SlideShare a Scribd company logo
1 of 10
CURRICULUM VITAE
NAME : MUHAMMAD ABDUL NAEEM QURESHI
AGE : 60 Years
NATIONALITY : PAKISTANI
EDUCATIONAL & PROFESSIONAL QUALIFICATIONS:
A) NED University of Engineering & Technology (Karachi, Pakistan)
Bachelor Degree in Mechanical Engineering(1978)
B) DESCON Engineering Limited, Lahore
Effective Project Planning & Controlling Project Successfully 1994
Finance & Accounting for Non-Financial Executive 1995
Finance Analysis, concept and Techniques 1995
SYSTEM 9000, Lahore
Auditing to ISO-9000 1996
Project Management Workshop 1997
Pakistan Institute of Management, Lahore, Pakistan
Effective Communication Skills 1998
Project Primavera Planner 1998
Lahore University of Management Sciences, Lahore
Customized Program for DESCON Building Effective Teams 1999
KPMS, Karachi
Developing and Enhancing English Language Skills 1999
Center for Management Development and Training Inc.
Washington D.C., USA
Naeem Qureshi Page 1 of 9
FOREIGN TRAINING
• One year ship building fabrication and welding training in Japan.
• Japanese Language Course, Planning & Control, Management and Quality Control.
• Welding practical training.
PROFESSIONAL EXPERIENCE :
Have thirty three (36) years experience of working in various industries pertaining to Oil & Gas including
running plants, Petrochemical, Ship Building and Barrage Construction, Power Plant Running Fabrication
workshop Fabrication of heavy lifting beam, heavy load transport platform Super heater tube bending,
Burner opening Panels .
The jobs covered all aspects of the business processes such as proposal preparation, project management,
warehouse management, procurement for EPC project, project planning, erection, modification,
shutdowns, commissioning related activities. Familiar with live operation requirements, permit to work
system, job safety analysis in running plants and safety prerequisites. Preparation of Method Statement,
TRA (Task Risk Assessment) Commissioning procedures, manuals and Rigging study. Preparation and
participation for HAZOP
a) Present
EPC Project Manager July 2006 till present
Manager Projects
Manager Work Shop & Machine Shop
Deutsche Babcock LLC
Abu Dhabi
b) Previous
Dy.General Manager
HABIB RAFIQ (Pvt) Ltd.
KSA Opération March 2003 to June 2006
Dy. General Manager
DESCON Engineering Ltd 1988 to Feb 2003
Karachi Shipyard & Engineering Works, Limited 1978 to 1988
Karachi, Pakistan
WORK EXPERIENCE: TOTAL 36 YEARS
YEAR EMPLOYER &
COUNTRY
NATURE OF JOB
April -2012 to Today • Deutsche
Babcock LLC
UAE
Hod Store, Ware House & Workshop
Store & Ware house
• Control Material Movement from Store to
Project site & Return.
Naeem Qureshi Page 2 of 9
Feb -2013 to Jan -2014
Jan-2013 to Nov-2014
Oct-2010 to Nov-2014
• Control Store & Ware house Inventory
Management.
• Control All Equipment movement to Project
site & Return.
• Control Equipment Repair and Maintenance.
• Control Equipment & tool Calibrations
records
• Control Equipment & Tool Rental from
Projects
Machine Shop & Fabrication Shop
• Fabrication of pipe spool, Fabrication of pipe
Support and Fabrication of Steel Structure for
Babcock projects as well as for other client.
• Fabrication of Burner Opening Panel (60 Sets)
