Introduction
 Typical joining of the components is done by two ways
1. Lacing
2. Battening
 Lacing bars or battern plates are not design as load carrying
members.
 They carry transverse shear force which occurs when the
column defects.
Lacing
 There are two types of lacing system.
1. Single lacing system
2. Double lacing system
 The lacing system should not be varied
throughout the length of the strut as far
as practicable.
 The single-laced systems on opposite sides of the main
components should preferably be in the same direction so that
one system is the shadow of the other.
 Cross (except tie plates) should not be provided along the
length of the column with lacing system, unless all forces
resulting from deformation of column members are calculated
and provided for in the lacing and its fastening.
DESIGN REQUIREMENT
FOR LACING
(AS PER IS : 800 – 2007
CL. 7.6 PG. NO.48)
(1) Angle of inclination(θ): (cl. 7.6.4)
 For single or double lacing system,
 θ = 40 ͦ to 70 ͦ To the axis of the built up member
 normally,=45 is taken
(2) Slendernes ratio(kL/r) : (cl. 7.6.5.1)
 KL/r for each component of column, should not be greater than
50. ( or)
 kL/r not greater than 0.7 *most favourable slenderness ratio of
the member as a whole
 The slenderness ratio of lacing shall not exceed 145
(cl.7.6.6.3)
(3) Effective length of lacing (le) :
For bolted connection :
For single lacing, le = L
For double lacing, le = 0.7 l
Where, L = distance between the inner end fastner
For welded connection :
Le = 0.7 x distance between the inner ends of welds
(4) Width of lacing bars(b) : ( cl, 7.6.2)
minimum width of lacing bar, b = 3d
Wh, D = nominal diameter of bolt
(5) Thickness of lacing (t) : (cl. 7.6.3)
For single lacing, t > Le/40
For double lacing, t > Le/60
(6) Transverse shear (Vt) : (cl. 7.6.6.1)
 Vt= 2.5% of the axial force in the column.
This force shall be divided equally among
the lacing systems in parallel Planes.
For single lacing
F=Vt / 2sin ϴ
For double lacing
F=Vt/4 sin ϴ
wh, F= axial force in each lacing bar
(7) Check for compressive strength
For lacing using Le/r min & fy = 250 Mpa
Find fcd from IS: 800, table -9 (c) pg. 42
For rectangular section buckling class is “c”.
So, Compressive load carrying capacity of lacing
Pd = (b x t) x fcd
If (b x t ) x fcd > F (axial force n lacing) …. OK
b*t = area of lacing
i.e. pd > F …. OK
(8) Check for Tensile Strength
 Tensile strength of lacing flat is,
Or
Whichever is less.
If …O.K. IS : 800 cl. 6.3.1, pg 32
(9) End connections :
The bolted connection for lacing may be two types as given case.
For case (a)
Resultant force on bolt = R = F
So, no of bolts required
For case (b)
Resultant force on bolt
So No. of bolts required
Strength in single shear
16 dia. Bolts = 29 kN
20 dia. Bolts = 45.3 kN
Strength of bolt in bearing (cl. 10.3.4)
(10) Overlap
 In case of welded connection, the amount of overlap measured
along either edge of lacing bar shall not be less than , four times
the thickness of the lacing bar (or)
The thickness of the element of main member, whichever is
less.
Battening
 Compression member can also be built up intermediate
horizontal connecting plates or angle connecting two or four
elements of column .these horizontal connecting plates are
called battens.
 The number of battens shall be such that the member is divided
into not less than three bays within its actual length
DESIGN REQUIREMENT
FOR BATTENING
(AS PER IS : 800 – 2007
CL. 7.6 PG. NO.51)
(1) The number of battens shall be
such that the member is divided
into not less than three bays.
(2) Battens shall be designed to resist
simultaneous
 Longitudinal shear
Vb = Vt C / Ns
 Moment
M=Vt C / 2N
Where,
Vt = transverse shear force
C = distance between centre to centre of battens longitudinally .
N = number of parallel planes of battens (2 usually)
S = Minimum transverse distance between the centroid of the
bolt/ rivet group / welding.
(3) Slenderness Ratio : (cl. 7.7.1.4)
 The effective slenderness ratio of battened column
shall be taken as 1.1 times the ,the maximum actual
slenderness ratio of the column, to account for shear deformation
effects.
(4) Spacing of battens (C) : (cl. 7.7.3)
 For any component of column,
(1)
(2) of built up column (which ever is smaller)
(5) Thickness of battens (t) : (cl. 7.7.2.3)
wh, = distance b/w the inner most
connecting lines of bolts,
perpendicular to the main member
(6) Effective Depth of battens (de) : (cl 7.7.2.3)
 de > 3/4 * a …for intermediate battens
 de > a,……. ...For end batten
 de > 2b , …… For any battens
Wh, de = distance between outermost bolts longitudinally
a = distance between centroids of the main member
b = width of one member
Overall depth of battens
D = de + (2 * end distance)
(7) Transverse shear (Vt) : (cl. 7.7.2.1)
Vt = 2.5 % of the factored axial column load
(8) Overlap (cl. 7.7.4.1)
for welded connection, the overlap shall be not less than four
times the thickness of the battens
It should be noted that the battens columns have least
resistance to shear compared to column with lacings
Lassing and Battering system

