What Is Embedded System?
 An embedded system is a computer system with a dedicated
function within a larger mechanical or electrical system, often with
real-time computing constraints. It is embedded as part of a
complete device often including hardware and mechanical parts. An
embedded system is designed to run on its own without human
intervention, and may be required to respond to events in real-time.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 AC PWM based Power Control by IGBT / MOSFET.
 ACPWM Control for Induction Motor.
 Ambulance Flashing Light with Beeper.
 Android Application Controlled Remote Robot Operation.
 Android based Remotely Programmable Sequential Load Operation.
 Android Based Smart Phone Used for Induction Motor Control.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Android Phone Speech Recognition Sensed Voice Command based Notice
Board Display.
 Any Type of Liquid Level Controller using Ultrasonic Transducer.
 APFC (Automatic Power Factor Compensation) for Industrial Power Use to
Minimize Penalty.
 Arduino based DC Motor Speed Control.
 Arduino Based Line Following Robot.
 Arduino based RFID Sensed Device Access.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Arduino Managed High Sensitive LDR based Power Saver for Street Light
Control System.
 ATmega based Garage Door Opening.
 Authorized Access with User Defined Password.
 Auto Dialing on Detecting Burglary using I2C Protocol.
 Auto Intensity Control of Street Lights.
 Auto Intensity Control of Street Lights using PIC Microcontroller.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Auto Metro Train to Shuttle between Stations.
 Auto Power Supply Control from 4 Different Sources using PIC Microcontroller:
Solar, Mains, Generator.
 Auto Power Supply Control from 4 Different Sources: Solar, Mains, Generator
&Inverter to ensure No Break Power.
 Auto Selection of Optimum Power from 4 Different Sources-Solar, Mains,
Generator & Inverter to ensure no Break Power.
 Automated Irrigation System using a Wireless Sensor Network and GPRS
Module.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Automatic Bell System for Institutions.
 Automatic Dialing to any Telephone Using I2C Protocol on Detecting Burglary.
 Automatic Irrigation System on Sensing Soil Moisture Content.
 Automatic Irrigation System on Sensing Soil Moisture using PIC Microcontroller.
 Automatic Surveillance Camera Panning System from PC.
 Automatic Wireless Health Monitoring System in Hospitals for Patients.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Aviation Obstruction Flashing Indicator.
 Battery Charging by Thyristor Triggering Control.
 Beacon Flasher using Microcontroller.
 Bidirectional Rotation of an Induction Motor with a Remote Control Device.
 Bidirectional Rotation of Single Phase Induction Motor without Run Capacitor.
 BLDC Motor Speed Control with RPM Display.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Brushless DC Motor (BLDC)/PMDC Speed Control by PWM with RPM Display.
 Car Parking Management by RFID.
 Cell Phone based DTMF Controlled Garage Door Opening System.
 Cell Phone Controlled Home Appliance Switching by PIC microcontroller.
 Cell Phone Controlled Robotic Vehicle.
 Celsius Scale Thermometer using Microcontroller.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Closed Loop Control for a Brushless DC Motor to Run at the Exactly Entered
Speed.
 Contactless Liquid Level Controller.
 Contactless Tachometer.
 Controlling AC Power by Programming.
 Conveyor Belt Object Counting with IR Sensing & Display.
 Cordless Mouse Features by TV Remote Using PIC Microcontroller
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Cyclo Converter using Thyristors.
 DC Motor with PWM Speed Control in All Four Quadrants using Microcontroller.
 Density Based Auto Traffic Signal Control with Android Based Remote Override.
 Density Based Traffic Signal System.
 Density based Traffic Signal System using PIC Microcontroller.
 Density Based Traffic Signal with Remote Override in Emergency.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Detecting Power Grid Synchronization Failure on Sensing Frequency
or Voltage Beyond Acceptable Range.
 Detecting Power Theft prior to feeding energy Meter and Intimating
to Control Room by GSM.
 Detecting Speed Limit Violation on Highways.
 Dialed Telephone Number LED Based Display System.
 Discotheque Light Stroboscopic Flasher.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Dish Positioning Control by IR Remote.
 Display of Dialed Telephone Numbers on Seven Segment Display.
 Display of Underground Cable Fault Distance over Internet.
 Distance Measurement by Ultrasonic Sensor.
