GraphFrames
DataFrame-based graphs for Apache® Spark™
Joseph K. Bradley
4/14/2016
About the speaker: Joseph Bradley
Joseph Bradley is a Software Engineerand Apache
Spark PMC member working on MLlib at
Databricks. Previously,he was a postdoc at UC
Berkeley after receiving hisPh.D. in Machine
Learning from Carnegie Mellon U.in 2013.His
research included probabilistic graphical models,
parallel sparse regression, and aggregation
mechanismsfor peergrading in MOOCs.
2
About the moderator: Denny Lee
Denny Lee is a Technology Evangelistwith
Databricks; he is a hands-on data sciencesengineer
with more than 15 years of experience developing
internet-scale infrastructure, data platforms, and
distributed systems for both on-premisesand cloud.
Prior to joining Databricks, Denny worked as a
SeniorDirector of Data SciencesEngineering at
Concur and was part of the incubation teamthat
builtHadoop on Windowsand Azure (currently
known as HDInsight).
3
We are Databricks, the company behind Apache Spark
Founded by the creators of
Apache Spark in 2013
Share of Spark code
contributed by Databricks
in 2014
75%
4
Data Value
Created Databricks on top of Spark to make big data simple.
…
Apache Spark Engine
Spark Core
Spark
Streaming
Spark SQL MLlib GraphX
Unified engineacross diverse workloads & environments
Scale out, fault tolerant
Python, Java, Scala, and R
APIs
Standard libraries
NOTABL E USERS THAT PRESENTED AT SPARK SUMMIT
2 0 1 5 SAN F RANCISCO
Source: Slide5ofSparkCommunityUpdate
Outline
GraphFrames overview
GraphFrames vs. GraphXand other libraries
Details for power users
Roadmap and resources
8
Outline
GraphFrames overview
GraphFrames vs. GraphXand other libraries
Details for power users
Roadmap and resources
9
Graphs
10
vertex
edge
id City State
“JFK” “New York” NY
Example: airports & flights between them
JFK
IAD
LAX
SFO
SEA
DFW
src dst delay tripID
“JFK
”
“SEA” 45 1058923
Apache Spark’s GraphX library
Overview
• General-purpose graph
processinglibrary
• Optimized for fast
distributedcomputing
• Library of algorithms:
PageRank, Connected
Components,etc.
11
Challenges
• No Java, PythonAPIs
• Lower-levelRDD-based
API (vs.DataFrames)
• Cannot use recent Spark
optimizations:Catalyst
query optimizer,Tungsten
memory management
Enter GraphFrames
Goal: DataFrame-based graphson ApacheSpark
• Simplify interactive queries
• Support motif-findingforstructural pattern search
• Benefitfrom DataFrame optimizations
Collaboration between Databricks, UC Berkeley& MIT
+ Now with community contributors!
12
Graphs
13
vertex
edge
id City State
“JFK” “New York” NY
Example: airports & flights between them
JFK
IAD
LAX
SFO
SEA
DFW
src dst delay tripID
“JFK
”
“SEA” 45 1058923
GraphFrames
“vertices” DataFrame
• 1 vertexper Row
• id: column with unique ID
“edges” DataFrame
• 1 edge per Row
• src, dst: columns using IDs from vertices.id
14
Extra columns store vertexor edge data
(a.k.a. attributes or properties).
id City State
“JFK” “New York” NY
“SEA” “Seattle” WA
src dst delay tripID
“JFK” “SEA” 45 1058923
“DFW” “SFO” -7 4100224
Demo:
Building a GraphFrame
15
16
Queries
Simple queries
Motif finding
Graph algorithms
19
Simple queries
SQL queries on vertices & edges
E.g., what trips are most likely to have significantdelays?
