CONTENT
• Introduction
• Goals of Forensic Engineering Investigation
• Qualification of the Forensic Engineer
• Failure of Structures
• Causes of Structural Failures
• Types of Failures
• Initiation of Failure Investigation
• General Investigation Process
• CASE STUDY: Hyatt Regency Walkway Collapse
• Conclusion
11/4/2022 Department of Civil Engineering,EKCTC 2/30
INTRODUCTION
• Application of the engineering sciences to the investigation of failures or
performance problems
• Highly specialized field of engineering practice
• Requires engineering expertise and knowledge of legal procedures
• From an engineering perspective, forensic engineering deals with the investigation
and reconstruction of failures
11/4/2022 Department of Civil Engineering,EKCTC 3/30
Goals of Structural Failure Investigations
• To determine the causes of failure
• To compare statements by witnesses or injured parties with physical evidence
• To ascertain whether an illegal or improper activity was causative
• To assess damage to materials, products or structures and evaluate repair estimate
11/4/2022 Department of Civil Engineering,EKCTC 4/30
Qualification of Forensic Engineer
• Technical Competency
• Knowledge of Legal Procedures
• Detective Skills
• Effective Oral and Written Communication
• High Ethical Standards
11/4/2022 Department of Civil Engineering,EKCTC 5/30
Failure of Structures
According to Jack Janney (1986), the structural failure can be divided into:
1. Structural Distress: an impairment of the strength or load response of a structure
which may limit its use as intended.
2. Structural Failure: the reduction of the capability of a structural system or
component to such a degree that it cannot safely serve its intended purpose.
11/4/2022 Department of Civil Engineering,EKCTC 6/30
Failure of Structures (contd…)
3. Structural Collapse: Gross movement of major members or a
significant portion of a structural system manifested by the creation
of rubble from breakage of the members themselves and elements
supported by themselves.
11/4/2022 Department of Civil Engineering,EKCTC 7/30
Failure of Structures (contd…)
• Gerald Leonards (1992) defines “failure” as an unacceptable difference between
expected and observed performance. This definition can be used to describe a
catastrophic failures as well as minor failures such as roof leaks.
• The ASCE Technical Council on Forensic Engineering has adopted the above
definition provided by Gerald Leonards.
11/4/2022 Department of Civil Engineering,EKCTC 8/30
Causes of Structural Failure
Causes of failures fall into five general areas:
1. Design deficiencies
2. Construction deficiencies
3. Material deficiencies
4. Administrative deficiencies
5. Maintenance deficiencies
11/4/2022 Department of Civil Engineering,EKCTC 9/30
Initiation of Failure Investigation
• Establishing a preliminary objective and scope of work,
• Checking on conflicts in interest,
• Executing a contract agreement, and
• Establishing an investigative plan.
11/4/2022 Department of Civil Engineering,EKCTC 10/30
General Investigation Process
The steps involved are:
1. Definition of investigation objective
2. Collection of background information and documents
3. Initial site visit
4. Formation of investigation plan and project team
5. Formulation of initial failure hypotheses
11/4/2022 Department of Civil Engineering,EKCTC 11/30
General Investigation Process (contd…)
6. Comprehensive document review
7. Site investigation, field testing, and sample collection
8. Structural analysis and laboratory testing
9. Revision of failure hypotheses
10. Final conclusion
11. Report
11/4/2022 Department of Civil Engineering,EKCTC 12/30
CASE STUDY: Hyatt Regency Walkway
Collapse
Background:
• The Hyatt Regency Walkway Collapse was the worst structural failure in the
history of the United States
• 111 people were killed and more than 200 were injured.
11/4/2022 Department of Civil Engineering,EKCTC 13/30
Sequence of Events
• The Hyatt Regency hotel opened in Kansas City, Missouri, USA in 1980
• It comprised a 40-story tower, an atrium, and a function block, housing all of the
hotel’s services
• Three walkways suspended from the atrium’s ceiling by six 32-mm-diameter
tension rods each spanned the 37-m distance between the tower and the function
block
11/4/2022 Department of Civil Engineering,EKCTC 14/30
Sequence of Events (contd…)
• The 3rd and 4th floor walkways hung from the ceiling
• The 2nd floor walkway was suspended from the beams of the 4th floor walkway,
directly below the 4th floor walkway
• On the July 17, 1981, around 1500-2000 people occupied the atrium floor and the
suspended walkways to see a dance competition
11/4/2022 Department of Civil Engineering,EKCTC 15/30
Sequence of Events (contd…)
• A loud crack echoed throughout the building and connections supporting the
