DNV GL © 2013
 First phase of this ALE Study focuses on subsea
components, especially the jacket, with damaged leg and
pipelines to the FPSO - Conduct jacket fatigue analysis and
pipeline condition assessments, to provide recommendations
for life extensions.
 Review of topside equipment data and define the gaps based
on redefined operational requirements.
 Prepare Scope of Work document for Phase 2.
 Phase 1 delivers requirements for subsea
inspection, to allow operator ample time to
plan for underwater inspections. Results will
be reviewed and justified in Phase 2. Phase 2
will also include detailed assessments for
topside equipment.
 Phase 2 Scope of Work documents helps
customer understand expectation of work
required in next phase of the life extension
studies, to further plan and obtain budget.
The offshore wellhead platform and flowlines in the field are
approaching design life but can still produce for another 10 years.
The original design life is considered short (10 years), whilst other
assets in the field were designed for 15 years.
Customer intends to extend the operations for additional 10 years
from end of life. Platform suffers minor damage on primary jacket
leg which requires further analysis, technical review and justification.
Asset Life Extension Study (Phase 1)
Vietnam Offshore Platform
1
VALUE DELIVEREDDNV GL SOLUTION
CUSTOMER CHALLENGE
PROJECT SHOWCASE
DNV GL © 2013
 Structural scope:
 in-place & fatigue analysis, ultimate strength
assessments & member criticality identification.
 Development of structural RBI program for life extension.
Continual review of inspection findings & risk ranking
update.
 Equipment study:
 E&I systems, static & rotating equipment, pipelines.
 Perform risk assessment and recommend measures to
extend the life for the platforms with focus on critical
equipment
 Costing analysis (Monte Carlo)
 List of issues to address/prioritize during life
extension.
 Optimize requirements for NDT inspection for
joints to re-baseline platform life & justify
structural life extension.
 Recommended measures to extend the life
of the critical equipment.
 Recommendations for future inspection &
maintenance plans.
This platform located offshore of east Malaysia started operation in
1997 and was designed for 20 years operation (until 2017).
The customer has obtained PSC for the field until 2032, with plans to
install a new wellhead platform which will be bridge linked to this
platform. Thus is looking to operate this facility beyond intended
service life.
Platform issues are ageing or obsolete systems & equipment.
Asset Life Extension Study
Malaysian Offshore Platform
2
VALUE DELIVEREDDNV GL SOLUTION
CUSTOMER CHALLENGE
PROJECT SHOWCASE
DNV GL © 2013
 Proposed alternative structural life extension methodology
(API RP2SIM) by performing ultimate strength pushover
analysis - Able to prove that platforms have adequate
reliability/reserve strength despite high marine growth
thickness and inadequate fatigue life.
 Performed marine growth sensitivity to justify non-cleaning
of marine growth
 Re-baseline fatigue lives based on targeted one-off node
inspection, instead of calculated fatigue lives.
 Conducted qualitative RBI assessment to determine
platform’s inspection interval of inspection during extended
operational life.
 Minimize cost of underwater inspections and
mitigation measures required for life
extension. Large cost savings (~USD 8.5m)
based on cost comparison study
 Reduced cost of future regular inspection by
optimizing inspection interval with RBI vs
time-based inspection planning.
Fourteen (14) offshore platforms were installed between 1993 to
1998, with original design life of 20 years.
The customer intends to extend the platform service life until 2032.
A previous life extension study was performed using conventional
linear analyses, which yielded many negative results due to high
marine growth thickness and short fatigue life. Based on results, a
considerable mitigation/inspection scheme was proposed, e.g.
marine growth cleaning, underwater node weld toe grinding &
hammer peening.
Structural Alternative Life Extension Methodology
Thailand Offshore Oil & Gas field
3
VALUE DELIVEREDDNV GL SOLUTION
CUSTOMER CHALLENGE
PROJECT SHOWCASE
DNV GL © 2013
 To address this challenge DNV GL carried out Condition And
Remnant Life (CARL) studies for four compressor stations and one
gas terminal.
 This involved collecting all available data relating to the asset’s