More Related Content

What's hot

Design of columns uniaxial load as per IS 456-2000
Design of columns  uniaxial load as per IS 456-2000Design of columns  uniaxial load as per IS 456-2000
Design of columns uniaxial load as per IS 456-2000
PraveenKumar Shanmugam
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
sharda university
 
Steel structures
Steel structuresSteel structures
Steel structures
Sukhdarshan Singh
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension members
Sabna Thilakan
 
Design of rcc structures
Design of rcc structuresDesign of rcc structures
Design of rcc structures
R VIJAYAKUMAR
 
BIAXIAL COLUMN DESIGN
BIAXIAL COLUMN DESIGNBIAXIAL COLUMN DESIGN
BIAXIAL COLUMN DESIGNshawon_sb
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
Binay Shrestha
 
Pile foundation
Pile foundationPile foundation
Pile foundation
ghildiyal8811
 
Compression member
Compression memberCompression member
Compression member
kamariya keyur
 
Singly reinforced beam ast - over reinforced
Singly reinforced beam   ast - over reinforcedSingly reinforced beam   ast - over reinforced
Singly reinforced beam ast - over reinforced
Selvakumar Palanisamy
 
Counterfort Retaining Wall
Counterfort Retaining WallCounterfort Retaining Wall
Counterfort Retaining Wall
Kaizer Dave
 
Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.
Pritesh Parmar
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete9833356555
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)
ahsanrabbani
 
Design of columns axial load as per IS 456-2000
Design of columns  axial load as per IS 456-2000Design of columns  axial load as per IS 456-2000
Design of columns axial load as per IS 456-2000
PraveenKumar Shanmugam
 
Reinforced concrete column
Reinforced concrete columnReinforced concrete column
Reinforced concrete column
civilengineeringfreedownload
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
INTEZAAR ALAM
 
Singly reinforced beam design
Singly reinforced beam   designSingly reinforced beam   design
Singly reinforced beam design
Selvakumar Palanisamy
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
KHUSHBU SHAH
 
Design of columns as per IS 456-2000
Design of columns as per IS 456-2000Design of columns as per IS 456-2000
Design of columns as per IS 456-2000
PraveenKumar Shanmugam
 

What's hot (20)

Design of columns uniaxial load as per IS 456-2000
Design of columns  uniaxial load as per IS 456-2000Design of columns  uniaxial load as per IS 456-2000
Design of columns uniaxial load as per IS 456-2000
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
 
Steel structures
Steel structuresSteel structures
Steel structures
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension members
 
Design of rcc structures
Design of rcc structuresDesign of rcc structures
Design of rcc structures
 
BIAXIAL COLUMN DESIGN
BIAXIAL COLUMN DESIGNBIAXIAL COLUMN DESIGN
BIAXIAL COLUMN DESIGN
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Compression member
Compression memberCompression member
Compression member
 
Singly reinforced beam ast - over reinforced
Singly reinforced beam   ast - over reinforcedSingly reinforced beam   ast - over reinforced
Singly reinforced beam ast - over reinforced
 
Counterfort Retaining Wall
Counterfort Retaining WallCounterfort Retaining Wall
Counterfort Retaining Wall
 
Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)
 
Design of columns axial load as per IS 456-2000
Design of columns  axial load as per IS 456-2000Design of columns  axial load as per IS 456-2000
Design of columns axial load as per IS 456-2000
 
Reinforced concrete column
Reinforced concrete columnReinforced concrete column
Reinforced concrete column
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Singly reinforced beam design
Singly reinforced beam   designSingly reinforced beam   design
Singly reinforced beam design
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
 