ceiling rods that held up the 2nd and 4th floor walkways across the atrium failed.
• The 4th floor walkway collapsed onto the 2nd floor walkway and then both
walkways collapsed onto the crowded 1st floor atrium.
11/4/2022 Department of Civil Engineering,EKCTC 16/30
Failure Hypothesis
Initially, the investigators had assumed two possibilities of the collapse as follows:
1. Walkways buckled from “harmonic vibration” set up by people swaying or
dancing at the same times. This wave like motion generated violent stress and
caused vibration failure of the structure.
2. Collapse due to inadequate design of structure.
11/4/2022 Department of Civil Engineering,EKCTC 17/30
Investigation Approach
The investigation approach that had been carried out is as follows:
1. Eyewitness and Expert Interviews
2. Site Investigation
3. Connection Design Check and Document Study
4. Laboratory Test
11/4/2022 Department of Civil Engineering,EKCTC 18/30
Eyewitness and Expert Interviews
• Roger McCarthy, an expert of failure analysis, had stated that there were telltale
signs in the skeleton of a structure well before it suffered vibration failure, and in
Hyatt Regency walkway collapse, there were no such signs.
• Eyewitness accounts gave another point that indicated there was a loud crack
echoed while the 2nd and 4th floor walkway crashed to the ground. Hence,
according to this, collapse was related to the sudden failure mechanism.
11/4/2022 Department of Civil Engineering,EKCTC 19/30
Site Investigation
The following photographic evidence was taken by Dr. Lee Lowery, shortly after the
collapse:
Fig. 1. General view of the lobby floor, during
the 1st day of investigation (wikipedia)
11/4/2022 Department of Civil Engineering,EKCTC 20/30
Walkway sections still remained
as a piece-form (wikipedia)
Photo of intact hanger rods from
4th floor walkway opening
(wikipedia)
Site Investigation (contd...)
Fig. 2. Fig. 3.
11/4/2022 Department of Civil Engineering,EKCTC 21/30
Photo of still hanging 3rd floor
walkway (wikipedia)
Fig. 5. Photo of Deformed 4th floor beam
(wikipedia)
Site Investigation (contd...)
Fig. 4.
11/4/2022 Department of Civil Engineering,EKCTC 22/30
Site Investigation (contd…)
• From the photographic evidence it was observed that there were no failure signs
on the walkway section, indicating that the collapse was not caused by inadequate
design of the section of the walkway.
• The photograph had provided significant proof to show that the walkway collapse
was most likely caused by connection failure.
11/4/2022 Department of Civil Engineering,EKCTC 23/30
Connection Design Check and Document Study
The National Bureau of Standards (NBS) found that the details of the connection of
the walkway beam to the suspender was not constructed as drawn but was changed
by the contractor for constructability reason.
11/4/2022 Department of Civil Engineering,EKCTC 24/30
Laboratory Test
Type of Connection Capacity(kN)
Original design 90
As-built 45
Table 1. Loading test result of connections
11/4/2022 Department of Civil Engineering,EKCTC 25/30
Laboratory Test (contd…)
Analysis of these two connection details revealed the following:
• The original design of the rod hanger connection would have supported 90 kN,
only 60% of the 151 kN required by the Kansas City building code. This showed
that the design of the connection was inadequate.
• As-built, however, the connection only supported 30% of the minimum load
which explains why the walkways collapsed well below maximum load.
11/4/2022 Department of Civil Engineering,EKCTC 26/30
Investigation Results
The National Bureau of Standards (NBS) discovered that the cause of this collapse
was quite simple: the rod hanger pulled through the box beam causing the
connection supporting the 4th floor walkway to fail.
11/4/2022 Department of Civil Engineering,EKCTC 27/30
Conclusion of Case Study
Case study Structure Problem Main Finding
Hyatt Regency
Walkway collapse
Reinforcement
concrete
suspended
walkway, with
steel to steel
connection.
Walkway
suddenly
collapsed
Collapse due to
fracture of the brittle
connection. This
fracture of connection
was caused because
the contractors did not
follow the design
drawing.
Table 2. Conclusion of Case Study
11/4/2022 Department of Civil Engineering,EKCTC 28/30
References
• Azizipour.M, Dalpasand.M, et al (2021) “Forensic Engineering Analysis applied
to flood control” – Vol. 594, ScienceDirect
• Balkaya.C, Etemadi.A (2020) “Collapsed RC-building failure mechanisms with a
Forensic Engineering Approach” – Vol. 34 Issue 5, ASCE
• Chou.J.S, Truong.D.N (2022) “Multiobjective forensic based investigation
algorithm for solving structural design problems” – Vol. 134, ScienceDirect
• Robert T. Ratay (2000) “Forensic Structural Engineering Handbook”
11/4/2022 Department of Civil Engineering,EKCTC 29/30
THANK
YOU
11/4/2022 Department of Civil Engineering,EKCTC 30/30

