Contents
 Introduction of GIS
 Gas Insulated Substation
 Internal equipments of GIS.
 Definitions of equipments.
 Internal equipments of GIS.
 Need of GIS
 Service condition of GIS
 Services offered by GIS to supplier.
 Drawback of GIS.
 Advantages of GIS.
 Application of GIS .
 Conclusion.
 References
Introduction to GIS
 GIS was first developed in various countries between 1968
and 1972.
 After about 5 years of experience, the use rate increased to
about 20% of new substations in countries where space is
limited.
 Conventional substations requires, small installations size,
protection against atmosphere pollution and moisture,
noiseless operation, on explosive and flame resistant,
reduced maintenance, minimal radio interference, but totally
enclosed substations using SF6 gas as insulation that are
also known as GIS which is stand for GAS INSULATED
SUBSTATIONS.
 GIS is now in widespread use in the electrical power industry.
GAS INSULATED SUBSTATIONS
Definition:
 A gas insulated substation(GIS) is a substation that uses a
superior dielectric gas, sulfur hexafluoride (SF6),high voltage.
 The basic principle of GIS equipment:
 Is that the high-voltage current carrying parts are within a
metal enclosure and are held in a concentric configuration by
cast epoxy spacer insulators.
 The space between the conductor and the enclosure is filled
with SF6 gas under moderate pressure.
GAS INSULATED SUBSTATIONS
 Components:
 1- Circuit breaker.
 2-Disconnector(Isolator).
 3-Ground switches.
 4-Bus-bar.
 5-Transformer.
 8-Outgoing bus-bar for electrically
connecting the gas insulated substation
with bus-bar.
 9-Outgoing portion of the transformer
being arranged in accordance with
extending direction of outgoing bus-bar.
INTERNAL EQUIPMENTS OF GIS
Definition's of equipment's
BUS-BAR:
 An electrical conductor that carries a large current,
especially one that is part of a power distribution
system; typically a thick strip, or a tube, of copper or
aluminum.
CIRCUIT BREAKER:
 Under short circuit conditions,however,the current
may reach tens of thousands of amperes at a power
factor as low as 0.1.
 It is duty of a circuit breaker to interrupt such currents
as soon as possible to avoid equipment damage.
CURRENT TRANSFORMER:
In the single phase enclosed core of CT is
located outside the enclosure inside for three
phase.
Gas compartment to reduce access of
moisture and to suppress gas-tight bushing for
secondary connections.
CT current rating is 120% of rated primary
current.
VOLTAGE TRANSFORMER:
Variable location on feeder and busbars.
Integrated disconnecting facility for GIS and
power cable testing without dismantling and
gas handling.
DISCONNECTOR:
Disconnectors or isolators are used for
electrical isolation of circuit parts.
Disconnect switches can be three pole,group-
operated,or single pole operated.
They are slow acting and operating at off load.
EARTHING SWITCH:
Slow operating earthing switch are used for
protection purpose.
 When work is being done in the substation,
but are operated only when it is certain that
the high-voltage system is not energized.
The fast closing earthing switch can close
against full voltage and short circuit power.
The high speed earthing switch is achieved by
means of a spring-closing device.
CABLES COMPARTMENT:
 Optimized solution for plug-in type power cable
connection.
 Adjustable support structure for minimum
requirements for the GIS floor.
 Fixation to the GIS floor by cemented anchor
bolts, no need for special foundation (steel
beams….etc.)
LOCAL CONTROL CUBICLE:
 LCC is the interface cubicles to all secondary system of a substation which
are represent a station control and protection.
 LCC includes control and alarm functions as well as the correct distribution
of auxiliary power supply for the relevant GIS .
 In general, each cabinet should contain the following equipment for
control, indication and protection of switches, circuit breaker, and
associated components:
 1. One control switch for each three phase circuit breaker.
 2. One remote local switch for each three phase circuit breaker.
 3. One open close control switch for each motor operated grounding switch.
 4. One or two red light-emitting diodes and one green for each circuit breaker, each
disconnect and grounding switch, or contact position indication .
 5. Control switches for ac and dc supply to each compartment.
Need for GIS
 Non availability of sufficient space.
 Reduction in length of feeders.
 Improvement of the quality of voltage regulation due to short length feeder.
 Total space required for GIS is 10% of the needed for a conventional substation.
 GIS technology can be used for installations in areas where the cost of real estates
is appreciable.
 Overcome or decrease the magnitude of limitation of AIS site selection.
Service condition of GIS
As per IEEE 122,IEEE123 and IEC 62271
 Indoor or outdoor :As per customer
 Elevation above sea level :As per site location
 Design ambient temperature :40 degree Celsius as per IEC 62271
 Maximum ambient temperature : 105 degree Celsius as per IEC 62271
Maximum Allowable Total Temperature in Celsius
Internal contacts/joints silver plated and 105
conductor in compact with epoxy insulator.
External surface-accessible . 70
External surface-inaccessible. 110
External surface-normally handled by 50
an operator.
Service offered by GIS user and GIS
supplier
Unless otherwise specified or agreed upon,the user should receive,install,and
field test the apparatus specified herein,installation and field testing of the
GIS should be completed under the supervision of the supplier to ensure
correct installation.Unless otherwise specified,the following equipment and
services should also be furnished by the user:
 Concrete foundation.
 Power transformer or reactor including bushings.
 Surge arrester,outsidee the GIS
 The station ground grid,below ground,and vertical connection risers of
adequate length.
 Ac and dc auxilary power to furnished equipment.
Drawbacks of GIS substation
 High cost.
 Waves get reflected and refracted.
 Excessive damage incase of internal faults.
 Diagnosis of internal takes very long time.
 SF6 gas pressure must be monitered in each compartment.
 SF6 cause ozone layer depletion and global warming.
Advantages of GIS
Occupies very less space.
Most reliable.
Number of outages due to the fault is less.
Maintenance free.
Applications of GIS
High voltage installations
The higher the voltage, the more favorable gas insulated technology becomes. The
footprint of 765kV conventional substation is enormous, and GIS technology allows a
significant size reduction.
Urban Installations
GIS technology can be used for installations in areas where the cost of real estate or aesthetic
appeal is a significant consideration.
Indoor Installations
Building an air insulated substation indoors is usually impractical, but a GIS can easily go inside
buildings.
Environmentally Sensitive Installations
GIS technology is popular in desert and arctic areas because it can be enclosed in a building with
environmental control.
Conclusion
GIS generate no noise and have no idea no
radio interference.
GIS is necessary for extra HV and Ultra HV
substations.
More conservative.
Reference
• www.google.com/gasinsulatedsubstation
• www.yahoo.com/gasinsulatedsubstation
• www.slideshare.com/gasinsulatedsubstation
Thanking you

