SlideShare a Scribd company logo
1 of 7
Education
Professional Education (Singapore)
• B.Sc. Degree in Facilities Management (Herriot Watt University. Edinburgh, UK)2015
• Certified as “CERT” member for Fire safety regulations 2014
• Certified for Risk Assessment 2009
• Energy Auditing Course May 2007 ( ITE Bedok )
• Fire Safety Manager in SINGAPORE CIVIL DEFENCE ACADAMY 2006
• Skill Evaluation test in Electrical wiring in Mar 1999
Technical Qualification (Singapore)
• NTC 2 (PTT) Electrical Installations & Service in Aug 2000
• NTC 3 (PTT) Electrical Technology in Feb 2000
Technical Qualification (India)
• Soldering Technology in Jun 1993
• Diploma in Audio & Video Technology in Jul 1997
• Diploma in AutoCAD R14 & 2000 in Jun 2001
Professional Education (India)
• Diploma in Electrical Engineering in May 1982
• HSC (+2 Eq to A level) in Jun 1980
• SSLC (10th Standard Eq to O level) in Jun1978
Computer Knowledge
• MS office (Excel, Word, Power Point Etc.)
• MS Project
• AutoCAD
Other Certifications
• Class 2B Driving License
• First Aid CPR Certificate
CV for G Radhakrishnan Page 1 of 7
Date: 12.10.2016
CV for G Radhakrishnan Page 2 of 7
Date: 12.10.2016
Professional Experience Summary
Work Experience in Singapore (01 November 1997-Till Now)
S/
N
Name of the
Organization
Position
Period
From To
1
Shangri La Rasa Ria Resorts
Tuaran, Kotakinabalu, Sabah
East Malaysia
Director of
Engineering
09 Aug 2015 Till now
2
FRASER SUITES
RIVERVALLEY
Engineering Manager 12 Jan 2015 05 Aug 2015
3
GRAND PARK ORCHARD
Hotel
Chief Engineer 02 May 2012 31 Dec 2014
4
KAER Pte Ltd
(Site: Goodwoodpark Hotel)
Assistant Chief
Engineer
17 Mar 2006 30 Apr 2012
5
Shangri-La Hotel Maintenance
Engineer
15 Oct 2001 03 Mar 2006
Traders Hotel Singapore
(Cover CE position in the
Evening)
Technical Consultant
09 Dec 2002 08 Feb 2003
Traders Hotel Chennai
(India)
Task Force for Pre-
Opening New Hotel
28 Dec 2004 11 Feb 2005
6
ISC Automation Assistant Engineer 03 Jul 2001 08 Sep 2001
7
National University of
Singapore (NUS)
(Under INDECO Engineers)
Technician 01 Feb 2000 06 Dec 2000
8
National University Hospital
(NUH)
(Under INDECO Engineers)
Technician 05 Jan 2000 31 Jan 2000
9
Tan Tock Seng Hospital
(Under INDECO Engineers) Artisan 01 Nov 1997 04 Jan 2000
Please Take Note: I went to India from 07 Dec 2000 to 02 Jul 2001 since my father passed away.
Work Experience in India (04 September 1983-22 Oct 1997)
S/N
Name of the
Organization
Position
Period
From To
1. High Energy Batteries
(India) Ltd
Trainee -
Superintendent
04 Sep 1983 22 Oct 1997
Professional Experience
Shangri La Rasa Ria Resorts, Kotakinabalu, Sabah (09 Aug 2015 to Till now)
It is …
Duties and Responsibilities:
• Head of Engineering Department and One of the EXCOM member.
• Taking care of Engineering and Grounds departments consist of 18 holes golf ground at 300
acres and the resort areas of 150 acres.
• Make sure guests safety and comfort at resort to enjoy their holidays.
• Managing the 499 guest rooms, huge public areas with gardens and 5 outlets (Italian, Indian,
Japanese, Western and locals), 2 nos of Swimming pools, water sport and natural reserve
areas.
• Taking care of 20 years old MEP plants (HT/LT Rooms, Chiller Plant, Boiler, Water tanks &
Pumps, Heat pumps and planning to replace as a part of the improvement for the obsolete
equipments.
• Handling renovations and refurbishments with Modification on the M&E systems based on
the requirements by end users.
• Planning and executing the preventive maintenance programme for Guest Room, Public
areas, HOH, Function room and Ballroom Air-con, Electrical panels, Laundry and Kitchen
equipments.
• Implementation of energy and water savings and achieved in compare with last year about
7% in electrical, 10% in Diesel, 15% in water by introducing the water saving device for the
guest room with money back period of 2-3 months on the investment and using recycled
water for the garden watering with sprinkler system, 20% in LPG. Planned further for next
year in compare with current year.
• Maintain department’s budget at below 4.7% and planning for capital expenditure on the
equipment replacement and renovations.
• Training to staffs on the MEP systems, equipments and Standard Operating Procedures.