More Related Content

What's hot

DEFECTS IN CONCRETE
DEFECTS IN CONCRETE DEFECTS IN CONCRETE
DEFECTS IN CONCRETE
pnorhayati
 
4.corrosion of reinforcement in concrete
4.corrosion of reinforcement in concrete4.corrosion of reinforcement in concrete
4.corrosion of reinforcement in concrete
Aqib Ahmed
 
Types of concrete
Types of concreteTypes of concrete
Types of concrete
jenicabullworth
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
Meet Shah
 
Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...
Shanmugasundaram N
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
brijlata sharma
 
Light Transmitting concrete
Light Transmitting concreteLight Transmitting concrete
Light Transmitting concrete
Mithilesh Mandal
 
Non destructive test
Non destructive test   Non destructive test
Non destructive test
NIRAV SHAH
 
Corrosion Assessment – Half-Cell Potential Method for reinforced concrete
Corrosion Assessment – Half-Cell Potential Method for reinforced concreteCorrosion Assessment – Half-Cell Potential Method for reinforced concrete
Corrosion Assessment – Half-Cell Potential Method for reinforced concrete
Yash Shah
 
TRANSPARENT CONCRETE
TRANSPARENT CONCRETETRANSPARENT CONCRETE
TRANSPARENT CONCRETE
sathish sak
 
Materials for repair: Ferro-cement (part 2) (RR&S)
Materials for repair: Ferro-cement (part 2) (RR&S)Materials for repair: Ferro-cement (part 2) (RR&S)
Materials for repair: Ferro-cement (part 2) (RR&S)
RAMPRASAD KUMAWAT
 
Transparent concrete
Transparent concreteTransparent concrete
Transparent concrete
Subrata Samai
 
fibre reinforced concrete
fibre reinforced concretefibre reinforced concrete
fibre reinforced concrete
Venkatesh Ca
 
Ultrasonic pulse velocity test for concrete
Ultrasonic pulse velocity test for concreteUltrasonic pulse velocity test for concrete
Ultrasonic pulse velocity test for concrete
Civil Engineer
 
Fire damage, evaluation, ndt, and repair of concrete structures
Fire damage, evaluation, ndt, and repair of concrete structuresFire damage, evaluation, ndt, and repair of concrete structures
Fire damage, evaluation, ndt, and repair of concrete structures
Akshaykumar More
 
Glass fiber reinforced concrete
Glass fiber reinforced concreteGlass fiber reinforced concrete
Glass fiber reinforced concrete
bhavin shah
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete ppt
Google
 
Light emitting concrete [OR] Translucent concrete
Light emitting concrete [OR] Translucent concreteLight emitting concrete [OR] Translucent concrete
Light emitting concrete [OR] Translucent concrete
Shaik Asif Ahmed
 
Perfomance evaluation on light transmitting concrete (translucent concrete)
Perfomance evaluation on light transmitting concrete (translucent concrete)Perfomance evaluation on light transmitting concrete (translucent concrete)
Perfomance evaluation on light transmitting concrete (translucent concrete)
eSAT Journals
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
kamariya keyur
 