20
Graph queries
• Vertex degrees
• # edgesper vertex(incoming,outgoing,total)
• Triplets
• Join vertices and edgesto get (src, edge,dst)
21
Motif finding
24
IAD
JFK
LAX
SFO
SEA
DFW
Search for structural
patterns within a graph.
val paths: DataFrame =
g.find(“(a)-[e1]->(b);
(b)-[e2]->(c);
!(c)-[]->(a)”)
Motif finding
25
IAD
JFK
LAX
SFO
SEA
DFW
(b)
(a)Search for structural
patterns within a graph.
val paths: DataFrame =
g.find(“(a)-[e1]->(b);
(b)-[e2]->(c);
!(c)-[]->(a)”)
Motif finding
26
IAD
JFK
LAX
SFO
SEA
DFW
(b)
(a)
(c)
Search for structural
patterns within a graph.
val paths: DataFrame =
g.find(“(a)-[e1]->(b);
(b)-[e2]->(c);
!(c)-[]->(a)”)
Motif finding
27
IAD
JFK
LAX
SFO
SEA
DFW
(b)
(a)
(c)
Search for structural
patterns within a graph.
val paths: DataFrame =
g.find(“(a)-[e1]->(b);
(b)-[e2]->(c);
!(c)-[]->(a)”)
Motif finding
28
IAD
JFK
LAX
SFO
SEA
DFW
Search for structural
patterns within a graph.
val paths: DataFrame =
g.find(“(a)-[e1]->(b);
(b)-[e2]->(c);
!(c)-[]->(a)”)
(b)
(a)
(c)
Then filter using vertex &
edge data.
paths.filter(“e1.delay > 20”)
29
Graph algorithms
Find importantvertices
• PageRank
31
Find pathsbetweensets of vertices
• Breadth-first search (BFS)
• Shortest paths
Find groupsof vertices(components,
communities)
• Connected components
• Strongly connected components
• Label Propagation Algorithm(LPA)
Other
• Triangle counting
• SVDPlusPlus
32
Algorithm implementations
Mostly wrappers for GraphX
• PageRank
• Shortest paths
• Connected components
• Strongly connected components
• Label Propagation Algorithm (LPA)
• SVDPlusPlus
33
Some algorithms implemented
usingDataFrames
• Breadth-first search
• Triangle counting
Saving & loading graphs
Save & load the DataFrames.
vertices = sqlContext.read.parquet(...)
edges = sqlContext.read.parquet(...)
g = GraphFrame(vertices, edges)
g.vertices.write.parquet(...)
g.edges.write.parquet(...)
In the future...
• SQL data sources for graph formats
34
APIs: Scala, Java, Python
API available from all 3 languages
à First time GraphX functionality hasbeen available to
Java & Python users
2 missing items (WIP)
• Java-friendliness is currently in alpha.
• Python does not have aggregateMessages
(for implementing your own graph algorithms).
35
Outline
GraphFrames overview
GraphFrames vs. GraphX and other libraries
Details for power users
Roadmap and resources
36
2 types of graph libraries
37
Graph algorithms Graph queries
Standard & custom algorithms
Optimized for batch processing
Motif finding
Point queries &updates
GraphFrames: Both algorithms &queries (but notpoint updates)
GraphFrames vs. GraphX
38
GraphFrames GraphX
Builton DataFrames RDDs
Languages Scala, Java, Python Scala
Use cases Queries & algorithms Algorithms
Vertex IDs Any type (in Catalyst) Long
Vertex/edg
e attributes
Any number of
DataFrame columns
Any type (VD, ED)
Return
types
GraphFrame or
DataFrame
Graph[VD, ED], or
RDD[Long, VD]
GraphX compatibility
Simple conversionsbetweenGraphFrames& GraphX.
val g: GraphFrame = ...
// Convert GraphFrame à GraphX
val gx: Graph[Row, Row] = g.toGraphX
// Convert GraphX à GraphFrame
val g2: GraphFrame = GraphFrame.fromGraphX(gx)
39
Vertex & edgeattributes
are Rows in order to
handlenon-LongIDs
Wrapping existing GraphX code: See Belief Propagation example:
https://github.com/graphframes/graphframes/blob/master/src/main/scala/org/graphframes/examples/BeliefPropagation.scala
Outline
GraphFrames overview
GraphFrames vs. GraphXand other libraries
Details for power users
Roadmap and resources
40
Scalability
Currentstatus
• DataFrame-based parts benefitfrom DataFrame scalability +
performance optimizations(Catalyst, Tungsten).
• GraphX wrappers are as fast as GraphX (+ conversion overhead).
WIP
• GraphX hasoptimizationswhich are not yet ported to GraphFrames.
• See nextslide…
41
WIP optimizations
Join elimination
• GraphFrame algorithms require lots
of joins.
• Not all joins are necessary
Solution:
• Vertex IDs serve as unique keys.
• Tracking keys allows Catalyst to
eliminate some joins.
