Turboden is an Italian firm and a global leader in the
design, manufacture, and maintenance of Organic
Rankine Cycle (ORC) systems, highly suitable for
distributed generation.
ORC systems can generate electric and thermal
power exploiting multiple sources, such as
renewables (biomass, geothermal energy, solar
energy), traditional fuels, and waste heat from
industrial processes, waste incinerators, engines or
gas turbines.
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION2
ABOUT US
Copyright © – Turboden S.p.A. All rights reserved
LEADING COMPANY IN ORC SOLUTIONS
Turboden, constantly supported by its parent
company, Mitsubishi Heavy Industries, holds
the know-how of ORC technology thanks to its
over-35 years experience.
RANGE SIZE
up to
20 MWe
per single shaft
APPLICATIONS
biomass, geothermal,
waste heat recovery,
oil&gas, waste to energy,
concentrated solar
power, steam&power
Copyright © – Turboden S.p.A. All rights reserved
20181990 20102000
MILESTONES
’60 - ‘70 1976 1980 1988 1998 2000 - 09 2013
First ORC biomass plant in
Switzerland (300 kW).
Prof. Mario Gaia founds
Turboden to design and
manufacture ORC
turbogenerators.
Prof. Mario Gaia makes
experience in the field of ORC
within his research group at
Politecnico di Milano.
First prototype of a solar
thermodynamic ORC. First geothermal project
1 100 220 350
300 kW 1 - 2 - 4 MW 5 - 8 - 10 MW 20 MW
ORC plants number
ORC Turbine frame
2018
United Technologies Corp.
(UTC) acquires the majority of
Turboden’s quota. PW Power
Systems supports Turboden
in new markets beyond
Europe.
Turboden boom of ORC
biomass plants, especially in
Austria, Germany and Italy.
MHI acquires the majority of
Turboden. Italian
quotaholders stay in charge
of management.
Over 350 ORC plants
in the world, about
300 in operation
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION4
Copyright © – Turboden S.p.A. All rights reserved
2009
Copyright © – Turboden S.p.A. All rights reserved
GLOBAL AND PROVEN EXPERIENCE
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION5
PLANTS:
359
COUNTRIES:
40
TOTAL CAPACITY:
564.4 MWe
CUMULATIVE OPERATION TIME:
13 million hours
ENERGY GENERATED:
15.7 thousand GWh
AVERAGE AVAILABILITY:
98+%
Last update: April 2018
Copyright © – Turboden S.p.A. All rights reserved
TURBODEN IN THE MITSUBISHI GROUP
Other
Business
Domains
Energy &
Environment
Domains
Integrate the thermal and
geothermal power generation
systems businesses in
Feb. 2014 now known as
Other
Companies
Power
Systems
Company
> 350 ORC
WORLDWIDE
> 0.5 GW
ORC power
> 100 GEO
UNITS
WORLDWIDE
> 3 GW
geothermal power
consolidated sales of around
$38 billion (in fiscal 2016)
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION7
Copyright © – Turboden S.p.A. All rights reserved
7
 Capacity: solutions up to 40 MW per single generator
 Temperature range: from 100 °C to more than 200 °C
 Working fluids: hydrocarbons, HFCs, HFOs
 Thermodynamic process and control philosophy designed by Turboden
 Turbine type: axial multi stage, Turboden proprietary design
 Key equipment designed in house (e.g. air cooled condenser and heat exchangers)
 Operation in remote areas: off grid capability (island mode) and active grid balancing
 Combined heat and power solutions
 Low O&M requirements
 Remote monitoring and long term service
OUR EXPERIENCE
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
Copyright © – Turboden S.p.A. All rights reserved