integrity (inspection reports, maintenance records, performance
data, etc.) as well as carrying out a visual survey and interviewing
site maintenance and operational personnel.
 Using all the data gathered DNV GL systematically assessed the
condition of all individual systems on each asset, and their major
components, in order to identify any potential threats to the safe
and reliable ongoing operation of the asset.
 A root cause analysis was carried out on potential threats in order
to determine the most effective remedial action.
 For each asset which has been assessed the
CARL studies have delivered a comprehensive
and prioritised list of all the issues which need to
be considered when planning future
maintenance, or making strategic decisions
regarding repair, replacement and upgrade.
 The CARL studies enabled the client to quantify
the costs required to extend the remnant life of
the assets.
 In addition the studies uncovered several major
integrity issues which the client had not
previously identified as significant.
This client has a large number of gas transmission assets across the UK
which are approaching or have exceeded their original design life. They
therefore have a need to understand the condition of these ageing assets
in order to prioritise maintenance work and develop future integrity
strategies.
Although they are continually generating large quantities of data regarding
the health of their assets, including regular inspections, maintenance
reports and performance data, this data is often not fully utilised to
determine the asset condition and identify possible threats to future safe
and reliable operation.
Condition And Remnant Life (CARL) Studies
Onshore Gas Asset, UK
4
VALUE DELIVEREDDNV GL SOLUTION
CUSTOMER CHALLENGE
PROJECT SHOWCASE
DNV GL © 2013
 Perform a lifetime assessment study together with the Operator
and identify the technical condition of the platforms (OSA, OSB
and OSD)
 Include study of structure, process systems and utility systems,
pipelines and sub-sea installations
 Perform lifetime evaluations, identify critical issues and risks
 Perform risk assessment and recommend measures to extend the
life for the platforms with focus on critical equipment
 Updated and documented overview of the main
technical challenges
 Updated and documented risk picture related to
life extension
 Recommended measures to extend the life of the
platforms and critical equipment
 Updated economical information for input to
Business Case for life extension
 A database tool for follow up of the
recommended measures
Oseberg Feltsenter started operation in 1988 with OSA and OSB, and
extended with OSD in 2000.
After more than 20 years in operation Oseberg Feltsenter is meeting
ageing issues on the systems and equipment and some of the original
equipment is becoming obsolete.
Oseberg Feltsenter has oil and gas resources that indicate production will
continue beyond 2030, which is beyond the design life for the facilities.
Life Extension Study
Oseberg Feltsenter, North Sea
5
VALUE DELIVEREDDNV GL SOLUTION
CUSTOMER CHALLENGE
PROJECT SHOWCASE
DNV GL © 2013
 Perform a lifetime assessment study together with the Operator
and identify the technical condition of the platforms (OSA, OSB
and OSD)
 Include study of structure, process systems and utility systems,
pipelines and sub-sea installations
 Perform lifetime evaluations, identify critical issues and risks
 Perform risk assessment and recommend measures to extend the
life for the platforms with focus on critical equipment
 Updated and documented overview of the main
technical challenges
 Updated and documented risk picture related to
life extension
 Recommended measures to extend the life of the
platforms and critical equipment
 Updated economical information for input to
Business Case for life extension
 A database tool for follow up of the
recommended measures
Oseberg Feltsenter started operation in 1988 with OSA and OSB, and
extended with OSD in 2000.
After more than 20 years in operation Oseberg Feltsenter is meeting
ageing issues on the systems and equipment and some of the original
equipment is becoming obsolete.
Oseberg Feltsenter has oil and gas resources that indicate production will
continue beyond 2030, which is beyond the design life for the facilities.
Life Extension Study
Oseberg Feltsenter, North Sea
5
VALUE DELIVEREDDNV GL SOLUTION
CUSTOMER CHALLENGE
PROJECT SHOWCASE

