Geothermal direct use in three areas of China
World Geothermal Conference (Harpa, Iceland)
Caixia Sun (Susan)
2013.03.07
Content
1. Company overview
2. Geothermal technologies
3. Operations and development
4. Concern and support
1. Company overview
• Sinopec Green Energy Geothermal
Development Co., Ltd (SGE),
established in 2006;
• JV between Sinopec Star Petroleum
Co., ltd. (51%) and Icelandic Orka
Energy Holding Co., ltd (49%);
• Main business: invest and operate
geothermal projects and provide
and research geothermal and
energy-saving technologies.
1.1 Profile
1. Company overview
Mainly cover Shaanxi, Hebei, and Shandong provinces, totally built heating area
more than 6 million m2,80 wells, 52 Heat Centrals and 80 km pipelines. Leading
position and the largest company in geothermal industry in China.
1.2 Development area
Hebei area: 2.5 million m2, more than
90% geothermal district heating in
Xiong county with 100% re-injection.
Shaanxi area: 3 million m2, covering 1/3
centralized district heating in Xianyang.
Shandong area: 300,000 m2, started
since 2011, has large developing
potential.
1. Company overview
Following the principle of “overall planning, step by step implementation,
scientific development and environmental friendly”, applying advanced
geothermal know-how to change the old and backward condition, to realize
sustainable development and improve quality of local people’s life.
1.3 Development concept
1.4 CDM
• Xianyang geothermal district heating
project has successfully registered by
UNFCCC , the first geothermal heating
CDM project in the world;
• Hebei project has also been approved by
NDRC, other projects are smoothly in
progress.
1. Company overview
Geothermal distribution in China
2. Geothermal technologies
2.1 Resource evaluation system
• System of preliminary resource evaluation and optimized selection of potential
area established;
• Successfully evaluated and selected geothermal area in Rongcheng of Hebei
and Laoling of Shandong;
2.2 Exploration and drilling
Regarding to different reservoir, geothermal
drilling method system established.
2. Geothermal technologies
Limestone reservoir: 100% geothermal natural
re-injection conducted in Xiong county and
Rongcheng county through scientific guidance
and operation procedure, effectively slow down
the water level declining.
2. Geothermal technologies
2.3 Re-injection
• Sandstone reservoir: First re-
injection test conducted in Xianyang
funded by Sinopec research project,
through perforating and fracturing,
the present reinjection volume is
about 50 m3/h, initial achievement;
• Re-injection research team
established to specified study re-
injection problem to maintain
sustainable development.
2. Geothermal technologies
陕西咸阳回灌一号井回灌现场
2.3 Re-injection
Regarding different conditions, cascaded geothermal utilization system
implemented in various sites, connecting both radiator system and floor
heating system.
Drilling Re-injection
Reservoir
management
Heat
exchange
process
Monitori
ng
system
Peak load
boiler
Distribution
system
Metering system
End users
2. Geothermal technologies
2.4 Cascaded geothermal utilization
• Renew old radiator system to new type and enlarge the radiator area to optimize
the entire heating system;
• The preferable end user system is floor heating.
2. Geothermal technologies
2.5 End user facility modification
• Shallow geothermal
resource can be widely used
by ground source heat
pump technology to provide
heating, cooling and hot tap
water for different types of
buildings.
• Booming development in
China and large market
potential.
Demo project in Xianyang Hospital GSHP project
2. Geothermal technologies
2.6 Ground source heat pump
Purification of geothermal water system
Apply purification technology to treat discharged geothermal water
to be mineral water, direct drink water or normal water, etc.
Realizing geothermal water recycling and environmental friendly
discharge.
2. Geothermal technologies
2.7 Purification of geothermal discharge water
There’s high geothermal potential in Tibet and Sichuan province, planned project
to apply flash cycle and ORC cycle with different working fluids.