42
For more info & benchmark results, see AnkurDave’s SSE 2016 talk.
https://spark-summit.org/east-2016/events/graphframes-graph-queries-in-spark-sql/
Materializedviews
• Data locality for common usecases
• Message-passing algorithms often
need “triplet view” (src,edge, dst)
Solution:
• Materialize specific views
• Analogous to GraphX’s “replicated
vertex view”
Implementing new algorithms
43
Method 2: Messagepassing
aggregateMessages
• Same primitive as GraphX
• Specify messages & aggregation
using DataFrame expressions
Belief propagation example code
Method 1: DataFrame &
GraphFrame operations
Motif finding
• Series of DataFrame joins
Triangle count
• DataFrame ops + motif finding
BFS
• DataFrame joins & filters
Outline
GraphFrames overview
GraphFrames vs. GraphXand other libraries
Details for power users
Roadmap and resources
44
Current status
Published
• Open source (Apache 2.0) on Github
https://github.com/graphframes/graphframes
• Spark package http://spark-
packages.org/package/graphframes/graphframes
Compatible
• Spark 1.4, 1.5, 1.6
• Databricks Community Edition
Documented
• http://graphframes.github.io/
45
Roadmap
• MergeWIP speed optimizations
• Java API tests & examples
• Migrate more algorithms to DataFrame-based
implementations for greater scalability
• Getcommunity feedback!
46
Contribute
• Tracking issueson Github
• Thanks to those who have
already sent pull requests!
Resources for learning more
User guide + API docs http://graphframes.github.io/
• Quick-start
• Overview & examples for all algorithms
• Alsoavailable as executablenotebooks:
• Scala: http://go.databricks.com/hubfs/notebooks/3-GraphFrames-User-Guide-scala.html
• Python: http://go.databricks.com/hubfs/notebooks/3-GraphFrames-User-Guide-python.html
Blog posts
• Intro: https://databricks.com/blog/2016/03/03/introducing-graphframes.html
• Flight delay analysis: https://databricks.com/blog/2016/03/16/on-time-flight-performance-
with-spark-graphframes.html
47
48
Thank you!
Thanks to
• Denny Lee & Bill Chambers (demo)
• Tim Hunter, Xiangrui Meng, Ankur Dave &others (GraphFrames development)

GraphFrames: DataFrame-based graphs for Apache® Spark™

  • 1.
    GraphFrames DataFrame-based graphs forApache® Spark™ Joseph K. Bradley 4/14/2016
  • 2.
    About the speaker:Joseph Bradley Joseph Bradley is a Software Engineerand Apache Spark PMC member working on MLlib at Databricks. Previously,he was a postdoc at UC Berkeley after receiving hisPh.D. in Machine Learning from Carnegie Mellon U.in 2013.His research included probabilistic graphical models, parallel sparse regression, and aggregation mechanismsfor peergrading in MOOCs. 2
  • 3.
    About the moderator:Denny Lee Denny Lee is a Technology Evangelistwith Databricks; he is a hands-on data sciencesengineer with more than 15 years of experience developing internet-scale infrastructure, data platforms, and distributed systems for both on-premisesand cloud. Prior to joining Databricks, Denny worked as a SeniorDirector of Data SciencesEngineering at Concur and was part of the incubation teamthat builtHadoop on Windowsand Azure (currently known as HDInsight). 3
  • 4.
    We are Databricks,the company behind Apache Spark Founded by the creators of Apache Spark in 2013 Share of Spark code contributed by Databricks in 2014 75% 4 Data Value Created Databricks on top of Spark to make big data simple.
  • 5.
    … Apache Spark Engine SparkCore Spark Streaming Spark SQL MLlib GraphX Unified engineacross diverse workloads & environments Scale out, fault tolerant Python, Java, Scala, and R APIs Standard libraries
  • 7.
    NOTABL E USERSTHAT PRESENTED AT SPARK SUMMIT 2 0 1 5 SAN F RANCISCO Source: Slide5ofSparkCommunityUpdate
  • 8.
    Outline GraphFrames overview GraphFrames vs.GraphXand other libraries Details for power users Roadmap and resources 8
  • 9.
    Outline GraphFrames overview GraphFrames vs.GraphXand other libraries Details for power users Roadmap and resources 9
  • 10.
    Graphs 10 vertex edge id City State “JFK”“New York” NY Example: airports & flights between them JFK IAD LAX SFO SEA DFW src dst delay tripID “JFK ” “SEA” 45 1058923
  • 11.
    Apache Spark’s GraphXlibrary Overview • General-purpose graph processinglibrary • Optimized for fast distributedcomputing • Library of algorithms: PageRank, Connected Components,etc. 11 Challenges • No Java, PythonAPIs • Lower-levelRDD-based API (vs.DataFrames) • Cannot use recent Spark optimizations:Catalyst query optimizer,Tungsten memory management
  • 12.
    Enter GraphFrames Goal: DataFrame-basedgraphson ApacheSpark • Simplify interactive queries • Support motif-findingforstructural pattern search • Benefitfrom DataFrame optimizations Collaboration between Databricks, UC Berkeley& MIT + Now with community contributors! 12
  • 13.
    Graphs 13 vertex edge id City State “JFK”“New York” NY Example: airports & flights between them JFK IAD LAX SFO SEA DFW src dst delay tripID “JFK ” “SEA” 45 1058923
  • 14.
    GraphFrames “vertices” DataFrame • 1vertexper Row • id: column with unique ID “edges” DataFrame • 1 edge per Row • src, dst: columns using IDs from vertices.id 14 Extra columns store vertexor edge data (a.k.a. attributes or properties). id City State “JFK” “New York” NY “SEA” “Seattle” WA src dst delay tripID “JFK” “SEA” 45 1058923 “DFW” “SFO” -7 4100224
  • 15.
  • 16.
  • 19.
  • 20.
    Simple queries SQL querieson vertices & edges E.g., what trips are most likely to have significantdelays? 20 Graph queries • Vertex degrees • # edgesper vertex(incoming,outgoing,total) • Triplets • Join vertices and edgesto get (src, edge,dst)
  • 21.
  • 24.
    Motif finding 24 IAD JFK LAX SFO SEA DFW Search forstructural patterns within a graph. val paths: DataFrame = g.find(“(a)-[e1]->(b); (b)-[e2]->(c); !(c)-[]->(a)”)
  • 25.
    Motif finding 25 IAD JFK LAX SFO SEA DFW (b) (a)Search forstructural patterns within a graph. val paths: DataFrame = g.find(“(a)-[e1]->(b); (b)-[e2]->(c); !(c)-[]->(a)”)
  • 26.
    Motif finding 26 IAD JFK LAX SFO SEA DFW (b) (a) (c) Search forstructural patterns within a graph. val paths: DataFrame = g.find(“(a)-[e1]->(b); (b)-[e2]->(c); !(c)-[]->(a)”)
  • 27.
    Motif finding 27 IAD JFK LAX SFO SEA DFW (b) (a) (c) Search forstructural patterns within a graph. val paths: DataFrame = g.find(“(a)-[e1]->(b); (b)-[e2]->(c); !(c)-[]->(a)”)
  • 28.
    Motif finding 28 IAD JFK LAX SFO SEA DFW Search forstructural patterns within a graph. val paths: DataFrame = g.find(“(a)-[e1]->(b); (b)-[e2]->(c); !(c)-[]->(a)”) (b) (a) (c) Then filter using vertex & edge data. paths.filter(“e1.delay > 20”)
  • 29.
  • 31.
    Graph algorithms Find importantvertices •PageRank 31 Find pathsbetweensets of vertices • Breadth-first search (BFS) • Shortest paths Find groupsof vertices(components, communities) • Connected components • Strongly connected components • Label Propagation Algorithm(LPA) Other • Triangle counting • SVDPlusPlus
  • 32.
  • 33.
    Algorithm implementations Mostly wrappersfor GraphX • PageRank • Shortest paths • Connected components • Strongly connected components • Label Propagation Algorithm (LPA) • SVDPlusPlus 33 Some algorithms implemented usingDataFrames • Breadth-first search • Triangle counting
  • 34.
    Saving & loadinggraphs Save & load the DataFrames. vertices = sqlContext.read.parquet(...) edges = sqlContext.read.parquet(...) g = GraphFrame(vertices, edges) g.vertices.write.parquet(...) g.edges.write.parquet(...) In the future... • SQL data sources for graph formats 34
  • 35.
    APIs: Scala, Java,Python API available from all 3 languages à First time GraphX functionality hasbeen available to Java & Python users 2 missing items (WIP) • Java-friendliness is currently in alpha. • Python does not have aggregateMessages (for implementing your own graph algorithms). 35
  • 36.