More Related Content

What's hot

GAS PROCESSING PRESENTATION.pdf
GAS PROCESSING PRESENTATION.pdfGAS PROCESSING PRESENTATION.pdf
GAS PROCESSING PRESENTATION.pdfHadiTahmasbi2
 
Natural gas processing technology sweetening processes
Natural gas processing technology    sweetening processesNatural gas processing technology    sweetening processes
Natural gas processing technology sweetening processesMohamad Abdelraof
 
Dust Explosion Prevention
Dust Explosion PreventionDust Explosion Prevention
Dust Explosion PreventionChetwinBrandon
 
Hydrogenation Reactor Run Away Conditions
Hydrogenation Reactor Run Away ConditionsHydrogenation Reactor Run Away Conditions
Hydrogenation Reactor Run Away ConditionsGerard B. Hawkins
 
Asset Integrity Management | Arrelic Insights
Asset Integrity Management | Arrelic InsightsAsset Integrity Management | Arrelic Insights
Asset Integrity Management | Arrelic InsightsArrelic
 
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation DiagramsShakeel Vakkil
 
Asset Integrity Management
Asset Integrity Management Asset Integrity Management
Asset Integrity Management Advisian
 
Liquefied Natural Gas ( LNG )
Liquefied Natural Gas ( LNG )Liquefied Natural Gas ( LNG )
Liquefied Natural Gas ( LNG )Saurabh Girdhar
 
Process Safety Management in Design, Construction & Commissioning | Lalit K...
Process Safety Management in Design, Construction &  Commissioning | Lalit  K...Process Safety Management in Design, Construction &  Commissioning | Lalit  K...
Process Safety Management in Design, Construction & Commissioning | Lalit K...Cairn India Limited
 
Corrosion under insulation
Corrosion under insulationCorrosion under insulation
Corrosion under insulationpatiphon
 
Physics and chemistry of explosions
Physics and chemistry of explosionsPhysics and chemistry of explosions
Physics and chemistry of explosionsKoyal Saha
 
Ethylene Plant Design Considerations
Ethylene Plant Design ConsiderationsEthylene Plant Design Considerations
Ethylene Plant Design ConsiderationsGerard B. Hawkins
 
Texas oil refinary explosion
Texas oil refinary explosionTexas oil refinary explosion
Texas oil refinary explosionNeha Baheti
 
Case study chemical accident
Case study chemical accidentCase study chemical accident
Case study chemical accidentHamidi Saidin
 
An Investigation Into the Root Cause of a Spill From Procuring and Handling o...
An Investigation Into the Root Cause of a Spill From Procuring and Handling o...An Investigation Into the Root Cause of a Spill From Procuring and Handling o...
An Investigation Into the Root Cause of a Spill From Procuring and Handling o...Turlough Guerin GAICD FGIA
 
Introduction to Risk Based Inspection (RBI) - MAT GROUP.pdf
Introduction to Risk Based Inspection (RBI) - MAT GROUP.pdfIntroduction to Risk Based Inspection (RBI) - MAT GROUP.pdf
Introduction to Risk Based Inspection (RBI) - MAT GROUP.pdfGustavoGonzlezServa
 

What's hot (20)

Jacket
JacketJacket
Jacket
 
GAS PROCESSING PRESENTATION.pdf
GAS PROCESSING PRESENTATION.pdfGAS PROCESSING PRESENTATION.pdf
GAS PROCESSING PRESENTATION.pdf
 
Natural gas processing technology sweetening processes
Natural gas processing technology    sweetening processesNatural gas processing technology    sweetening processes
Natural gas processing technology sweetening processes
 
Piper Alpha Disaster
Piper Alpha DisasterPiper Alpha Disaster
Piper Alpha Disaster
 
Dust Explosion Prevention
Dust Explosion PreventionDust Explosion Prevention
Dust Explosion Prevention
 
Hydrogenation Reactor Run Away Conditions
Hydrogenation Reactor Run Away ConditionsHydrogenation Reactor Run Away Conditions
Hydrogenation Reactor Run Away Conditions
 
Asset Integrity Management | Arrelic Insights
Asset Integrity Management | Arrelic InsightsAsset Integrity Management | Arrelic Insights
Asset Integrity Management | Arrelic Insights
 
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
 
Asset Integrity Management
Asset Integrity Management Asset Integrity Management
Asset Integrity Management
 
Liquefied Natural Gas ( LNG )
Liquefied Natural Gas ( LNG )Liquefied Natural Gas ( LNG )
Liquefied Natural Gas ( LNG )
 
Process Safety Management in Design, Construction & Commissioning | Lalit K...
Process Safety Management in Design, Construction &  Commissioning | Lalit  K...Process Safety Management in Design, Construction &  Commissioning | Lalit  K...
Process Safety Management in Design, Construction & Commissioning | Lalit K...
 