Design of columns as per IS 456-2000
Design of columns as per IS 456-2000Design of columns as per IS 456-2000
Design of columns as per IS 456-2000
 

Viewers also liked

Disposal of sewage on land
Disposal of sewage on landDisposal of sewage on land
Disposal of sewage on land
Ankit Gola
 
waste water treatment ppt
waste water treatment pptwaste water treatment ppt
waste water treatment ppt
Nusrat Bashir
 
Waste water management
Waste water managementWaste water management
Waste water management
Samyuktha Samy
 
Sewerage design
Sewerage designSewerage design
Sewerage design
Sharifah Ain
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and Pumping
GAURAV. H .TANDON
 
Environmental Engineering -II Unit I
Environmental Engineering -II Unit IEnvironmental Engineering -II Unit I
Environmental Engineering -II Unit I
GAURAV. H .TANDON
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
Akepati S. Reddy
 
Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)
GAURAV. H .TANDON
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-pptabhiiii4558
 
Collection and Conveyance of Water
Collection and Conveyance of WaterCollection and Conveyance of Water
Collection and Conveyance of Water
GAURAV. H .TANDON
 

Viewers also liked (11)

Sewage treatment
Sewage treatmentSewage treatment
Sewage treatment
 
Disposal of sewage on land
Disposal of sewage on landDisposal of sewage on land
Disposal of sewage on land
 
waste water treatment ppt
waste water treatment pptwaste water treatment ppt
waste water treatment ppt
 
Waste water management
Waste water managementWaste water management
Waste water management
 
Sewerage design
Sewerage designSewerage design
Sewerage design
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and Pumping
 
Environmental Engineering -II Unit I
Environmental Engineering -II Unit IEnvironmental Engineering -II Unit I
Environmental Engineering -II Unit I
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt
 
Collection and Conveyance of Water
Collection and Conveyance of WaterCollection and Conveyance of Water
Collection and Conveyance of Water
 

Similar to Lassing and Battering system

Esd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHODEsd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHOD
yasir Khan
 
lacing and battening .pptx
lacing and battening .pptxlacing and battening .pptx
lacing and battening .pptx
mayur280524
 
Design of connections
Design of connectionsDesign of connections
Design of connections
Valmik Mahajan
 
Fmd riveted joints
Fmd riveted jointsFmd riveted joints
Fmd riveted joints
Krushal Kakadia
 
Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2
saibabu48
 
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdfDiv_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
LandelSmith1
 
Comparative Study on Anchorage in Reinforced Concrete Using Codes of Practice...
Comparative Study on Anchorage in Reinforced Concrete Using Codes of Practice...Comparative Study on Anchorage in Reinforced Concrete Using Codes of Practice...
Comparative Study on Anchorage in Reinforced Concrete Using Codes of Practice...
IJERA Editor
 
DACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptxDACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptx
Abhijeet Pabale
 
Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structures
anand bhatnagar
 
H slabs
H slabsH slabs
H slabs
AbirMahmud34
 
Steel strucure lec # (4) copy
Steel strucure lec #  (4)  copySteel strucure lec #  (4)  copy
Steel strucure lec # (4) copy
Civil Zone
 
Reinforced concrete II Hand out Chapter 5_PPT_Torsion.pdf
Reinforced concrete II Hand out Chapter 5_PPT_Torsion.pdfReinforced concrete II Hand out Chapter 5_PPT_Torsion.pdf
Reinforced concrete II Hand out Chapter 5_PPT_Torsion.pdf
ObsiNaanJedhani
 
Theory for Welded connection.pdf
Theory for Welded connection.pdfTheory for Welded connection.pdf
Theory for Welded connection.pdf
YatiTank
 
Ch8 Truss Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
Ch8 Truss Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...Ch8 Truss Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
Ch8 Truss Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
Hossam Shafiq II
 
ch-02_cotter-joint-knuckle-joint-design.pdf
ch-02_cotter-joint-knuckle-joint-design.pdfch-02_cotter-joint-knuckle-joint-design.pdf
ch-02_cotter-joint-knuckle-joint-design.pdf
Praveen Kumar
 
module3-Design-of-Tension-Members.pdf
module3-Design-of-Tension-Members.pdfmodule3-Design-of-Tension-Members.pdf
module3-Design-of-Tension-Members.pdf
CivilEngineering63
 
Practical on cotter joint.pptx
Practical on cotter joint.pptxPractical on cotter joint.pptx
Practical on cotter joint.pptx
fahamkhan7
 