UPDATE ON LATEST GEOTHERMAL PROJECTS
8
Under construction
(Start-up 2019)
Project site: Lightning Dock
Country: New Mexico (US)
Customer: Cyrq
Configuration: Power only
Design capacity: 14 MW
Description:
 Liquid brine ~155 °C
 Single turbine
 ACC
Under construction
(Start-up 2019)
Project site: Holzkirchen
Country: Germany
Customer: Holzkirchen GmbH
Configuration: Heat&Power
Design capacity: 3.3 MW + 10 MWth
Description:
 Liquid brine ~152 °C
 Single turbine,
 ACC
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
Under construction
(Start-up 2018)
Project site: Velika Ciglena
Country: Croatia
Customer: MB Holding
Configuration: Power only
Design capacity: 16.5 MW
Description:
 Liquid+steam ~171 °C
 Single turbine
 ACC
 1,5 MW NCG turbine
In operation
(Start-up 2015)
Project site: Hatchobaru
Country: Japan
Customer: Undisclosed
Configuration: Power only
Design capacity: 5 MW
Description:
 Liquid+steam ~140 °C
 Single turbine
 ACC
WELLHEAD UNIT WELLHEAD UNIT
Copyright © – Turboden S.p.A. All rights reserved
ADVANTAGES OF GEOTHERMAL BINARY PLANTS
FOR HIGH ENTHALPY
 Capable to exploit both the separated hot brine & steam (two phase flow)
 Higher efficiency (steam consumption < 7 tph/MW) than single flash plants (for small units < 10 MW)
 Lower CAPEX than single flash plants (for small units < 10 MW)
 Early generation, relocation option, no complicate steam gathering system
 Full reinjection of geothermal fluid is possible (with dry cooling)!
 Low requirement for land (wellpad generation with simplified gathering system)
 Stable base-load energy and island mode operation
 Proven and mature technology
 Scalable to utility size (modular technology)
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
10
Copyright © – Turboden S.p.A. All rights reserved
10
Preheater
Brine Evaporator
Binary
Turbine
Feed Pump Condenser
Production
Well
Generator
Steam Evaporator
Separator
Steam
Brine
Condensate
BINARY CYCLES CAN BE AN EFFICIENT SOLUTION
FOR WELLHEAD PLANTS
 HIGH EFFICIENCY WITH
RESOURCE ENTHALPY UP TO
2000 KJ/KG
 ENVIRONMENTAL FRIENDLY
(FULL REINJECTION)
 LOWER O&M COMPARED TO
FLASH PLANTS
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
Injection
Well
2 phase
flow
ORC fluid
Copyright © – Turboden S.p.A. All rights reserved
BINARY GEOTHERMAL WELLHEAD UNITS:
EXAMPLES OF TURBODEN PLANTS
5 MW Turboden ORC
geothermal power plant in
Sauerlach, Germany
5.6 MW Turboden ORC
geothermal power plant in
Dürrnhaar, Germany
5.6 MW Turboden ORC
geothermal power plant in
Kirchstockach, Germany
11 BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
Copyright © – Turboden S.p.A. All rights reserved
WELLHEAD UNIT EXAMPLE (AIR COOLED)
12
1
2
Production well
Reinjection well
1
2
1
2
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
Copyright © – Turboden S.p.A. All rights reserved
13
 20 ÷ 40% ADDITIONAL
POWER ACCORDING TO
REINJECTION LIMITS (SCALING
ISSUES)
 NO ADDITIONAL DRILLING
REQUIRED
 BINARY PLANT CAN USE
EXISTING COOLING SYSTEM
 EASY ACCESS TO FINANCING
BECAUSE THERE IS NO
RESOURCE RISK
BINARY CYCLES CAN BE COMBINED WITH
TRADITIONAL FLASH STEAM PLANTS
Re-injection Well
CondenserFeed Pump
Binary
Turbine
Condensing
Turbine
Cooling
Tower
Condenser
Separator
Production
Well
Hotwell Pump
BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
Joseph Bonafin
joseph.bonafin@turboden.it
THANK YOU
FOR YOUR
ATTENTION

