SlideShare a Scribd company logo
1 of 10
Download to read offline
I Nixon Das + 6012 - 6400 270 I P a g e 1
I Private and Confidential
NIXON DAS
NRIC : 730812-04-5007 I Male I Malaysian
24, Jalan Limau Besar
Bukit Bandaraya, Bangsar
59000 Kuala Lumpur, Malaysia
Mobile No I +6012 – 6400 270
Email I nixon.das@gmail.com
OPERATIONS ENGINEER I PROJECT ENGINEER I MARKETING I PLANNING & COSTING
Igniting business with uncommon vision. Entrepreneurial experience in New Business Development and
Industry Networking Initiatives in Oil and Gas.
Self-motivated to achieve peak performance, penetrate competitive markets and meet aggressive
business objectives. High-capacity professional with experience in Oil & Gas and Electromechanical market
sectors, specializing in project engineering roles and working as part of a ‘key personnel team’ where
inputs would assist with developing, planning and starting up projects, primarily supporting management
with optimal schedule development options for delivering a project. Acquired a reputation for quickly
grasping complicated projects and completing projects within budget and time frame. A creative thinker,
problem solver and decision maker who effectively balances the needs of clients, contractors with the
mission of the organization. Cited by past employers for willingness to work hard, co-operative outlook,
high degree of initiative, keen and analytical mind.
VALUE OFFERED
• New Business Development • Lead Development & Networking • Hook-up & Commissioning
• Solutions Selling • Supplier Liaison & Negotiation • Technical Knowledge
• Operations Management • Costing and Budgeting • Hardworking
• Project Management • Creative Thinking • Tenders & Quotations
TRAINING SNAPHOT
PETRONAS Offshore Safety Passport (Valid BOSET and Offshore Medical)
Niosh Oil & Gas Safety Passport
PETRONAS Carigali Permit To Work System Assessment
(PTW)
Loss Prevention System and Knowledge Test at (Terengganu Safety Training Centre)
Presentation Skills Training
SELECTED EMPLOYMENT HIGHLIGHTS
Successfully Completed EPC TLP Malikai Project on Piping Installation total pipe spools 1200
Total Dia-Inch 12,190 ahead of schedule
Successfully Completed EPCC PUMA Project (May 2013 to Aug 2014) ahead of schedule
Successfully raked in revenue from Petronas Penapisan Melaka Sdn Bhd (PPMSB) for Dialog Systems
Sdn Bhd amounting to RM 15,000,000 for Flare Gas Recovery Units. The project, being the first of its
kind in Malaysia was awarded in April 2013.
“Congratulations. Nixon, you have done a good job to finally secure this project. This will be the first installation
in Malaysia using LRC system…”
~Alizan Abdul Manan - Director, Dialog Systems Asia, Apr 1
st
,2013(via email)
Acquired a one-year contract from Talisman, increasing revenue for the company by up to RM 700,000
per month as rental for a Portable Mercury Removal Unit (MRU). This was a 1-year follow-up on my
part.
Secured new business from Petronas Methnol Labuan Sdn Bhd for RM 400,000 for the inspection work
scope by our Principal Quest Integrity Crew for the Reformer Tube Inspection in PMLSB during plant
shutdown.