Behavior of RC Shallow and Deep Beams with Openings Via the Strut-and-Tie Mod...
Behavior of RC Shallow and Deep Beams with Openings Via the Strut-and-Tie Mod...Behavior of RC Shallow and Deep Beams with Openings Via the Strut-and-Tie Mod...
Behavior of RC Shallow and Deep Beams with Openings Via the Strut-and-Tie Mod...
Waleed E. El-Demerdash
 
Riveted joints 200708
Riveted joints 200708Riveted joints 200708
Riveted joints 200708
Shehbaz Ali
 

Similar to Lassing and Battering system (20)

Esd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHODEsd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHOD
 
lacing and battening .pptx
lacing and battening .pptxlacing and battening .pptx
lacing and battening .pptx
 
Design of connections
Design of connectionsDesign of connections
Design of connections
 
Fmd riveted joints
Fmd riveted jointsFmd riveted joints
Fmd riveted joints
 
Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2
 
311 C H19
311 C H19311 C H19
311 C H19
 
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdfDiv_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
 
Comparative Study on Anchorage in Reinforced Concrete Using Codes of Practice...
Comparative Study on Anchorage in Reinforced Concrete Using Codes of Practice...Comparative Study on Anchorage in Reinforced Concrete Using Codes of Practice...
Comparative Study on Anchorage in Reinforced Concrete Using Codes of Practice...
 
DACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptxDACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptx
 
Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structures
 
H slabs
H slabsH slabs
H slabs
 
Steel strucure lec # (4) copy
Steel strucure lec #  (4)  copySteel strucure lec #  (4)  copy
Steel strucure lec # (4) copy
 
Reinforced concrete II Hand out Chapter 5_PPT_Torsion.pdf
Reinforced concrete II Hand out Chapter 5_PPT_Torsion.pdfReinforced concrete II Hand out Chapter 5_PPT_Torsion.pdf
Reinforced concrete II Hand out Chapter 5_PPT_Torsion.pdf
 
Theory for Welded connection.pdf
Theory for Welded connection.pdfTheory for Welded connection.pdf
Theory for Welded connection.pdf
 
Ch8 Truss Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
Ch8 Truss Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...Ch8 Truss Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
Ch8 Truss Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
 
ch-02_cotter-joint-knuckle-joint-design.pdf
ch-02_cotter-joint-knuckle-joint-design.pdfch-02_cotter-joint-knuckle-joint-design.pdf
ch-02_cotter-joint-knuckle-joint-design.pdf
 
module3-Design-of-Tension-Members.pdf
module3-Design-of-Tension-Members.pdfmodule3-Design-of-Tension-Members.pdf
module3-Design-of-Tension-Members.pdf
 
Practical on cotter joint.pptx
Practical on cotter joint.pptxPractical on cotter joint.pptx
Practical on cotter joint.pptx
 
Behavior of RC Shallow and Deep Beams with Openings Via the Strut-and-Tie Mod...
Behavior of RC Shallow and Deep Beams with Openings Via the Strut-and-Tie Mod...Behavior of RC Shallow and Deep Beams with Openings Via the Strut-and-Tie Mod...
Behavior of RC Shallow and Deep Beams with Openings Via the Strut-and-Tie Mod...
 
Riveted joints 200708
Riveted joints 200708Riveted joints 200708
Riveted joints 200708
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 