More Related Content

What's hot

Introducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectIntroducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar Project
MitchellDong
 
Solar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power GenerationSolar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power Generation
Anand Upadhyay
 
Geothermal power - financial comparison
Geothermal power -  financial comparisonGeothermal power -  financial comparison
Geothermal power - financial comparison
mgankema
 
Economies Of Industrial Cogeneration
Economies Of Industrial CogenerationEconomies Of Industrial Cogeneration
Economies Of Industrial CogenerationSurraya Mehbub Malik
 
Conventional Power generation
Conventional Power generationConventional Power generation
Conventional Power generation
Sushma Pardeshi
 
4.5 mw hybrid_senegal_presentation
4.5 mw hybrid_senegal_presentation4.5 mw hybrid_senegal_presentation
4.5 mw hybrid_senegal_presentationF_Chanelle_K
 
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
IrSOLaV Pomares
 
Solar Power Generation 2011 (Las Vegas, NV)
Solar Power Generation 2011 (Las Vegas, NV)Solar Power Generation 2011 (Las Vegas, NV)
Solar Power Generation 2011 (Las Vegas, NV)
MitchellDong
 
Concentrated solar power in India - an evaluation
Concentrated solar power in India - an evaluationConcentrated solar power in India - an evaluation
Concentrated solar power in India - an evaluation
Sindhu Maiyya
 
50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)VICTOR MANICKAM
 
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
The Brewer-Garrett Company
 
arijit summer training
arijit summer trainingarijit summer training
arijit summer trainingArijit Roy
 
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
eecfncci
 
G therm thermal _pr presentation_animated_r4 2 19 13 electricial
G therm thermal _pr presentation_animated_r4 2 19 13 electricialG therm thermal _pr presentation_animated_r4 2 19 13 electricial
G therm thermal _pr presentation_animated_r4 2 19 13 electricial
Axess1, LLC (www.axess1.com)
 
Biomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plantBiomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plant
abhi1802verma
 
Solar-biomass hybrid power plant
Solar-biomass hybrid power plantSolar-biomass hybrid power plant
Solar-biomass hybrid power plant
prajeesh pv
 
Subbu.ppt
Subbu.ppt Subbu.ppt
Subbu.ppt
Mani Kanta
 
power generation
power generationpower generation
power generation
Abdullah A.Shehata
 
Cogeneration
CogenerationCogeneration
Cogeneration
Pinaki Bhadury
 

What's hot (19)

Introducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectIntroducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar Project
 
Solar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power GenerationSolar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power Generation
 
Geothermal power - financial comparison
Geothermal power -  financial comparisonGeothermal power -  financial comparison
Geothermal power - financial comparison
 
Economies Of Industrial Cogeneration
Economies Of Industrial CogenerationEconomies Of Industrial Cogeneration
Economies Of Industrial Cogeneration
 
Conventional Power generation
Conventional Power generationConventional Power generation
Conventional Power generation
 
4.5 mw hybrid_senegal_presentation
4.5 mw hybrid_senegal_presentation4.5 mw hybrid_senegal_presentation
4.5 mw hybrid_senegal_presentation
 
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
Solar Thermal Power Plant with Thermal Storage - Ignacio Burgaleta (Torresol ...
 
Solar Power Generation 2011 (Las Vegas, NV)
Solar Power Generation 2011 (Las Vegas, NV)Solar Power Generation 2011 (Las Vegas, NV)
Solar Power Generation 2011 (Las Vegas, NV)
 
Concentrated solar power in India - an evaluation
Concentrated solar power in India - an evaluationConcentrated solar power in India - an evaluation
Concentrated solar power in India - an evaluation
 
50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)50 Mwe Concentrated Solar Power Plant (1)
50 Mwe Concentrated Solar Power Plant (1)
 
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
 
arijit summer training
arijit summer trainingarijit summer training
arijit summer training
 
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
 
G therm thermal _pr presentation_animated_r4 2 19 13 electricial
G therm thermal _pr presentation_animated_r4 2 19 13 electricialG therm thermal _pr presentation_animated_r4 2 19 13 electricial
G therm thermal _pr presentation_animated_r4 2 19 13 electricial
 
Biomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plantBiomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plant
 
Solar-biomass hybrid power plant
Solar-biomass hybrid power plantSolar-biomass hybrid power plant
Solar-biomass hybrid power plant
 
Subbu.ppt
Subbu.ppt Subbu.ppt
Subbu.ppt
 
power generation
power generationpower generation
power generation
 
Cogeneration
CogenerationCogeneration
Cogeneration
 

Similar to C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION

30 Years of ORC development.pdf
30 Years of ORC development.pdf30 Years of ORC development.pdf
30 Years of ORC development.pdf
Bryanlillibridge
 
silo.tips_gli-impianti-orc-per-la-produzione-di-energia-elettrica-da-fonti-ge...
silo.tips_gli-impianti-orc-per-la-produzione-di-energia-elettrica-da-fonti-ge...silo.tips_gli-impianti-orc-per-la-produzione-di-energia-elettrica-da-fonti-ge...
silo.tips_gli-impianti-orc-per-la-produzione-di-energia-elettrica-da-fonti-ge...
Bryanlillibridge
 
43-slides-0-2_Turbodenl.pdf
43-slides-0-2_Turbodenl.pdf43-slides-0-2_Turbodenl.pdf
43-slides-0-2_Turbodenl.pdf
Bryanlillibridge
 