I Nixon Das + 6012 - 6400 270 I P a g e 2
i Private and Confidential
EMPLOYMENT SUMMARY
DIALOG PAC Aug 2014-Present
Project Engineer
DIALOG Engineering & Construction Jul 2013-Aug2014
Project Engineer
DIALOG SYSTEMS SDN BHD, Malaysia Oct 2011 - May 2013
Operations Engineer c/w Project Engineer & Marketing
GLOBAL PROCESS SOLUTION (GPS Pipeline LLC) Malaysia Feb 2009 – Oct 2010
Planning & Costing Support Engineer
SOLUTIONS ON SILICON BV (SOS) Netherlands, Shenzhen, China May 2006 – Dec 2008
Senior Engineer Specialist & Project Engineer
QUALITY ASSURANCE ANAGEMENT (QAM), Singapore May 2004 – Apr 2006
Senior Engineer Specialist & Project Engineer
ST MICROELECTRONICS - Ang Mo Kio, Singapore Jun 2000 – May 2004
Technician (Etching Department)
NATIONAL SEMICONDUCTOR SDN BHD- Melaka, Malaysia Jan 1998 – Dec 1999
Senior Technician
SGS THOMPSON MICROELECTRONICS, Singapore Jun 1996 – Dec 1997
Technician (Etching Department)
SGS THOMPSON MICROELECTRONICS, Singapore Jun 1993 – May 1994
Technical Assistant (Photolithography Department)
CENTRAL EDIBLE OIL (Palm Oil Refinery)- Melaka, Malaysia Jan 1992 – May 1993
Line Leader
EMPLOYMENT CHRONICLE
DIALOG PAC – Malikai EPC TLP Project - SSPC Aug 2014– PRESENT
Project Engineer
Reporting to: Project Manager
Key Responsibilities:
• Attending kick-off meeting w/ Main-con (MMHE Management)
• Monitoring Pre-Fabrication of Pipe Spools at Nilai yard
• Erection of pipe spools at site
• Follow up Engineering and Procurement w/ regards to design and material expediting.
• Follow up with QA/QC document for all the test pack, weld summary and final documentations.
• Attending weekly safety walkabout w/ MMHE PMT and SSPC Clients
• Dialog KPI have achieve ZERO Lost Time Incident (LTI)
• Attending Weekly and daily Progress meeting w/ MMHE PMT,PM and Clients
• Follow-up SI’s And VO’s for piping activities
• Coordinate w/ PMT’s for the scaffolding, painting and installation of pipe supports activities
• Preparing weekly and monthly progress reports
• Preparing MTO
• Control Manpower budget within the cost limit for client
I Nixon Das + 6012 - 6400 270 I P a g e 3
i Private and Confidential
EMPLOYMENT CHRONICLE
Continued
• Coordinate w/ logistics for material delivery @ Site
• Coordinate w/ inter discipline PMT in order to conduct piping activities
• Liaise with the clients (SHELL to resolved major issues w/ regards on piping fabrication and erection
activities
• Conducting Hydro testing Activity
• Conducting Re-instatement and Flange Management
• Clear Punch list to achieve ITR
• Managing all activities @ Site and resources (Manpower, Equip,Consumables,and facilities w/ regards
to Fabrication/Erection of Pipe spools, Pipe supports, valves and hydro testing
• Attending Permit to Work (PTW) Meeting and managing
• Total Pipe Spools 1,200 and Total Dia-inch is 12,190
• Prepare COC’s to our main- con MMHE
EMPLOYMENT CHRONICLE
DIALOG E&C May 2013 – Aug 2014
Dialog has been awarded as EPCC Contractor for Puma Bitumen Terminal At Tanjung Langsat Johor
Baharu is a fast track project and completion within 1 year
Project Engineer
Reporting to: Project Manager and Project Director i
Key Responsibilities:
• Assist Project Manager to strengthen the site office, Operation and Project Execution.
• Follow up Engineering and Procurement w/ regards to design and material expediting.