• Team & Man Management (44 engineering and 33 grounds staffs) for the smooth hotel
operation.
• Make sure the effective service contracts are executed by vendors by monitoring.
• Co-ordinate with contractors for any repairs with making the scope of job to meet the
standard.
• Technical support for the Fire Life Safety and Security Managers.
• Co-ordinate and meet the requirements for the SFSMS, HACCP, ISO 14001, FLS and
Engineering audits as per SLIM standards.
• To assists sales & Events department for the guest needs and clarifications on the hotel
facilities.
• Reports to RM & GM
CV for G Radhakrishnan Page 3 of 7
Date: 12.10.2016
FCL Management Services Pte Ltd (12 Jan 2015 to 05 Aug 2015)
It is formerly from F&N, one of the pioneers Group of company having Serviced Apartments,
Residence and Shopping Complexes in Singapore and many other hospitality properties around the
world
Duties and Responsibilities:
• In-Charge of Engineering
• Take care of Serviced apartment’s operation for the long and short staying guest comfort
• Team management for the operation
• Man power management
• Training for the Staffs
• Energy management
• Budget Management
• Schedule of Preventive Maintenance and execute without affecting the hotel operation
• Addition and Alteration works, co-ordinate with contractors
• Take care and Trouble shooting of HVAC. Electrical, Plumbing and Etc..
• Equipment's service and repair follow up with contractors
• Maintain the Equipments and fixtures in order
• Take care of Building Fire safety and the equipment's and Play the role of FSM
• Co-Ordinate with local authorities for the Building operation
• Co-Ordinate with Head of the departments for smooth operations.
• Report to G.M
KAER Pte Ltd (17 March 2006 to 30 Apr 2012)
It is a company doing an energy auditing and Air-con and Facilities Management I had assigned to
Goodwoodpark Hotel as an Assistant Chief Engineer for the Maintenance Department. It is also a five
star hotel having 235 rooms (including 64 apartments), 2 ballrooms and 6 outlets.
Duties and Responsibilities:
• To assist the Chief Engineer or Take charge in case of his absence and report to
management regarding Operations and Projects in morning briefing.
• Make sure the hotel running smoothly to Guest comfort.
• Chiller Plant Operation and make sure saving energy.
• Dealing with contractors regarding Projects, Add Hoc and repair jobs.
• Make sure the ACMV and others regular maintenance going as per prepared schedule.
• Manpower management, Cost management and preparing budget for Maintenance
department.
• Prepare maintenance contract and make sure the contractors are following the schedule.
• To arrange to do HT/LT, MSB servicing, Chiller servicing, Water Tank cleaning, cooling
Tower servicing and others as required by the Government’s operating procedure for Building
Maintenance
• To coordinate with security manager for Fire alarm activation and Fire drill.
• To attend Maintenance /Operation meeting, Hotel Inspection and Kitchen Inspection.
• Time remedy for any kind of fault in Electrical, Electronic, Air condition and others
CV for G Radhakrishnan Page 4 of 7
Date: 12.10.2016
Shangri-La Hotel Singapore (15 Oct 2001 to 04 Feb 2005)
It is a Five Star Hotel having 758 rooms in 3 wings including Suite rooms and 2 Ballrooms, 10
function rooms, 3 big outlets.
1. Preventive Maintenance In-Charge (From 06 Feb 2003 to 04 Feb 2005)
• Prepare Preventive Maintenance Schedule and Check list
• Make sure the Maintenance going as per Schedule for Electrical, Gen –sets, Chillers (Trane
make 3 Nos of 600T & 2 nos of 400 T), Cooling Towers, AHUs, FCUs, Mechanical Ventilation
System, Plumbing and Drainage systems.
• Knowledge of OS2 Automatic Chiller Plant’s operating System & Manual starts and
monitoring the chiller plant based on the load, energy saving.
• Knowledge of Chillers, Cooling Towers, Heat Machines, AHUs & FCUs operation, Trouble
shooting and Repairs.
• Knowledge of Building Fire Alarm System (CERBRUS, ZITON) and PA system, CCTV,
MATV.
• Dealing with Contractors for Periodic servicing.
• Swimming pool, Jacuzzi, Steam Room, Sauna Room maintenance and Dealing with
contractors
• Prepare and Conduct Training to Staffs by OHP and Power Point