Commercial IGCC Plants
Commercial IGCC PlantsCommercial IGCC Plants
Commercial IGCC Plants
Gerard B. Hawkins
 
ACF2023_MHI
ACF2023_MHIACF2023_MHI
ACF2023_MHI
AyakaIto2
 
Asis company overview english noc_vf_rev2
Asis company overview english noc_vf_rev2Asis company overview english noc_vf_rev2
Asis company overview english noc_vf_rev2Brett Wightman
 
Thyssenkrupp uhde advanced ammonia processes dual pressure
Thyssenkrupp uhde advanced ammonia processes dual pressureThyssenkrupp uhde advanced ammonia processes dual pressure
Thyssenkrupp uhde advanced ammonia processes dual pressure
Steve Wittrig
 
Super critcal_sub critical_higher capacity sets - Copy.pdf
Super critcal_sub critical_higher capacity sets - Copy.pdfSuper critcal_sub critical_higher capacity sets - Copy.pdf
Super critcal_sub critical_higher capacity sets - Copy.pdf
vishal laddha
 
GE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CC
GE코리아
 
Green Power Presentation
Green Power PresentationGreen Power Presentation
Green Power Presentation
djehlke
 
ORC - Organic Rankine Cycle technology for biomass and EfW cogeneration and t...
ORC - Organic Rankine Cycle technology for biomass and EfW cogeneration and t...ORC - Organic Rankine Cycle technology for biomass and EfW cogeneration and t...
ORC - Organic Rankine Cycle technology for biomass and EfW cogeneration and t...
Carlo Minini
 
4.1 - "Science & Technology for sustainable biogas production and use" - Jan ...
4.1 - "Science & Technology for sustainable biogas production and use" - Jan ...4.1 - "Science & Technology for sustainable biogas production and use" - Jan ...
4.1 - "Science & Technology for sustainable biogas production and use" - Jan ...Pomcert
 
Short Scan of Natural Gas Technologies in New Buildings in France
Short Scan of Natural Gas Technologies in New Buildings in FranceShort Scan of Natural Gas Technologies in New Buildings in France
Short Scan of Natural Gas Technologies in New Buildings in FranceCenter for Energy and Environment
 
Saba Power Plant
Saba Power Plant Saba Power Plant
Saba Power Plant
Mohammad Shoeb Siddiqui
 
Cement industry solution
Cement industry solutionCement industry solution
Cement industry solutionDidier Varlot
 
Mitsubishi 2011 price
Mitsubishi 2011 priceMitsubishi 2011 price
Mitsubishi 2011 price
dokundot
 
Parabolic trough technology vs tower technology.
Parabolic trough technology vs tower technology.Parabolic trough technology vs tower technology.
Parabolic trough technology vs tower technology.
Abengoa
 
Business plan of Talos.pdf
Business plan of Talos.pdfBusiness plan of Talos.pdf
Business plan of Talos.pdf
JohnYan26
 

Similar to C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION (20)

30 Years of ORC development.pdf
30 Years of ORC development.pdf30 Years of ORC development.pdf
30 Years of ORC development.pdf
 
silo.tips_gli-impianti-orc-per-la-produzione-di-energia-elettrica-da-fonti-ge...
silo.tips_gli-impianti-orc-per-la-produzione-di-energia-elettrica-da-fonti-ge...silo.tips_gli-impianti-orc-per-la-produzione-di-energia-elettrica-da-fonti-ge...
silo.tips_gli-impianti-orc-per-la-produzione-di-energia-elettrica-da-fonti-ge...
 
43-slides-0-2_Turbodenl.pdf
43-slides-0-2_Turbodenl.pdf43-slides-0-2_Turbodenl.pdf
43-slides-0-2_Turbodenl.pdf
 
BrighSourceEnergy 2010
BrighSourceEnergy 2010BrighSourceEnergy 2010
BrighSourceEnergy 2010
 
Commercial IGCC Plants
Commercial IGCC PlantsCommercial IGCC Plants
Commercial IGCC Plants
 
ACF2023_MHI
ACF2023_MHIACF2023_MHI
ACF2023_MHI
 
Asis company overview english noc_vf_rev2
Asis company overview english noc_vf_rev2Asis company overview english noc_vf_rev2
Asis company overview english noc_vf_rev2
 
Thyssenkrupp uhde advanced ammonia processes dual pressure
Thyssenkrupp uhde advanced ammonia processes dual pressureThyssenkrupp uhde advanced ammonia processes dual pressure
Thyssenkrupp uhde advanced ammonia processes dual pressure
 
