 
My Projects
My ProjectsMy Projects
My Projects
 
Kurt Cluster Tower
Kurt  Cluster TowerKurt  Cluster Tower
Kurt Cluster Tower
 
Highrisesummaryjun2011
Highrisesummaryjun2011Highrisesummaryjun2011
Highrisesummaryjun2011
 

More from Lahmeyer International, UAE

Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Lahmeyer International, UAE
 
Design of transmission lines in india a review of multiple swing angle
Design of transmission lines in india  a review of multiple swing angleDesign of transmission lines in india  a review of multiple swing angle
Design of transmission lines in india a review of multiple swing angleLahmeyer International, UAE
 
Counter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlCounter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlLahmeyer International, UAE
 

More from Lahmeyer International, UAE (20)

Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01
 
AP88 & AP91 shifting proposal
AP88 & AP91 shifting proposalAP88 & AP91 shifting proposal
AP88 & AP91 shifting proposal
 
Design of transmission lines in india a review of multiple swing angle
Design of transmission lines in india  a review of multiple swing angleDesign of transmission lines in india  a review of multiple swing angle
Design of transmission lines in india a review of multiple swing angle
 
Guide to sampling concrete
Guide to sampling concreteGuide to sampling concrete
Guide to sampling concrete
 
Guide to sampling concrete
Guide to sampling concreteGuide to sampling concrete
Guide to sampling concrete
 
Use of bentonite
Use of bentoniteUse of bentonite
Use of bentonite
 
Gb137
Gb137Gb137
Gb137
 
Ohl project risk register
Ohl project risk registerOhl project risk register
Ohl project risk register
 
Ohl project risk register
Ohl project risk registerOhl project risk register
Ohl project risk register
 
Counter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlCounter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohl
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 2
Copy of stub setting 2Copy of stub setting 2
Copy of stub setting 2
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 3
Copy of stub setting 3Copy of stub setting 3
Copy of stub setting 3
 
Copy of stub setting 1
Copy of stub setting 1Copy of stub setting 1
Copy of stub setting 1
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 1
Copy of stub setting 1Copy of stub setting 1
Copy of stub setting 1
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 

Recently uploaded

"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 

Recently uploaded (20)