More Related Content

What's hot

Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
himanshu kumar
 
Gis substation
Gis substationGis substation
Gis substation
Asif Eqbal
 
Sub stations-air insulated substations
Sub stations-air insulated substationsSub stations-air insulated substations
Sub stations-air insulated substations
bhanu lucky
 
GAS INSULATED SUB-STATION
GAS INSULATED SUB-STATIONGAS INSULATED SUB-STATION
GAS INSULATED SUB-STATION
sujitmandalsk
 
GIS(GAS INSULATED SUBSTATION)
GIS(GAS  INSULATED  SUBSTATION) GIS(GAS  INSULATED  SUBSTATION)
GIS(GAS INSULATED SUBSTATION)
suneel kumar Aggela
 
Electrical Grid Substation
Electrical Grid SubstationElectrical Grid Substation
Electrical Grid Substation
Ang Sovann
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
Power System Operation
 
Electric substation
Electric substation Electric substation
Electric substation
ANNU KUMAR
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
SF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKERSF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKER
sssspp
 
Powerpoint presentation on SF6 circuit breaker
Powerpoint presentation on SF6 circuit breakerPowerpoint presentation on SF6 circuit breaker
Powerpoint presentation on SF6 circuit breaker
PoojaGupta663
 
Gas insulated substation 2
Gas insulated substation 2Gas insulated substation 2
Gas insulated substation 2
naga pooja
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
Ajay Kuriakose
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
yohannes feleke
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
ayyadurai SHANMUGAM
 
Reactors
ReactorsReactors
Reactors
Molla Morshad
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
Anbarasu Balakrishnan
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
Shubham Patel
 

What's hot (20)

Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Gis substation
Gis substationGis substation
Gis substation
 
Sub stations-air insulated substations
Sub stations-air insulated substationsSub stations-air insulated substations
Sub stations-air insulated substations
 