for BBS Kuwait.
• Fabrication of Burner Opening Panel (128 Sets)
for BBS Kuwait
• Fabrication of Steam Coil for Pertofac
• Fabrication of Super Heater Coils(60) Set for
BBS Kuwait
• Fabrication of ladder stairs and platform for
Braden.
• Repair of Pig Launcher (R Stamp) for ADCO
• Reformer pigtail tube bending(30 Sets) for
QAFCO
12 M3/Day RO plant for ZADCO.
• Coordinating with Manufacturer for
Engineering Supply Manufacturing and Site
Installation of Three unit of 12 M3/Day RO
plant for SSP, NSP & WSP
EMAL ALUMINUM PLANT, TAWEELAH
(Aluminum Smelter) Phase II
Client: SNC Lavalin International
Scope of Work.
• Installation of two Nos Black Start Generator
• Supply, Fabrication & Erection of Structure for
Water Treatment Building
• Supply, Fabrication & Erection of Structure for
Pipe Rack
• Supply, Fabrication & Erection of piping Spool
• Supply & Erection of FRP piping (48”) for Sea
water intake
Repair & Replacement Work for below Client at
EMAL site for Phase I
GE
BRADEN USA
Naeem Qureshi Page 3 of 9
BREDEN UK
EMAL OPERATION Phase I
DOOSAN
J.C MacElroy Company, Inc USA
.
Dec-2008 to Jan-2011
Deutsche Babcock
Energies UAE
EPC Project Manager
• Installation of HRSGs
• Fabrication & Installation of BOP Piping
• Installation of Equipment’s
EMAL ALUMINUM PLANT, TAWEELAH
(Aluminum Smelter)
Client: SNC Lavalin International Inc. and
Worley Parsons Engineering Pty Ltd. (SLPW)
Aug 2006 to Feb-2009 Deutsche Babcock
Energie Abu Dhabi
Project Manager
New Nitrogen Plant - 10 (Nitrogen Plant 11 & 12
Replacement) at DAs Island UAE
Client: Abu Dhabi Gas Liquefaction Co. Ltd.
(ADGAS)
Project, Covers,
• Design,
• Procurement,
• Project Management,
• Warehouse Services,
• Removal of old Equipments,
• Civil Mechanical and E&I construction,
including shut down for Tie in.
• Participate in HAZOP meeting and review.
Preparation of ITP’s, TRA (Task Risk
Assessment) Method statement, Rigging
Studies, Operation and commissioning
manuals, shut down Packages
• Pre-commissioning and Commissioning.
July 2006 to Nov-2008 Deutsche Babcock
Energie Abu Dhabi
Project Manager:
New Liquid Sulphur Sumps for unit 50 / 51 Habshan
UAE.
Client: Abu Dhabi Gas Industries Ltd. (GASCO).
Project, Covers,
• Design,
• Procurement,
• Project Management,
• Warehouse Services,
• Civil Mechanical and E&I construction,
including shut down for Tie in. Erection of
Equipment’s.
Naeem Qureshi Page 4 of 9
• Pre-commissioning and Commissioning.
Aug-2005 to June -2006 HABIB RAFIQ (Pvt)
Ltd. KSA
Project Manager:
Riyadh Cement Company Power Plant Project,
Project covers,
• Project Management,
• Warehouse Services,
• Mechanical construction,
April-2005 to July-2005 HABIB RAFIQ (Pvt)
Ltd. KSA
Project Manager:
Replacement of Air Intake Filter for GE Gas turbine
(2nso) for Jizan Power Plant Project.:
• Construction of civil foundation,
• Fabrication and Erection of steel structure,
• Removal of existing Air filter
• Installation of new Air filter
June-2003 to March-2005 HABIB RAFIQ (Pvt)
Ltd. KSA
Project Manager:
Reinforcement of FRASAN Power Plant.( FRASAN
ISLAND)
Project, Covers,
• Design,
• Procurement,
• Project Management,
• Warehouse Services,
• Civil Mechanical and E&I construction,
responsibilities
• Tie-in which existing plants.