 Down Counter for Industrial Load Operation.
 DTMF based Load Control System.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Dual Converter using Thyristors.
 EEPROM based Preset Speed Control of BLDC Motor.
 Electric Line Man Safety with Password Based Circuit Breaker.
 Electrical Load Control from PC Terminal.
 Embedded Password Based Access Control System using I2C Protocol.
 Energy Meter Billing with Load Control over GSM with User
Programmable Number Features.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Energy Meter Billing with Load Control over GSM with User Programmable
Number Features by PIC.
 Energy Meter Reading over Internet.
 Enhancing Projection Lamp Life by ZVS (Zero Voltage Switching).
 Ensuring Secrecy in Parallel Connected Telephone Instruments.
 Entry Exit Counter cum Electrical Load Management.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 EVM-Electronic Voting Machine.
 EVM-Electronic Voting Machine using PIC Microcontroller.
 Exhaust Fan for Bidirectional Motion with Remote Control.
 FACTS (Flexible AC Transmission) by TSR.
 FACTS By SVC (Flexible AC Transmission).
 Fan Speed Control by TV Remote.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Farmer Friendly Solar Based Electric Fence for Deterring Cattles.
 Fire Fighting Robot Remotely Operated by Android Applications.
 Fire Fighting Robotic Vehicle.
 Flash Flood Intimation over GSM with User Programmable Number
Features to The Station Master.
 Four Quadrant DC Motor Speed Control with Microcontroller.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Four Quadrant Operation of DC Motor Remotely Controlled by Android
Application.
 Garage Door Lifting System by Cell Phone.
 Grid Synchronization Fail Detection on Sensing Frequency or Voltage Beyond
Range.
 GSM based Electricity Energy Meter Billing with Onsite Display.
 GSM based Monthly Electricity Energy Meter Billing and SMS upon GSM with
User Programmable Number Features.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 GSM Based Remote Monitoring of 8 Parameters of Transformer.
 Home Appliances Control by TV Remote.
 Home Automation by Android Application based Remote Control.
 Home automation under Wi-Fi through Android apps from any smart phone.
 Human Body Temperature Sensed Automatic Door Opening System.
 IGBT based Soft Start for Induction Motor.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Implementation of Solar Inverter for Home, Garden, Street Light
Applications.
 Induction Motor Speed Control by Thyristor.
 Industrial Battery Charger by Thyristor Firing Angle Control.
 Industrial Power Control by Integral Cycle Switching without Generating
Harmonics.
 Industrial Power Control by Integral Cycle Switching without Generating
Harmonics using PIC Microcontroller
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Industrial Temperature Controller.
 Instant Electrical Load Survey for Industries/Home.
 Integral Cycle Switching (Cycle Stealing) means of Power Control without
Generating Harmonics.
 Integrated Energy Management System based on GSM with User
Programmable Number Features and acknowledge features.
 Intelligent Traffic Management by Synchronized Signalling.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Intensity Controlled Energy Saving LED Street Lights.
 IR Controlled Robotic Vehicle.
 IR Obstacle Detection to Actuate Load.
 Lamp Life Extender by ZVS (Zero Voltage Switching).
 LDR Based Power Saver for Intensity Controlled Street Light.
 LED Lamp Dimmer Circuit.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Life Cycle Testing of Electrical Loads by Down Counter.
 Line following Robotic Vehicle using Microcontroller.
 Measuring Solar Photovoltaic Power.
 Medication Reminder using PIC Microcontroller.
 Metal Detector Robotic Vehicle.
 Metal Detector Robotic Vehicle Operated by Android Application.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Minimizing Penalty in Industrial Power Consumption by Engaging APFC Unit.
 Mouse Function Achieved by a TV Remote for Cordless Operation.
 Movement Sensed Automatic Door Opening System.
 Multiple Microcontrollers in LAN like Setup.
 Networking of Multiple Microcontrollers.
 Networking of Multiple Street Junction Signals for Better Traffic Management.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Non-Contact Tachometer.
 Object Counter with 7 Segment Display.
 Object Detection by Ultrasonic Means.
 Obstacle Avoidance Robotic Vehicle.
 Obstacle Sensed Switching in Industrial Applications.