What's hot (20)

DEFECTS IN CONCRETE
DEFECTS IN CONCRETE DEFECTS IN CONCRETE
DEFECTS IN CONCRETE
 
4.corrosion of reinforcement in concrete
4.corrosion of reinforcement in concrete4.corrosion of reinforcement in concrete
4.corrosion of reinforcement in concrete
 
Types of concrete
Types of concreteTypes of concrete
Types of concrete
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
 
Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...Strength and durability of concrete - Repair and rehabilitation of structures...
Strength and durability of concrete - Repair and rehabilitation of structures...
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
 
Light Transmitting concrete
Light Transmitting concreteLight Transmitting concrete
Light Transmitting concrete
 
Non destructive test
Non destructive test   Non destructive test
Non destructive test
 
Corrosion Assessment – Half-Cell Potential Method for reinforced concrete
Corrosion Assessment – Half-Cell Potential Method for reinforced concreteCorrosion Assessment – Half-Cell Potential Method for reinforced concrete
Corrosion Assessment – Half-Cell Potential Method for reinforced concrete
 
TRANSPARENT CONCRETE
TRANSPARENT CONCRETETRANSPARENT CONCRETE
TRANSPARENT CONCRETE
 
Materials for repair: Ferro-cement (part 2) (RR&S)
Materials for repair: Ferro-cement (part 2) (RR&S)Materials for repair: Ferro-cement (part 2) (RR&S)
Materials for repair: Ferro-cement (part 2) (RR&S)
 
Transparent concrete
Transparent concreteTransparent concrete
Transparent concrete
 
fibre reinforced concrete
fibre reinforced concretefibre reinforced concrete
fibre reinforced concrete
 
Ultrasonic pulse velocity test for concrete
Ultrasonic pulse velocity test for concreteUltrasonic pulse velocity test for concrete
Ultrasonic pulse velocity test for concrete
 
Fire damage, evaluation, ndt, and repair of concrete structures
Fire damage, evaluation, ndt, and repair of concrete structuresFire damage, evaluation, ndt, and repair of concrete structures
Fire damage, evaluation, ndt, and repair of concrete structures
 
Glass fiber reinforced concrete
Glass fiber reinforced concreteGlass fiber reinforced concrete
Glass fiber reinforced concrete
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete ppt
 
Light emitting concrete [OR] Translucent concrete
Light emitting concrete [OR] Translucent concreteLight emitting concrete [OR] Translucent concrete
Light emitting concrete [OR] Translucent concrete
 
Perfomance evaluation on light transmitting concrete (translucent concrete)
Perfomance evaluation on light transmitting concrete (translucent concrete)Perfomance evaluation on light transmitting concrete (translucent concrete)
Perfomance evaluation on light transmitting concrete (translucent concrete)
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
 

Similar to FORENSIC STRUCTURAL ENGINEERING.pptx

Construction Forensic
Construction ForensicConstruction Forensic
Construction Forensic
Dr. ABEER KHALID MANSOUR
 
Forensic Engineering
Forensic EngineeringForensic Engineering
Forensic Engineering
Dr. ABEER KHALID MANSOUR
 
Walkie Talkie.pptx
Walkie Talkie.pptxWalkie Talkie.pptx
Walkie Talkie.pptx
Vigneshwarsankar2
 
A case study_of_residential_buildings_subjected_to
A case study_of_residential_buildings_subjected_toA case study_of_residential_buildings_subjected_to
A case study_of_residential_buildings_subjected_to
asmatullah90
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
ashleyyeap
 
1. Civil Engineering and Society_CIVL1100_1 Sept 2016 (1).pdf
1. Civil Engineering and Society_CIVL1100_1 Sept 2016 (1).pdf1. Civil Engineering and Society_CIVL1100_1 Sept 2016 (1).pdf
1. Civil Engineering and Society_CIVL1100_1 Sept 2016 (1).pdf
p2bqnkbj88
 
Connstruction engg ppt 2016
Connstruction engg ppt 2016Connstruction engg ppt 2016
Connstruction engg ppt 2016
Ghulam Mehdi Sahito
 
Example of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complexExample of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complex
Sibilike K. Makhanu
 
Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studies
Yogi Yogesh
 
M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1
Jing Chuang
 
230777001-Repair-and-Rehabilitation-of-Structures.ppt
230777001-Repair-and-Rehabilitation-of-Structures.ppt230777001-Repair-and-Rehabilitation-of-Structures.ppt
230777001-Repair-and-Rehabilitation-of-Structures.ppt
DebendraDevKhanal1
 
Soundness & feasibility of additional floor on existing rc building with ...
Soundness & feasibility of additional floor on existing rc building with ...Soundness & feasibility of additional floor on existing rc building with ...
Soundness & feasibility of additional floor on existing rc building with ...
eSAT Journals
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
Lucas ChinSheng
 
Foundation_HU_Lec_5 Design of Shallow Foundations Lec#1.pptx
Foundation_HU_Lec_5 Design of Shallow Foundations  Lec#1.pptxFoundation_HU_Lec_5 Design of Shallow Foundations  Lec#1.pptx
Foundation_HU_Lec_5 Design of Shallow Foundations Lec#1.pptx
SolomonAlemu28
 
STUDY ON STRUCTURAL COLLAPSE BEHAVIOUR OF REINFORCED CONCRETE BUILDING COLLAP...
STUDY ON STRUCTURAL COLLAPSE BEHAVIOUR OF REINFORCED CONCRETE BUILDING COLLAP...STUDY ON STRUCTURAL COLLAPSE BEHAVIOUR OF REINFORCED CONCRETE BUILDING COLLAP...
STUDY ON STRUCTURAL COLLAPSE BEHAVIOUR OF REINFORCED CONCRETE BUILDING COLLAP...
IRJET Journal
 
Engineering Fundamental 6 August 2020.pptx
Engineering Fundamental 6 August 2020.pptxEngineering Fundamental 6 August 2020.pptx
Engineering Fundamental 6 August 2020.pptx
Jagdishannaya
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
LAKSHITHA RAJAPAKSHA
 
EFFECT OF SEISMIC LOAD ON REINFORCED CONCRETE MULTISTORY BUILDING FROM ECONOM...
EFFECT OF SEISMIC LOAD ON REINFORCED CONCRETE MULTISTORY BUILDING FROM ECONOM...EFFECT OF SEISMIC LOAD ON REINFORCED CONCRETE MULTISTORY BUILDING FROM ECONOM...
EFFECT OF SEISMIC LOAD ON REINFORCED CONCRETE MULTISTORY BUILDING FROM ECONOM...
IAEME Publication
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
Megan Chung
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
Garnette Robert
 

Similar to FORENSIC STRUCTURAL ENGINEERING.pptx (20)

Construction Forensic
Construction ForensicConstruction Forensic
Construction Forensic
 
Forensic Engineering
Forensic EngineeringForensic Engineering
Forensic Engineering
 
Walkie Talkie.pptx
Walkie Talkie.pptxWalkie Talkie.pptx
Walkie Talkie.pptx
 
A case study_of_residential_buildings_subjected_to
A case study_of_residential_buildings_subjected_toA case study_of_residential_buildings_subjected_to
A case study_of_residential_buildings_subjected_to
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
1. Civil Engineering and Society_CIVL1100_1 Sept 2016 (1).pdf
1. Civil Engineering and Society_CIVL1100_1 Sept 2016 (1).pdf1. Civil Engineering and Society_CIVL1100_1 Sept 2016 (1).pdf
1. Civil Engineering and Society_CIVL1100_1 Sept 2016 (1).pdf
 
Connstruction engg ppt 2016
Connstruction engg ppt 2016Connstruction engg ppt 2016
Connstruction engg ppt 2016
 
Example of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complexExample of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complex
 
Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studies
 
M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1
 
230777001-Repair-and-Rehabilitation-of-Structures.ppt
230777001-Repair-and-Rehabilitation-of-Structures.ppt230777001-Repair-and-Rehabilitation-of-Structures.ppt
230777001-Repair-and-Rehabilitation-of-Structures.ppt
 