GIS-NESCL-6
GIS-NESCL-6GIS-NESCL-6
GIS-NESCL-6
 
Ppt
PptPpt
Ppt
 
GAS INSULATED SUB-STATION
GAS INSULATED SUB-STATIONGAS INSULATED SUB-STATION
GAS INSULATED SUB-STATION
 
GIS(GAS INSULATED SUBSTATION)
GIS(GAS  INSULATED  SUBSTATION) GIS(GAS  INSULATED  SUBSTATION)
GIS(GAS INSULATED SUBSTATION)
 
Electrical Grid Substation
Electrical Grid SubstationElectrical Grid Substation
Electrical Grid Substation
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
 
Electric substation
Electric substation Electric substation
Electric substation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
SF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKERSF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKER
 
Powerpoint presentation on SF6 circuit breaker
Powerpoint presentation on SF6 circuit breakerPowerpoint presentation on SF6 circuit breaker
Powerpoint presentation on SF6 circuit breaker
 
Gas insulated substation 2
Gas insulated substation 2Gas insulated substation 2
Gas insulated substation 2
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Reactors
ReactorsReactors
Reactors
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 

Viewers also liked

Gas insulated substation 1
Gas insulated substation 1Gas insulated substation 1
Gas insulated substation 1
Ronal Parmar
 
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWARFACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
ashwini kumar
 
Substation overview
Substation overviewSubstation overview
Substation overview
BHAGWAN PRASAD
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 
Moct magneto-optic-current-transformer
Moct magneto-optic-current-transformerMoct magneto-optic-current-transformer
Moct magneto-optic-current-transformerLaxmikant Sain
 
Electrical grounding and earthing
Electrical grounding and earthingElectrical grounding and earthing
Electrical grounding and earthing
Nitesh Dash
 
132kv Substation
132kv Substation132kv Substation
132kv Substationguestecdd58
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systemsBiswajit Pratihari
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and details
Mahesh Sontyal
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breaker
Renuka Verma
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-StationTowfiqur Rahman
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Pradeep Avanigadda
 
Dtl nit-1496-140709 (1)
Dtl nit-1496-140709 (1)Dtl nit-1496-140709 (1)
Dtl nit-1496-140709 (1)
Mrugesh_Goldfinch
 
Schneider RM6 - MV Medium Voltage Compact Switchboard (Ring Main Unit) up to ...
Schneider RM6 - MV Medium Voltage Compact Switchboard (Ring Main Unit) up to ...Schneider RM6 - MV Medium Voltage Compact Switchboard (Ring Main Unit) up to ...
Schneider RM6 - MV Medium Voltage Compact Switchboard (Ring Main Unit) up to ...
Thorne & Derrick International
 
Multi-Parameter Measurement of ICU Patient Using GSM and Embedded Technology
Multi-Parameter Measurement of ICU Patient Using GSM and Embedded TechnologyMulti-Parameter Measurement of ICU Patient Using GSM and Embedded Technology
Multi-Parameter Measurement of ICU Patient Using GSM and Embedded Technology
International Journal of Engineering Inventions www.ijeijournal.com
 
Blue LED
Blue LEDBlue LED
Blue LED
prathul Nath
 
Gas insulated sub station 3
Gas insulated sub station 3Gas insulated sub station 3
Gas insulated sub station 3
Ronal Parmar
 
Reactivepowercompensation 140401183847-phpapp01 (6)
Reactivepowercompensation 140401183847-phpapp01 (6)Reactivepowercompensation 140401183847-phpapp01 (6)
Reactivepowercompensation 140401183847-phpapp01 (6)
REVANTH CHINTU
 
Gas insulated sub station 4
Gas insulated sub station 4Gas insulated sub station 4
Gas insulated sub station 4
Ronal Parmar
 

Viewers also liked (20)

Gas insulated substation 1
Gas insulated substation 1Gas insulated substation 1
Gas insulated substation 1
 
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWARFACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
FACULTY OF ENGINEERING & TECHNOLOGY , GURUKULA KANGARI UNIVERSITY ,HARIDWAR
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Deepak kumar
Deepak kumarDeepak kumar
Deepak kumar
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
Moct magneto-optic-current-transformer
Moct magneto-optic-current-transformerMoct magneto-optic-current-transformer
Moct magneto-optic-current-transformer
 