 Optimum Energy Management System.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Pair of SCR Bridge based High Power Dual Converter
 Parallel Telephone Lines with Security System
 Parking Availability Indication System
 Password Based Circuit Breaker
 Password based Remote Controlled Door Opening by Android Application
 Path Tracking Robotic Vehicle by Programmed Microcontroller
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Patient health monitoring system with location details by GPS over GSM.
 Patient Medication Reminder.
 PC Based Electrical Load Control.
 PC Controlled Scrolling Message Display for Notice Board.
 PC Controlled Surveillance Camera.
 PC Mouse operated Electrical Load Control Using VB Application.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Phone Controlled Load Management System.
 PI Control for Brushless DC Motor Running at Entered Speed.
 PIC Controlled Dynamic Time Based City Traffic Signal.
 Pick N Place Robotic Arm and Movement Controlled by Android Wirelessly.
 Pick N Place with Soft Catching Gripper.
 Portable Programmable Medication Reminder.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Portable Programmable Medication Reminder using PIC Microcontroller.
 Power Saver for Industries & Commercial Establishments.
 Pre Stampede Monitoring and Alarm System.
 Pre Stampede Monitoring and Alarm System using PIC Microcontroller.
 Precise Detection of Distance in Underground Cable Fault.
 Precise Digital Temperature Control.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Precise Illumination Control of Lamp.
 Precise Weight Measurement using ADC.
 Predefined Speed Control of BLDC Motor.
 Prepaid Energy Meter with GSM Interface.
 Program based Accurate Intensity Control Lamp.
 Programmable AC Power.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Programmable Decoration Light.
 Programmable Digital Temperature Controller.
 Programmable Energy Meter for Electrical Load Survey.
 Programmable Load Shedding Time Management for Utility Department.
 Programmable School / College Bell Ringing System.
 Programmable Switching Control for Industrial Automation in Repetitive
Nature of Work
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Propeller Display of Message by Virtual LEDs.
 Pub Used Disco Lights with Power LEDs for Stroboscopic Effect.
 PWM based Speed Control for DC Motor.
 Railway Level Crossing Gate Control through GSM by SMS with User
Programmable Number Features by the Station Master or the Driver.
 Railway Level Crossing Gate Operation Remotely by Android.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Railway Track Security by GSM With User Programmable Number Features.
 Real Time Clock Based LED Street Light Automation Using RTC and I2C Protocol.
 Reducing Electric Bill for Industries & Commercial Establishments.
 Remote AC Power Control by Android Application with LCD Display.
 Remote Alignment of 3D Dish Positioning by Android Application.
 Remote Induction Motor Control by Android Application with 7 Segment Display.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Remote monitoring of patient body temperature over internet.
 Remote monitoring of transformer / generator health over internet.
 Remote Operated Domestic Appliances Control by Android Application.
 Remote Operation Of Dish Antenna Positioning.
 Remote Password Operated Security Control by Android Applications.
 Remote Speed Control of DC Motor by Android Application.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Remotely Controlled Android based Electronic Notice Board.
 RF based Home Automation System.
 RF Controlled Robotic Vehicle with Laser Beam Arrangement.
 RFID based Attendance System.
 RFID Based Device Control and Authentication using PIC Microcontroller.
 RFID based Electronic Passport System for Easy Governance using Arduino.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 RFID based Paid Car Parking.
 RFID based Passport Details.
 RFID Security Access Control System.
 Robotic Vehicle Movement By Cell Phone.
 Robotic Vehicle Operated by a TV Remote.
 SCADA (Supervisory Control And Data Acquisition) for Remote Industrial Plant.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 SCADA (Supervisory Control And Data Acquisition) Using PC and
Embedded System.
 SCR Based Single Phase Cyclo converter.
 Scrolling Message Display by LCD from PC Terminal.
 Secret Code Enabled Secure Communication using RF Technology.
 Security System using Smart Card Technology.
 Security System with User Changeable Password.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Semiconductor Relay with ZVS.
 Sequential Switching System Replacing PLCs.
 Sine Pulse Width Modulation (SPWM).
 Smart Card Based Electronic Passport System.
 Smart Phone Controlled Traffic Signal Override with Density Sensing System.
 Soft Start of Induction Motor by ACPWM.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Soil Moisture Sensed Auto Irrigation System.
 Solar Energy Measurement System.
 Solar Energy Measurement System Conveyed over RF using a PIC
microcontroller.