• Complete testing and Commissioning and
Trial Run.
Coordination from HABIB RAFIQ (Pvt) Ltd.KSA
office for,
Up- Gradation of De-Dusting System for Qassim
Cement plant.
• Civil work,
• Mechanical Erection,
• Insulation & cladding
• Electrical erection.
Tabuk Power Plant
Expansion of power plant, Project covers:
• Design,
• Procurement,
• Project Management,
• Warehouse Services,
• Civil Mechanical and E&I construction
• Complete testing , Commissioning and Trial
Run.
2001 to 2002 DESCON Engineering
Ltd Qatar
Site Manager QATAR GAS Debottlenecking
Project
Naeem Qureshi Page 5 of 9
Project Scope:
• Construction of facilities including
• Demolition of Compressor and compressor
foundation by Diamond wire cutting,
• Prefabrication and erection of piping,
• Equipment, installation with in pre-shutdown
and shutdown phases.
• Pre-commissioning and site test runs.
DESCON Engineering
Ltd Pakistan
PROPOSAL MANAGER. Head office Lahore
• Prepare technical and commercial proposal to
ensure accuracy of costing and the marketing
strategy.
• Communication/clarification with client well
in time so as to fulfill the need of Client
schedule
• Preparation of Project Schedule on Primavera
P3.
• Participate in all discussions with the client.
• Coordinate with Business Development
Department of the Company to maximize the
success of Proposals.
• Prepare cash flow and budget.
2000 to 2001 DESCON Engineering
Ltd. UAE
Project Manager
Borouge Petrochemical Project, Ruwais, Abu Dhabi for
Alliance Bechtel Linde.
Project is a part of Borouge Petrochemical Complex
(Ethylene Plant)
EPC Contractor Alliance Bechtel Linde.
Project Scope:
• Prepare Project Quality Plan and HSE Plan.
• Fabrication and Erection of CS and SS Pipes
and
• Installation of Equipment.
1999 to 2000
DESCON Engineering
Ltd. Pakistan
Project Manager:
Relocation of Dehydration Units (2NO) from Pirkoh
Gas field to Qadirpur Gas field.
EPC Project for Oil & Gas Development Corporation
of Pakistan.
Naeem Qureshi Page 6 of 9
1998 to 1999 DESCON Engineering
Ltd. Pakistan
Project Manager
VCM Storage & Handling Facility Project an EPC
Project for Engro Paktank
(J.V Dutch & Pakistani Co.)
• Pilling and Civil work
• Fabrication and erection of two 29.5 M Dia
spheres with other equipment, piping and E &
I work. Testing & Commissioning
1997 to 1998 DESCON Engineering
Ltd. Pakistan
Project Manager
LPG Storage & Handling Facility (5000ton). Pakistan
EPC Project for Engro Pak Tank (J.V Dutch &
Pakistani Co.)
• Pilling, Civil Foundation and Building work
• Fabrication and erection of 10 Nos. LPG
bullets 5 M Dia and 60 M length. Installation
of Equipment, Fabrication and erection piping
E & I work. Pre-commissioning &
commissioning
July 1996 to Sept-1996 DESCON Engineering
Ltd. Oman
Deputy Project Manager
Oman Refinery Project, responsible
• Refurbishment of heat exchanger, columns,
vessels.
• Replacement of pipe and furnace tube
1993 to 1994 DESCON Engineering
Ltd. Pakistan
Project Manager
ICI Polyester Expansion. Pakistan
Project covers
• Design,
• Procurement,
• Project management,
• Warehouse services,
• Civil, Mechanical and E&I construction,
1992 to 1993 DESCON Engineering
Ltd Pakistan
Project Manager:
ICI Soda Ash Expansion 141KTP-191KTP, . Pakistan
Project, covers,
• Design,
• Procurement,
• Project Management,
• Warehouse Services,
• Civil Mechanical and E&I construction,
• Testing , Commissioning and Tie-in with the
existing plants
1992 to 1993 DESCON Engineering
Ltd Pakistan
Project Manager
Naeem Qureshi Page 7 of 9
ICI Sodium Bicarbonate. . Pakistan
Project, covers,
• Design,
• Procurement,
• Project Management,
• Warehouse Services,
• Civil Mechanical and E&I construction,
• Testing and Commissioning and Tie-in with
the existing plants
1988 to 1992 DESCON Engineering
Ltd Pakistan
Deputy Project Manager:
(Descon Whesssoe Joint-venture) rehabilitation of
Sukkhaur Barrage, Pakistan
• Fabrication of 56 Nos. River Gates (45 ton
each), 165 canal gates (9 ton each).
• Removal of old gates and Installation of new
Gates (River and Canal).
• Removal and installation of 66 Nos. River
Counter weight (90 ton each).
• Refurbishment of hoisting equipment.
1985 TO 1988 Karachi Shipyard and
Engineering
Installation of Three Gas Compressors Stations.
• Installation of Compressor
• Instalation of Associate Equipment.
• Fabrication and Erection of Pipe Line.
• Fabrication and Erection of Structure.
• Testing and Commissioning.
1984 TO 1985 Karachi Shipyard and
Engineering
General Tire and Rubber Company
• Machinery Assembly, Erection and Alignment
(2,000 tons)
• Fabrication and Erection of Pipe and
Structure.
• Testing and Commissioning.
1981 TO 1983 Karachi Shipyard and
Engineering
In charge Fabrication Shop
• Fabrication of Cement Plant, Structure,
Vessels, Ducts, Conveyor.
• Fabrication of 58 Nos. Aluminum Boats.
• Fabrication of Heavy Structure of Sugar Mill.
• Fabrication of skid mounted dehydration
plant.
• Fabrication of 3 Nos. Diving Boats for Pak
Navy.
• Fabrication of Ship Blocks (40 tons)
1978 TO 1981
Karachi Shipyard and
Engineering
In charge Ship Machinery Installation
Naeem Qureshi Page 8 of 9
• Assembly and Erection of Main Engines (up to
10,000 BHP)
• Erection of Diesel Generator, Boiler, Pumps,
Erection and testing of Cranes, Winches,
• Installation and testing Refrigeration and Air
conditioning system.
PERSONAL
INFORMATION
Date of Birth May 23, 1954
Nationality Pakistan
Religion Islam
Passport No. KG-308073
Place and date of Issue Lahore
Marital Status Married
U.A.E Driving License 536252/A
Languages English , Urdu, Japanese
Contact Details.
Mobile 00971-050-4431605
Office: 00971-2-4995999 Ex-1206
Office Dir: 00971-2-499571
Home : 00971-2-6278260
E- mail; naeem.qureshi@babcock.ae
naeemqureshi54@hotmail.com
Naeem Qureshi Page 9 of 9
• Assembly and Erection of Main Engines (up to
10,000 BHP)
• Erection of Diesel Generator, Boiler, Pumps,
Erection and testing of Cranes, Winches,
• Installation and testing Refrigeration and Air
conditioning system.
PERSONAL
INFORMATION
Date of Birth May 23, 1954
Nationality Pakistan
Religion Islam
Passport No. KG-308073
Place and date of Issue Lahore
Marital Status Married
U.A.E Driving License 536252/A
Languages English , Urdu, Japanese
Contact Details.
Mobile 00971-050-4431605
Office: 00971-2-4995999 Ex-1206
Office Dir: 00971-2-499571
Home : 00971-2-6278260
E- mail; naeem.qureshi@babcock.ae
naeemqureshi54@hotmail.com
Naeem Qureshi Page 9 of 9