Soundness & feasibility of additional floor on existing rc building with ...
Soundness & feasibility of additional floor on existing rc building with ...Soundness & feasibility of additional floor on existing rc building with ...
Soundness & feasibility of additional floor on existing rc building with ...
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
Foundation_HU_Lec_5 Design of Shallow Foundations Lec#1.pptx
Foundation_HU_Lec_5 Design of Shallow Foundations  Lec#1.pptxFoundation_HU_Lec_5 Design of Shallow Foundations  Lec#1.pptx
Foundation_HU_Lec_5 Design of Shallow Foundations Lec#1.pptx
 
STUDY ON STRUCTURAL COLLAPSE BEHAVIOUR OF REINFORCED CONCRETE BUILDING COLLAP...
STUDY ON STRUCTURAL COLLAPSE BEHAVIOUR OF REINFORCED CONCRETE BUILDING COLLAP...STUDY ON STRUCTURAL COLLAPSE BEHAVIOUR OF REINFORCED CONCRETE BUILDING COLLAP...
STUDY ON STRUCTURAL COLLAPSE BEHAVIOUR OF REINFORCED CONCRETE BUILDING COLLAP...
 
Engineering Fundamental 6 August 2020.pptx
Engineering Fundamental 6 August 2020.pptxEngineering Fundamental 6 August 2020.pptx
Engineering Fundamental 6 August 2020.pptx
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
EFFECT OF SEISMIC LOAD ON REINFORCED CONCRETE MULTISTORY BUILDING FROM ECONOM...
EFFECT OF SEISMIC LOAD ON REINFORCED CONCRETE MULTISTORY BUILDING FROM ECONOM...EFFECT OF SEISMIC LOAD ON REINFORCED CONCRETE MULTISTORY BUILDING FROM ECONOM...
EFFECT OF SEISMIC LOAD ON REINFORCED CONCRETE MULTISTORY BUILDING FROM ECONOM...
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 

Recently uploaded

AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
OKORIE1
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
IJCNCJournal
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
Kuvempu University
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
PreethaV16
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
GOKULKANNANMMECLECTC
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
UNIT-III- DATA CONVERTERS ANALOG TO DIGITAL CONVERTER
UNIT-III- DATA CONVERTERS ANALOG TO DIGITAL CONVERTERUNIT-III- DATA CONVERTERS ANALOG TO DIGITAL CONVERTER
UNIT-III- DATA CONVERTERS ANALOG TO DIGITAL CONVERTER
vmspraneeth
 

Recently uploaded (20)

AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
UNIT-III- DATA CONVERTERS ANALOG TO DIGITAL CONVERTER
UNIT-III- DATA CONVERTERS ANALOG TO DIGITAL CONVERTERUNIT-III- DATA CONVERTERS ANALOG TO DIGITAL CONVERTER
UNIT-III- DATA CONVERTERS ANALOG TO DIGITAL CONVERTER
 