Super critcal_sub critical_higher capacity sets - Copy.pdf
Super critcal_sub critical_higher capacity sets - Copy.pdfSuper critcal_sub critical_higher capacity sets - Copy.pdf
Super critcal_sub critical_higher capacity sets - Copy.pdf
 
GE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CC
 
Green Power Presentation
Green Power PresentationGreen Power Presentation
Green Power Presentation
 
ORC - Organic Rankine Cycle technology for biomass and EfW cogeneration and t...
ORC - Organic Rankine Cycle technology for biomass and EfW cogeneration and t...ORC - Organic Rankine Cycle technology for biomass and EfW cogeneration and t...
ORC - Organic Rankine Cycle technology for biomass and EfW cogeneration and t...
 
4.1 - "Science & Technology for sustainable biogas production and use" - Jan ...
4.1 - "Science & Technology for sustainable biogas production and use" - Jan ...4.1 - "Science & Technology for sustainable biogas production and use" - Jan ...
4.1 - "Science & Technology for sustainable biogas production and use" - Jan ...
 
Short Scan of Natural Gas Technologies in New Buildings in France
Short Scan of Natural Gas Technologies in New Buildings in FranceShort Scan of Natural Gas Technologies in New Buildings in France
Short Scan of Natural Gas Technologies in New Buildings in France
 
Coal firing
Coal firingCoal firing
Coal firing
 
Saba Power Plant
Saba Power Plant Saba Power Plant
Saba Power Plant
 
Cement industry solution
Cement industry solutionCement industry solution
Cement industry solution
 
Mitsubishi 2011 price
Mitsubishi 2011 priceMitsubishi 2011 price
Mitsubishi 2011 price
 
Parabolic trough technology vs tower technology.
Parabolic trough technology vs tower technology.Parabolic trough technology vs tower technology.
Parabolic trough technology vs tower technology.
 
Business plan of Talos.pdf
Business plan of Talos.pdfBusiness plan of Talos.pdf
Business plan of Talos.pdf
 

More from Iceland Geothermal

Geothermal Landscape study final
Geothermal Landscape study finalGeothermal Landscape study final
Geothermal Landscape study final
Iceland Geothermal
 
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
A1  Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...A1  Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
Iceland Geothermal
 
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
C4 - Geothermal Fuels Prosperity:  How Geothermal Direct Use Projects Enable ...C4 - Geothermal Fuels Prosperity:  How Geothermal Direct Use Projects Enable ...
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
Iceland Geothermal
 
C4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from airC4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from air
Iceland Geothermal
 
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
C4 - Opportunities to develop low-enthalpy geothermal project in MexicoC4 - Opportunities to develop low-enthalpy geothermal project in Mexico
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
Iceland Geothermal
 
C4 - Lithium recovery from high temperature geothermal brines.
C4 - Lithium recovery from high temperature geothermal brines.C4 - Lithium recovery from high temperature geothermal brines.
C4 - Lithium recovery from high temperature geothermal brines.
Iceland Geothermal
 
C4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial productC4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial product
Iceland Geothermal
 
C3 - Production Modelling for Sustainability
C3 - Production Modelling for SustainabilityC3 - Production Modelling for Sustainability
C3 - Production Modelling for Sustainability
Iceland Geothermal
 
C3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrowC3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrow
Iceland Geothermal
 
C3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approachC3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approach
Iceland Geothermal
 
C3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable useC3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable use
Iceland Geothermal
 
C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...
Iceland Geothermal
 
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
Iceland Geothermal
 
C2 - ENGINEERING THE ENERGY TRANSITION
C2 - ENGINEERING THE  ENERGY TRANSITIONC2 - ENGINEERING THE  ENERGY TRANSITION
C2 - ENGINEERING THE ENERGY TRANSITION
Iceland Geothermal
 
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
Iceland Geothermal
 
C1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its EffectsC1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its Effects
Iceland Geothermal
 
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTSC1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
Iceland Geothermal
 
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
Iceland Geothermal
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
Iceland Geothermal
 
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal ProjectsB4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
Iceland Geothermal
 

More from Iceland Geothermal (20)

Geothermal Landscape study final
Geothermal Landscape study finalGeothermal Landscape study final
Geothermal Landscape study final
 
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
A1  Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...A1  Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
 
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
C4 - Geothermal Fuels Prosperity:  How Geothermal Direct Use Projects Enable ...C4 - Geothermal Fuels Prosperity:  How Geothermal Direct Use Projects Enable ...
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
 
C4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from airC4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from air
 
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
C4 - Opportunities to develop low-enthalpy geothermal project in MexicoC4 - Opportunities to develop low-enthalpy geothermal project in Mexico
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
 
C4 - Lithium recovery from high temperature geothermal brines.
C4 - Lithium recovery from high temperature geothermal brines.C4 - Lithium recovery from high temperature geothermal brines.
C4 - Lithium recovery from high temperature geothermal brines.
 
