SlideShare a Scribd company logo
QUALIFICATION AND
VALIDATION
Nahri Musyrif S.Farm., Apt.
Quality Sr. Engineer
of Alcon – A Novartis Company
Reference
• ISPE Vol. 5, Commissioning and Qualification for New
and Renovated Facility.
• ISPE GAMP 5, A Risk-Based Approach to Compliant GxP
Computerized System.
• EU Guidelines for GMP for Medical Product for Human
and Veterinary Use – Annex 15 Qualification and
Validation
Definition,
• Qualification, Action of proving and documenting that equipment or
ancillary systems are properly installed, work correctly, and actually lead
to the expected results. Qualification is part of validation, but the
individual qualification steps alone do not constitute process validation.
• Validation, A documented program that provides a high degree of
assurance that a specific process, method, or system will consistently
produce a result meeting pre-determined acceptance criteria.
• Commissioning, the process of assuring that all systems and
components of a building or industrial plant are designed, installed,
tested, operated, and maintained according to the operational
requirements.
• Calibration, The demonstration that a particular instrument or device
produces results within specified limits by comparison with those
produced by a reference or traceable standard over an appropriate
range of measurements.
• Computer System, A group of hardware components and associated
software, designed and assembled to perform a specific function or
group of functions.
• Computerized System, A process or operation integrated with a
computer system.
Definition (continue),
Mix and Match?
Commissioning
Building
Utility
System
Qualification
Utility
Equipment/System
Instrumentation
Validation
Manufacturing
Process
Cleaning Process
Analytical Process
Aseptic Process
Computerized
System
Calibration
Instrument
Measured Device
Equipment – Computer System
Integrated Control System
e.g. PLC, Single Board Computer,
PC, which control a single system or
piece of equipment
Stand-alone System
e.g. Distributed Control System (DCS), Building
Management System (BMS), System Control and Data
Acquisition (SCADA), which link or control multiple
system and equipment
Equipment – Computer System
Integrated Control System
e.g. PLC, Single Board Computer,
PC, which control a single system or
piece of equipment
Stand-alone System
e.g. Distributed Control System (DCS), Building
Management System (BMS), System Control and Data
Acquisition (SCADA), which link or control multiple
system and equipment
Typically qualified with “Qualification”
approach
Typically qualified with “Validation”
approach
Equipment – Computer System
Software Category - GAMP 5 approach
Software
1. Infrastructure
Software
Layered software
Software used to manage
operating environment
3. Non-Configured
Software
Run-time parameters may
be entered and stored
Software cannot be configured
to suit business process
4. Configured
Software
Software that can be configured
by user to meet the specific needs
of business process
Software code is not
altered
5. Customized
Software
Software custom designed
and coded to suit the
business process
You can refer to ISPE GAMP 5, Appendix D5 [page 209 – 212] for the testing
applied to different categories of systems
Commissioning & Qualification
Commissioning & Qualification
System Impact Assessment (SIA) for System Classification
• The purpose of SIA is to focusing the qualification activity to the
system/equipment that impacted to product quality.
• Not all the system/equipment on Site needs to be qualified.
System Impact Assessment (SIA)
Component Impact Assessment (CIA)
Critical component is part of QA change control.
Installation and operation of the critical component should be verified in System
Qualification.
Critical Component also subjected to preventive maintenance and calibration
activity.
System Classification to Qualification Activity
Direct Impact System to Qualification Activity
Customized System
Direct Impact System to Qualification Activity
Off the Shelf (OTS) System
Equipment
Qualification
(EQ)
Indirect Impact System to Qualification Activity
Indirect Impact System to Qualification Activity
Refer to EU Guidelines Vol.4 Annex.15 – Qualification and Validation
1.4 The key elements of the site qualification and validation program should be
clearly defined and documented in a validation master plan (VMP) or equivalent
document
Validation Master Plan is a high level document which establishes the qualification
and validation policy to satisfy the regulatory authorities. The outline should, not
limited to:
1. Qualification and Validation Strategy
2. Organization structure, role, and responsibility for qualification and validation
activity
3. Summary of facility, equipment, system, and process on Site including the validity
status
4. Change control and deviation management during qualification and validation
activity
VMP should be review periodically, to ensure all qualification and validation activity
during a certain periods is included.
Validation Master Plan
Validation Plan
Question:
Why we need to prepare Validation Plan if the qualification and validation strategy
was determined in Validation Master Plan?
For the large and/or complex project, separate validation plan may required to
enhance clarity for the strategy and project time line.
Validation plan may also required to the project that have a more than 1 equipment
or integrated system to be qualified or sequence the qualification and validation
Risk Assessment in Qualification and Validation
Why and where the Risk Assessment are placed in Qualification?
Risk Assessment in Qualification and Validation
GMP Requirement
Quality Risk Assessment Approach
is applied
EU GMP Guideline Vol.4
Annex 15
FDA ICH Q9 Quality
Management System
Process (FMEA)
Safety (HAZOP)
DQ is :
“The documented verification that the proposed design of the facilities, systems and
equipment is suitable for the intended purpose.”
Purpose of Design Qualification
To ensure the compliance of the facility/system/equipment design with GMP
Requirement, demonstrated and documented.
How to perform Design Qualification?
Requirement (EU Guideline Annex 15) :
“The requirements of the user requirements specification should be verified during
the design qualification.”
Design Qualification (DQ)
IQ is :
“The documented verification that the facilities, systems and equipment, as installed or
modified, comply with the approved design and the manufacturer's
recommendations.”
What items to be verified in IQ?
Not limited to:
Installation Qualification (IQ)
“Installed”
Installation
Requirement
Space Layout Drawing
Environment
Requirement
Critical
Components
Drawing
P&ID (as-built)
E&ID (as-built)
Material List
Certificate of
Calibration
Required Utilities
Control System
Installation
Hardware
Software
OQ is :
“The documented verification that the facilities, systems and equipment, as installed or
modified, perform as intended throughout the anticipated operating ranges.”
What the items to be verified?
Not limited to:
Installation Qualification (IQ)
“Operated”
Procedure
Sequence
Operation
Control Function
Security
System Access
Audit Trail
HMI Configuration
Back-up and
RestoreInput Output
Check (I/O)
Interlock and
Alarm
Power Loss and
Recovery
Operating Range
Critical Component
Set Point
Recipe Result Verification
PQ is :
“The documented verification that systems and equipment can perform effectively and
reproducibly based on the approved process method and product specification.”
What items to be verified?
It’s depend on the product specification.
The product means the product from the process/method of the system/equipment, and
it should be verifiable (can be measured). It’s not the manufacturer product.
How we link of URS and PQ?
The product specification should be described in the URS.
Performance Qualification (PQ)
System / Equipment
• Qualified IQ and OQ
Process Method
• Normal Operating
Condition
• In Operating Range
• Worst Case Batch Size
(rational)
Product Specification
• Sampling Plan (rational)
Gauge Repeatability and Reproducibility (R&R)
Gauge R&R is a statistical tools to investigates:
• Repeatability: How much variability in the measurement system is caused by the
measurement device.
• Reproducibility: How much variability in the measurement system is caused by
differences between operators.
Gauge R&R in scheme:
Gauge R&R is a study to identify the variable in the measurement system.
Gauge R&R cannot be considered as Performance Qualification.
Gauge R&R
Measurement
Device
Qualified
Calibrated
Method / Process
Validated
Operator
Qualification Review and Requalification
Qualification state of utilities, system, equipment, and the process should be maintained
through out the operation lifecycle, include for any change of the system.
Qualification State
Re-test
Specific system is required to be
tested in periodic of time
related to performance
Example: Autoclave
Sterilization, Cleanroom
performance
Review
For the system that have
routine monitoring activity
e.g. environment monitoring
review, calibration, routine
verification.
Review result can lead the
further action on re-test or
re-qualification
Re-qualification
Any changes on requirement, design, critical
component, utilities supplied that potentially
impact to system performance