2. Assigned as a Technical consultant for Traders Hotel Singapore for 2 months
• To run the Operation and Prepare the SOP for them
• To inspect the building and recommend for rectification and Improvement
• To do the Energy saving recommendations.
3. Assigned as Taskforce for Engineering division to New Hotel (Traders Hotel) opening
in Chennai, India for 2 months
• To Implement the Shangri-La group SOPs
• To follow up with Project & contractors to finish up their work in time and report acting GM
daily
• To setup the Engineering Department with local team members
• To do the training for the Engineering Team
4. Operation In-charge (From 15 Oct 2001 to 05 Feb 2003) to deliver the Hospitality
Service to Guest and Customers
• In-Charge of 4 Duty Engineers and the Shift & Normal Duty Technicians.
• To make sure the Building runs smoothly with Electrical, ACMV, Centralized Chiller plant &
Plumbing systems
• Knowledge of Building Automation System (BAS 2800+) to Control & monitoring the Building
Equipment’s such as Function room AHUs, FCUs & Mechanical Ventilation System.
• Knowledge of Felecon Multi System (FMS) Works Order and Guest room control system.
• Analyzing guest feedback and rectify the problem
CV for G Radhakrishnan Page 5 of 7
Date: 12.10.2016
ISC Automation Pte Ltd (03 Jul 2001 to 08 Sep 2001)
It is a single owner company doing Automation systems for Factories and Shipyards and Makes
MIMIC and PLC panels.
Duties and Responsibilities:
• Automation Technical support to Customers.
• Submit Quotation to customers & Preparation of Purchase Orders
• Drawing work for MIMIC and PLC Panels in AutoCAD.
INDECO Engineers Pte Ltd (01 Feb 2000 to 06 Dec 2000)
It is company doing Building Maintenance by contract, previously under Temasek holdings.
1. Technician in Electrical Dept at NUS (From 01 Feb 2000 to 06 Dec 2000)
• Preparing schedule for PM and Monthly, Weekly, Daily Inspection list for Building Electrical.
• Receiving complaints and rectification to the customer satisfaction.
• Dealing with sub-contractors.
• Submitting Inspection checklists and reports to the Managements and Customer.
• Time remedy for any kind of fault in Electrical, Electronic & Air condition.
2. Technician in Electronics Dept at NUH (From 05 Jan 2000 – 31 Jan 2000)
• Fire Alarm Testing and Fault Rectification.
• Nurse Call System fault rectification.
3. Artisan in Maintenance Dept at TTSH (From 01 Nov 1997 – 04 Jan 2000)
• Receiving complaints from Hospital and pass it to respective Dept when working at
• Fault Reporting Centre.
• Assisting for Servicing of Building MSB and DBs.
• Wiring and Fault rectification for Electrical, Aircon and Car park lightings.
• PM and Servicing of Nurse Call Bell, CCTV and Fire Alarm Testing.
• Fault tracing and rectification of Audio & Video Equipment.
High Energy Batteries (India) Ltd, India as a Superintendent (04 Sep 1983 – 22 Oct 1997)
Joined as a Trainee then promoted to Technician, Senior Technician and Assistant Superintendent
then Superintendent
It is a Silver Zinc and Nickel Cadmium battery manufacturing company supplying to IAF, NAVY, ISRO,
DRDL of INDIA, collaborated with Yardney Electric Corporation of USA
Duties and Responsibilities:
• In-Charge of Primary and Secondary battery production (Silver – Zinc Oxide).
• Production Plan and Schedule to meet the target.
• Follow up with Sub contractors and Material flow for non-stop production.
• Make new Jigs and Fixtures for easy production (Got Awards 5 times from Managing Director).
• Battery Testing and Commissioning after sales at site. (Indian Air force & Indian Navy)
CV for G Radhakrishnan Page 6 of 7
Date: 12.10.2016
Salary and Benefits
Current drawing Salary: US$ 6000 (Tax free pay in Malaysia, paid by hotel) + Accommodation +
Bonus
References
1) Mr. Tan Heng Wang 2) Mr. Antonio Muci
Engineering Manager (Operations) Project Director
Shangri-La Hotel Singapore. KAER, Singapore.
HP: +65 97498903 HP: +65 96532962
3) Mr. Darren Ware
General Manger
Carlton City Hotel, Singapore.
HP: +65 97519422
I declare that the given above is accurate to the best of my knowledge and belief.
Please call me for an Interview, if you feel I could meet your expectations.
Yours truly,
(G.Radhakrishnan)
CV for G Radhakrishnan Page 7 of 7
Date: 12.10.2016