2. Geothermal technologies
2.8 Geothermal power generation
3. Operations and development
3.1 Shaanxi area operation
• Operated since 2006;
• 22 wells, 17 HCs and 26 small HCs to provide 3 million m2 district
heating(residential and commercial), 1/3 of centralized heating areas in
Xianyang;
• Signing development agreement with Xian, Qinhan New City, Konggang New
City, Xingping, Sanyuan, Jingyang, etc.
Signing ceremony with Xian-Xianyang new cityCompany establishment ceremony Geothermal well location map
Decommissioned coal heating facility in Xianyang
3.1 Shaanxi area operation
• Replacement of old coal boiler system by geothermal district
heating system;
• Sandstone reservoir, temperature 70-110 degree, 80-120 m3/h;
• Geothermal district heating system combined with heat pump and
gas boiler system;
• Standardization of each heat central including designing,
construction and operation, etc.
• Implementation of CERs underway. The operation reduces CO2
emissions by over 67,000 tons annually.
New geothermal heating facility in Xianyang
3.1 Shaanxi area operation
Heat Centrals:
Signing ceremony in Xiong county in 2009
• Operated in Xiong county since 2009;
• 45 wells, 22 HCs to provide about 2.5 million m2. More than 90% heating in
Xiong county supplied by geothermal realizing smoke-free city;
• 100% re-injection in new operations;
• New projects started in Rongcheng county 2012, agreement signed with
Baoding Municipality and its 14 counties.
First well drilling ceremony in Rongcheng county
3. Operations and development
3.2 Hebei area operation
3.2 Hebei area operation
• Geothermal overall planning compiled in 2009 once launched in
Xiong county.;
• Limestone reservoir, temperature 60-80 degree, 150-200 m3/h;
• Cascaded use of geothermal providing both space heating and
domestic hot water.
• The operation reduces CO2 emissions by over 95,000 tons
annually.
高/低温
区
采暖用户
软化水设备
自来水
60℃ 45℃
40℃45℃
30℃
25℃30℃
换热器2#
换热器3#
45℃
回灌井
低温区
采暖用户
蒸发器
冷凝器
热泵机组
75℃ 55℃
45℃60℃
高温区
采暖用户
生产井
换热器1#
软化水箱
Well and HC distribution map in Xiong county Typical district heating system schematic
Exterior of standardized heat central Interior standardized heat central
Old pumping facilities
3.2 Hebei area operation
Heat centrals:
New heat central facilities
• Operated since 2011;
• Present heating area is 300,000m2;
• Sandstone re-injection is the bottle-neck difficulty, test
undergoing;
• Planning to sign agreement with Heze, Zibo, Dongying and
Weifang, etc.
Signing ceremony in Shanghe county Heze delegation visit Shandong project
3. Operations and development
3.3 Shandong area operation
3.3 Shandong area operation
• Sandstone reservoir, temperature 50-55 degree, 150-200 m3/h;
• To maximize the use of geothermal by cascaded system;
• Re-injection test has been conducted for this heating season.
The flow rate is about 30 m3/h.
Interior of standard heat central Re-injection facilities
• Promote geothermal development
throughout the country to realize
geothermal industrialization and
leap type development;
• Become one of the main business
of Sinopec Group and the leading
geothermal company with top-
ranking geothermal strength in
the world.
• Expanding business as an ESCO.
30 million heating m2 by 2015,and 100 million m2 by
2020, and enlarge scale of geothermal power generation
projects.
3. Operations and development
Concerns from the state leaders of China and Iceland, as well as all levels of
government attach the great importance to the geothermal projects.
4. Concern and support
President Hu and President Grimson
meeting in Shanghai
Premier Wen and President Grimson
meeting in Beijing
Chinese Embassador to Iceland visited
Xianyang project in 2009
Joint Venture signing ceremony witnessed by two
state leaders of China and Iceland in 2012
4. Concern and support
President Grimson visited Xianyang in 2007
Land resource minister visited Xiong
county in 2012
Mainstream media has given great attention to the project, rapid
development
4. Concern and support
Sinopec Green Energy Geothermal Development Co. ltd.
Tel:029-38113251
Fax:029-38113355
Web:www.cngeg.com.cn
Thank you!