Electrical grounding and earthing
Electrical grounding and earthingElectrical grounding and earthing
Electrical grounding and earthing
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and details
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breaker
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 
Dtl nit-1496-140709 (1)
Dtl nit-1496-140709 (1)Dtl nit-1496-140709 (1)
Dtl nit-1496-140709 (1)
 
Schneider RM6 - MV Medium Voltage Compact Switchboard (Ring Main Unit) up to ...
Schneider RM6 - MV Medium Voltage Compact Switchboard (Ring Main Unit) up to ...Schneider RM6 - MV Medium Voltage Compact Switchboard (Ring Main Unit) up to ...
Schneider RM6 - MV Medium Voltage Compact Switchboard (Ring Main Unit) up to ...
 
Multi-Parameter Measurement of ICU Patient Using GSM and Embedded Technology
Multi-Parameter Measurement of ICU Patient Using GSM and Embedded TechnologyMulti-Parameter Measurement of ICU Patient Using GSM and Embedded Technology
Multi-Parameter Measurement of ICU Patient Using GSM and Embedded Technology
 
Blue LED
Blue LEDBlue LED
Blue LED
 
Gas insulated sub station 3
Gas insulated sub station 3Gas insulated sub station 3
Gas insulated sub station 3
 
Reactivepowercompensation 140401183847-phpapp01 (6)
Reactivepowercompensation 140401183847-phpapp01 (6)Reactivepowercompensation 140401183847-phpapp01 (6)
Reactivepowercompensation 140401183847-phpapp01 (6)
 
Gas insulated sub station 4
Gas insulated sub station 4Gas insulated sub station 4
Gas insulated sub station 4
 

Similar to Gas insulated substation.

Gagan
GaganGagan
Internship ppt(santhosh).pptx
Internship ppt(santhosh).pptxInternship ppt(santhosh).pptx
Internship ppt(santhosh).pptx
Basavarajbanakar6
 
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptxChapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
borapring
 
substation 101
substation 101substation 101
substation 101danica11
 
Gases insulation powerstation
Gases  insulation powerstationGases  insulation powerstation
Gases insulation powerstation
raja sukumar
 
Substation_fundamental.pptx
Substation_fundamental.pptxSubstation_fundamental.pptx
Substation_fundamental.pptx
Satish Pydimarla
 
GSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPURGSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPURHARISH KUMAR
 
Substation
Substation Substation
Substation
SanjayMk11
 
Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...
Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...
Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...
IJERA Editor
 
GIS PRESENTATION.pdf
GIS PRESENTATION.pdfGIS PRESENTATION.pdf
GIS PRESENTATION.pdf
AyazAhmadKhan3
 
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Power System Operation
 
Compact DC switch gear
Compact DC switch gearCompact DC switch gear
Compact DC switch gear
VeenaVK
 
Analysis of Fault Detection and its Location using Microcontroller for Underg...
Analysis of Fault Detection and its Location using Microcontroller for Underg...Analysis of Fault Detection and its Location using Microcontroller for Underg...
Analysis of Fault Detection and its Location using Microcontroller for Underg...
IRJET Journal
 
TYPES OF SUBSTATION.pptx
TYPES OF SUBSTATION.pptxTYPES OF SUBSTATION.pptx
TYPES OF SUBSTATION.pptx
MadhusmitaMohanty29
 
Gi e
Gi eGi e
Gi e
hoa hong2
 
IRJET- A Review: Microstrip Antenna
IRJET-  	  A Review: Microstrip AntennaIRJET-  	  A Review: Microstrip Antenna
IRJET- A Review: Microstrip Antenna
IRJET Journal
 
IRJET- Battery Management System by using PWM Charge Controller
IRJET- Battery Management System by using PWM Charge ControllerIRJET- Battery Management System by using PWM Charge Controller
IRJET- Battery Management System by using PWM Charge Controller
IRJET Journal
 
EHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesEHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniques
Yashwant Chaudhari
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
Mahesh Chandra Manav
 

Similar to Gas insulated substation. (20)

Gagan
GaganGagan
Gagan
 
Internship ppt(santhosh).pptx
Internship ppt(santhosh).pptxInternship ppt(santhosh).pptx
Internship ppt(santhosh).pptx
 
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptxChapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
 
substation 101
substation 101substation 101
substation 101
 
Gases insulation powerstation
Gases  insulation powerstationGases  insulation powerstation
Gases insulation powerstation
 
Substation_fundamental.pptx
Substation_fundamental.pptxSubstation_fundamental.pptx
Substation_fundamental.pptx
 
GSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPURGSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPUR
 
Substation
Substation Substation
Substation
 
Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...
Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...
Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...
 