Corrosion under insulation
Corrosion under insulationCorrosion under insulation
Corrosion under insulation
 
Physics and chemistry of explosions
Physics and chemistry of explosionsPhysics and chemistry of explosions
Physics and chemistry of explosions
 
Ethylene Plant Design Considerations
Ethylene Plant Design ConsiderationsEthylene Plant Design Considerations
Ethylene Plant Design Considerations
 
Texas oil refinary explosion
Texas oil refinary explosionTexas oil refinary explosion
Texas oil refinary explosion
 
Case study chemical accident
Case study chemical accidentCase study chemical accident
Case study chemical accident
 
Liquefied Natural Gas (LNG) Life Cycle
Liquefied Natural Gas (LNG) Life CycleLiquefied Natural Gas (LNG) Life Cycle
Liquefied Natural Gas (LNG) Life Cycle
 
AC 6Ed.pdf
AC 6Ed.pdfAC 6Ed.pdf
AC 6Ed.pdf
 
An Investigation Into the Root Cause of a Spill From Procuring and Handling o...
An Investigation Into the Root Cause of a Spill From Procuring and Handling o...An Investigation Into the Root Cause of a Spill From Procuring and Handling o...
An Investigation Into the Root Cause of a Spill From Procuring and Handling o...
 
Introduction to Risk Based Inspection (RBI) - MAT GROUP.pdf
Introduction to Risk Based Inspection (RBI) - MAT GROUP.pdfIntroduction to Risk Based Inspection (RBI) - MAT GROUP.pdf
Introduction to Risk Based Inspection (RBI) - MAT GROUP.pdf
 

Similar to DNV GL Asset Life Extension (ALE) Projects Showcase

Paper: Life Extension of Aging Petroleum Production Facilities Offshore
Paper: Life Extension of Aging Petroleum Production Facilities Offshore Paper: Life Extension of Aging Petroleum Production Facilities Offshore
Paper: Life Extension of Aging Petroleum Production Facilities Offshore E.ON Exploration & Production
 
Dnv rp g103 non intrusive inspection 2011
Dnv rp g103   non intrusive inspection 2011Dnv rp g103   non intrusive inspection 2011
Dnv rp g103 non intrusive inspection 2011Mohammad Shoeb Ahmed
 
Guidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanksGuidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanksOsama Lari
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...Forum for the Future
 
RINA approach to the offshore
RINA approach to the offshoreRINA approach to the offshore
RINA approach to the offshoreRINA_SERVICES
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsJean-Francois Saint-Marcoux
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018TECNALIA Marine Energy
 
Inspecta OTD presentation
Inspecta OTD presentation Inspecta OTD presentation
Inspecta OTD presentation inacatrine
 
Item no
Item noItem no
Item norehant
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 

Similar to DNV GL Asset Life Extension (ALE) Projects Showcase (20)

Paper: Life Extension of Aging Petroleum Production Facilities Offshore
Paper: Life Extension of Aging Petroleum Production Facilities Offshore Paper: Life Extension of Aging Petroleum Production Facilities Offshore
Paper: Life Extension of Aging Petroleum Production Facilities Offshore
 
Rp g103 2011-01
Rp g103 2011-01Rp g103 2011-01
Rp g103 2011-01
 
Dnv rp g103 non intrusive inspection 2011
Dnv rp g103   non intrusive inspection 2011Dnv rp g103   non intrusive inspection 2011
Dnv rp g103 non intrusive inspection 2011
 
Guidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanksGuidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanks
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
 
RINA approach to the offshore
RINA approach to the offshoreRINA approach to the offshore
RINA approach to the offshore
 
Abraham Sanni CV
Abraham Sanni CVAbraham Sanni CV
Abraham Sanni CV
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
 