FORENSIC STRUCTURAL ENGINEERING.pptx

  • 1. FORENSIC STRUCTURAL ENGINEERING PRESENTED BY: RUKSANA BEEGAM E EKC19CE044 GUIDED BY: AJANA P ASSISTANT PROFESSOR EKC TECHNICAL CAMPUS 11/4/2022 Department of Civil Engineering,EKCTC 1/30
  • 2. CONTENT • Introduction • Goals of Forensic Engineering Investigation • Qualification of the Forensic Engineer • Failure of Structures • Causes of Structural Failures • Types of Failures • Initiation of Failure Investigation • General Investigation Process • CASE STUDY: Hyatt Regency Walkway Collapse • Conclusion 11/4/2022 Department of Civil Engineering,EKCTC 2/30
  • 3. INTRODUCTION • Application of the engineering sciences to the investigation of failures or performance problems • Highly specialized field of engineering practice • Requires engineering expertise and knowledge of legal procedures • From an engineering perspective, forensic engineering deals with the investigation and reconstruction of failures 11/4/2022 Department of Civil Engineering,EKCTC 3/30
  • 4. Goals of Structural Failure Investigations • To determine the causes of failure • To compare statements by witnesses or injured parties with physical evidence • To ascertain whether an illegal or improper activity was causative • To assess damage to materials, products or structures and evaluate repair estimate 11/4/2022 Department of Civil Engineering,EKCTC 4/30
  • 5. Qualification of Forensic Engineer • Technical Competency • Knowledge of Legal Procedures • Detective Skills • Effective Oral and Written Communication • High Ethical Standards 11/4/2022 Department of Civil Engineering,EKCTC 5/30
  • 6. Failure of Structures According to Jack Janney (1986), the structural failure can be divided into: 1. Structural Distress: an impairment of the strength or load response of a structure which may limit its use as intended. 2. Structural Failure: the reduction of the capability of a structural system or component to such a degree that it cannot safely serve its intended purpose. 11/4/2022 Department of Civil Engineering,EKCTC 6/30
  • 7. Failure of Structures (contd…) 3. Structural Collapse: Gross movement of major members or a significant portion of a structural system manifested by the creation of rubble from breakage of the members themselves and elements supported by themselves. 11/4/2022 Department of Civil Engineering,EKCTC 7/30
  • 8. Failure of Structures (contd…) • Gerald Leonards (1992) defines “failure” as an unacceptable difference between expected and observed performance. This definition can be used to describe a catastrophic failures as well as minor failures such as roof leaks. • The ASCE Technical Council on Forensic Engineering has adopted the above definition provided by Gerald Leonards. 11/4/2022 Department of Civil Engineering,EKCTC 8/30
  • 9. Causes of Structural Failure Causes of failures fall into five general areas: 1. Design deficiencies 2. Construction deficiencies 3. Material deficiencies 4. Administrative deficiencies 5. Maintenance deficiencies 11/4/2022 Department of Civil Engineering,EKCTC 9/30
  • 10. Initiation of Failure Investigation • Establishing a preliminary objective and scope of work, • Checking on conflicts in interest, • Executing a contract agreement, and • Establishing an investigative plan. 11/4/2022 Department of Civil Engineering,EKCTC 10/30
  • 11. General Investigation Process The steps involved are: 1. Definition of investigation objective 2. Collection of background information and documents 3. Initial site visit 4. Formation of investigation plan and project team 5. Formulation of initial failure hypotheses 11/4/2022 Department of Civil Engineering,EKCTC 11/30
  • 12. General Investigation Process (contd…) 6. Comprehensive document review 7. Site investigation, field testing, and sample collection 8. Structural analysis and laboratory testing 9. Revision of failure hypotheses 10. Final conclusion 11. Report 11/4/2022 Department of Civil Engineering,EKCTC 12/30
  • 13. CASE STUDY: Hyatt Regency Walkway Collapse Background: • The Hyatt Regency Walkway Collapse was the worst structural failure in the history of the United States • 111 people were killed and more than 200 were injured. 11/4/2022 Department of Civil Engineering,EKCTC 13/30
  • 14. Sequence of Events • The Hyatt Regency hotel opened in Kansas City, Missouri, USA in 1980 • It comprised a 40-story tower, an atrium, and a function block, housing all of the hotel’s services • Three walkways suspended from the atrium’s ceiling by six 32-mm-diameter tension rods each spanned the 37-m distance between the tower and the function block 11/4/2022 Department of Civil Engineering,EKCTC 14/30
  • 15. Sequence of Events (contd…) • The 3rd and 4th floor walkways hung from the ceiling • The 2nd floor walkway was suspended from the beams of the 4th floor walkway, directly below the 4th floor walkway • On the July 17, 1981, around 1500-2000 people occupied the atrium floor and the suspended walkways to see a dance competition 11/4/2022 Department of Civil Engineering,EKCTC 15/30