Lassing and Battering system

  • 1. GANDHINAGAR INSTITUTE OF TECHNOLOGY BE SEM :-6th DEPARTMENT OF CIVIL ENGINERING Active Learning Assignment of ELEMENTARY STRUCTURAL DESING (STEEL) Topic : LASSING AND BATTERING SYSTEM Prepared By: PRAJAPATI HIMANSU 140120106085 Guided By Prof. Mohammed Challawala
  • 2. Introduction  Typical joining of the components is done by two ways 1. Lacing 2. Battening  Lacing bars or battern plates are not design as load carrying members.  They carry transverse shear force which occurs when the column defects.
  • 4.  There are two types of lacing system. 1. Single lacing system 2. Double lacing system  The lacing system should not be varied throughout the length of the strut as far as practicable.
  • 5.  The single-laced systems on opposite sides of the main components should preferably be in the same direction so that one system is the shadow of the other.  Cross (except tie plates) should not be provided along the length of the column with lacing system, unless all forces resulting from deformation of column members are calculated and provided for in the lacing and its fastening.
  • 6. DESIGN REQUIREMENT FOR LACING (AS PER IS : 800 – 2007 CL. 7.6 PG. NO.48)
  • 7. (1) Angle of inclination(θ): (cl. 7.6.4)  For single or double lacing system,  θ = 40 ͦ to 70 ͦ To the axis of the built up member  normally,=45 is taken (2) Slendernes ratio(kL/r) : (cl. 7.6.5.1)  KL/r for each component of column, should not be greater than 50. ( or)  kL/r not greater than 0.7 *most favourable slenderness ratio of the member as a whole
  • 8.  The slenderness ratio of lacing shall not exceed 145 (cl.7.6.6.3) (3) Effective length of lacing (le) : For bolted connection : For single lacing, le = L For double lacing, le = 0.7 l Where, L = distance between the inner end fastner For welded connection : Le = 0.7 x distance between the inner ends of welds
  • 9. (4) Width of lacing bars(b) : ( cl, 7.6.2) minimum width of lacing bar, b = 3d Wh, D = nominal diameter of bolt (5) Thickness of lacing (t) : (cl. 7.6.3) For single lacing, t > Le/40 For double lacing, t > Le/60
  • 10. (6) Transverse shear (Vt) : (cl. 7.6.6.1)  Vt= 2.5% of the axial force in the column. This force shall be divided equally among the lacing systems in parallel Planes. For single lacing F=Vt / 2sin ϴ For double lacing F=Vt/4 sin ϴ wh, F= axial force in each lacing bar
  • 11. (7) Check for compressive strength For lacing using Le/r min & fy = 250 Mpa Find fcd from IS: 800, table -9 (c) pg. 42 For rectangular section buckling class is “c”. So, Compressive load carrying capacity of lacing Pd = (b x t) x fcd If (b x t ) x fcd > F (axial force n lacing) …. OK b*t = area of lacing i.e. pd > F …. OK
  • 12. (8) Check for Tensile Strength  Tensile strength of lacing flat is, Or Whichever is less. If …O.K. IS : 800 cl. 6.3.1, pg 32
  • 13. (9) End connections : The bolted connection for lacing may be two types as given case. For case (a) Resultant force on bolt = R = F So, no of bolts required
  • 14. For case (b) Resultant force on bolt So No. of bolts required Strength in single shear 16 dia. Bolts = 29 kN 20 dia. Bolts = 45.3 kN
  • 15. Strength of bolt in bearing (cl. 10.3.4) (10) Overlap  In case of welded connection, the amount of overlap measured along either edge of lacing bar shall not be less than , four times the thickness of the lacing bar (or) The thickness of the element of main member, whichever is less.
  • 17.  Compression member can also be built up intermediate horizontal connecting plates or angle connecting two or four elements of column .these horizontal connecting plates are called battens.  The number of battens shall be such that the member is divided into not less than three bays within its actual length
  • 18. DESIGN REQUIREMENT FOR BATTENING (AS PER IS : 800 – 2007 CL. 7.6 PG. NO.51)
  • 19. (1) The number of battens shall be such that the member is divided into not less than three bays. (2) Battens shall be designed to resist simultaneous
  • 20.  Longitudinal shear Vb = Vt C / Ns  Moment M=Vt C / 2N Where, Vt = transverse shear force C = distance between centre to centre of battens longitudinally . N = number of parallel planes of battens (2 usually) S = Minimum transverse distance between the centroid of the bolt/ rivet group / welding.
  • 21. (3) Slenderness Ratio : (cl. 7.7.1.4)  The effective slenderness ratio of battened column shall be taken as 1.1 times the ,the maximum actual slenderness ratio of the column, to account for shear deformation effects. (4) Spacing of battens (C) : (cl. 7.7.3)  For any component of column, (1) (2) of built up column (which ever is smaller)
  • 22. (5) Thickness of battens (t) : (cl. 7.7.2.3) wh, = distance b/w the inner most connecting lines of bolts, perpendicular to the main member (6) Effective Depth of battens (de) : (cl 7.7.2.3)  de > 3/4 * a …for intermediate battens  de > a,……. ...For end batten  de > 2b , …… For any battens Wh, de = distance between outermost bolts longitudinally a = distance between centroids of the main member b = width of one member
  • 23. Overall depth of battens D = de + (2 * end distance) (7) Transverse shear (Vt) : (cl. 7.7.2.1) Vt = 2.5 % of the factored axial column load (8) Overlap (cl. 7.7.4.1) for welded connection, the overlap shall be not less than four times the thickness of the battens It should be noted that the battens columns have least resistance to shear compared to column with lacings