More Related Content

What's hot

What's hot (20)

Validation Protocol
Validation ProtocolValidation Protocol
Validation Protocol
 
A Lifecycle Approach to Process Validation
A Lifecycle Approach to Process ValidationA Lifecycle Approach to Process Validation
A Lifecycle Approach to Process Validation
 
Overview on “Computer System Validation” CSV
Overview on  “Computer System Validation” CSVOverview on  “Computer System Validation” CSV
Overview on “Computer System Validation” CSV
 
Auditing in pharmacutical industries
Auditing in pharmacutical industriesAuditing in pharmacutical industries
Auditing in pharmacutical industries
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management System
 
New WHO Guidance on CS Validation
New WHO Guidance on CS ValidationNew WHO Guidance on CS Validation
New WHO Guidance on CS Validation
 
Audits in pharma industries
Audits in pharma industriesAudits in pharma industries
Audits in pharma industries
 
Gamp 5 overview by jaya prakash ra
Gamp 5 overview by jaya prakash raGamp 5 overview by jaya prakash ra
Gamp 5 overview by jaya prakash ra
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
 
Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics
 
Equipment Qualification.pptx
Equipment Qualification.pptxEquipment Qualification.pptx
Equipment Qualification.pptx
 
Pharmaceutical Quality System
Pharmaceutical Quality SystemPharmaceutical Quality System
Pharmaceutical Quality System
 
Change management system
Change management systemChange management system
Change management system
 