"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 

Copy of stub setting

  • 1. INSPECTION /RECORD SHEET FOR FOUNDATION EXCAVATION DIMENTION NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 +2 +3 +4 CHEMNEY EXT: 0 0 0 0 SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 EXCAVATION DETAILS EXCAVATION DRAWING NO: A/SP/7660/P/040 LEG#1 LEG#2 LEG#3 LEG#4 AS DRNG ACTUEL AS DRNG ACTUEL AS DRNG ACTUEL AS DRNG ACTUEL AVERAGE DEPTH TO CP 4250 4250 4250 4250 4250 4250 4250 4250 EXCAVATION WIDTH 6030 6950 6030 7200 6030 6650 6030 6700 WIDTH 150 150 150 150 150 150 150 150 UNDER CUT HEIGHT 200 200 200 200 200 200 200 200 SOIL STRATA MIXED SOIL MIXED SOIL MIXED SOIL MIXED SOIL DEWATERING REQUIRED YES/NO YES/NO YES/NO YES/NO SHUTERING EMPLOYED YES/NO YES/NO YES/NO YES/NO CHANGE OF FOUNDATION CLASS : YES/NO IF YES ACCEPTED CLASS: Remark : Excavation accepted for stub setting and concreting --------------------------------------------- INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION 1
  • 2. NAME OF LINE: 0 CONSULTANT : CLIENT : CONTRACTOR : DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 STUB DETAILS STUB MARK NO: H5800-1 STUB LENGTH 6021 STUB DIMENTIONS LEVEL LEG#2 LEVEL LEG#3 T= 0.616 T= 14015.2 T= 1.616 A= 0.614 A= 8053.0 A= 1.613 T= 20108.0 A= 11344.0 T= 14353.4 A= 7900.0 T= 14292.7 A= 8055.0 T= 20272.7 A= 11172.0 LEVEL LEG#1 T= 14487.0 LEVEL LEG#4 T= 1.616 A= 7902.0 T= 1.616 A= 1.616 A= 1.615 NOTE: SETTING LEG FOR LEVELL :LEG NO:………………………………. 1 INSPECTION /RECORD SHEET FOR REINFORCEMENT AND CONCRETING NAME OF LINE: 0 CONSULTANT : 2
  • 3. CLIENT : CONTRACTOR : DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 CONCRETE MATERIALS (if as per drawing Y(es): ITEM OBSERVATION COMMENTS CEMENT OK N/A GRAVEL SIZE OK N/A SAND PROPERTY OK N/A CONCRETE SUPPLIER LOADING TIME 11:43 7:13 10:52 8:45 CONCRETING TIME 13:10 9:15 12:00 10:40 REINFORCEMENT MATERIALS (if as per drawing Yes): REINFORCEMENT WEIGHT LEG#1 LEG#2 LEG#3 LEG#4 PER LEG 1768.31 1768.31 1768.31 1768.31 TOTAL WEIGHT 7073.24 CONCRETING DATE OF DATE OF CONCRETING VOLUME SLUMP CONCRETING CONCRETING LEG PYRAMID CHIMNEY AS PER DRAWING ACTUEL MM 1 11/1/2007 11/1/2007 33.23 46 85 2 28/2/2007 28/2/2007 33.23 50 90 3 19/1/2007 25/1/2007 33.23 42.5 90 4 11/12/2006 11/12/2006 33.23 42 100 TOTAL CONCRETING VOLUME 132.91 180.5 INSPECTION /RECORD SHEET FOR REINFORCEMENT AND CONCRETING NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : 3
  • 4. DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 CUBES CYLINDRES TAKEN (ID=Mark identification )S for slab,C for chimney ID DATE LEG DATE LEG S 11/1/2007 1 19/1/2007 3 C 28/2/2007 2 11/12/2006 4 FORM WORK REMOVED LEG DATE OBSERVATION 1 13/1/2007 OK 2 2/3/2007 OK 3 27/1/2007 OK 4 13/12/2006 OK REMARK: ACCEPTED FOR BACK FILLING FOUNDATION ACCEPTED FOR PAYMENT: INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : DATE 12-Dec-07 4
  • 5. TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 STUB DETAILS STUB MARK NO: H5800-1 STUB LENGTH 6021 CLEATS/STUB 12 CLEAT BOLTS/STUB 24 STUB DIMENTIONS LEG#1 LEG#2 STUB SLOPE WING1 WING2 WING1 WING2 THEORETICAL 90 90 90 90 ACTUAL AT SITE 90 90 89 90 1MTR A LEG#3 LEG#4 STUB SLOPE WING1 WING2 WING1 WING2 THEORETICAL 90 90 90 90 ACTUAL AT SITE 91 90 90 90 STUB SETTING IS ACCEPTED FOR CONCRETING INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : 5
  • 6. DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 2 3 1 4 SLOPE IN 50CM LEVEL LEG LEG EXT CHI.EXT WING1 WING2 TOP OF STUB 1 +4 0 45 45 1.616 2 +2 0 44.5 45 0.614 3 +3 0 45.5 45 1.613 4 +4 0 45 45 1.615 SIDE SLOPE IN 50CM=45 REFERENCE LEG FOR LEVEL 1 -b +b a 1-2 1-4 2-1 2-3 3-2 3-4 4-1 4-3 DISTANCE"a"cm 1429.3 1448.7 1429.3 1401.5 1401.5 1435.3 1448.7 1435.3 VALUE"b"cm -4 6 0 0 0 2.5 -2 6 (b/a)x100%value -0.280 0.414 0.000 0.000 0.000 0.174 -0.138 0.418 INSPECTION /RECORD SHEET FOR EARTHING MEASURMENTS NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : DATE 12-Dec-07 6
  • 7. TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M BASIC EARTHING CONNECTED TO LEG NO: 1 3 DATE EARTH RESISTANCE (OHM) WITH BASIC EARTHING 12/12/2007 1.8 OHM NOTE: IF TOWER FOOTING RESISTANCE IS GREATER THAN 15 OHM ADDITIONAL EARTHING MAY BE REQUIRED ,SUBJECT TO THE APPROVAL OF ENGINEER AGREED FOR ADDITIONAL EARTHING TO BE INSTALLED FOR EDF FOR CONTRACTOR DATE EARTH RESISTANCE (OHM) WITH ADDITIONAL EARTHING OHM EARTHING INSTALLATION ACCEPTED FOR EDF FOR CONTRACTOR 7