• Attending Kick off meeting with all the sub-con
• Member of HSE Committee Member achieved 1 Million Man-hours
(Dialog’s KPI) without Lost Time Incident (LTI) with maximum manpower
600 Work Forces during Peak Period. Actively involved in Weekly Safety
Walk about with the HSE Committee and the Client
PIPING
• Coordinate On Piping Activity
- Manage Project Material (Piping, Shall Plate &Pipe Support) receiving Activity
- Manage, Control and accelerate Jetty Piping and Terminal Piping
- Monitoring of Pre-Fabrication of pipe spools @ yard
- Erection of Piping Spools at Jetty 2.2Km and Terminal Piping Finish On Time
- Establishment for Client & DOSH approval for Pressure Test at Jetty
- Conducting Re-instatement and Flange Management
- Cost Saving 570,000 for not using barge and Road Transportation
- Monitoring pipe support fabrication with our sub-con
- Provide daily and weekly report for piping
- Monitoring Electrical Heat Tracing for Jetty Piping and thermo hot oil piping for terminals
- Evaluation of design changes and initiates the change orders
- Submitting documents and attending meeting w/ DOSH for approval of jetty piping
- Total piping Dia-inch is 65,000
- Prepare SI and Progress Claims
Blasting & Painting
• Coordinate On Blasting and Panting at Blasting Yard,for all the materials
• Follow up on Touch up Painting at Terminal and Jetty
I Nixon Das + 6012 - 6400 270 I P a g e 4
i Private and Confidential
EMPLOYMENT CHRONICLE
Continued
Tanks Fabrication
• Monitoring for the pre-fabrication and delivery at site
• Erection of annular plates and bottom plates for 16 nos of tanks.
And Shell plates erection by conventional and jacking method
• Monitoring of resources deployed in daily basis
• Develop and maintain project plans to achieve the project objectives
• Evaluation of design changes and initiates the change orders
• Hydro Testing Tanks
• Prepare SI and Progress Claims
Scaffolding
• Coordinates with Scaffolding team erection and dismantling
• Verification of claims
TELECOM
• Submitting documents to TELECOM and to lay TELECOM cables to the terminal
• Coordinate with TELECOM vendors to conduct internal wiring including w/servers
QA/QC
• Coordinating with QA/QC document’s ready for Inspection
• Coordinating Hydro testing, Flushing & Blowing test packages and final documentations.
Commissioning
• Conducting commissioning works for all pumps
• Coordinate on commissioning of Fire Water line with Fire brigade team & Client’s for approval
• Pursue for final punch Items clearing and Test Packages hand over to achieve Mechanical Completion
( MC)and Ready For Start Up (RFSU)
• Receive first oil without any complication
EMPLOYMENT CHRONICLE
DIALOG SYSTEMS SDN BHD, Malaysia Oct 2011 – May 2013
Principally involved in the marketing of specialty chemicals, catalysts and absorbents, petroleum additives, drilling
base oil and specialty equipment and provision of specialist technical services.
Operations Engineer c/w Project Engineer & Marketing
Reporting to: Department Head (Sr. Sales Manager) and Director
Key Responsibilities:
• To provide technical support for the sales & marketing of the specialty products marketed by
the company.
• To develop sales & marketing opportunities for the products by making frequent sales I
marketing visits to the various clients.
• To coordinate and prepare all quotations and tenders by liaising with the clients, principals,
logistics and finance support to ensure that all submissions are done in a timely manner and to
monitor the status of all quotations and tenders.
• To maintain a close relationship with all clients and
principals.
• To keep abreast of developments in the petroleum and petrochemical industries that may impact
on the sales of the range of products such as organizational changes, product obsolescence,
statutory changes and production process.
I Nixon Das + 6012 - 6400 270 I P a g e 5
i Private and Confidential
EMPLOYMENT CHRONICLE
c o n t i n u e d
• To review, identify and develop opportunities for the development of additional sales for the
products.
• Finding the best solution for the customer needs by fitting the appropriate application to the
needs
• Making the necessary procurement through creating relations with the sub-suppliers and
providers
• Making the necessary evaluation, costing and pricing till presenting the final offer or quotation to
the end user or for a tender.
• After the purchase order is received, as Project Engineer I was responsible for accomplishing
the contracted project according to the contract with the highest possible quality standards and
customer satisfaction.
Achievements (Project Based):
April 2013: Personally responsible for acquiring! winning a tender project from Petronas Penapisan Melaka
Sdn Bhd (PPMSB) for Dialog Systems Sdn Bhd amounting to RM 15,000,000 for Flare Gas Recovery Units.
This project has been identified to be the first of its kind in Malaysia.