More Related Content

What's hot

Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16SHYAM NIKESH
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir JavedAamir Javed
 
CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16Rakesh Arya
 
Nuberg EPC Plants & Turnkey Chemical Projects
Nuberg EPC Plants & Turnkey Chemical ProjectsNuberg EPC Plants & Turnkey Chemical Projects
Nuberg EPC Plants & Turnkey Chemical ProjectsNuberg Engineering
 
GEC presentation
GEC  presentationGEC  presentation
GEC presentationrickyhargrove
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliZain Ali Syed
 
Work Experience
Work ExperienceWork Experience
Work ExperienceCraig Norman
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Gravesbernard graves
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527Rob Smith
 
Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Kerry Polkinghorne
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
projects
projectsprojects
projectsMan Singh
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon
 

What's hot (20)

Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
 
jahangir
jahangirjahangir
jahangir
 
CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16
 
Nuberg EPC Plants & Turnkey Chemical Projects
Nuberg EPC Plants & Turnkey Chemical ProjectsNuberg EPC Plants & Turnkey Chemical Projects
Nuberg EPC Plants & Turnkey Chemical Projects
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
GEC presentation
GEC  presentationGEC  presentation
GEC presentation
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain Ali
 
Work Experience
Work ExperienceWork Experience
Work Experience
 
CV-Balamurugan.
CV-Balamurugan.CV-Balamurugan.
CV-Balamurugan.
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
CV -TRV-Civil Engg. Credentials
CV -TRV-Civil Engg. CredentialsCV -TRV-Civil Engg. Credentials
CV -TRV-Civil Engg. Credentials
 
projects
projectsprojects
projects
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016
 

Similar to CV NAEEM QURESHI 2014

Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Waqas Farooq, PMP®
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineerVinodh Kumar
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .Arun (kurup)
 
RESUME-MOHAN MUKUND
RESUME-MOHAN MUKUNDRESUME-MOHAN MUKUND
RESUME-MOHAN MUKUNDMukund Mohan
 
curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015KOSHY VARGHESE KOSHY
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CVVinodg Kumar
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
SUKESH-CV 01.09.2016
SUKESH-CV 01.09.2016SUKESH-CV 01.09.2016
SUKESH-CV 01.09.2016sukesh kesavan
 
k4_Engg_profile_New
k4_Engg_profile_Newk4_Engg_profile_New
k4_Engg_profile_NewSujit Tharakan
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01SATYAVIR SINGH
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CVManish Ray
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017Kenrick Ramos
 
Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)TANVEER MOHAMMED PHANSOPKAR
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1Tata
 

Similar to CV NAEEM QURESHI 2014 (20)

Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
RESUME-MOHAN MUKUND
RESUME-MOHAN MUKUNDRESUME-MOHAN MUKUND
RESUME-MOHAN MUKUND
 
curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
SUKESH-CV 01.09.2016
SUKESH-CV 01.09.2016SUKESH-CV 01.09.2016
SUKESH-CV 01.09.2016
 
k4_Engg_profile_New
k4_Engg_profile_Newk4_Engg_profile_New
k4_Engg_profile_New
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
Cv vinaya
Cv vinayaCv vinaya
Cv vinaya
 
Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
 

CV NAEEM QURESHI 2014

  • 1. CURRICULUM VITAE NAME : MUHAMMAD ABDUL NAEEM QURESHI AGE : 60 Years NATIONALITY : PAKISTANI EDUCATIONAL & PROFESSIONAL QUALIFICATIONS: A) NED University of Engineering & Technology (Karachi, Pakistan) Bachelor Degree in Mechanical Engineering(1978) B) DESCON Engineering Limited, Lahore Effective Project Planning & Controlling Project Successfully 1994 Finance & Accounting for Non-Financial Executive 1995 Finance Analysis, concept and Techniques 1995 SYSTEM 9000, Lahore Auditing to ISO-9000 1996 Project Management Workshop 1997 Pakistan Institute of Management, Lahore, Pakistan Effective Communication Skills 1998 Project Primavera Planner 1998 Lahore University of Management Sciences, Lahore Customized Program for DESCON Building Effective Teams 1999 KPMS, Karachi Developing and Enhancing English Language Skills 1999 Center for Management Development and Training Inc. Washington D.C., USA Naeem Qureshi Page 1 of 9
  • 2. FOREIGN TRAINING • One year ship building fabrication and welding training in Japan. • Japanese Language Course, Planning & Control, Management and Quality Control. • Welding practical training. PROFESSIONAL EXPERIENCE : Have thirty three (36) years experience of working in various industries pertaining to Oil & Gas including running plants, Petrochemical, Ship Building and Barrage Construction, Power Plant Running Fabrication workshop Fabrication of heavy lifting beam, heavy load transport platform Super heater tube bending, Burner opening Panels . The jobs covered all aspects of the business processes such as proposal preparation, project management, warehouse management, procurement for EPC project, project planning, erection, modification, shutdowns, commissioning related activities. Familiar with live operation requirements, permit to work system, job safety analysis in running plants and safety prerequisites. Preparation of Method Statement, TRA (Task Risk Assessment) Commissioning procedures, manuals and Rigging study. Preparation and participation for HAZOP a) Present EPC Project Manager July 2006 till present Manager Projects Manager Work Shop & Machine Shop Deutsche Babcock LLC Abu Dhabi b) Previous Dy.General Manager HABIB RAFIQ (Pvt) Ltd. KSA OpĂ©ration March 2003 to June 2006 Dy. General Manager DESCON Engineering Ltd 1988 to Feb 2003 Karachi Shipyard & Engineering Works, Limited 1978 to 1988 Karachi, Pakistan WORK EXPERIENCE: TOTAL 36 YEARS YEAR EMPLOYER & COUNTRY NATURE OF JOB April -2012 to Today • Deutsche Babcock LLC UAE Hod Store, Ware House & Workshop Store & Ware house • Control Material Movement from Store to Project site & Return. Naeem Qureshi Page 2 of 9
  • 3. Feb -2013 to Jan -2014 Jan-2013 to Nov-2014 Oct-2010 to Nov-2014 • Control Store & Ware house Inventory Management. • Control All Equipment movement to Project site & Return. • Control Equipment Repair and Maintenance. • Control Equipment & tool Calibrations records • Control Equipment & Tool Rental from Projects Machine Shop & Fabrication Shop • Fabrication of pipe spool, Fabrication of pipe Support and Fabrication of Steel Structure for Babcock projects as well as for other client. • Fabrication of Burner Opening Panel (60 Sets) for BBS Kuwait. • Fabrication of Burner Opening Panel (128 Sets) for BBS Kuwait • Fabrication of Steam Coil for Pertofac • Fabrication of Super Heater Coils(60) Set for BBS Kuwait • Fabrication of ladder stairs and platform for Braden. • Repair of Pig Launcher (R Stamp) for ADCO • Reformer pigtail tube bending(30 Sets) for QAFCO 12 M3/Day RO plant for ZADCO. • Coordinating with Manufacturer for Engineering Supply Manufacturing and Site Installation of Three unit of 12 M3/Day RO plant for SSP, NSP & WSP EMAL ALUMINUM PLANT, TAWEELAH (Aluminum Smelter) Phase II Client: SNC Lavalin International Scope of Work. • Installation of two Nos Black Start Generator • Supply, Fabrication & Erection of Structure for Water Treatment Building • Supply, Fabrication & Erection of Structure for Pipe Rack • Supply, Fabrication & Erection of piping Spool • Supply & Erection of FRP piping (48”) for Sea water intake Repair & Replacement Work for below Client at EMAL site for Phase I GE BRADEN USA Naeem Qureshi Page 3 of 9
