Rahul De
MIS
MANAGING INFORMATION SYSTEMS IN BUSINESS,
GOVERNMENT AND SOCIETY
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
LEARNING OBJECTIVES
• Understand e-commerce technology
• Learn doing business over the internet
• Get an overview of electronic governance
2
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
MIND MAP OF CHAPTER TOPICS
3
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
E-COMMERCE TECHNOLOGY
• E-commerce emerged making use of the Internet for providing information, taking
orders and sending out information goods.
• Dotcom Boom and Bust of the late 1990s was symbolic of the hope placed on e-
commerce
• New Internet based business models came up around innovative ideas with the
premise that simply having a website would ensure an increasing pool of visitors,
through network effects; increasing scope for generating revenues from advertisers
and sponsors
4
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
THE DOTCOM BOOM AND BUST
• Venture capitalists brought in large sums of money to invest in such promising start-
ups
• With the funding, start-ups garnered widespread attention, through publicity
campaigns, leading to a few going in for very successful launches of their stocks,
bringing in public money to further raise capital. This snowballed, making many
millionaires along the way, increasing overall stock prices to unreal levels – leading to
a bubble.
• In 2000, the markets crashed and drove many firms to bankruptcy – termed the 'bust'
of the bubble.
5
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
THE DOTCOM BOOM AND BUST
.
• The dotcom boom-doctcom bust period is depicted through fluctuation in IT stock
prices in the BSE from Feb 1999 through Oct 2004. The Sensex peaked in early 2000
and then crashed, sinking to a new low in 2001, after which it climbed again. The
figure shows the closing value of the index of IT stocks in the Sensex.
6
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
HTML
• The commercial growth of the Internet was due to the World Wide Web. The Web is a
technology the permits linking of data files (text, multimedia) over the Internet, using
the Hypertext Markup Language (HTML). Such links across computers are called
Hyperlinks.
• HTML uses tags to indicate how the browser can process the contents enclosed by
tags.
7
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
E-MAIL
• Email is the most popular application on the Internet, though among the earliest
• It is a form of asynchronous communication that allows messages to be delivered to
the identified individual(s). The sender's name and institution are also identified,
helping develop a network of collaborators.
• E-mail groups help broadcast messages within groups, with some being moderated.
8
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
E-MAIL
• Email is the most popular application on the Internet, though among the earliest
• It is a form of asynchronous communication that allows messages to be delivered to
the identified individual(s). The sender's name and institution are also identified,
helping develop a network of collaborators.
• E-mail groups help broadcast messages within groups, with some being moderated.
• Spam
• Viruses
• Some statistics on E-mail usage
9
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
E-MAIL
10
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
NETWORKS
• Internet – collection of networks connected together by common, shared standards of
communication
• Intranet – A network of computers within an organisation that follows the protocols of
the Internet
• Local Area network (LAN) – n Intranet built in a single location
• Virtual Private Network (VPN) – helps organisations create an Intranet on the Internet
• Extranet – links an organisation with its partners and collaborators
11
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
NETWORKS: A BRIEF INTRODUCTION
12
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
ELECTRONIC DATA INTERCHANGE (EDI)
• EDI is a private network used by some organisations to link their offices. The protocol
used in these networks is different from the Internet protocols.
• They are still in use by some institutions, since it provides continuity with older
methods of communication and a certain measure of security, since the standards are
not too well-known.
13
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
ONLINE PAYMENT TECHNOLOGY
Online payment technologies form the heart of e-commerce.
• Special online Payment services like Paypal
• Credit cards
• Cash cards
• Net-banking service provided by some banks
14
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
MOBILE COMMERCE
• Mobile commerce leverages security and ease of payments on the pervasive mobiles,
supporting innovative payment solutions through mobiles
• Benefits include the ability to make payments without the use of a computer or access
to Internet and without a credit card.
• Mobile transactions are similar to credit card transactions, in that the merchant must
have an account with the service
15
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
DOING BUSINESS ON THE INTERNET
The Internet presents a unique channel for business characterised by:
• Almost instant communication through email, chat and sharing of audio, video and text
• Ease of broadcasting instantly
• Lower costs of communication
• Ability to search huge amounts of information
• E-commerce refers to businesses created to use the Internet technologies as a basis
for transactions.
16
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
DOING BUSINESS ON THE INTERNET
• Portal – A web page that acts as an entry point to the web; listing pages according to
themes; they provide search facilities; they re usually 'pure-play' in that they do not
involve any e-commerce, but this is changing fast
• Search Engine – A website that allows users to search for pages on the Internet; early
search engines crawled the web, using the word-count method. Google used a Page
ranking algorithm to make searches more relevant and introduced a differential pricing
model for revenue generation, leveraging IT
17
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
DIRECT SELLING
• When goods are sold through a website, sellers directly connect to buyers without
intermediaries. Direct selling is characterised by convenience, larger choice and the
ability to search easily which makes it popular for almost all kinds of goods and
services.
