The document provides an evaluation of each stage of a graphic design Final Major Project (FMP). Some key points:
- The production stage went the best, with rotoscoped designs and retro designs turning out well aesthetically. However, the initial research stage was challenging.
- Strengths included thorough inspiration research, effective audience profiling using Instagram data, and mastering techniques through experimentation.
- Weaknesses included unrealistic initial planning, vague survey questions that lacked useful data, and not further exploring techniques or integrating influences.
- With more time, the author would have done additional testing, incorporated other Formula 1 elements into rotoscopes, added retro details, and developed pages like the Leclerc