More Related Content

What's hot

M2G May 2015 GTI Presentation
M2G May 2015 GTI PresentationM2G May 2015 GTI Presentation
M2G May 2015 GTI Presentation
Charles Rice
 
International Gas Union Bert Klamer Tokyo Japan 2003 (2)
International Gas Union Bert Klamer Tokyo Japan 2003 (2)International Gas Union Bert Klamer Tokyo Japan 2003 (2)
International Gas Union Bert Klamer Tokyo Japan 2003 (2)
Bert Klamer
 
Coal gasification liquid fuel conversion sept 2011 master final
Coal gasification liquid fuel conversion sept 2011 master finalCoal gasification liquid fuel conversion sept 2011 master final
Coal gasification liquid fuel conversion sept 2011 master final
congresominero
 
Waste 2 Energy
Waste 2 EnergyWaste 2 Energy
Waste 2 Energy
Raul Amaro
 
Biomass Gasification presentation
Biomass Gasification presentationBiomass Gasification presentation
Biomass Gasification presentation
Pritish Shardul
 

What's hot (20)

Condensing Boiler Optimization
Condensing Boiler OptimizationCondensing Boiler Optimization
Condensing Boiler Optimization
 
M2G May 2015 GTI Presentation
M2G May 2015 GTI PresentationM2G May 2015 GTI Presentation
M2G May 2015 GTI Presentation
 
Gi energy renewable energy opportunities with infrastructure projects june ...
Gi energy   renewable energy opportunities with infrastructure projects june ...Gi energy   renewable energy opportunities with infrastructure projects june ...
Gi energy renewable energy opportunities with infrastructure projects june ...
 
CPD for indoor pools & heat recovery
CPD for indoor pools & heat recoveryCPD for indoor pools & heat recovery
CPD for indoor pools & heat recovery
 
Cold Cliamte Air Source Heat Pumps: Study Update
Cold Cliamte Air Source Heat Pumps: Study UpdateCold Cliamte Air Source Heat Pumps: Study Update
Cold Cliamte Air Source Heat Pumps: Study Update
 
International Gas Union Bert Klamer Tokyo Japan 2003 (2)
International Gas Union Bert Klamer Tokyo Japan 2003 (2)International Gas Union Bert Klamer Tokyo Japan 2003 (2)
International Gas Union Bert Klamer Tokyo Japan 2003 (2)
 
Coal gasification liquid fuel conversion sept 2011 master final
Coal gasification liquid fuel conversion sept 2011 master finalCoal gasification liquid fuel conversion sept 2011 master final
Coal gasification liquid fuel conversion sept 2011 master final
 
Waste 2 Energy
Waste 2 EnergyWaste 2 Energy
Waste 2 Energy
 
Enhancing performance of transcritical CO2 heat pumps with heat recovery
Enhancing performance of transcritical CO2 heat pumps with heat recoveryEnhancing performance of transcritical CO2 heat pumps with heat recovery
Enhancing performance of transcritical CO2 heat pumps with heat recovery
 
Commercial IGCC Plants
Commercial IGCC PlantsCommercial IGCC Plants
Commercial IGCC Plants
 
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
 
PERFORMANCE AND EMISSION CHARACTERISTICS OF BIOGAS –PETROL DUAL FUEL IN SI EN...
PERFORMANCE AND EMISSION CHARACTERISTICS OF BIOGAS –PETROL DUAL FUEL IN SI EN...PERFORMANCE AND EMISSION CHARACTERISTICS OF BIOGAS –PETROL DUAL FUEL IN SI EN...
PERFORMANCE AND EMISSION CHARACTERISTICS OF BIOGAS –PETROL DUAL FUEL IN SI EN...
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 
Biogas for road vehicles
Biogas for road vehiclesBiogas for road vehicles
Biogas for road vehicles
 
Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...
 
Producer gas ppt
Producer gas pptProducer gas ppt
Producer gas ppt
 
Gasification Systems Overview
Gasification Systems OverviewGasification Systems Overview
Gasification Systems Overview
 
Biomass Gasification presentation
Biomass Gasification presentationBiomass Gasification presentation
Biomass Gasification presentation
 
Different types of gasifiers
Different types of gasifiersDifferent types of gasifiers
Different types of gasifiers
 
Heatreflex
HeatreflexHeatreflex
Heatreflex
 

Similar to Geothermal direct use in three areas of China

Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Craig Heal
 
EIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxEIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptx
Sandeep754657
 
Energy Saver Presentation
Energy Saver PresentationEnergy Saver Presentation
Energy Saver Presentation
Mark Forester
 