• Coordinate with our Principal in Australia for all the technical requirements
• Involved in Technical Commercial meeting with Petronas Melaka and with our principal
• Kick off Meeting with Petronas Melaka
• Responsible for negotiation and contract administration for this project
• Attended the Kick off Meeting with our principal in Melbourne, Australia so that all the technical
requirements comply with PETRONAS Melaka
• Responsible for planning and scheduling.
• Responsible for cost control and monitoring.
• Responsible for technical execution of work.
• Responsible for design, fabrication & construction from our Principal in Australia to Petronas Melaka
and oversee the projects undertaken by the company
• Participate actively in Hazop
• Responsible for submitting weekly meeting & progress report
Jan 2012 – present: Portable Mercury Removal Unit for Talisman at Bunga Orkid A (BOA) – FSO Offshore
Platform. Acted in the capacity of a Project Engineer having secured a 1-year contract with Talisman for a
rental fee or RM 700,000 per month.
• Kick off Meeting with Talisman
• Coordinated with our Dialog yard to refurbish the MRU skid
• Responsible for the improvement and technology application on the skid.
• Responsible for the client to visit at site for FAT
• Advised and support team on health, safety & environment matters
• Responsible for mob-demob
• Responsible for commissioning and testing
• Responsible for the operation
• Responsible for invoicing to our client Talisman
• Responsible for receiving payment monthly from our client Talisman
April 2012: Secured business from Petronas Methnol Labuan Sdn Bhd bringing revenue for the company
amounting to RM 400,000 for the inspection work scope by our Principal Quest Integrity Crew. This was for
the Reformer Tube Inspection in PMLSB to be used during the plant shutdown.
• Kick off Meeting with Petronas Methnol Labuan Sdn Bhd
• Coordinated with PMLSB and our Principal Quest Integrity
• MANTIS Inspection of 336 Installed Reformer Tubes located in PMLSB.
I Nixon Das + 6012 - 6400 270 I P a g e 6
i Private and Confidential
EMPLOYMENT CHRONICLE
c o n t i n u e d
• Detected creep growth rate of the tubes and performed a Level 1 assessment on the tubes.
• Communicated with clients and reported the inspection finding to PMLSB within 48 hours upon
completing the inspection.
• Performed a Level 3 Remaining Life Assessment of the reformer tubes.
• Responsible for invoicing our client PMLSB
• Responsible for receiving payment from our client PMLSB
• Responsible for releasing payment to our principal’s & sub-contractor
May 2012: Coordinated with our Principal Johnson Matthey to our client BASF with all the jobs on site and
prepared reports for our client BASF. The objectives of the service carried out on the accessible furnace
tubes in the H-1201 reformer for BASF Petronas Chemicals Sdn Bhd at Kuantan is:
• To compare GC pyrometer readings to the plant IR pyrometer and new purchase thermal
imaging equipment, hence to use the GC pyrometer reading to calibrate both instruments
or as a benchmark for future reference.
• To detect actual tubes wall temperature as confirmation that plant is operating within the tube
• Design temperature after catalysts and new tubes change out to different materials (micro alloy).
This is critical due to current plant load had been increased to 105%
• The temperatures of the tubes were measured via the lower and top elevation peepholes.
• Numbers of tubes measured depended on site and peep hole accessibility. However, only
• Selected tubes had been measured at the top elevation due to the direct flames from the burners
at the top elevation. This will restrict and alter accuracy of IR pyrometer reading. Hence all this
values measured by gold cup are to act as reference to ensure low tube wall temperature
for the top part of reformer tubes.
• Responsible for invoicing our client BASF
• Responsible for receiving payment from our client BASF
• Responsible for releasing payment to our principal’s & sub-contractor
PERSONAL ! PROFESSIONAL HIATUS Sep 2010 – Sep 2011
Upon leaving GPS, focused entirely on getting re-employed within an Oil & Gas industry where my passion
lies. I sacrificed a huge earning potential as I regarded the move into Dialog as a necessary stepping stone.
GLOBAL PROCESS SOLUTION (GPS Pipeline LLC), Malaysia Feb 2009 – Oct 2010
A global provider of technology-based “design and build“ process facilities solutions for the upstream oil & gas industry
with core business in an integrated package of services engineered towards a traditional “lump-sum“ of Engineering,
Procurement and Construction (EPC).
Planning & Costing Support Engineer
Reporting to: Project Manager
Key Responsibilities:
Responsible for EPC project as part of the Project Management Team for the ‘Bouri FSO, replacement’
offshore Project for Mellitah Oil & Gas ;ENI , Libya based at the PMT’s head quarters, Kuala Lumpur,
Malaysia. The main sub-contractor base was in Dalian, China where the new build of an Ultra Large FSO
c!w turret moored vessel was designed and constructed. The Subsea pipeline was designed and
constructed in UK. Total value of the project USD 465 million
I Nixon Das + 6012 - 6400 270 I P a g e 7
i Private and Confidential
EMPLOYMENT CHRONICLE
c o n t i n u e d
• Project Management – provided support to both engineering and planning/cost managers
with primavera planning including cost models and diagrams.
• Planning and schedule
development.
• Managing main sub-contractors across Libya, Malaysia, China and the
US.
• Develop what if scenarios to identify potential cost and schedule risk and potential
impacts.
• Develop recovery plans to manage risk
areas.
• Prepare weekly and monthly progress reports, S-Curve, resource allocations analysis
etc.
Reason for Leaving : Company affected by financial crisis-made to sign Deed of Indemnity & Release
SOLUTIONS ON SILICON BV (SOS) Netherlands, Shenzhen, China May 2006 – Dec 2008
A company of highly experienced engineers and technicians in the high -tech world of semiconductors and related
fields that provide turnkey Semiconductor/MEMS Equipment for Dry-Etch, Ion Implant, Epitaxy, RTP, PVD and SACVD
technologies.
Senior Engineer Specialist & Project Engineer
Reporting to: Company Director; Direct reports: 6 Engineers
Key Responsibilities:
. Initiated the Semiconductor equipment setup in China, Singapore and Shenzhen. In China – was part
of the key personnel team involved with the start-up and commissioning of a new production facility.
. Programmed automated machinery and power up systems inclusive of hardware set-up and
calibration optimization work.
. Preventive maintenance, Refurbishment of equipment and troubleshooting on LAM 9600, LAM 9400,
LAM Rainbow 4520, Axcelis, Fusion, Etcher Applied Material 8300, Tegal 903, Danippon, Gasonic,
Gasonic PEP, Semitool, Rf generator and Microwave generator.
. Conducted user training on site to ensure that every user knew how to maintain the system to prevent
it from breaking down due to improper operation.
. Further support work included regular daily on-site visits.
. Attended to all emergency service calls where engineering solutions were required in order to
diagnose and bring back on-line production operation.
. Assisted the APAC Sales Director in prospecting for new clients in Asia, including attending client sales
presentations to offer electrical and mechanical production automated production services to
Malaysia, China & Singapore.
Achievements:
. Programmed automated machinery and power up systems including hardware setup and calibration
optimization work.
. Initiated semi-conductor equipment setup in China, Singapore and Shenzhen and commissioned a new
production facility.
. Delivered the project on time to the client
. Secured business and revenue for company amounting to USD 20,000,000 – Siltera Kulim Project in
Malaysia and SSMC Pasir Ris, Singapore through own initiatives, personal sourcing and networking.
Reason for Leaving : Contract Assignment – Completed Project
I Nixon Das + 6012 - 6400 270 I P a g e 8
i Private and Confidential
EMPLOYMENT CHRONICLE
c o n t I n u e d
QUALITY ASSURANCE MANAGEMENT (QAM), Singapore May 2004 – Apr 2006
Leading technical service provider to the Semiconductor, Biotechnology, Pharmaceutical, Solar and Electronics Industry
Senior Engineer Specialist & Project Engineer
Reported to: Company Director
Key Responsibilities:
. Was based in Shanghai from May 13 – June 13th
2004
. Set-up the machines, hook up the power cables and power up the systems.