More Related Content

What's hot (18)

RESUME7
RESUME7RESUME7
RESUME7
 
FUV CV
FUV CVFUV CV
FUV CV
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)
 
Ashok Sai
Ashok SaiAshok Sai
Ashok Sai
 
CV- Sreekumar GN
CV- Sreekumar GNCV- Sreekumar GN
CV- Sreekumar GN
 
Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
 
The Projects
The ProjectsThe Projects
The Projects
 
Kalai Resume - Copy
Kalai Resume - CopyKalai Resume - Copy
Kalai Resume - Copy
 
CV-ATO-3 (1)
CV-ATO-3 (1)CV-ATO-3 (1)
CV-ATO-3 (1)
 
Mari's CV
Mari's CVMari's CV
Mari's CV
 
Vinod Singh_CV
Vinod Singh_CVVinod Singh_CV
Vinod Singh_CV
 
Resume
ResumeResume
Resume
 
10. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.201610. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.2016
 
POWER SOLUTIONS
POWER SOLUTIONSPOWER SOLUTIONS
POWER SOLUTIONS
 
BSR 1-1
BSR 1-1BSR 1-1
BSR 1-1
 
Pankaj-prajapati
Pankaj-prajapatiPankaj-prajapati
Pankaj-prajapati
 
MANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGMANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDING
 
JEFF CV
JEFF CVJEFF CV
JEFF CV
 

Viewers also liked (20)

Daswimms Cv 2012
Daswimms Cv 2012Daswimms Cv 2012
Daswimms Cv 2012
 
CV
CVCV
CV
 
CV Mohamad Tarmimi latest (kapal)
CV Mohamad Tarmimi latest (kapal)CV Mohamad Tarmimi latest (kapal)
CV Mohamad Tarmimi latest (kapal)
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Resume_Canny Tee_24 October 2016_v1
Resume_Canny Tee_24 October 2016_v1Resume_Canny Tee_24 October 2016_v1
Resume_Canny Tee_24 October 2016_v1
 
RESUME
RESUMERESUME
RESUME
 
Mendis Nalan Oiler CV
Mendis Nalan Oiler CVMendis Nalan Oiler CV
Mendis Nalan Oiler CV
 
RICHARD J.Y - Barge Admin_CV & Offshore Docs
RICHARD J.Y - Barge Admin_CV & Offshore DocsRICHARD J.Y - Barge Admin_CV & Offshore Docs
RICHARD J.Y - Barge Admin_CV & Offshore Docs
 
My packages Wan Muhammad Zamyr
My packages Wan Muhammad ZamyrMy packages Wan Muhammad Zamyr
My packages Wan Muhammad Zamyr
 
Cover Letter Sazmi (Engineer)23062016
Cover Letter Sazmi (Engineer)23062016Cover Letter Sazmi (Engineer)23062016
Cover Letter Sazmi (Engineer)23062016
 
