Objectives
 Define Production and discuss its nature.
 List the elements of production process and explain each
 Illustrate how a technical plan look like
 Analyze the example given and reflect on the processes involved
 Draw your own production processes and technical plan
 Write an explanation to your technical plan concept
What do you see in this image? How many steps did each process take?
Explanation:
 There are four processes in the image:
Procurement, Production, Packaging, and
Distribution
 In the Procurement Process, there are 4 steps:
Listing of Orders, Inventory Control, Pay COD/
Terms, and Storage
 In Production Process, there are ten steps in
the process: Cutting, Boiling H2O, Squeezing,
Draining, Boiling of Ingredient, Draining of
Ingredient, Mixing, Boiling the Mix, Cold
Storage, and Compute Volume of Finished
product.
Explanation
 In the Packaging Process there are 4 steps
involved: Bottling, Branding, Equating
Volume, and Final Packaging
 In the Distribution Process the following steps
are involved: Confirming of Orders, Computing
the Direct Cost with Voucher
 Contracting with the Buyer on the conditions
of payment.
 Possible markets were also identified based
from the previous market test conducted.
What do you see in this image? How many steps did each process take?
Production and its
Nature1. Concerns with the creation of
goods and services
undertaken in big or small
scale
2. Creation encompasses
modification and assembly of
goods already in existence
3. May also include the repair
and servicing of goods in a
service marketing course
4. Fabrication of a physical
object thru the use of
men, materials and machines
Elements of
Production
System
1. Men
2. Materials
3. Machines
4. Processes
5. Information
Network
Explanation
1. Men are the sources of labour
2. Materials consist of raw and
assembly of goods already in
existence that are needed in the
production of another goods. May
also include the repair and servicing
of goods
3. Machines are the tools of production;
the processes are the nature of all
the activities from procurement to
distribution of the finished product.
4. Fabrication of a physical product thru
the use of men, materials and
machines need information network
in order to fully managed and
supervised the steps and activities
in the processes called the
Technical Plan.
 Transformation Process consists of
Input- Process- Output;
1. Inputs are materials of various kinds in
varying quantities and states of
completion
2. Activities may effect mechanical or
man controlled, continuous or
intermittent; or involved job
order, serialized, batched type or mass
production
3. The movement of material inputs thru
the process to become outputs is
accomplished by a flow network called
the material handling. This network
begins with receipt of materials and
ends with shipment of finished goods.
Let us reflect on the
Example
LET US DRAW &
WRITE Direction
Make a summary of your
Technical flow plan and
draw a concept using your
written parts and processes.
Assignment:
1. Start encoding the requirements for Mid Term and Pre Finals and send to
atiram40@yahoo.com- Deadline for Mid Term Grade Sept 12, 2013 coverage of
Marketing Plan and Technical Plan
Deadline for qualified Exemption September 14, 2013
Coverage of Marketing Plan, Technical Plan and organization and Management
Plan
2. Be ready for an activity next meeting. Using the time allotted in each of your
steps in processes, will be utilized in the application of CPM process evaluation.
Assignment  Study our next lesson on Critical
Path Method, and Critical Path
Analysis
 Answer the following questions
1. Define CPM, CPA
2. What does CPM figure out?
3. Why is CPM needed and
important?
4. How do we do it to help
management decide?
5. Will there be needed action for
the management
 to make when CPA is done?

Feasibility Study Lesson- Technical Plan

  • 2.
    Objectives  Define Productionand discuss its nature.  List the elements of production process and explain each  Illustrate how a technical plan look like  Analyze the example given and reflect on the processes involved  Draw your own production processes and technical plan  Write an explanation to your technical plan concept
  • 3.
    What do yousee in this image? How many steps did each process take?
  • 4.
    Explanation:  There arefour processes in the image: Procurement, Production, Packaging, and Distribution  In the Procurement Process, there are 4 steps: Listing of Orders, Inventory Control, Pay COD/ Terms, and Storage  In Production Process, there are ten steps in the process: Cutting, Boiling H2O, Squeezing, Draining, Boiling of Ingredient, Draining of Ingredient, Mixing, Boiling the Mix, Cold Storage, and Compute Volume of Finished product.
  • 5.
    Explanation  In thePackaging Process there are 4 steps involved: Bottling, Branding, Equating Volume, and Final Packaging  In the Distribution Process the following steps are involved: Confirming of Orders, Computing the Direct Cost with Voucher  Contracting with the Buyer on the conditions of payment.  Possible markets were also identified based from the previous market test conducted.
  • 6.
    What do yousee in this image? How many steps did each process take?
  • 7.
    Production and its Nature1.Concerns with the creation of goods and services undertaken in big or small scale 2. Creation encompasses modification and assembly of goods already in existence 3. May also include the repair and servicing of goods in a service marketing course 4. Fabrication of a physical object thru the use of men, materials and machines Elements of Production System 1. Men 2. Materials 3. Machines 4. Processes 5. Information Network
  • 8.
    Explanation 1. Men arethe sources of labour 2. Materials consist of raw and assembly of goods already in existence that are needed in the production of another goods. May also include the repair and servicing of goods 3. Machines are the tools of production; the processes are the nature of all the activities from procurement to distribution of the finished product. 4. Fabrication of a physical product thru the use of men, materials and machines need information network in order to fully managed and supervised the steps and activities in the processes called the Technical Plan.
  • 9.
     Transformation Processconsists of Input- Process- Output; 1. Inputs are materials of various kinds in varying quantities and states of completion 2. Activities may effect mechanical or man controlled, continuous or intermittent; or involved job order, serialized, batched type or mass production 3. The movement of material inputs thru the process to become outputs is accomplished by a flow network called the material handling. This network begins with receipt of materials and ends with shipment of finished goods.
  • 10.
    Let us reflecton the Example
  • 11.
    LET US DRAW& WRITE Direction Make a summary of your Technical flow plan and draw a concept using your written parts and processes. Assignment: 1. Start encoding the requirements for Mid Term and Pre Finals and send to atiram40@yahoo.com- Deadline for Mid Term Grade Sept 12, 2013 coverage of Marketing Plan and Technical Plan Deadline for qualified Exemption September 14, 2013 Coverage of Marketing Plan, Technical Plan and organization and Management Plan 2. Be ready for an activity next meeting. Using the time allotted in each of your steps in processes, will be utilized in the application of CPM process evaluation.
  • 12.
    Assignment  Studyour next lesson on Critical Path Method, and Critical Path Analysis  Answer the following questions 1. Define CPM, CPA 2. What does CPM figure out? 3. Why is CPM needed and important? 4. How do we do it to help management decide? 5. Will there be needed action for the management  to make when CPA is done?