Inspecta OTD presentation
Inspecta OTD presentation Inspecta OTD presentation
Inspecta OTD presentation
 
CV_WCJANG_0210_Eng
CV_WCJANG_0210_EngCV_WCJANG_0210_Eng
CV_WCJANG_0210_Eng
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
Subsea leak detection systems
Subsea leak detection systemsSubsea leak detection systems
Subsea leak detection systems
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Item no
Item noItem no
Item no
 
Shivang raval 2018
Shivang raval 2018Shivang raval 2018
Shivang raval 2018
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 

Recently uploaded

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 

Recently uploaded (20)

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 

DNV GL Asset Life Extension (ALE) Projects Showcase

  • 1. DNV GL © 2013  First phase of this ALE Study focuses on subsea components, especially the jacket, with damaged leg and pipelines to the FPSO - Conduct jacket fatigue analysis and pipeline condition assessments, to provide recommendations for life extensions.  Review of topside equipment data and define the gaps based on redefined operational requirements.  Prepare Scope of Work document for Phase 2.  Phase 1 delivers requirements for subsea inspection, to allow operator ample time to plan for underwater inspections. Results will be reviewed and justified in Phase 2. Phase 2 will also include detailed assessments for topside equipment.  Phase 2 Scope of Work documents helps customer understand expectation of work required in next phase of the life extension studies, to further plan and obtain budget. The offshore wellhead platform and flowlines in the field are approaching design life but can still produce for another 10 years. The original design life is considered short (10 years), whilst other assets in the field were designed for 15 years. Customer intends to extend the operations for additional 10 years from end of life. Platform suffers minor damage on primary jacket leg which requires further analysis, technical review and justification. Asset Life Extension Study (Phase 1) Vietnam Offshore Platform 1 VALUE DELIVEREDDNV GL SOLUTION CUSTOMER CHALLENGE PROJECT SHOWCASE
  • 2. DNV GL © 2013  Structural scope:  in-place & fatigue analysis, ultimate strength assessments & member criticality identification.  Development of structural RBI program for life extension. Continual review of inspection findings & risk ranking update.  Equipment study:  E&I systems, static & rotating equipment, pipelines.  Perform risk assessment and recommend measures to extend the life for the platforms with focus on critical equipment  Costing analysis (Monte Carlo)  List of issues to address/prioritize during life extension.  Optimize requirements for NDT inspection for joints to re-baseline platform life & justify structural life extension.  Recommended measures to extend the life of the critical equipment.  Recommendations for future inspection & maintenance plans. This platform located offshore of east Malaysia started operation in 1997 and was designed for 20 years operation (until 2017). The customer has obtained PSC for the field until 2032, with plans to install a new wellhead platform which will be bridge linked to this platform. Thus is looking to operate this facility beyond intended service life. Platform issues are ageing or obsolete systems & equipment. Asset Life Extension Study Malaysian Offshore Platform 2 VALUE DELIVEREDDNV GL SOLUTION CUSTOMER CHALLENGE PROJECT SHOWCASE
  • 3. DNV GL © 2013  Proposed alternative structural life extension methodology (API RP2SIM) by performing ultimate strength pushover analysis - Able to prove that platforms have adequate reliability/reserve strength despite high marine growth thickness and inadequate fatigue life.  Performed marine growth sensitivity to justify non-cleaning of marine growth  Re-baseline fatigue lives based on targeted one-off node inspection, instead of calculated fatigue lives.  Conducted qualitative RBI assessment to determine platform’s inspection interval of inspection during extended operational life.  Minimize cost of underwater inspections and mitigation measures required for life extension. Large cost savings (~USD 8.5m) based on cost comparison study  Reduced cost of future regular inspection by optimizing inspection interval with RBI vs time-based inspection planning. Fourteen (14) offshore platforms were installed between 1993 to 1998, with original design life of 20 years. The customer intends to extend the platform service life until 2032. A previous life extension study was performed using conventional linear analyses, which yielded many negative results due to high marine growth thickness and short fatigue life. Based on results, a considerable mitigation/inspection scheme was proposed, e.g. marine growth cleaning, underwater node weld toe grinding & hammer peening. Structural Alternative Life Extension Methodology Thailand Offshore Oil & Gas field 3 VALUE DELIVEREDDNV GL SOLUTION CUSTOMER CHALLENGE PROJECT SHOWCASE
  • 4. DNV GL © 2013  To address this challenge DNV GL carried out Condition And Remnant Life (CARL) studies for four compressor stations and one gas terminal.  This involved collecting all available data relating to the asset’s integrity (inspection reports, maintenance records, performance data, etc.) as well as carrying out a visual survey and interviewing site maintenance and operational personnel.  Using all the data gathered DNV GL systematically assessed the condition of all individual systems on each asset, and their major components, in order to identify any potential threats to the safe and reliable ongoing operation of the asset.  A root cause analysis was carried out on potential threats in order to determine the most effective remedial action.  For each asset which has been assessed the CARL studies have delivered a comprehensive and prioritised list of all the issues which need to be considered when planning future maintenance, or making strategic decisions regarding repair, replacement and upgrade.  The CARL studies enabled the client to quantify the costs required to extend the remnant life of the assets.  In addition the studies uncovered several major integrity issues which the client had not previously identified as significant. This client has a large number of gas transmission assets across the UK which are approaching or have exceeded their original design life. They therefore have a need to understand the condition of these ageing assets in order to prioritise maintenance work and develop future integrity strategies. Although they are continually generating large quantities of data regarding the health of their assets, including regular inspections, maintenance reports and performance data, this data is often not fully utilised to determine the asset condition and identify possible threats to future safe and reliable operation. Condition And Remnant Life (CARL) Studies Onshore Gas Asset, UK 4 VALUE DELIVEREDDNV GL SOLUTION CUSTOMER CHALLENGE PROJECT SHOWCASE
  • 5. DNV GL © 2013  Perform a lifetime assessment study together with the Operator and identify the technical condition of the platforms (OSA, OSB and OSD)  Include study of structure, process systems and utility systems, pipelines and sub-sea installations  Perform lifetime evaluations, identify critical issues and risks  Perform risk assessment and recommend measures to extend the life for the platforms with focus on critical equipment  Updated and documented overview of the main technical challenges  Updated and documented risk picture related to life extension  Recommended measures to extend the life of the platforms and critical equipment  Updated economical information for input to Business Case for life extension  A database tool for follow up of the recommended measures Oseberg Feltsenter started operation in 1988 with OSA and OSB, and extended with OSD in 2000. After more than 20 years in operation Oseberg Feltsenter is meeting ageing issues on the systems and equipment and some of the original equipment is becoming obsolete. Oseberg Feltsenter has oil and gas resources that indicate production will continue beyond 2030, which is beyond the design life for the facilities. Life Extension Study Oseberg Feltsenter, North Sea 5 VALUE DELIVEREDDNV GL SOLUTION CUSTOMER CHALLENGE PROJECT SHOWCASE
  • 6. DNV GL © 2013  Perform a lifetime assessment study together with the Operator and identify the technical condition of the platforms (OSA, OSB and OSD)  Include study of structure, process systems and utility systems, pipelines and sub-sea installations  Perform lifetime evaluations, identify critical issues and risks  Perform risk assessment and recommend measures to extend the life for the platforms with focus on critical equipment  Updated and documented overview of the main technical challenges  Updated and documented risk picture related to life extension  Recommended measures to extend the life of the platforms and critical equipment  Updated economical information for input to Business Case for life extension  A database tool for follow up of the recommended measures Oseberg Feltsenter started operation in 1988 with OSA and OSB, and extended with OSD in 2000. After more than 20 years in operation Oseberg Feltsenter is meeting ageing issues on the systems and equipment and some of the original equipment is becoming obsolete. Oseberg Feltsenter has oil and gas resources that indicate production will continue beyond 2030, which is beyond the design life for the facilities. Life Extension Study Oseberg Feltsenter, North Sea 5 VALUE DELIVEREDDNV GL SOLUTION CUSTOMER CHALLENGE PROJECT SHOWCASE

Editor's Notes

  1. Page 1 example
  2. Page 1 example
  3. Page 1 example
  4. Page 1 example
  5. Page 1 example