Anantharaja_resume
Anantharaja_resumeAnantharaja_resume
Anantharaja_resume
 
Onshore Project
Onshore ProjectOnshore Project
Onshore Project
 
CV NB
CV NBCV NB
CV NB
 
Mohamed Elfadil cv
Mohamed Elfadil cvMohamed Elfadil cv
Mohamed Elfadil cv
 
Mohd Feidzal bin Hashim cv
Mohd Feidzal bin Hashim cvMohd Feidzal bin Hashim cv
Mohd Feidzal bin Hashim cv
 
CV Madi
CV MadiCV Madi
CV Madi
 
SHANKAR_RATH RESUME[1]
SHANKAR_RATH RESUME[1]SHANKAR_RATH RESUME[1]
SHANKAR_RATH RESUME[1]
 
Josh Resume
Josh ResumeJosh Resume
Josh Resume
 
JULY 2016 RESUME
JULY 2016 RESUMEJULY 2016 RESUME
JULY 2016 RESUME
 
SSS Cert
SSS CertSSS Cert
SSS Cert
 

Similar to CV_Radhakrishnan_Oct 16

Similar to CV_Radhakrishnan_Oct 16 (20)

Resume34
Resume34Resume34
Resume34
 
resume34
resume34resume34
resume34
 
resume34
resume34resume34
resume34
 
RESUME for Data Center Facility Maintenance
RESUME for Data Center Facility MaintenanceRESUME for Data Center Facility Maintenance
RESUME for Data Center Facility Maintenance
 
Mohd Norrasyid Sudarno_Resume1
Mohd Norrasyid Sudarno_Resume1Mohd Norrasyid Sudarno_Resume1
Mohd Norrasyid Sudarno_Resume1
 
R.Patil
R.PatilR.Patil
R.Patil
 
SanthoshMGowtham-updated
SanthoshMGowtham-updatedSanthoshMGowtham-updated
SanthoshMGowtham-updated
 
Raghunath Patil
Raghunath Patil Raghunath Patil
Raghunath Patil
 
Chet_FM 2 Rev
Chet_FM 2 RevChet_FM 2 Rev
Chet_FM 2 Rev
 
Muthuselvan Bio
Muthuselvan BioMuthuselvan Bio
Muthuselvan Bio
 
Resume
ResumeResume
Resume
 
chayana
chayanachayana
chayana
 
Utility TTIPL RESUME 1 -new Address Copy
Utility TTIPL RESUME 1 -new Address  CopyUtility TTIPL RESUME 1 -new Address  Copy
Utility TTIPL RESUME 1 -new Address Copy
 
s.khan.cv for Chief Engineer
s.khan.cv for Chief Engineers.khan.cv for Chief Engineer
s.khan.cv for Chief Engineer
 
Rupesh_Gosavi_CV_
Rupesh_Gosavi_CV_Rupesh_Gosavi_CV_
Rupesh_Gosavi_CV_
 
Zaw Min Khaing Resume.
Zaw Min Khaing Resume.Zaw Min Khaing Resume.
Zaw Min Khaing Resume.
 
Kamban Cv 14 Year Gulf
Kamban Cv 14 Year GulfKamban Cv 14 Year Gulf
Kamban Cv 14 Year Gulf
 
Latest_Resume_May_11_2016
Latest_Resume_May_11_2016Latest_Resume_May_11_2016
Latest_Resume_May_11_2016
 
Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC
 
xinyuan resume
xinyuan resumexinyuan resume
xinyuan resume
 

CV_Radhakrishnan_Oct 16

  • 1. Education Professional Education (Singapore) • B.Sc. Degree in Facilities Management (Herriot Watt University. Edinburgh, UK)2015 • Certified as “CERT” member for Fire safety regulations 2014 • Certified for Risk Assessment 2009 • Energy Auditing Course May 2007 ( ITE Bedok ) • Fire Safety Manager in SINGAPORE CIVIL DEFENCE ACADAMY 2006 • Skill Evaluation test in Electrical wiring in Mar 1999 Technical Qualification (Singapore) • NTC 2 (PTT) Electrical Installations & Service in Aug 2000 • NTC 3 (PTT) Electrical Technology in Feb 2000 Technical Qualification (India) • Soldering Technology in Jun 1993 • Diploma in Audio & Video Technology in Jul 1997 • Diploma in AutoCAD R14 & 2000 in Jun 2001 Professional Education (India) • Diploma in Electrical Engineering in May 1982 • HSC (+2 Eq to A level) in Jun 1980 • SSLC (10th Standard Eq to O level) in Jun1978 Computer Knowledge • MS office (Excel, Word, Power Point Etc.) • MS Project • AutoCAD Other Certifications • Class 2B Driving License • First Aid CPR Certificate CV for G Radhakrishnan Page 1 of 7 Date: 12.10.2016
  • 2. CV for G Radhakrishnan Page 2 of 7 Date: 12.10.2016 Professional Experience Summary Work Experience in Singapore (01 November 1997-Till Now) S/ N Name of the Organization Position Period From To 1 Shangri La Rasa Ria Resorts Tuaran, Kotakinabalu, Sabah East Malaysia Director of Engineering 09 Aug 2015 Till now 2 FRASER SUITES RIVERVALLEY Engineering Manager 12 Jan 2015 05 Aug 2015 3 GRAND PARK ORCHARD Hotel Chief Engineer 02 May 2012 31 Dec 2014 4 KAER Pte Ltd (Site: Goodwoodpark Hotel) Assistant Chief Engineer 17 Mar 2006 30 Apr 2012 5 Shangri-La Hotel Maintenance Engineer 15 Oct 2001 03 Mar 2006 Traders Hotel Singapore (Cover CE position in the Evening) Technical Consultant 09 Dec 2002 08 Feb 2003 Traders Hotel Chennai (India) Task Force for Pre- Opening New Hotel 28 Dec 2004 11 Feb 2005 6 ISC Automation Assistant Engineer 03 Jul 2001 08 Sep 2001 7 National University of Singapore (NUS) (Under INDECO Engineers) Technician 01 Feb 2000 06 Dec 2000 8 National University Hospital (NUH) (Under INDECO Engineers) Technician 05 Jan 2000 31 Jan 2000 9 Tan Tock Seng Hospital (Under INDECO Engineers) Artisan 01 Nov 1997 04 Jan 2000 Please Take Note: I went to India from 07 Dec 2000 to 02 Jul 2001 since my father passed away. Work Experience in India (04 September 1983-22 Oct 1997) S/N Name of the Organization Position Period From To 1. High Energy Batteries (India) Ltd Trainee - Superintendent 04 Sep 1983 22 Oct 1997
  • 3. Professional Experience Shangri La Rasa Ria Resorts, Kotakinabalu, Sabah (09 Aug 2015 to Till now) It is … Duties and Responsibilities: • Head of Engineering Department and One of the EXCOM member. • Taking care of Engineering and Grounds departments consist of 18 holes golf ground at 300 acres and the resort areas of 150 acres. • Make sure guests safety and comfort at resort to enjoy their holidays. • Managing the 499 guest rooms, huge public areas with gardens and 5 outlets (Italian, Indian, Japanese, Western and locals), 2 nos of Swimming pools, water sport and natural reserve areas. • Taking care of 20 years old MEP plants (HT/LT Rooms, Chiller Plant, Boiler, Water tanks & Pumps, Heat pumps and planning to replace as a part of the improvement for the obsolete equipments. • Handling renovations and refurbishments with Modification on the M&E systems based on the requirements by end users. • Planning and executing the preventive maintenance programme for Guest Room, Public areas, HOH, Function room and Ballroom Air-con, Electrical panels, Laundry and Kitchen equipments. • Implementation of energy and water savings and achieved in compare with last year about 7% in electrical, 10% in Diesel, 15% in water by introducing the water saving device for the guest room with money back period of 2-3 months on the investment and using recycled water for the garden watering with sprinkler system, 20% in LPG. Planned further for next year in compare with current year. • Maintain department’s budget at below 4.7% and planning for capital expenditure on the equipment replacement and renovations. • Training to staffs