C4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial productC4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial product
 
C3 - Production Modelling for Sustainability
C3 - Production Modelling for SustainabilityC3 - Production Modelling for Sustainability
C3 - Production Modelling for Sustainability
 
C3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrowC3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrow
 
C3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approachC3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approach
 
C3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable useC3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable use
 
C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...
 
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
 
C2 - ENGINEERING THE ENERGY TRANSITION
C2 - ENGINEERING THE  ENERGY TRANSITIONC2 - ENGINEERING THE  ENERGY TRANSITION
C2 - ENGINEERING THE ENERGY TRANSITION
 
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
 
C1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its EffectsC1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its Effects
 
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTSC1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
 
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal ProjectsB4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
 

Recently uploaded

The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 

Recently uploaded (20)

The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 

C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION

  • 1. Joseph Bonafin Sales and Business Development Manager - Geothermal BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
  • 2. Copyright © – Turboden S.p.A. All rights reserved SINCE 1980 Turboden is an Italian firm and a global leader in the design, manufacture, and maintenance of Organic Rankine Cycle (ORC) systems, highly suitable for distributed generation. ORC systems can generate electric and thermal power exploiting multiple sources, such as renewables (biomass, geothermal energy, solar energy), traditional fuels, and waste heat from industrial processes, waste incinerators, engines or gas turbines. BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION2 ABOUT US
  • 3. Copyright © – Turboden S.p.A. All rights reserved LEADING COMPANY IN ORC SOLUTIONS Turboden, constantly supported by its parent company, Mitsubishi Heavy Industries, holds the know-how of ORC technology thanks to its over-35 years experience. RANGE SIZE up to 20 MWe per single shaft APPLICATIONS biomass, geothermal, waste heat recovery, oil&gas, waste to energy, concentrated solar power, steam&power
  • 4. Copyright © – Turboden S.p.A. All rights reserved 20181990 20102000 MILESTONES ’60 - ‘70 1976 1980 1988 1998 2000 - 09 2013 First ORC biomass plant in Switzerland (300 kW). Prof. Mario Gaia founds Turboden to design and manufacture ORC turbogenerators. Prof. Mario Gaia makes experience in the field of ORC within his research group at Politecnico di Milano. First prototype of a solar thermodynamic ORC. First geothermal project 1 100 220 350 300 kW 1 - 2 - 4 MW 5 - 8 - 10 MW 20 MW ORC plants number ORC Turbine frame 2018 United Technologies Corp. (UTC) acquires the majority of Turboden’s quota. PW Power Systems supports Turboden in new markets beyond Europe. Turboden boom of ORC biomass plants, especially in Austria, Germany and Italy. MHI acquires the majority of Turboden. Italian quotaholders stay in charge of management. Over 350 ORC plants in the world, about 300 in operation BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION4 Copyright © – Turboden S.p.A. All rights reserved 2009
  • 5. Copyright © – Turboden S.p.A. All rights reserved GLOBAL AND PROVEN EXPERIENCE BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION5 PLANTS: 359 COUNTRIES: 40 TOTAL CAPACITY: 564.4 MWe CUMULATIVE OPERATION TIME: 13 million hours ENERGY GENERATED: 15.7 thousand GWh AVERAGE AVAILABILITY: 98+% Last update: April 2018
  • 6. Copyright © – Turboden S.p.A. All rights reserved TURBODEN IN THE MITSUBISHI GROUP Other Business Domains Energy & Environment Domains Integrate the thermal and geothermal power generation systems businesses in Feb. 2014 now known as Other Companies Power Systems Company > 350 ORC WORLDWIDE > 0.5 GW ORC power > 100 GEO UNITS WORLDWIDE > 3 GW geothermal power consolidated sales of around $38 billion (in fiscal 2016) BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION7