  • 4. BREDEN UK EMAL OPERATION Phase I DOOSAN J.C MacElroy Company, Inc USA . Dec-2008 to Jan-2011 Deutsche Babcock Energies UAE EPC Project Manager • Installation of HRSGs • Fabrication & Installation of BOP Piping • Installation of Equipment’s EMAL ALUMINUM PLANT, TAWEELAH (Aluminum Smelter) Client: SNC Lavalin International Inc. and Worley Parsons Engineering Pty Ltd. (SLPW) Aug 2006 to Feb-2009 Deutsche Babcock Energie Abu Dhabi Project Manager New Nitrogen Plant - 10 (Nitrogen Plant 11 & 12 Replacement) at DAs Island UAE Client: Abu Dhabi Gas Liquefaction Co. Ltd. (ADGAS) Project, Covers, • Design, • Procurement, • Project Management, • Warehouse Services, • Removal of old Equipments, • Civil Mechanical and E&I construction, including shut down for Tie in. • Participate in HAZOP meeting and review. Preparation of ITP’s, TRA (Task Risk Assessment) Method statement, Rigging Studies, Operation and commissioning manuals, shut down Packages • Pre-commissioning and Commissioning. July 2006 to Nov-2008 Deutsche Babcock Energie Abu Dhabi Project Manager: New Liquid Sulphur Sumps for unit 50 / 51 Habshan UAE. Client: Abu Dhabi Gas Industries Ltd. (GASCO). Project, Covers, • Design, • Procurement, • Project Management, • Warehouse Services, • Civil Mechanical and E&I construction, including shut down for Tie in. Erection of Equipment’s. Naeem Qureshi Page 4 of 9
  • 5. • Pre-commissioning and Commissioning. Aug-2005 to June -2006 HABIB RAFIQ (Pvt) Ltd. KSA Project Manager: Riyadh Cement Company Power Plant Project, Project covers, • Project Management, • Warehouse Services, • Mechanical construction, April-2005 to July-2005 HABIB RAFIQ (Pvt) Ltd. KSA Project Manager: Replacement of Air Intake Filter for GE Gas turbine (2nso) for Jizan Power Plant Project.: • Construction of civil foundation, • Fabrication and Erection of steel structure, • Removal of existing Air filter • Installation of new Air filter June-2003 to March-2005 HABIB RAFIQ (Pvt) Ltd. KSA Project Manager: Reinforcement of FRASAN Power Plant.( FRASAN ISLAND) Project, Covers, • Design, • Procurement, • Project Management, • Warehouse Services, • Civil Mechanical and E&I construction, responsibilities • Tie-in which existing plants. • Complete testing and Commissioning and Trial Run. Coordination from HABIB RAFIQ (Pvt) Ltd.KSA office for, Up- Gradation of De-Dusting System for Qassim Cement plant. • Civil work, • Mechanical Erection, • Insulation & cladding • Electrical erection. Tabuk Power Plant Expansion of power plant, Project covers: • Design, • Procurement, • Project Management, • Warehouse Services, • Civil Mechanical and E&I construction • Complete testing , Commissioning and Trial Run. 2001 to 2002 DESCON Engineering Ltd Qatar Site Manager QATAR GAS Debottlenecking Project Naeem Qureshi Page 5 of 9
  • 6. Project Scope: • Construction of facilities including • Demolition of Compressor and compressor foundation by Diamond wire cutting, • Prefabrication and erection of piping, • Equipment, installation with in pre-shutdown and shutdown phases. • Pre-commissioning and site test runs. DESCON Engineering Ltd Pakistan PROPOSAL MANAGER. Head office Lahore • Prepare technical and commercial proposal to ensure accuracy of costing and the marketing strategy. • Communication/clarification with client well in time so as to fulfill the need of Client schedule • Preparation of Project Schedule on Primavera P3. • Participate in all discussions with the client. • Coordinate with Business Development Department of the Company to maximize the success of Proposals. • Prepare cash flow and budget. 2000 to 2001 DESCON Engineering Ltd. UAE Project Manager Borouge Petrochemical Project, Ruwais, Abu Dhabi for Alliance Bechtel Linde. Project is a part of Borouge Petrochemical Complex (Ethylene Plant) EPC Contractor Alliance Bechtel Linde. Project Scope: • Prepare Project Quality Plan and HSE Plan. • Fabrication and Erection of CS and SS Pipes and • Installation of Equipment. 1999 to 2000 DESCON Engineering Ltd. Pakistan Project Manager: Relocation of Dehydration Units (2NO) from Pirkoh Gas field to Qadirpur Gas field. EPC Project for Oil & Gas Development Corporation of Pakistan. Naeem Qureshi Page 6 of 9
  • 7. 1998 to 1999 DESCON Engineering Ltd. Pakistan Project Manager VCM Storage & Handling Facility Project an EPC Project for Engro Paktank (J.V Dutch & Pakistani Co.) • Pilling and Civil work • Fabrication and erection of two 29.5 M Dia spheres with other equipment, piping and E & I work. Testing & Commissioning 1997 to 1998 DESCON Engineering Ltd. Pakistan Project Manager LPG Storage & Handling Facility (5000ton). Pakistan EPC Project for Engro Pak Tank (J.V Dutch & Pakistani Co.) • Pilling, Civil Foundation and Building work • Fabrication and erection of 10 Nos. LPG bullets 5 M Dia and 60 M length. Installation of Equipment, Fabrication and erection piping E & I work. Pre-commissioning & commissioning July 1996 to Sept-1996 DESCON Engineering Ltd. Oman Deputy Project Manager Oman Refinery Project, responsible • Refurbishment of heat exchanger, columns, vessels. • Replacement of pipe and furnace tube 1993 to 1994 DESCON Engineering Ltd. Pakistan Project Manager ICI Polyester Expansion. Pakistan Project covers • Design, • Procurement, • Project management, • Warehouse services, • Civil, Mechanical and E&I construction, 1992 to 1993 DESCON Engineering Ltd Pakistan Project Manager: ICI Soda Ash Expansion 141KTP-191KTP, . Pakistan Project, covers, • Design, • Procurement, • Project Management, • Warehouse Services, • Civil Mechanical and E&I construction, • Testing , Commissioning and Tie-in with the existing plants 1992 to 1993 DESCON Engineering Ltd Pakistan Project Manager Naeem Qureshi Page 7 of 9
  • 8. ICI Sodium Bicarbonate. . Pakistan Project, covers, • Design, • Procurement, • Project Management, • Warehouse Services, • Civil Mechanical and E&I construction, • Testing and Commissioning and Tie-in with the existing plants 1988 to 1992 DESCON Engineering Ltd Pakistan Deputy Project Manager: (Descon Whesssoe Joint-venture) rehabilitation of Sukkhaur Barrage, Pakistan • Fabrication of 56 Nos. River Gates (45 ton each), 165 canal gates (9 ton each). • Removal of old gates and Installation of new Gates (River and Canal). • Removal and installation of 66 Nos. River Counter weight (90 ton each). • Refurbishment of hoisting equipment. 1985 TO 1988 Karachi Shipyard and Engineering Installation of Three Gas Compressors Stations. • Installation of Compressor • Instalation of Associate Equipment. • Fabrication and Erection of Pipe Line. • Fabrication and Erection of Structure. • Testing and Commissioning. 1984 TO 1985 Karachi Shipyard and Engineering General Tire and Rubber Company • Machinery Assembly, Erection and Alignment (2,000 tons) • Fabrication and Erection of Pipe and Structure. • Testing and Commissioning. 1981 TO 1983 Karachi Shipyard and Engineering In charge Fabrication Shop • Fabrication of Cement Plant, Structure, Vessels, Ducts, Conveyor. • Fabrication of 58 Nos. Aluminum Boats. • Fabrication of Heavy Structure of Sugar Mill. • Fabrication of skid mounted dehydration plant. • Fabrication of 3 Nos. Diving Boats for Pak Navy. • Fabrication of Ship Blocks (40 tons) 1978 TO 1981 Karachi Shipyard and Engineering In charge Ship Machinery Installation Naeem Qureshi Page 8 of 9
  • 9. • Assembly and Erection of Main Engines (up to 10,000 BHP) • Erection of Diesel Generator, Boiler, Pumps, Erection and testing of Cranes, Winches, • Installation and testing Refrigeration and Air conditioning system. PERSONAL INFORMATION Date of Birth May 23, 1954 Nationality Pakistan Religion Islam Passport No. KG-308073 Place and date of Issue Lahore Marital Status Married U.A.E Driving License 536252/A Languages English , Urdu, Japanese Contact Details. Mobile 00971-050-4431605 Office: 00971-2-4995999 Ex-1206 Office Dir: 00971-2-499571 Home : 00971-2-6278260 E- mail; naeem.qureshi@babcock.ae naeemqureshi54@hotmail.com Naeem Qureshi Page 9 of 9
  • 10. • Assembly and Erection of Main Engines (up to 10,000 BHP) • Erection of Diesel Generator, Boiler, Pumps, Erection and testing of Cranes, Winches, • Installation and testing Refrigeration and Air conditioning system. PERSONAL INFORMATION Date of Birth May 23, 1954 Nationality Pakistan Religion Islam Passport No. KG-308073 Place and date of Issue Lahore Marital Status Married U.A.E Driving License 536252/A Languages English , Urdu, Japanese Contact Details. Mobile 00971-050-4431605 Office: 00971-2-4995999 Ex-1206 Office Dir: 00971-2-499571 Home : 00971-2-6278260 E- mail; naeem.qureshi@babcock.ae naeemqureshi54@hotmail.com Naeem Qureshi Page 9 of 9