GIS PRESENTATION.pdf
GIS PRESENTATION.pdfGIS PRESENTATION.pdf
GIS PRESENTATION.pdf
 
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
Medium-Voltage, Gas-Insulated Arc-Resistant Switchgear Types 8DA10 & 8DB10
 
Compact DC switch gear
Compact DC switch gearCompact DC switch gear
Compact DC switch gear
 
Analysis of Fault Detection and its Location using Microcontroller for Underg...
Analysis of Fault Detection and its Location using Microcontroller for Underg...Analysis of Fault Detection and its Location using Microcontroller for Underg...
Analysis of Fault Detection and its Location using Microcontroller for Underg...
 
TYPES OF SUBSTATION.pptx
TYPES OF SUBSTATION.pptxTYPES OF SUBSTATION.pptx
TYPES OF SUBSTATION.pptx
 
Gi e
Gi eGi e
Gi e
 
IRJET- A Review: Microstrip Antenna
IRJET-  	  A Review: Microstrip AntennaIRJET-  	  A Review: Microstrip Antenna
IRJET- A Review: Microstrip Antenna
 
IRJET- Battery Management System by using PWM Charge Controller
IRJET- Battery Management System by using PWM Charge ControllerIRJET- Battery Management System by using PWM Charge Controller
IRJET- Battery Management System by using PWM Charge Controller
 
EHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesEHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniques
 
Mobile sniffer and jammer
Mobile sniffer and jammerMobile sniffer and jammer
Mobile sniffer and jammer
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
 

Recently uploaded

ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 

Recently uploaded (20)

ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 

Gas insulated substation.