  • 7. Copyright © – Turboden S.p.A. All rights reserved 7  Capacity: solutions up to 40 MW per single generator  Temperature range: from 100 °C to more than 200 °C  Working fluids: hydrocarbons, HFCs, HFOs  Thermodynamic process and control philosophy designed by Turboden  Turbine type: axial multi stage, Turboden proprietary design  Key equipment designed in house (e.g. air cooled condenser and heat exchangers)  Operation in remote areas: off grid capability (island mode) and active grid balancing  Combined heat and power solutions  Low O&M requirements  Remote monitoring and long term service OUR EXPERIENCE BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
  • 8. Copyright © – Turboden S.p.A. All rights reserved UPDATE ON LATEST GEOTHERMAL PROJECTS 8 Under construction (Start-up 2019) Project site: Lightning Dock Country: New Mexico (US) Customer: Cyrq Configuration: Power only Design capacity: 14 MW Description:  Liquid brine ~155 °C  Single turbine  ACC Under construction (Start-up 2019) Project site: Holzkirchen Country: Germany Customer: Holzkirchen GmbH Configuration: Heat&Power Design capacity: 3.3 MW + 10 MWth Description:  Liquid brine ~152 °C  Single turbine,  ACC BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION Under construction (Start-up 2018) Project site: Velika Ciglena Country: Croatia Customer: MB Holding Configuration: Power only Design capacity: 16.5 MW Description:  Liquid+steam ~171 °C  Single turbine  ACC  1,5 MW NCG turbine In operation (Start-up 2015) Project site: Hatchobaru Country: Japan Customer: Undisclosed Configuration: Power only Design capacity: 5 MW Description:  Liquid+steam ~140 °C  Single turbine  ACC WELLHEAD UNIT WELLHEAD UNIT
  • 9. Copyright © – Turboden S.p.A. All rights reserved ADVANTAGES OF GEOTHERMAL BINARY PLANTS FOR HIGH ENTHALPY  Capable to exploit both the separated hot brine & steam (two phase flow)  Higher efficiency (steam consumption < 7 tph/MW) than single flash plants (for small units < 10 MW)  Lower CAPEX than single flash plants (for small units < 10 MW)  Early generation, relocation option, no complicate steam gathering system  Full reinjection of geothermal fluid is possible (with dry cooling)!  Low requirement for land (wellpad generation with simplified gathering system)  Stable base-load energy and island mode operation  Proven and mature technology  Scalable to utility size (modular technology) BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION 10
  • 10. Copyright © – Turboden S.p.A. All rights reserved 10 Preheater Brine Evaporator Binary Turbine Feed Pump Condenser Production Well Generator Steam Evaporator Separator Steam Brine Condensate BINARY CYCLES CAN BE AN EFFICIENT SOLUTION FOR WELLHEAD PLANTS  HIGH EFFICIENCY WITH RESOURCE ENTHALPY UP TO 2000 KJ/KG  ENVIRONMENTAL FRIENDLY (FULL REINJECTION)  LOWER O&M COMPARED TO FLASH PLANTS BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION Injection Well 2 phase flow ORC fluid
  • 11. Copyright © – Turboden S.p.A. All rights reserved BINARY GEOTHERMAL WELLHEAD UNITS: EXAMPLES OF TURBODEN PLANTS 5 MW Turboden ORC geothermal power plant in Sauerlach, Germany 5.6 MW Turboden ORC geothermal power plant in Dürrnhaar, Germany 5.6 MW Turboden ORC geothermal power plant in Kirchstockach, Germany 11 BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
  • 12. Copyright © – Turboden S.p.A. All rights reserved WELLHEAD UNIT EXAMPLE (AIR COOLED) 12 1 2 Production well Reinjection well 1 2 1 2 BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
  • 13. Copyright © – Turboden S.p.A. All rights reserved 13  20 ÷ 40% ADDITIONAL POWER ACCORDING TO REINJECTION LIMITS (SCALING ISSUES)  NO ADDITIONAL DRILLING REQUIRED  BINARY PLANT CAN USE EXISTING COOLING SYSTEM  EASY ACCESS TO FINANCING BECAUSE THERE IS NO RESOURCE RISK BINARY CYCLES CAN BE COMBINED WITH TRADITIONAL FLASH STEAM PLANTS Re-injection Well CondenserFeed Pump Binary Turbine Condensing Turbine Cooling Tower Condenser Separator Production Well Hotwell Pump BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION