1. V-4
Woon Chul Jang
(+82) 10 6252 3702
(+82) 70 7556 3705
E-mail : sid999@naver.com
Address: YongHo- Yega APT 101/1201, Nam-Gu, Busan, Republic of Korea
SUMMARY
Structural engineer with 20 years of working experience within
shipbuilding industry with Shipyards and Classification Societies and
extensive experiences on various ship types
Maritime classification with deep understanding of Class systematics,
rules and regulatory compliance
Expertise in Hull Structure, Hull Strength and engineering software
DNV’s Tutor for Hull General/ Oil Tanker/ Bulk Carrier
DNVGL’s Ship Type Expert in Korea/ Japan combine detailed in depth
technical knowledge with a border experience
DNVGL Site Surveyor
WORK EXPERIENCE
DNVGL June 2008 ~ Feb 2017
Hull Approval Engineer in Plan Approval Center, Korea 2008-06 ~ 2015-12
Responsibilities:
Structural Lead for main scantling approval, and detail design verification
Global/ Local Structural Analysis & Verification
Support for CSR BC&OT Rule & Tool development & Consequence Assessment
Contact Point in IACS Knowledge Center for CSR BC Rule proposal & technical support
Internal assistance to Design Verification for DNV Japan/ China/ Norway Approval Center
Technical Support to Korean/ Japan Shipyards/ Ship Owners
Tutor in DNV Academy and tutoring of junior engineers
Pre-contract support
Handling of quality cases
.
Achievements :
Conducted lots of FE Analysis covering yielding, buckling, fatigue including very fine mesh
analysis for projects
Established “Best Practice” for approval of vessels subjected to CSR BC&OT
Trained many internal/ external engineers through DNV Academy courses and secured very good
feedback every year according to the survey results made by participants (Avg. score 9.5/10)
Metrostar 300K VLCC (HHI H.2725/26/27/28/66/67)
- First Approval of Crosstieless VLCC within DNVGL
- Design verification by independent cargo hold FE analysis and intensive fatigue analysis
2. V-4
Norden 50K Product Carrier (STX H.1641/42/44/45)
Odfjell 51K Product Carrier (HMD H.2377/78/79/80)
PYXIS 52K Oil Chemical Tanker (SPP H.4095)
Pipavav 74.5K Bulk Carrier
Wilhelmsen 8,000 PCTC (HSHI H.721/22/25/26)
35K Bulk Carrier (Samjin H.1065/67/68/72/73)
58K Bulk Carrier (STX H.2027/37)
56K Bulk Carrier (HMD H.6143)
82K Bulk Carrier (HMD H.6065)
81K Bulk Carrier (STX H.2078/62/67/82/1422/1057/1420/1512)
83K Bulk Carrier (STX H.1512)
181K Bulk Carrier (STX H.2281/82/83/84)
181K Bulk Carrier (HSHI H.764/65)
Joint Development Project for Optimization of Hull Scantling based on CSR BC&OT with Oshima
Shipbuilding Co.,Ltd. (84K Bulk Carrier)
Joint Development Project for Optimization of Hull Scantling based on CSR BC&OT with Hyundai
Heavy Industries Co.,Ltd. (208K Bulk Carrier)
Joint Development Project for Optimization of Hull Scantling based on CSR BC&OT with
SUNGDONG Shipbuilding & Marine Engineering Co.,Ltd. (115K Aframax Tanker)
Conducted several Technical Seminar in China/ Vietnam
Conducted Seminar for CSR BC&OT in most of Korean Shipyards
Ship Type Expert for Bulk Carrier 2014-06 ~ 2015-12
Responsibilities:
Technical leader for Bulk Carrier in Approval Centre Korea/Japan
Input to spec. review
Pro-active involvement towards customers and contact point in Korea/ Japan who can rapidly
respond with a targeted solution to best meet customers
Achievements :
Developed Specification Review Guidance
Conducted technical seminar for CSR OT& BC Rules and the hottest topics in maritime such as
Ballast Water Management, LNG as fuel, Cargo Liquefaction, Composites Hatch Cover for
shipyards & Owners
Responsible for Bulk Booster Tactical Initiative in Korea/Japan
- Bring DNVGL to the No.2(GT) positon in the market
- Conducted a dedicated campaign with support from the business director Bulk to gain a major
share of the expected large ordering in VLOC segment
Worked with extensive global networks in maritime
Introduced CSR BC&OT actively to approach shipyards and get early involved in their design
Process
Analysed competitor’s software & activity and reported proposal/feedback to DNVGL Software
Analysed lost contracts in 2014 with the objective to understand the reason behind the Class losing
Project Manager Approval 2014-05 ~ 2015-12
Responsibilities:
Project manager for the plan approval of new buildings and major conversion at the Approval
Centre
Follow-up of contractual issues/ Project initiation
Coordinate resource allocation within the approval centre
Coordinates the plan approval process to ensure delivery of the plan approval on time/budget to
agreed quality
Achievements :
Central Mare Inc. 50K Product Carrier (HVS H.406/407/414/417)
Metrostar 300K VLCC (HHI H.2725/26/27/28/66/67)
3. V-4
Norden 50K Product Carrier (STX H.1641/42/44/45)
Site Surveyor 2016-01 ~ 2016-12
Responsibilities:
Newbuilding Survey for Euronav/ Metrostar 300K VLCC (HHI H.2727/2728/2827)
Achievements :
General survey and inspection of hull structure (material and welding) and hull equipment
Established welder qualification procedure in HHI Gunsan yard
Sea Trial for H.2827
Conducted technical seminar regarding critical points of hull, permanent means of access and
introduction to CSR BC&OT for QM/QC in HSHI/ HHI Gunsan yard
Consulted quality cases, repair jobs in the yard
Korean Resister of Shipping, Korea May 2005 ~ May 2008
Hull Plan Approval Engineer
Responsibilities:
Compliance of International Regulations (SOLAS, MARPOL, Load Line, Korean Maritime
Regulation)
Structural Lead for main scantling approval, and detail design verification
Global/ Local Structural Analysis & Verification
Conversion
CAP (Condition Assessment Programme) for vessels
Achievements :
Nuclear Waste Carrier (Daesun)
962Teu Container Carrier (Daesun)
11.5K Multi Purpose Carrier (Hanjin)
8.5K Multi Purpose Carrier (Turkey)
6,500 Unit/8,000 Unit Car Carrier (HSHI)
6,700 DWT/ 2,600 DWT General Cargo Ship (China)
150,000 CBM LNG Carrier (HHI)
Extra Large Floating Dock (DSME)
105K Product Carier (HHI)
49.9K, 51K, 13K, 8.8K, 3.5K Oil/Chemical Tanker (STX etc.)