 Solar Highway Lighting System with Auto Turn Off in Daytime.
 Solar Inverter
 Solar Powered Auto Irrigation System.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Solar Powered Led Street Light with Auto Intensity Control.
 Solar Water Pump Control with Four Different Time Slots for Power Saving
Applications.
 Speed Checker to Detect Rash Driving on Highways.
 Speed Control Unit Designed for a DC Motor.
 Speed Control Unit Designed for a DC Motor using PIC Microcontroller.
 Speed Synchronization of Multiple Motors in Industries.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Speed Synchronization of Multiple Motors In Industries using PIC
Microcontroller.
 Stamp Value Calculator for Postage Needs.
 Street Light that Glows on Detecting Vehicle Movement.
 Sun Tracking Solar Panel.
 Super-Fast Electronic Circuit Breaker.
 SVPWM (Space Vector Pulse Width Modulation).
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Synchronized Traffic Signals.
 Synchronized Traffic Signals at Various Junctions using PIC
Microcontroller.
 Tampered Energy Meter Monitoring Conveyed to Control Room by GSM
with User Programmable Number Features.
 Temperature Control with Digital Sensor.
 The Temperature Humidity Monitoring System of Soil Based on
Wireless Sensor Networks using Arduino
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Theft Intimation of the Vehicle Over GSM by SMS with User Programmable
Number Feature to Owner who can Stop the Engine Remotely.
 Three Phase Solid State Relay with ZVS.
 Thyristor Controlled Power for Induction Motor
 Thyristor Controlled Power for Induction Motor using PIC Microcontroller.
 Thyristor Power Control by IR Remote.
 Time Programed Sun Tracking Solar Panel.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Time Programmable Switch to Control Load.
 Touch Screen based Home Automation System.
 Touch Screen Based Industrial Load Switching.
 Touch Screen based Remote Controlled Robotic Vehicle for Stores
Management.
 Traffic Density Sensed Signal Light System.
 TV Remote Operated Domestic Appliances Control.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Ultra Fast Acting Electronic Circuit Breaker.
 Ultrafast Acting Electronic Circuit Breaker Using PIC Microcontroller.
 Ultrasonic Obstacle Sensed Robotic Vehicle.
 Ultrasonic Sound Reflecting Means of Distance Measurement.
 Underground Cable Fault Distance Conveyed over GSM.
 Underground Cable Fault Distance Locator.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Unique Office Communication System using RF.
 UPFC Related Display of Lag and Lead Power Factor.
 Urban Traffic Signal Based on Density and also with Remote Override.
 Using TV Remote as a Cordless Mouse for the Computer.
 Using TV Remote as a Cordless Mouse for the Computer using PIC
Microcontroller.
 Vehicle Movement Sensed LED Street Light with Idle Time Dimming.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Vehicle Movement Sensed Streetlight with Daytime auto off Features.
 Vehicle Movement Tracked Street Lighting of Highways.
 Vehicle Theft Intimation to the Owner on his Cell Phone by GSM with
User Programmable Number Features using.
 Vehicle Theft Location Intimation by GPS/GSM to the Owner.
 Vehicle tracking by GPS – GSM.
 Virtual Display of Message by Propeller Driven LEDs
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Voice Controlled Home Appliances.
 Voice Controlled Robot by Cell Phone with Android App.
 Voice Controlled Robotic Vehicle with Long Distance Speech Recognition.
 War Field Spying Robot with Night Vision Wireless Camera.
 War Field Spying Robot with Night Vision Wireless Camera by Android
Applications.
 Wireless DC Motor Speed and Direction Control for Robotic Applications.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Wireless Electronic Notice Board by GSM With User Programmable
Number Features.
 Wireless Home Appliance like Fan Speed Control using RF Communication.
 Wireless Power Driven Car or Train.
 Wireless Rash Driving Detection.
http://www.edgefxkits.com/
Embedded Systems
Projects Ideas
 Wireless SCADA.
 XBEE Based Remote Monitoring of 3 Parameters on Transformer /
Generator Health.
 XBEE Based Remote Monitoring of 3 Parameters on Transformer /
Generator Health with Voice Announcement and Wireless PC interference.
 Zigbee based Automatic Meter Reading System.
http://www.edgefxkits.com/

Embedded Systems Projects Ideas

  • 1.
  • 2.
    http://www.edgefxkits.com/ Introduction Embedded Systems Projects Ideas WhatIs Embedded System?  An embedded system is a computer system with a dedicated function within a larger mechanical or electrical system, often with real-time computing constraints. It is embedded as part of a complete device often including hardware and mechanical parts. An embedded system is designed to run on its own without human intervention, and may be required to respond to events in real-time.
  • 3.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas AC PWM based Power Control by IGBT / MOSFET.  ACPWM Control for Induction Motor.  Ambulance Flashing Light with Beeper.  Android Application Controlled Remote Robot Operation.  Android based Remotely Programmable Sequential Load Operation.  Android Based Smart Phone Used for Induction Motor Control.
  • 4.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Android Phone Speech Recognition Sensed Voice Command based Notice Board Display.  Any Type of Liquid Level Controller using Ultrasonic Transducer.  APFC (Automatic Power Factor Compensation) for Industrial Power Use to Minimize Penalty.  Arduino based DC Motor Speed Control.  Arduino Based Line Following Robot.  Arduino based RFID Sensed Device Access.
  • 5.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Arduino Managed High Sensitive LDR based Power Saver for Street Light Control System.  ATmega based Garage Door Opening.  Authorized Access with User Defined Password.  Auto Dialing on Detecting Burglary using I2C Protocol.  Auto Intensity Control of Street Lights.  Auto Intensity Control of Street Lights using PIC Microcontroller.
  • 6.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Auto Metro Train to Shuttle between Stations.  Auto Power Supply Control from 4 Different Sources using PIC Microcontroller: Solar, Mains, Generator.  Auto Power Supply Control from 4 Different Sources: Solar, Mains, Generator &Inverter to ensure No Break Power.  Auto Selection of Optimum Power from 4 Different Sources-Solar, Mains, Generator & Inverter to ensure no Break Power.  Automated Irrigation System using a Wireless Sensor Network and GPRS Module.
  • 7.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Automatic Bell System for Institutions.  Automatic Dialing to any Telephone Using I2C Protocol on Detecting Burglary.  Automatic Irrigation System on Sensing Soil Moisture Content.  Automatic Irrigation System on Sensing Soil Moisture using PIC Microcontroller.  Automatic Surveillance Camera Panning System from PC.  Automatic Wireless Health Monitoring System in Hospitals for Patients.
  • 8.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Aviation Obstruction Flashing Indicator.  Battery Charging by Thyristor Triggering Control.  Beacon Flasher using Microcontroller.  Bidirectional Rotation of an Induction Motor with a Remote Control Device.  Bidirectional Rotation of Single Phase Induction Motor without Run Capacitor.  BLDC Motor Speed Control with RPM Display.
  • 9.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Brushless DC Motor (BLDC)/PMDC Speed Control by PWM with RPM Display.  Car Parking Management by RFID.  Cell Phone based DTMF Controlled Garage Door Opening System.  Cell Phone Controlled Home Appliance Switching by PIC microcontroller.  Cell Phone Controlled Robotic Vehicle.  Celsius Scale Thermometer using Microcontroller.
  • 10.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Closed Loop Control for a Brushless DC Motor to Run at the Exactly Entered Speed.  Contactless Liquid Level Controller.  Contactless Tachometer.  Controlling AC Power by Programming.  Conveyor Belt Object Counting with IR Sensing & Display.  Cordless Mouse Features by TV Remote Using PIC Microcontroller
  • 11.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Cyclo Converter using Thyristors.  DC Motor with PWM Speed Control in All Four Quadrants using Microcontroller.  Density Based Auto Traffic Signal Control with Android Based Remote Override.  Density Based Traffic Signal System.  Density based Traffic Signal System using PIC Microcontroller.  Density Based Traffic Signal with Remote Override in Emergency.
  • 12.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Detecting Power Grid Synchronization Failure on Sensing Frequency or Voltage Beyond Acceptable Range.  Detecting Power Theft prior to feeding energy Meter and Intimating to Control Room by GSM.  Detecting Speed Limit Violation on Highways.  Dialed Telephone Number LED Based Display System.  Discotheque Light Stroboscopic Flasher.
  • 13.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Dish Positioning Control by IR Remote.  Display of Dialed Telephone Numbers on Seven Segment Display.  Display of Underground Cable Fault Distance over Internet.  Distance Measurement by Ultrasonic Sensor.  Down Counter for Industrial Load Operation.  DTMF based Load Control System.
  • 14.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Dual Converter using Thyristors.  EEPROM based Preset Speed Control of BLDC Motor.  Electric Line Man Safety with Password Based Circuit Breaker.  Electrical Load Control from PC Terminal.  Embedded Password Based Access Control System using I2C Protocol.  Energy Meter Billing with Load Control over GSM with User Programmable Number Features.
  • 15.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Energy Meter Billing with Load Control over GSM with User Programmable Number Features by PIC.  Energy Meter Reading over Internet.  Enhancing Projection Lamp Life by ZVS (Zero Voltage Switching).  Ensuring Secrecy in Parallel Connected Telephone Instruments.  Entry Exit Counter cum Electrical Load Management.
  • 16.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas EVM-Electronic Voting Machine.  EVM-Electronic Voting Machine using PIC Microcontroller.  Exhaust Fan for Bidirectional Motion with Remote Control.  FACTS (Flexible AC Transmission) by TSR.  FACTS By SVC (Flexible AC Transmission).  Fan Speed Control by TV Remote.
  • 17.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Farmer Friendly Solar Based Electric Fence for Deterring Cattles.  Fire Fighting Robot Remotely Operated by Android Applications.  Fire Fighting Robotic Vehicle.  Flash Flood Intimation over GSM with User Programmable Number Features to The Station Master.  Four Quadrant DC Motor Speed Control with Microcontroller.
  • 18.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Four Quadrant Operation of DC Motor Remotely Controlled by Android Application.  Garage Door Lifting System by Cell Phone.  Grid Synchronization Fail Detection on Sensing Frequency or Voltage Beyond Range.  GSM based Electricity Energy Meter Billing with Onsite Display.  GSM based Monthly Electricity Energy Meter Billing and SMS upon GSM with User Programmable Number Features.
  • 19.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas GSM Based Remote Monitoring of 8 Parameters of Transformer.  Home Appliances Control by TV Remote.  Home Automation by Android Application based Remote Control.  Home automation under Wi-Fi through Android apps from any smart phone.  Human Body Temperature Sensed Automatic Door Opening System.  IGBT based Soft Start for Induction Motor.
  • 20.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Implementation of Solar Inverter for Home, Garden, Street Light Applications.  Induction Motor Speed Control by Thyristor.  Industrial Battery Charger by Thyristor Firing Angle Control.  Industrial Power Control by Integral Cycle Switching without Generating Harmonics.  Industrial Power Control by Integral Cycle Switching without Generating Harmonics using PIC Microcontroller
  • 21.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Industrial Temperature Controller.  Instant Electrical Load Survey for Industries/Home.  Integral Cycle Switching (Cycle Stealing) means of Power Control without Generating Harmonics.  Integrated Energy Management System based on GSM with User Programmable Number Features and acknowledge features.  Intelligent Traffic Management by Synchronized Signalling.
  • 22.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Intensity Controlled Energy Saving LED Street Lights.  IR Controlled Robotic Vehicle.  IR Obstacle Detection to Actuate Load.  Lamp Life Extender by ZVS (Zero Voltage Switching).  LDR Based Power Saver for Intensity Controlled Street Light.  LED Lamp Dimmer Circuit.
  • 23.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Life Cycle Testing of Electrical Loads by Down Counter.  Line following Robotic Vehicle using Microcontroller.  Measuring Solar Photovoltaic Power.  Medication Reminder using PIC Microcontroller.  Metal Detector Robotic Vehicle.  Metal Detector Robotic Vehicle Operated by Android Application.
  • 24.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Minimizing Penalty in Industrial Power Consumption by Engaging APFC Unit.  Mouse Function Achieved by a TV Remote for Cordless Operation.  Movement Sensed Automatic Door Opening System.  Multiple Microcontrollers in LAN like Setup.  Networking of Multiple Microcontrollers.  Networking of Multiple Street Junction Signals for Better Traffic Management.
  • 25.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Non-Contact Tachometer.  Object Counter with 7 Segment Display.  Object Detection by Ultrasonic Means.  Obstacle Avoidance Robotic Vehicle.  Obstacle Sensed Switching in Industrial Applications.  Optimum Energy Management System.
  • 26.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Pair of SCR Bridge based High Power Dual Converter  Parallel Telephone Lines with Security System  Parking Availability Indication System  Password Based Circuit Breaker  Password based Remote Controlled Door Opening by Android Application  Path Tracking Robotic Vehicle by Programmed Microcontroller
  • 27.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Patient health monitoring system with location details by GPS over GSM.  Patient Medication Reminder.  PC Based Electrical Load Control.  PC Controlled Scrolling Message Display for Notice Board.  PC Controlled Surveillance Camera.  PC Mouse operated Electrical Load Control Using VB Application.
  • 28.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Phone Controlled Load Management System.  PI Control for Brushless DC Motor Running at Entered Speed.  PIC Controlled Dynamic Time Based City Traffic Signal.  Pick N Place Robotic Arm and Movement Controlled by Android Wirelessly.  Pick N Place with Soft Catching Gripper.  Portable Programmable Medication Reminder.
  • 29.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Portable Programmable Medication Reminder using PIC Microcontroller.  Power Saver for Industries & Commercial Establishments.  Pre Stampede Monitoring and Alarm System.  Pre Stampede Monitoring and Alarm System using PIC Microcontroller.  Precise Detection of Distance in Underground Cable Fault.  Precise Digital Temperature Control.
  • 30.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Precise Illumination Control of Lamp.  Precise Weight Measurement using ADC.  Predefined Speed Control of BLDC Motor.  Prepaid Energy Meter with GSM Interface.  Program based Accurate Intensity Control Lamp.  Programmable AC Power.
  • 31.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Programmable Decoration Light.  Programmable Digital Temperature Controller.  Programmable Energy Meter for Electrical Load Survey.  Programmable Load Shedding Time Management for Utility Department.  Programmable School / College Bell Ringing System.  Programmable Switching Control for Industrial Automation in Repetitive Nature of Work
  • 32.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Propeller Display of Message by Virtual LEDs.  Pub Used Disco Lights with Power LEDs for Stroboscopic Effect.  PWM based Speed Control for DC Motor.  Railway Level Crossing Gate Control through GSM by SMS with User Programmable Number Features by the Station Master or the Driver.  Railway Level Crossing Gate Operation Remotely by Android.
  • 33.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Railway Track Security by GSM With User Programmable Number Features.  Real Time Clock Based LED Street Light Automation Using RTC and I2C Protocol.  Reducing Electric Bill for Industries & Commercial Establishments.  Remote AC Power Control by Android Application with LCD Display.  Remote Alignment of 3D Dish Positioning by Android Application.  Remote Induction Motor Control by Android Application with 7 Segment Display.
  • 34.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Remote monitoring of patient body temperature over internet.  Remote monitoring of transformer / generator health over internet.  Remote Operated Domestic Appliances Control by Android Application.  Remote Operation Of Dish Antenna Positioning.  Remote Password Operated Security Control by Android Applications.  Remote Speed Control of DC Motor by Android Application.
  • 35.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Remotely Controlled Android based Electronic Notice Board.  RF based Home Automation System.  RF Controlled Robotic Vehicle with Laser Beam Arrangement.  RFID based Attendance System.  RFID Based Device Control and Authentication using PIC Microcontroller.  RFID based Electronic Passport System for Easy Governance using Arduino.
  • 36.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas RFID based Paid Car Parking.  RFID based Passport Details.  RFID Security Access Control System.  Robotic Vehicle Movement By Cell Phone.  Robotic Vehicle Operated by a TV Remote.  SCADA (Supervisory Control And Data Acquisition) for Remote Industrial Plant.
  • 37.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas SCADA (Supervisory Control And Data Acquisition) Using PC and Embedded System.  SCR Based Single Phase Cyclo converter.  Scrolling Message Display by LCD from PC Terminal.  Secret Code Enabled Secure Communication using RF Technology.  Security System using Smart Card Technology.  Security System with User Changeable Password.
  • 38.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Semiconductor Relay with ZVS.  Sequential Switching System Replacing PLCs.  Sine Pulse Width Modulation (SPWM).  Smart Card Based Electronic Passport System.  Smart Phone Controlled Traffic Signal Override with Density Sensing System.  Soft Start of Induction Motor by ACPWM.
  • 39.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Soil Moisture Sensed Auto Irrigation System.  Solar Energy Measurement System.  Solar Energy Measurement System Conveyed over RF using a PIC microcontroller.  Solar Highway Lighting System with Auto Turn Off in Daytime.  Solar Inverter  Solar Powered Auto Irrigation System.
  • 40.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Solar Powered Led Street Light with Auto Intensity Control.  Solar Water Pump Control with Four Different Time Slots for Power Saving Applications.  Speed Checker to Detect Rash Driving on Highways.  Speed Control Unit Designed for a DC Motor.  Speed Control Unit Designed for a DC Motor using PIC Microcontroller.  Speed Synchronization of Multiple Motors in Industries.
  • 41.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Speed Synchronization of Multiple Motors In Industries using PIC Microcontroller.  Stamp Value Calculator for Postage Needs.  Street Light that Glows on Detecting Vehicle Movement.  Sun Tracking Solar Panel.  Super-Fast Electronic Circuit Breaker.  SVPWM (Space Vector Pulse Width Modulation).
  • 42.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Synchronized Traffic Signals.  Synchronized Traffic Signals at Various Junctions using PIC Microcontroller.  Tampered Energy Meter Monitoring Conveyed to Control Room by GSM with User Programmable Number Features.  Temperature Control with Digital Sensor.  The Temperature Humidity Monitoring System of Soil Based on Wireless Sensor Networks using Arduino
  • 43.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Theft Intimation of the Vehicle Over GSM by SMS with User Programmable Number Feature to Owner who can Stop the Engine Remotely.  Three Phase Solid State Relay with ZVS.  Thyristor Controlled Power for Induction Motor  Thyristor Controlled Power for Induction Motor using PIC Microcontroller.  Thyristor Power Control by IR Remote.  Time Programed Sun Tracking Solar Panel.
  • 44.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Time Programmable Switch to Control Load.  Touch Screen based Home Automation System.  Touch Screen Based Industrial Load Switching.  Touch Screen based Remote Controlled Robotic Vehicle for Stores Management.  Traffic Density Sensed Signal Light System.  TV Remote Operated Domestic Appliances Control.
  • 45.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Ultra Fast Acting Electronic Circuit Breaker.  Ultrafast Acting Electronic Circuit Breaker Using PIC Microcontroller.  Ultrasonic Obstacle Sensed Robotic Vehicle.  Ultrasonic Sound Reflecting Means of Distance Measurement.  Underground Cable Fault Distance Conveyed over GSM.  Underground Cable Fault Distance Locator.
  • 46.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Unique Office Communication System using RF.  UPFC Related Display of Lag and Lead Power Factor.  Urban Traffic Signal Based on Density and also with Remote Override.  Using TV Remote as a Cordless Mouse for the Computer.  Using TV Remote as a Cordless Mouse for the Computer using PIC Microcontroller.  Vehicle Movement Sensed LED Street Light with Idle Time Dimming.
  • 47.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Vehicle Movement Sensed Streetlight with Daytime auto off Features.  Vehicle Movement Tracked Street Lighting of Highways.  Vehicle Theft Intimation to the Owner on his Cell Phone by GSM with User Programmable Number Features using.  Vehicle Theft Location Intimation by GPS/GSM to the Owner.  Vehicle tracking by GPS – GSM.  Virtual Display of Message by Propeller Driven LEDs
  • 48.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Voice Controlled Home Appliances.  Voice Controlled Robot by Cell Phone with Android App.  Voice Controlled Robotic Vehicle with Long Distance Speech Recognition.  War Field Spying Robot with Night Vision Wireless Camera.  War Field Spying Robot with Night Vision Wireless Camera by Android Applications.  Wireless DC Motor Speed and Direction Control for Robotic Applications.
  • 49.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Wireless Electronic Notice Board by GSM With User Programmable Number Features.  Wireless Home Appliance like Fan Speed Control using RF Communication.  Wireless Power Driven Car or Train.  Wireless Rash Driving Detection.
  • 50.
    http://www.edgefxkits.com/ Embedded Systems Projects Ideas Wireless SCADA.  XBEE Based Remote Monitoring of 3 Parameters on Transformer / Generator Health.  XBEE Based Remote Monitoring of 3 Parameters on Transformer / Generator Health with Voice Announcement and Wireless PC interference.  Zigbee based Automatic Meter Reading System.
  • 51.