Training Report 7121113526
Training Report 7121113526Training Report 7121113526
Training Report 7121113526
Kshitij Sharma
 

Similar to Geothermal direct use in three areas of China (20)

Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
 
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
 
EIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxEIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptx
 
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plant
 
A4 - Zero Emission Cities: China District Heating Development
A4 - Zero Emission Cities: China District Heating DevelopmentA4 - Zero Emission Cities: China District Heating Development
A4 - Zero Emission Cities: China District Heating Development
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
 
concentrated solar power technology - csp
concentrated solar power technology - cspconcentrated solar power technology - csp
concentrated solar power technology - csp
 
Waste heat recovery
Waste heat recoveryWaste heat recovery
Waste heat recovery
 
Solar Thermal Energy: Parabolic Trough Technology versus Tower Technology
Solar Thermal Energy: Parabolic Trough Technology versus Tower TechnologySolar Thermal Energy: Parabolic Trough Technology versus Tower Technology
Solar Thermal Energy: Parabolic Trough Technology versus Tower Technology
 
Energy Saver Presentation
Energy Saver PresentationEnergy Saver Presentation
Energy Saver Presentation
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Training Report 7121113526
Training Report 7121113526Training Report 7121113526
Training Report 7121113526
 
Boiler
BoilerBoiler
Boiler
 
Module 2.pdf
Module 2.pdfModule 2.pdf
Module 2.pdf
 
Geothermal energy
Geothermal energyGeothermal energy
Geothermal energy
 
Small Council, Big Vision, Bigger Savings - AIRAH Pre-loved Buildings 2014
Small Council, Big Vision, Bigger Savings - AIRAH Pre-loved Buildings 2014Small Council, Big Vision, Bigger Savings - AIRAH Pre-loved Buildings 2014
Small Council, Big Vision, Bigger Savings - AIRAH Pre-loved Buildings 2014
 
OTEC (Ocean Thermal Energy Conversion)
OTEC (Ocean Thermal Energy Conversion)OTEC (Ocean Thermal Energy Conversion)
OTEC (Ocean Thermal Energy Conversion)
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRIDProject Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
 
Advanced Solar Power Tower Coupled to a Supercritical CO2 Turbine Cycle
Advanced Solar Power Tower Coupled to a Supercritical CO2 Turbine CycleAdvanced Solar Power Tower Coupled to a Supercritical CO2 Turbine Cycle
Advanced Solar Power Tower Coupled to a Supercritical CO2 Turbine Cycle
 

More from Iceland Geothermal

More from Iceland Geothermal (20)

Geothermal Landscape study final
Geothermal Landscape study finalGeothermal Landscape study final
Geothermal Landscape study final
 
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
A1  Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...A1  Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
 
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
C4 - Geothermal Fuels Prosperity:  How Geothermal Direct Use Projects Enable ...C4 - Geothermal Fuels Prosperity:  How Geothermal Direct Use Projects Enable ...
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
 
C4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from airC4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from air
 
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
C4 - Opportunities to develop low-enthalpy geothermal project in MexicoC4 - Opportunities to develop low-enthalpy geothermal project in Mexico
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
 
C4 - Lithium recovery from high temperature geothermal brines.
C4 - Lithium recovery from high temperature geothermal brines.C4 - Lithium recovery from high temperature geothermal brines.
C4 - Lithium recovery from high temperature geothermal brines.
 
C4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial productC4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial product
 
C3 - Production Modelling for Sustainability
C3 - Production Modelling for SustainabilityC3 - Production Modelling for Sustainability
C3 - Production Modelling for Sustainability
 
C3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrowC3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrow
 
C3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approachC3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approach
 
C3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable useC3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable use
 
C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...
 