on the MEP systems, equipments and Standard Operating Procedures. • Team & Man Management (44 engineering and 33 grounds staffs) for the smooth hotel operation. • Make sure the effective service contracts are executed by vendors by monitoring. • Co-ordinate with contractors for any repairs with making the scope of job to meet the standard. • Technical support for the Fire Life Safety and Security Managers. • Co-ordinate and meet the requirements for the SFSMS, HACCP, ISO 14001, FLS and Engineering audits as per SLIM standards. • To assists sales & Events department for the guest needs and clarifications on the hotel facilities. • Reports to RM & GM CV for G Radhakrishnan Page 3 of 7 Date: 12.10.2016
  • 4. FCL Management Services Pte Ltd (12 Jan 2015 to 05 Aug 2015) It is formerly from F&N, one of the pioneers Group of company having Serviced Apartments, Residence and Shopping Complexes in Singapore and many other hospitality properties around the world Duties and Responsibilities: • In-Charge of Engineering • Take care of Serviced apartment’s operation for the long and short staying guest comfort • Team management for the operation • Man power management • Training for the Staffs • Energy management • Budget Management • Schedule of Preventive Maintenance and execute without affecting the hotel operation • Addition and Alteration works, co-ordinate with contractors • Take care and Trouble shooting of HVAC. Electrical, Plumbing and Etc.. • Equipment's service and repair follow up with contractors • Maintain the Equipments and fixtures in order • Take care of Building Fire safety and the equipment's and Play the role of FSM • Co-Ordinate with local authorities for the Building operation • Co-Ordinate with Head of the departments for smooth operations. • Report to G.M KAER Pte Ltd (17 March 2006 to 30 Apr 2012) It is a company doing an energy auditing and Air-con and Facilities Management I had assigned to Goodwoodpark Hotel as an Assistant Chief Engineer for the Maintenance Department. It is also a five star hotel having 235 rooms (including 64 apartments), 2 ballrooms and 6 outlets. Duties and Responsibilities: • To assist the Chief Engineer or Take charge in case of his absence and report to management regarding Operations and Projects in morning briefing. • Make sure the hotel running smoothly to Guest comfort. • Chiller Plant Operation and make sure saving energy. • Dealing with contractors regarding Projects, Add Hoc and repair jobs. • Make sure the ACMV and others regular maintenance going as per prepared schedule. • Manpower management, Cost management and preparing budget for Maintenance department. • Prepare maintenance contract and make sure the contractors are following the schedule. • To arrange to do HT/LT, MSB servicing, Chiller servicing, Water Tank cleaning, cooling Tower servicing and others as required by the Government’s operating procedure for Building Maintenance • To coordinate with security manager for Fire alarm activation and Fire drill. • To attend Maintenance /Operation meeting, Hotel Inspection and Kitchen Inspection. • Time remedy for any kind of fault in Electrical, Electronic, Air condition and others CV for G Radhakrishnan Page 4 of 7 Date: 12.10.2016
  • 5. Shangri-La Hotel Singapore (15 Oct 2001 to 04 Feb 2005) It is a Five Star Hotel having 758 rooms in 3 wings including Suite rooms and 2 Ballrooms, 10 function rooms, 3 big outlets. 1. Preventive Maintenance In-Charge (From 06 Feb 2003 to 04 Feb 2005) • Prepare Preventive Maintenance Schedule and Check list • Make sure the Maintenance going as per Schedule for Electrical, Gen –sets, Chillers (Trane make 3 Nos of 600T & 2 nos of 400 T), Cooling Towers, AHUs, FCUs, Mechanical Ventilation System, Plumbing and Drainage systems. • Knowledge of OS2 Automatic Chiller Plant’s operating System & Manual starts and monitoring the chiller plant based on the load, energy saving. • Knowledge of Chillers, Cooling Towers, Heat Machines, AHUs & FCUs operation, Trouble shooting and Repairs. • Knowledge of Building Fire Alarm System (CERBRUS, ZITON) and PA system, CCTV, MATV. • Dealing with Contractors for Periodic servicing. • Swimming pool, Jacuzzi, Steam Room, Sauna Room maintenance and Dealing with contractors • Prepare and Conduct Training to Staffs by OHP and Power Point 2. Assigned as a Technical consultant for Traders Hotel Singapore for 2 months • To run the Operation and Prepare the SOP for them • To inspect the building and recommend for rectification and Improvement • To do the Energy saving recommendations. 3. Assigned as Taskforce for Engineering division to New Hotel (Traders Hotel) opening in Chennai, India for 2 months • To Implement the Shangri-La group SOPs • To follow up with Project & contractors to finish up their work in time and report acting GM daily • To setup the Engineering Department with local team members • To do the training for the Engineering Team 4. Operation In-charge (From 15 Oct 2001 to 05 Feb 2003) to deliver the Hospitality Service to Guest and Customers • In-Charge of 4 Duty Engineers and the Shift & Normal Duty Technicians. • To make sure the Building runs smoothly with Electrical, ACMV, Centralized Chiller plant & Plumbing systems • Knowledge of Building Automation System (BAS 2800+) to Control & monitoring the Building Equipment’s such as Function room AHUs, FCUs & Mechanical Ventilation System. • Knowledge of Felecon Multi System (FMS) Works Order and Guest room control system. • Analyzing guest feedback and rectify the problem CV for G Radhakrishnan Page 5 of 7 Date: 12.10.2016
  • 6. ISC Automation Pte Ltd (03 Jul 2001 to 08 Sep 2001) It is a single owner company doing Automation systems for Factories and Shipyards and Makes MIMIC and PLC panels. Duties and Responsibilities: • Automation Technical support to Customers. • Submit Quotation to customers & Preparation of Purchase Orders • Drawing work for MIMIC and PLC Panels in AutoCAD. INDECO Engineers Pte Ltd (01 Feb 2000 to 06 Dec 2000) It is company doing Building Maintenance by contract, previously under Temasek holdings. 1. Technician in Electrical Dept at NUS (From 01 Feb 2000 to 06 Dec 2000) • Preparing schedule for PM and Monthly, Weekly, Daily Inspection list for Building Electrical. • Receiving complaints and rectification to the customer satisfaction. • Dealing with sub-contractors. • Submitting Inspection checklists and reports to the Managements and Customer. • Time remedy for any kind of fault in Electrical, Electronic & Air condition. 2. Technician in Electronics Dept at NUH (From 05 Jan 2000 – 31 Jan 2000) • Fire Alarm Testing and Fault Rectification. • Nurse Call System fault rectification. 3. Artisan in Maintenance Dept at TTSH (From 01 Nov 1997 – 04 Jan 2000) • Receiving complaints from Hospital and pass it to respective Dept when working at • Fault Reporting Centre. • Assisting for Servicing of Building MSB and DBs. • Wiring and Fault rectification for Electrical, Aircon and Car park lightings. • PM and Servicing of Nurse Call Bell, CCTV and Fire Alarm Testing. • Fault tracing and rectification of Audio & Video Equipment. High Energy Batteries (India) Ltd, India as a Superintendent (04 Sep 1983 – 22 Oct 1997) Joined as a Trainee then promoted to Technician, Senior Technician and Assistant Superintendent then Superintendent It is a Silver Zinc and Nickel Cadmium battery manufacturing company supplying to IAF, NAVY, ISRO, DRDL of INDIA, collaborated with Yardney Electric Corporation of USA Duties and Responsibilities: • In-Charge of Primary and Secondary battery production (Silver – Zinc Oxide). • Production Plan and Schedule to meet the target. • Follow up with Sub contractors and Material flow for non-stop production. • Make new Jigs and Fixtures for easy production (Got Awards 5 times from Managing Director). • Battery Testing and Commissioning after sales at site. (Indian Air force & Indian Navy) CV for G Radhakrishnan Page 6 of 7 Date: 12.10.2016
  • 7. Salary and Benefits Current drawing Salary: US$ 6000 (Tax free pay in Malaysia, paid by hotel) + Accommodation + Bonus References 1) Mr. Tan Heng Wang 2) Mr. Antonio Muci Engineering Manager (Operations) Project Director Shangri-La Hotel Singapore. KAER, Singapore. HP: +65 97498903 HP: +65 96532962 3) Mr. Darren Ware General Manger Carlton City Hotel, Singapore. HP: +65 97519422 I declare that the given above is accurate to the best of my knowledge and belief. Please call me for an Interview, if you feel I could meet your expectations. Yours truly, (G.Radhakrishnan) CV for G Radhakrishnan Page 7 of 7 Date: 12.10.2016