• E-commerce in developing countries like India are also gaining ground
18
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
DIRECT SELLING: TYPES OF E-COMMERCE
B2C – Direct selling to consumers; B2B – Commerce between businesses
B2G – Direct transactions between businesses and government departments
G2G – transactions between government departments
G2C – transactions between government departments and citizens (e-governance)
C2C – transactions between customers and citizens
19
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
AUCTIONS AND AGGREGATORS
• Auctions – websites that allow sellers and buyers to meet over the Internet; pricing
may be through bidding or direct pricing; usually C2C; use rating of users; subject to
strong network effects.
• Aggregators (B2B) – websites that allow institutional buyers and sellers to transact
over the Internet, managing the entire bidding and sale process. Most aggregators
deal with industrial products.
20
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
DIFFERENCES BETWEEN B2B AND B2C E-COMMERCE
• B2C transactions are ad-hoc in nature, with one seller, selling to customers in a single
transaction; B2B involves many buyers and sellers who establish long-term
purchasing contracts
• B2C transactions are of low value vis-à-vis B2B transactions
• The delivery schedule and timing of goods are critical and require high degree of
commitment in B2B, since they tie into organisational supply-chains
• B2B do not have fixed prices and may involve auctions
21
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
E-BUSINESS
• E-business enhances the internal functioning of businesses by using the facilities of
the Internet, to share data and information with partners, outside the firm. The
infrastructure is HTML-based.
• Lowers transaction costs; faster and more accurate communications;
• Secure communication;
• Supports distributed organisations with partners from different countries
22
MIS : Managing Information Systems in Business, Government and Society by Rahul De
Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
E-GOVERNANCE
• E-business enhances the internal functioning of businesses by using the facilities of
the Internet, to share data and information with partners, outside the firm. The
Refers to he use of e-business and e-commerce technologies by governments and their
departments to conduct their business
• Services – G2B, G2C and G2G
• Advantages -
• Reduced transaction costs
• Convenience – saves time, effort, money
• Higher accuracy
23

• E-commerce, e-business ,e-governance

  • 1.
    Rahul De MIS MANAGING INFORMATIONSYSTEMS IN BUSINESS, GOVERNMENT AND SOCIETY Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002
  • 2.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 LEARNING OBJECTIVES • Understand e-commerce technology • Learn doing business over the internet • Get an overview of electronic governance 2
  • 3.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 MIND MAP OF CHAPTER TOPICS 3
  • 4.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 E-COMMERCE TECHNOLOGY • E-commerce emerged making use of the Internet for providing information, taking orders and sending out information goods. • Dotcom Boom and Bust of the late 1990s was symbolic of the hope placed on e- commerce • New Internet based business models came up around innovative ideas with the premise that simply having a website would ensure an increasing pool of visitors, through network effects; increasing scope for generating revenues from advertisers and sponsors 4
  • 5.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 THE DOTCOM BOOM AND BUST • Venture capitalists brought in large sums of money to invest in such promising start- ups • With the funding, start-ups garnered widespread attention, through publicity campaigns, leading to a few going in for very successful launches of their stocks, bringing in public money to further raise capital. This snowballed, making many millionaires along the way, increasing overall stock prices to unreal levels – leading to a bubble. • In 2000, the markets crashed and drove many firms to bankruptcy – termed the 'bust' of the bubble. 5
  • 6.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 THE DOTCOM BOOM AND BUST . • The dotcom boom-doctcom bust period is depicted through fluctuation in IT stock prices in the BSE from Feb 1999 through Oct 2004. The Sensex peaked in early 2000 and then crashed, sinking to a new low in 2001, after which it climbed again. The figure shows the closing value of the index of IT stocks in the Sensex. 6
  • 7.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 HTML • The commercial growth of the Internet was due to the World Wide Web. The Web is a technology the permits linking of data files (text, multimedia) over the Internet, using the Hypertext Markup Language (HTML). Such links across computers are called Hyperlinks. • HTML uses tags to indicate how the browser can process the contents enclosed by tags. 7
  • 8.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 E-MAIL • Email is the most popular application on the Internet, though among the earliest • It is a form of asynchronous communication that allows messages to be delivered to the identified individual(s). The sender's name and institution are also identified, helping develop a network of collaborators. • E-mail groups help broadcast messages within groups, with some being moderated. 8
  • 9.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 E-MAIL • Email is the most popular application on the Internet, though among the earliest • It is a form of asynchronous communication that allows messages to be delivered to the identified individual(s). The sender's name and institution are also identified, helping develop a network of collaborators. • E-mail groups help broadcast messages within groups, with some being moderated. • Spam • Viruses • Some statistics on E-mail usage 9