  • 1. SEMINAR PRESENTATION TOPIC: GAS INSULATED SUBSTATIONS SESSION:2014-2015 PRESENTED BY: NAME:MOHAMMAD SAIF BRANCH:ELECTRICAL AND ELECTRONICS ENGG. 1
  • 2. Contents  Introduction of GIS  Gas Insulated Substation  Internal equipments of GIS.  Definitions of equipments.  Internal equipments of GIS.  Need of GIS  Service condition of GIS  Services offered by GIS to supplier.  Drawback of GIS.  Advantages of GIS.  Application of GIS .  Conclusion.  References
  • 3. Introduction to GIS  GIS was first developed in various countries between 1968 and 1972.  After about 5 years of experience, the use rate increased to about 20% of new substations in countries where space is limited.  Conventional substations requires, small installations size, protection against atmosphere pollution and moisture, noiseless operation, on explosive and flame resistant, reduced maintenance, minimal radio interference, but totally enclosed substations using SF6 gas as insulation that are also known as GIS which is stand for GAS INSULATED SUBSTATIONS.  GIS is now in widespread use in the electrical power industry.
  • 4.
  • 5. GAS INSULATED SUBSTATIONS Definition:  A gas insulated substation(GIS) is a substation that uses a superior dielectric gas, sulfur hexafluoride (SF6),high voltage.  The basic principle of GIS equipment:  Is that the high-voltage current carrying parts are within a metal enclosure and are held in a concentric configuration by cast epoxy spacer insulators.  The space between the conductor and the enclosure is filled with SF6 gas under moderate pressure.
  • 6. GAS INSULATED SUBSTATIONS  Components:  1- Circuit breaker.  2-Disconnector(Isolator).  3-Ground switches.  4-Bus-bar.  5-Transformer.  8-Outgoing bus-bar for electrically connecting the gas insulated substation with bus-bar.  9-Outgoing portion of the transformer being arranged in accordance with extending direction of outgoing bus-bar.
  • 7.
  • 9.
  • 10. Definition's of equipment's BUS-BAR:  An electrical conductor that carries a large current, especially one that is part of a power distribution system; typically a thick strip, or a tube, of copper or aluminum. CIRCUIT BREAKER:  Under short circuit conditions,however,the current may reach tens of thousands of amperes at a power factor as low as 0.1.  It is duty of a circuit breaker to interrupt such currents as soon as possible to avoid equipment damage.
  • 11. CURRENT TRANSFORMER: In the single phase enclosed core of CT is located outside the enclosure inside for three phase. Gas compartment to reduce access of moisture and to suppress gas-tight bushing for secondary connections. CT current rating is 120% of rated primary current.
  • 12. VOLTAGE TRANSFORMER: Variable location on feeder and busbars. Integrated disconnecting facility for GIS and power cable testing without dismantling and gas handling. DISCONNECTOR: Disconnectors or isolators are used for electrical isolation of circuit parts. Disconnect switches can be three pole,group- operated,or single pole operated. They are slow acting and operating at off load.
  • 13. EARTHING SWITCH: Slow operating earthing switch are used for protection purpose.  When work is being done in the substation, but are operated only when it is certain that the high-voltage system is not energized. The fast closing earthing switch can close against full voltage and short circuit power. The high speed earthing switch is achieved by means of a spring-closing device.
  • 14. CABLES COMPARTMENT:  Optimized solution for plug-in type power cable connection.  Adjustable support structure for minimum requirements for the GIS floor.  Fixation to the GIS floor by cemented anchor bolts, no need for special foundation (steel beams….etc.)
  • 15. LOCAL CONTROL CUBICLE:  LCC is the interface cubicles to all secondary system of a substation which are represent a station control and protection.  LCC includes control and alarm functions as well as the correct distribution of auxiliary power supply for the relevant GIS .  In general, each cabinet should contain the following equipment for control, indication and protection of switches, circuit breaker, and associated components:  1. One control switch for each three phase circuit breaker.  2. One remote local switch for each three phase circuit breaker.  3. One open close control switch for each motor operated grounding switch.  4. One or two red light-emitting diodes and one green for each circuit breaker, each disconnect and grounding switch, or contact position indication .  5. Control switches for ac and dc supply to each compartment.
  • 16. Need for GIS  Non availability of sufficient space.  Reduction in length of feeders.  Improvement of the quality of voltage regulation due to short length feeder.  Total space required for GIS is 10% of the needed for a conventional substation.  GIS technology can be used for installations in areas where the cost of real estates is appreciable.  Overcome or decrease the magnitude of limitation of AIS site selection.
  • 17. Service condition of GIS As per IEEE 122,IEEE123 and IEC 62271  Indoor or outdoor :As per customer  Elevation above sea level :As per site location  Design ambient temperature :40 degree Celsius as per IEC 62271  Maximum ambient temperature : 105 degree Celsius as per IEC 62271 Maximum Allowable Total Temperature in Celsius Internal contacts/joints silver plated and 105 conductor in compact with epoxy insulator. External surface-accessible . 70 External surface-inaccessible. 110 External surface-normally handled by 50 an operator.
  • 18. Service offered by GIS user and GIS supplier Unless otherwise specified or agreed upon,the user should receive,install,and field test the apparatus specified herein,installation and field testing of the GIS should be completed under the supervision of the supplier to ensure correct installation.Unless otherwise specified,the following equipment and services should also be furnished by the user:  Concrete foundation.  Power transformer or reactor including bushings.  Surge arrester,outsidee the GIS  The station ground grid,below ground,and vertical connection risers of adequate length.  Ac and dc auxilary power to furnished equipment.
  • 19. Drawbacks of GIS substation  High cost.  Waves get reflected and refracted.  Excessive damage incase of internal faults.  Diagnosis of internal takes very long time.  SF6 gas pressure must be monitered in each compartment.  SF6 cause ozone layer depletion and global warming.
  • 20. Advantages of GIS Occupies very less space. Most reliable. Number of outages due to the fault is less. Maintenance free.
  • 21. Applications of GIS High voltage installations The higher the voltage, the more favorable gas insulated technology becomes. The footprint of 765kV conventional substation is enormous, and GIS technology allows a significant size reduction. Urban Installations GIS technology can be used for installations in areas where the cost of real estate or aesthetic appeal is a significant consideration. Indoor Installations Building an air insulated substation indoors is usually impractical, but a GIS can easily go inside buildings. Environmentally Sensitive Installations GIS technology is popular in desert and arctic areas because it can be enclosed in a building with environmental control.