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
 
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATIONC2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
 
C2 - ENGINEERING THE ENERGY TRANSITION
C2 - ENGINEERING THE  ENERGY TRANSITIONC2 - ENGINEERING THE  ENERGY TRANSITION
C2 - ENGINEERING THE ENERGY TRANSITION
 
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
 
C1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its EffectsC1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its Effects
 
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTSC1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
 
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 

Recently uploaded

Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
YibeltalNibretu
 
plant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated cropsplant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated crops
parmarsneha2
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 

Recently uploaded (20)

MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptxSolid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
NCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdfNCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdf
 
Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
NLC-2024-Orientation-for-RO-SDO (1).pptx
NLC-2024-Orientation-for-RO-SDO (1).pptxNLC-2024-Orientation-for-RO-SDO (1).pptx
NLC-2024-Orientation-for-RO-SDO (1).pptx
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
plant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated cropsplant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated crops
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 

Geothermal direct use in three areas of China

  • 1. Geothermal direct use in three areas of China World Geothermal Conference (Harpa, Iceland) Caixia Sun (Susan) 2013.03.07
  • 2. Content 1. Company overview 2. Geothermal technologies 3. Operations and development 4. Concern and support
  • 3. 1. Company overview • Sinopec Green Energy Geothermal Development Co., Ltd (SGE), established in 2006; • JV between Sinopec Star Petroleum Co., ltd. (51%) and Icelandic Orka Energy Holding Co., ltd (49%); • Main business: invest and operate geothermal projects and provide and research geothermal and energy-saving technologies. 1.1 Profile
  • 4. 1. Company overview Mainly cover Shaanxi, Hebei, and Shandong provinces, totally built heating area more than 6 million m2,80 wells, 52 Heat Centrals and 80 km pipelines. Leading position and the largest company in geothermal industry in China. 1.2 Development area Hebei area: 2.5 million m2, more than 90% geothermal district heating in Xiong county with 100% re-injection. Shaanxi area: 3 million m2, covering 1/3 centralized district heating in Xianyang. Shandong area: 300,000 m2, started since 2011, has large developing potential.
  • 5. 1. Company overview Following the principle of “overall planning, step by step implementation, scientific development and environmental friendly”, applying advanced geothermal know-how to change the old and backward condition, to realize sustainable development and improve quality of local people’s life. 1.3 Development concept
  • 6. 1.4 CDM • Xianyang geothermal district heating project has successfully registered by UNFCCC , the first geothermal heating CDM project in the world; • Hebei project has also been approved by NDRC, other projects are smoothly in progress. 1. Company overview
  • 7. Geothermal distribution in China 2. Geothermal technologies 2.1 Resource evaluation system • System of preliminary resource evaluation and optimized selection of potential area established; • Successfully evaluated and selected geothermal area in Rongcheng of Hebei and Laoling of Shandong;
  • 8. 2.2 Exploration and drilling Regarding to different reservoir, geothermal drilling method system established. 2. Geothermal technologies
  • 9. Limestone reservoir: 100% geothermal natural re-injection conducted in Xiong county and Rongcheng county through scientific guidance and operation procedure, effectively slow down the water level declining. 2. Geothermal technologies 2.3 Re-injection
  • 10. • Sandstone reservoir: First re- injection test conducted in Xianyang funded by Sinopec research project, through perforating and fracturing, the present reinjection volume is about 50 m3/h, initial achievement; • Re-injection research team established to specified study re- injection problem to maintain sustainable development. 2. Geothermal technologies 陕西咸阳回灌一号井回灌现场 2.3 Re-injection
  • 11. Regarding different conditions, cascaded geothermal utilization system implemented in various sites, connecting both radiator system and floor heating system. Drilling Re-injection Reservoir management Heat exchange process Monitori ng system Peak load boiler Distribution system Metering system End users 2. Geothermal technologies 2.4 Cascaded geothermal utilization
  • 12. • Renew old radiator system to new type and enlarge the radiator area to optimize the entire heating system; • The preferable end user system is floor heating. 2. Geothermal technologies 2.5 End user facility modification
  • 13. • Shallow geothermal resource can be widely used by ground source heat pump technology to provide heating, cooling and hot tap water for different types of buildings. • Booming development in China and large market potential. Demo project in Xianyang Hospital GSHP project 2. Geothermal technologies 2.6 Ground source heat pump
  • 14. Purification of geothermal water system Apply purification technology to treat discharged geothermal water to be mineral water, direct drink water or normal water, etc. Realizing geothermal water recycling and environmental friendly discharge. 2. Geothermal technologies 2.7 Purification of geothermal discharge water
  • 15. There’s high geothermal potential in Tibet and Sichuan province, planned project to apply flash cycle and ORC cycle with different working fluids. 2. Geothermal technologies 2.8 Geothermal power generation
  • 16. 3. Operations and development 3.1 Shaanxi area operation • Operated since 2006; • 22 wells, 17 HCs and 26 small HCs to provide 3 million m2 district heating(residential and commercial), 1/3 of centralized heating areas in Xianyang; • Signing development agreement with Xian, Qinhan New City, Konggang New City, Xingping, Sanyuan, Jingyang, etc. Signing ceremony with Xian-Xianyang new cityCompany establishment ceremony Geothermal well location map
  • 17. Decommissioned coal heating facility in Xianyang 3.1 Shaanxi area operation • Replacement of old coal boiler system by geothermal district heating system; • Sandstone reservoir, temperature 70-110 degree, 80-120 m3/h; • Geothermal district heating system combined with heat pump and gas boiler system; • Standardization of each heat central including designing, construction and operation, etc. • Implementation of CERs underway. The operation reduces CO2 emissions by over 67,000 tons annually. New geothermal heating facility in Xianyang
  • 18. 3.1 Shaanxi area operation Heat Centrals:
  • 19. Signing ceremony in Xiong county in 2009 • Operated in Xiong county since 2009; • 45 wells, 22 HCs to provide about 2.5 million m2. More than 90% heating in Xiong county supplied by geothermal realizing smoke-free city; • 100% re-injection in new operations; • New projects started in Rongcheng county 2012, agreement signed with Baoding Municipality and its 14 counties. First well drilling ceremony in Rongcheng county 3. Operations and development 3.2 Hebei area operation
  • 20. 3.2 Hebei area operation • Geothermal overall planning compiled in 2009 once launched in Xiong county.; • Limestone reservoir, temperature 60-80 degree, 150-200 m3/h; • Cascaded use of geothermal providing both space heating and domestic hot water. • The operation reduces CO2 emissions by over 95,000 tons annually. 高/低温 区 采暖用户 软化水设备 自来水 60℃ 45℃ 40℃45℃ 30℃ 25℃30℃ 换热器2# 换热器3# 45℃ 回灌井 低温区 采暖用户 蒸发器 冷凝器 热泵机组 75℃ 55℃ 45℃60℃ 高温区 采暖用户 生产井 换热器1# 软化水箱 Well and HC distribution map in Xiong county Typical district heating system schematic
  • 21. Exterior of standardized heat central Interior standardized heat central Old pumping facilities 3.2 Hebei area operation Heat centrals: New heat central facilities
  • 22. • Operated since 2011; • Present heating area is 300,000m2; • Sandstone re-injection is the bottle-neck difficulty, test undergoing; • Planning to sign agreement with Heze, Zibo, Dongying and Weifang, etc. Signing ceremony in Shanghe county Heze delegation visit Shandong project 3. Operations and development 3.3 Shandong area operation
  • 23. 3.3 Shandong area operation • Sandstone reservoir, temperature 50-55 degree, 150-200 m3/h; • To maximize the use of geothermal by cascaded system; • Re-injection test has been conducted for this heating season. The flow rate is about 30 m3/h. Interior of standard heat central Re-injection facilities
  • 24. • Promote geothermal development throughout the country to realize geothermal industrialization and leap type development; • Become one of the main business of Sinopec Group and the leading geothermal company with top- ranking geothermal strength in the world. • Expanding business as an ESCO. 30 million heating m2 by 2015,and 100 million m2 by 2020, and enlarge scale of geothermal power generation projects. 3. Operations and development
  • 25. Concerns from the state leaders of China and Iceland, as well as all levels of government attach the great importance to the geothermal projects. 4. Concern and support President Hu and President Grimson meeting in Shanghai Premier Wen and President Grimson meeting in Beijing
  • 26. Chinese Embassador to Iceland visited Xianyang project in 2009 Joint Venture signing ceremony witnessed by two state leaders of China and Iceland in 2012 4. Concern and support President Grimson visited Xianyang in 2007 Land resource minister visited Xiong county in 2012
  • 27. Mainstream media has given great attention to the project, rapid development 4. Concern and support
  • 28. Sinopec Green Energy Geothermal Development Co. ltd. Tel:029-38113251 Fax:029-38113355 Web:www.cngeg.com.cn Thank you!