  • 10.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 E-MAIL 10
  • 11.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 NETWORKS • Internet – collection of networks connected together by common, shared standards of communication • Intranet – A network of computers within an organisation that follows the protocols of the Internet • Local Area network (LAN) – n Intranet built in a single location • Virtual Private Network (VPN) – helps organisations create an Intranet on the Internet • Extranet – links an organisation with its partners and collaborators 11
  • 12.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 NETWORKS: A BRIEF INTRODUCTION 12
  • 13.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 ELECTRONIC DATA INTERCHANGE (EDI) • EDI is a private network used by some organisations to link their offices. The protocol used in these networks is different from the Internet protocols. • They are still in use by some institutions, since it provides continuity with older methods of communication and a certain measure of security, since the standards are not too well-known. 13
  • 14.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 ONLINE PAYMENT TECHNOLOGY Online payment technologies form the heart of e-commerce. • Special online Payment services like Paypal • Credit cards • Cash cards • Net-banking service provided by some banks 14
  • 15.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 MOBILE COMMERCE • Mobile commerce leverages security and ease of payments on the pervasive mobiles, supporting innovative payment solutions through mobiles • Benefits include the ability to make payments without the use of a computer or access to Internet and without a credit card. • Mobile transactions are similar to credit card transactions, in that the merchant must have an account with the service 15
  • 16.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 DOING BUSINESS ON THE INTERNET The Internet presents a unique channel for business characterised by: • Almost instant communication through email, chat and sharing of audio, video and text • Ease of broadcasting instantly • Lower costs of communication • Ability to search huge amounts of information • E-commerce refers to businesses created to use the Internet technologies as a basis for transactions. 16
  • 17.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 DOING BUSINESS ON THE INTERNET • Portal – A web page that acts as an entry point to the web; listing pages according to themes; they provide search facilities; they re usually 'pure-play' in that they do not involve any e-commerce, but this is changing fast • Search Engine – A website that allows users to search for pages on the Internet; early search engines crawled the web, using the word-count method. Google used a Page ranking algorithm to make searches more relevant and introduced a differential pricing model for revenue generation, leveraging IT 17
  • 18.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 DIRECT SELLING • When goods are sold through a website, sellers directly connect to buyers without intermediaries. Direct selling is characterised by convenience, larger choice and the ability to search easily which makes it popular for almost all kinds of goods and services. • E-commerce in developing countries like India are also gaining ground 18
  • 19.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 DIRECT SELLING: TYPES OF E-COMMERCE B2C – Direct selling to consumers; B2B – Commerce between businesses B2G – Direct transactions between businesses and government departments G2G – transactions between government departments G2C – transactions between government departments and citizens (e-governance) C2C – transactions between customers and citizens 19
  • 20.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 AUCTIONS AND AGGREGATORS • Auctions – websites that allow sellers and buyers to meet over the Internet; pricing may be through bidding or direct pricing; usually C2C; use rating of users; subject to strong network effects. • Aggregators (B2B) – websites that allow institutional buyers and sellers to transact over the Internet, managing the entire bidding and sale process. Most aggregators deal with industrial products. 20
  • 21.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 DIFFERENCES BETWEEN B2B AND B2C E-COMMERCE • B2C transactions are ad-hoc in nature, with one seller, selling to customers in a single transaction; B2B involves many buyers and sellers who establish long-term purchasing contracts • B2C transactions are of low value vis-à-vis B2B transactions • The delivery schedule and timing of goods are critical and require high degree of commitment in B2B, since they tie into organisational supply-chains • B2B do not have fixed prices and may involve auctions 21
  • 22.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 E-BUSINESS • E-business enhances the internal functioning of businesses by using the facilities of the Internet, to share data and information with partners, outside the firm. The infrastructure is HTML-based. • Lowers transaction costs; faster and more accurate communications; • Secure communication; • Supports distributed organisations with partners from different countries 22
  • 23.
    MIS : ManagingInformation Systems in Business, Government and Society by Rahul De Copyright © 2018 by Wiley India Pvt. Ltd., 4436/7, Ansari Road, Daryaganj, New Delhi-110002 E-GOVERNANCE • E-business enhances the internal functioning of businesses by using the facilities of the Internet, to share data and information with partners, outside the firm. The Refers to he use of e-business and e-commerce technologies by governments and their departments to conduct their business • Services – G2B, G2C and G2G • Advantages - • Reduced transaction costs • Convenience – saves time, effort, money • Higher accuracy 23