PROCESS VALIDATION
PROCESS VALIDATIONPROCESS VALIDATION
PROCESS VALIDATION
 
Gamp5 new
Gamp5 newGamp5 new
Gamp5 new
 
CSV - Computer System Validation
CSV - Computer System Validation CSV - Computer System Validation
CSV - Computer System Validation
 
Process Validation Guidances FDA and Global
Process Validation Guidances FDA and GlobalProcess Validation Guidances FDA and Global
Process Validation Guidances FDA and Global
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 

Similar to Equipment qualification of medical device

validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdf
abdo badr
 
Process Validation of API
Process Validation of APIProcess Validation of API
Process Validation of API
srirao3462
 

Similar to Equipment qualification of medical device (20)

Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdf
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
Qualification for validation
Qualification for validationQualification for validation
Qualification for validation
 
Process validation ppt.
Process validation ppt.Process validation ppt.
Process validation ppt.
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom Qualification
 
Pharmaceutical Validation.pdf
Pharmaceutical Validation.pdfPharmaceutical Validation.pdf
Pharmaceutical Validation.pdf
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
Process Validation of API
Process Validation of APIProcess Validation of API
Process Validation of API
 
validationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdfvalidationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdf
 
Validation (1).pptx
Validation (1).pptxValidation (1).pptx
Validation (1).pptx
 
Basic concept of process validation
Basic concept of process validation Basic concept of process validation
Basic concept of process validation
 
Qualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptxQualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptx
 
Risk assessment for computer system validation
Risk assessment for computer system validationRisk assessment for computer system validation
Risk assessment for computer system validation
 
Validation qualification
Validation qualificationValidation qualification
Validation qualification
 
Jatin validation
Jatin validationJatin validation
Jatin validation
 
Validation
ValidationValidation
Validation
 
Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation'
 
Validation
ValidationValidation
Validation
 
Validation : Project Management
Validation : Project ManagementValidation : Project Management
Validation : Project Management
 

Recently uploaded

RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 

Recently uploaded (20)

Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 

Equipment qualification of medical device

  • 1. QUALIFICATION AND VALIDATION Nahri Musyrif S.Farm., Apt. Quality Sr. Engineer of Alcon – A Novartis Company
  • 2. Reference • ISPE Vol. 5, Commissioning and Qualification for New and Renovated Facility. • ISPE GAMP 5, A Risk-Based Approach to Compliant GxP Computerized System. • EU Guidelines for GMP for Medical Product for Human and Veterinary Use – Annex 15 Qualification and Validation
  • 3. Definition, • Qualification, Action of proving and documenting that equipment or ancillary systems are properly installed, work correctly, and actually lead to the expected results. Qualification is part of validation, but the individual qualification steps alone do not constitute process validation. • Validation, A documented program that provides a high degree of assurance that a specific process, method, or system will consistently produce a result meeting pre-determined acceptance criteria. • Commissioning, the process of assuring that all systems and components of a building or industrial plant are designed, installed, tested, operated, and maintained according to the operational requirements. • Calibration, The demonstration that a particular instrument or device produces results within specified limits by comparison with those produced by a reference or traceable standard over an appropriate range of measurements.
  • 4. • Computer System, A group of hardware components and associated software, designed and assembled to perform a specific function or group of functions. • Computerized System, A process or operation integrated with a computer system. Definition (continue),
  • 5. Mix and Match? Commissioning Building Utility System Qualification Utility Equipment/System Instrumentation Validation Manufacturing Process Cleaning Process Analytical Process Aseptic Process Computerized System Calibration Instrument Measured Device
  • 6. Equipment – Computer System Integrated Control System e.g. PLC, Single Board Computer, PC, which control a single system or piece of equipment Stand-alone System e.g. Distributed Control System (DCS), Building Management System (BMS), System Control and Data Acquisition (SCADA), which link or control multiple system and equipment
  • 7. Equipment – Computer System Integrated Control System e.g. PLC, Single Board Computer, PC, which control a single system or piece of equipment Stand-alone System e.g. Distributed Control System (DCS), Building Management System (BMS), System Control and Data Acquisition (SCADA), which link or control multiple system and equipment Typically qualified with “Qualification” approach Typically qualified with “Validation” approach
  • 9. Software Category - GAMP 5 approach Software 1. Infrastructure Software Layered software Software used to manage operating environment 3. Non-Configured Software Run-time parameters may be entered and stored Software cannot be configured to suit business process 4. Configured Software Software that can be configured by user to meet the specific needs of business process Software code is not altered 5. Customized Software Software custom designed and coded to suit the business process You can refer to ISPE GAMP 5, Appendix D5 [page 209 – 212] for the testing applied to different categories of systems
  • 12. System Impact Assessment (SIA) for System Classification • The purpose of SIA is to focusing the qualification activity to the system/equipment that impacted to product quality. • Not all the system/equipment on Site needs to be qualified.
  • 14. Component Impact Assessment (CIA) Critical component is part of QA change control. Installation and operation of the critical component should be verified in System Qualification. Critical Component also subjected to preventive maintenance and calibration activity.
  • 15. System Classification to Qualification Activity
  • 16. Direct Impact System to Qualification Activity Customized System
  • 17. Direct Impact System to Qualification Activity Off the Shelf (OTS) System Equipment Qualification (EQ)
  • 18. Indirect Impact System to Qualification Activity
  • 19. Indirect Impact System to Qualification Activity
  • 20. Refer to EU Guidelines Vol.4 Annex.15 – Qualification and Validation 1.4 The key elements of the site qualification and validation program should be clearly defined and documented in a validation master plan (VMP) or equivalent document Validation Master Plan is a high level document which establishes the qualification and validation policy to satisfy the regulatory authorities. The outline should, not limited to: 1. Qualification and Validation Strategy 2. Organization structure, role, and responsibility for qualification and validation activity 3. Summary of facility, equipment, system, and process on Site including the validity status 4. Change control and deviation management during qualification and validation activity VMP should be review periodically, to ensure all qualification and validation activity during a certain periods is included. Validation Master Plan
  • 21. Validation Plan Question: Why we need to prepare Validation Plan if the qualification and validation strategy was determined in Validation Master Plan? For the large and/or complex project, separate validation plan may required to enhance clarity for the strategy and project time line. Validation plan may also required to the project that have a more than 1 equipment or integrated system to be qualified or sequence the qualification and validation
  • 22. Risk Assessment in Qualification and Validation Why and where the Risk Assessment are placed in Qualification?
  • 23. Risk Assessment in Qualification and Validation GMP Requirement Quality Risk Assessment Approach is applied EU GMP Guideline Vol.4 Annex 15 FDA ICH Q9 Quality Management System Process (FMEA) Safety (HAZOP)
  • 24. DQ is : “The documented verification that the proposed design of the facilities, systems and equipment is suitable for the intended purpose.” Purpose of Design Qualification To ensure the compliance of the facility/system/equipment design with GMP Requirement, demonstrated and documented. How to perform Design Qualification? Requirement (EU Guideline Annex 15) : “The requirements of the user requirements specification should be verified during the design qualification.” Design Qualification (DQ)
  • 25. IQ is : “The documented verification that the facilities, systems and equipment, as installed or modified, comply with the approved design and the manufacturer's recommendations.” What items to be verified in IQ? Not limited to: Installation Qualification (IQ) “Installed” Installation Requirement Space Layout Drawing Environment Requirement Critical Components Drawing P&ID (as-built) E&ID (as-built) Material List Certificate of Calibration Required Utilities Control System Installation Hardware Software
  • 26. OQ is : “The documented verification that the facilities, systems and equipment, as installed or modified, perform as intended throughout the anticipated operating ranges.” What the items to be verified? Not limited to: Installation Qualification (IQ) “Operated” Procedure Sequence Operation Control Function Security System Access Audit Trail HMI Configuration Back-up and RestoreInput Output Check (I/O) Interlock and Alarm Power Loss and Recovery Operating Range Critical Component Set Point Recipe Result Verification
  • 27. PQ is : “The documented verification that systems and equipment can perform effectively and reproducibly based on the approved process method and product specification.” What items to be verified? It’s depend on the product specification. The product means the product from the process/method of the system/equipment, and it should be verifiable (can be measured). It’s not the manufacturer product. How we link of URS and PQ? The product specification should be described in the URS. Performance Qualification (PQ) System / Equipment • Qualified IQ and OQ Process Method • Normal Operating Condition • In Operating Range • Worst Case Batch Size (rational) Product Specification • Sampling Plan (rational)
  • 28. Gauge Repeatability and Reproducibility (R&R) Gauge R&R is a statistical tools to investigates: • Repeatability: How much variability in the measurement system is caused by the measurement device. • Reproducibility: How much variability in the measurement system is caused by differences between operators. Gauge R&R in scheme: Gauge R&R is a study to identify the variable in the measurement system. Gauge R&R cannot be considered as Performance Qualification. Gauge R&R Measurement Device Qualified Calibrated Method / Process Validated Operator
  • 29. Qualification Review and Requalification Qualification state of utilities, system, equipment, and the process should be maintained through out the operation lifecycle, include for any change of the system. Qualification State Re-test Specific system is required to be tested in periodic of time related to performance Example: Autoclave Sterilization, Cleanroom performance Review For the system that have routine monitoring activity e.g. environment monitoring review, calibration, routine verification. Review result can lead the further action on re-test or re-qualification Re-qualification Any changes on requirement, design, critical component, utilities supplied that potentially impact to system performance