  • 16. Sequence of Events (contd…) • A loud crack echoed throughout the building and connections supporting the ceiling rods that held up the 2nd and 4th floor walkways across the atrium failed. • The 4th floor walkway collapsed onto the 2nd floor walkway and then both walkways collapsed onto the crowded 1st floor atrium. 11/4/2022 Department of Civil Engineering,EKCTC 16/30
  • 17. Failure Hypothesis Initially, the investigators had assumed two possibilities of the collapse as follows: 1. Walkways buckled from “harmonic vibration” set up by people swaying or dancing at the same times. This wave like motion generated violent stress and caused vibration failure of the structure. 2. Collapse due to inadequate design of structure. 11/4/2022 Department of Civil Engineering,EKCTC 17/30
  • 18. Investigation Approach The investigation approach that had been carried out is as follows: 1. Eyewitness and Expert Interviews 2. Site Investigation 3. Connection Design Check and Document Study 4. Laboratory Test 11/4/2022 Department of Civil Engineering,EKCTC 18/30
  • 19. Eyewitness and Expert Interviews • Roger McCarthy, an expert of failure analysis, had stated that there were telltale signs in the skeleton of a structure well before it suffered vibration failure, and in Hyatt Regency walkway collapse, there were no such signs. • Eyewitness accounts gave another point that indicated there was a loud crack echoed while the 2nd and 4th floor walkway crashed to the ground. Hence, according to this, collapse was related to the sudden failure mechanism. 11/4/2022 Department of Civil Engineering,EKCTC 19/30
  • 20. Site Investigation The following photographic evidence was taken by Dr. Lee Lowery, shortly after the collapse: Fig. 1. General view of the lobby floor, during the 1st day of investigation (wikipedia) 11/4/2022 Department of Civil Engineering,EKCTC 20/30
  • 21. Walkway sections still remained as a piece-form (wikipedia) Photo of intact hanger rods from 4th floor walkway opening (wikipedia) Site Investigation (contd...) Fig. 2. Fig. 3. 11/4/2022 Department of Civil Engineering,EKCTC 21/30
  • 22. Photo of still hanging 3rd floor walkway (wikipedia) Fig. 5. Photo of Deformed 4th floor beam (wikipedia) Site Investigation (contd...) Fig. 4. 11/4/2022 Department of Civil Engineering,EKCTC 22/30
  • 23. Site Investigation (contd…) • From the photographic evidence it was observed that there were no failure signs on the walkway section, indicating that the collapse was not caused by inadequate design of the section of the walkway. • The photograph had provided significant proof to show that the walkway collapse was most likely caused by connection failure. 11/4/2022 Department of Civil Engineering,EKCTC 23/30
  • 24. Connection Design Check and Document Study The National Bureau of Standards (NBS) found that the details of the connection of the walkway beam to the suspender was not constructed as drawn but was changed by the contractor for constructability reason. 11/4/2022 Department of Civil Engineering,EKCTC 24/30
  • 25. Laboratory Test Type of Connection Capacity(kN) Original design 90 As-built 45 Table 1. Loading test result of connections 11/4/2022 Department of Civil Engineering,EKCTC 25/30
  • 26. Laboratory Test (contd…) Analysis of these two connection details revealed the following: • The original design of the rod hanger connection would have supported 90 kN, only 60% of the 151 kN required by the Kansas City building code. This showed that the design of the connection was inadequate. • As-built, however, the connection only supported 30% of the minimum load which explains why the walkways collapsed well below maximum load. 11/4/2022 Department of Civil Engineering,EKCTC 26/30
  • 27. Investigation Results The National Bureau of Standards (NBS) discovered that the cause of this collapse was quite simple: the rod hanger pulled through the box beam causing the connection supporting the 4th floor walkway to fail. 11/4/2022 Department of Civil Engineering,EKCTC 27/30
  • 28. Conclusion of Case Study Case study Structure Problem Main Finding Hyatt Regency Walkway collapse Reinforcement concrete suspended walkway, with steel to steel connection. Walkway suddenly collapsed Collapse due to fracture of the brittle connection. This fracture of connection was caused because the contractors did not follow the design drawing. Table 2. Conclusion of Case Study 11/4/2022 Department of Civil Engineering,EKCTC 28/30
  • 29. References • Azizipour.M, Dalpasand.M, et al (2021) “Forensic Engineering Analysis applied to flood control” – Vol. 594, ScienceDirect • Balkaya.C, Etemadi.A (2020) “Collapsed RC-building failure mechanisms with a Forensic Engineering Approach” – Vol. 34 Issue 5, ASCE • Chou.J.S, Truong.D.N (2022) “Multiobjective forensic based investigation algorithm for solving structural design problems” – Vol. 134, ScienceDirect • Robert T. Ratay (2000) “Forensic Structural Engineering Handbook” 11/4/2022 Department of Civil Engineering,EKCTC 29/30
  • 30. THANK YOU 11/4/2022 Department of Civil Engineering,EKCTC 30/30