    Outline GraphFrames overview GraphFrames vs.GraphX and other libraries Details for power users Roadmap and resources 36
  • 37.
    2 types ofgraph libraries 37 Graph algorithms Graph queries Standard & custom algorithms Optimized for batch processing Motif finding Point queries &updates GraphFrames: Both algorithms &queries (but notpoint updates)
  • 38.
    GraphFrames vs. GraphX 38 GraphFramesGraphX Builton DataFrames RDDs Languages Scala, Java, Python Scala Use cases Queries & algorithms Algorithms Vertex IDs Any type (in Catalyst) Long Vertex/edg e attributes Any number of DataFrame columns Any type (VD, ED) Return types GraphFrame or DataFrame Graph[VD, ED], or RDD[Long, VD]
  • 39.
    GraphX compatibility Simple conversionsbetweenGraphFrames&GraphX. val g: GraphFrame = ... // Convert GraphFrame à GraphX val gx: Graph[Row, Row] = g.toGraphX // Convert GraphX à GraphFrame val g2: GraphFrame = GraphFrame.fromGraphX(gx) 39 Vertex & edgeattributes are Rows in order to handlenon-LongIDs Wrapping existing GraphX code: See Belief Propagation example: https://github.com/graphframes/graphframes/blob/master/src/main/scala/org/graphframes/examples/BeliefPropagation.scala
  • 40.
    Outline GraphFrames overview GraphFrames vs.GraphXand other libraries Details for power users Roadmap and resources 40
  • 41.
    Scalability Currentstatus • DataFrame-based partsbenefitfrom DataFrame scalability + performance optimizations(Catalyst, Tungsten). • GraphX wrappers are as fast as GraphX (+ conversion overhead). WIP • GraphX hasoptimizationswhich are not yet ported to GraphFrames. • See nextslide… 41
  • 42.
    WIP optimizations Join elimination •GraphFrame algorithms require lots of joins. • Not all joins are necessary Solution: • Vertex IDs serve as unique keys. • Tracking keys allows Catalyst to eliminate some joins. 42 For more info & benchmark results, see AnkurDave’s SSE 2016 talk. https://spark-summit.org/east-2016/events/graphframes-graph-queries-in-spark-sql/ Materializedviews • Data locality for common usecases • Message-passing algorithms often need “triplet view” (src,edge, dst) Solution: • Materialize specific views • Analogous to GraphX’s “replicated vertex view”
  • 43.
    Implementing new algorithms 43 Method2: Messagepassing aggregateMessages • Same primitive as GraphX • Specify messages & aggregation using DataFrame expressions Belief propagation example code Method 1: DataFrame & GraphFrame operations Motif finding • Series of DataFrame joins Triangle count • DataFrame ops + motif finding BFS • DataFrame joins & filters
  • 44.
    Outline GraphFrames overview GraphFrames vs.GraphXand other libraries Details for power users Roadmap and resources 44
  • 45.
    Current status Published • Opensource (Apache 2.0) on Github https://github.com/graphframes/graphframes • Spark package http://spark- packages.org/package/graphframes/graphframes Compatible • Spark 1.4, 1.5, 1.6 • Databricks Community Edition Documented • http://graphframes.github.io/ 45
  • 46.
    Roadmap • MergeWIP speedoptimizations • Java API tests & examples • Migrate more algorithms to DataFrame-based implementations for greater scalability • Getcommunity feedback! 46 Contribute • Tracking issueson Github • Thanks to those who have already sent pull requests!
  • 47.
    Resources for learningmore User guide + API docs http://graphframes.github.io/ • Quick-start • Overview & examples for all algorithms • Alsoavailable as executablenotebooks: • Scala: http://go.databricks.com/hubfs/notebooks/3-GraphFrames-User-Guide-scala.html • Python: http://go.databricks.com/hubfs/notebooks/3-GraphFrames-User-Guide-python.html Blog posts • Intro: https://databricks.com/blog/2016/03/03/introducing-graphframes.html • Flight delay analysis: https://databricks.com/blog/2016/03/16/on-time-flight-performance- with-spark-graphframes.html 47
  • 48.
  • 49.
    Thank you! Thanks to •Denny Lee & Bill Chambers (demo) • Tim Hunter, Xiangrui Meng, Ankur Dave &others (GraphFrames development)