6.25K Asphalt Carrier
Developed the guidance of CAP
Several Technical Seminar in China
Hyundai Mipo Dockyard, Korea May 2001 ~ April 2005
Hull Engineer / Assistant Manager
Responsibilities:
Design of key drawings, detail construction drawings and standards
Global/ Local Structural Analysis & Verification
Achievements :
2,800 TEU Container Carrier
4. V-4
46K Chemical/Oil Tanker
47K Chemical/Oil Tanker etc.
SLS Shipbuilding Co.,Ltd, Korea Mar. 1998 ~ May 2001
Hull Engineer
Responsibilities:
Design of key drawings, detail construction drawings and standard
Global/ Local Structural Analysis & Verification
Achievements :
3,300 Units PCC
25K Chemical/Oil Tanker
37K Chemical/Oil Tanker etc.
Skills & ACCOMPLISHMENTS
Computer
- MS Office (Word, Excel, Powerpoint)
- Engineering Software (Patran/Nastran, DNVGL Genie, Xtract, PULS, Natuticus Hull, 3d-beam,
KR Holdan, ABS Safe Hull, GL Poseidon)
- Design Tools (Cadra, Tribon)
Language Capabilities
- Korean (Native), English (Medium), Japanese (Low)
EDUCATION
TRAINING
2016: Working at Height-Training Module
2016: Working in Confined Spaces-training module
2016: Safety Transfer - Workshop Module
2016: Safety CMC - Workshop Module
2016: Safety Training for Experienced Surveyors(COENS)
2016: Introduction to DNV GL Rules – Module 2
2016: Introduction to DNV GL Rules – Module 1
2016: Welding procedure qualification - DNVGL rules Pt.2 Ch.4 Sec.5
2016: Steel plates - DNVGL rules Pt.2 Ch.2 Sec.1, 2 and 3
2016: Electrical - DNVGL rules
2016: Piping - DNVGL rules
2016: Machinery - DNVGL rules
2016: Material and Welding General - DNVGL rules Pt.2
2016: Control and Monitoring - DNVGL rules
2016: Fabrication and NDT - DNVGL rules Pt.2 Ch.4 Sec.1 to 4 and 7 to 9
2016: Steel pipes and fittings -DNVGL rules Pt.2 Ch.2 Sec.5
2016: Field work Health and Safety
2015: NDT Principles and Limitations
2015: Experience Exchange Seminar – Plan Approval(China)
2015: Experience Exchange Seminar - Survey
2015: NDT Web primer
2015: One way of working – Introduction to DMS for Maritime
2015: 2010w DNV GL’s approach to Anti-Corruption and Anti-Trust – An Introduction
5. V-4
2015: DNV GL Code of Conduct
2014: Experience Exchange Seminar – Plan Approval(Norway)
2014: WE in DNV GL, web
2014: HSE in DNV GL - Travel safety
2014: HSE in DNV GL - Incident reporting
2013: DwD – Dealing with Dilemmas, web
2012: Project Management the DNV Way
2012: Does not need Affinitas Training
2012: PM Essentials WEB-course
2011: Coating and Corrosion Protection/ IMO PSPC
2011: Train the Trainer - new methods for high impact
2011: Coating and Corrosion Protection/ IMO PSPC, Web primer
2010: SOLAS Basic - Fire and LSA
2010: Materials Technology
2010: Materials Technology Web primer
2010: Field work Health and Safety
2009: Classification Basics
2009: QMS Web Primer
2009: DNV Classification Processes
2009: Hull Structure – Fleet in Service
2008: Communication Skills for Classification
2008: Welding Course
2008: WE in DNV GL
2008: Intercultural Communication
PERSONAL INFORMATION
Bachelor of Science, ULSAN University, Naval Architecture & Ocean Engineering, 1998
I hereby certify that all the above statements are true and correct to the best of my knowledge.