. Hard ware set-up and calibration.
. Conducted preventive maintenance and troubleshooting on the equipment P5000 and SACVD.
Achievements:
. Consistently delivered equipments on time in excellent working order.
. Upgrade of equipment to standard spec according to client specification.
. Implemented equipment improvement to achieve best possible equipment reliability and performance.
. Reduced downtime, allowing equipment to run optimally at 95-97%.
. Yield improvement from 89% to 96%.
. Managed, guided and trained several engineers on the team.
Reason for Leaving : Contract Assignment – Completed Project
ST MICROELECTRONICS - Ang Mo Kio, Singapore Jun 2000 – May 2004
A world leader in providing the semiconductor solutions.
Technician (Etching Department)
Reported to: Section Manager and Department GM
Key Responsibilities:
. Responsible for carrying out corrective and preventive maintenance in order to ensure that the
equipments operate within specifications.
. Provided technical support throughout equipment installation and relocation stages to improve
equipment capacities and efficiencies.
. Implemented equipment reliability, efficiency improvement and cost reduction projects.
. Carried out corrective and preventive action, based on the technical analysis done to improve fab
yields.
. Implemented projects to standardize equipment hardware.
Achievements:
. Implemented operating procedures to improve ease of use and cost of ownership.
. Assisted in start up equipment for a New Plant.
. Was able to hook up new machines and completed all assignments on time. Worked on the following
tools: LAM 9600, LAM 9400, LAM Rainbow 4520, Axcelis, Fusion, Etcher, Applied Material 8300, Tegal
903, Danippon, Gasonic, Gasonic PEP, Semitool, Rf generator and Microwave generator.
Reason for Leaving : Better career prospect, exposure and travel opportunity.
I Nixon Das + 6012 - 6400 270 I P a g e 9
i Private and Confidential
EMPLOYMENT CHRONICLE
c o n t i n u e d
NATIONAL SEMICONDUCTOR SDN BHD- Melaka, Malaysia Jan 1998 – Dec 1999
Subsidiary of National Semiconductor Corporation specializing in analog devices and subsystems
Senior Technician
Reported to : Section Manager and Department Head; Direct reports: 10 Technicians
Key Responsibilities:
. Headed the engineering department
. Performed preventive maintenance and troubleshooting of equipments
. Planned and upgraded equipments to achieve optimum and production output with lower down time
. Co-ordinated TPM activities to ensure 24 hours support is available.
Achievements:
. TPM activities successfully achieved with team efficiencies
Reason for Leaving : No career and role progression sighted.
SGS THOMPSON MICROELECTRONICS, Singapore Jun 1996 – Dec 1997
A global independent semiconductor company that designs, develops, manufactures and market s a broad range of
semiconductor integrated circuits (ICs) and discrete devices used in a wide variety of microelectronic applications,
including telecommunications systems, computer systems, consumer products, automotive products and industrial
automation and control systems.
Technician (Etching Department)
Reported to: Coordinator
Key Responsibilities:
. Performed corrective and preventive maintenance for wet and dry etch
. Assisted Maintenance Engineer in performing daily line activities, troubleshooting PCB, Tegal, RF
generator, semi tool and Alcatel vacuum mechanical pump.
. Provided technical skill training to new technicians and PM technicians
Achievements:
. Implemented equipment improvement to achieve best possible equipment reliability and performance.
Technical Assistant (Photolithography Department) Jun 1993 – May 1994
Reported to : Production Supervisor and Coordinator
. Performed preventive maintenance on electrical chemical bench, canon tools, SVG Resist Coating tools
and performed troubleshooting
Reason for Leaving : To explore work opportunity in Malaysia.
I Nixon Das + 6012 - 6400 270 I P a g e 1
0
i Private and Confidential
EMPLOYMENT CHRONICLE
c o n t i n u e d
CENTRAL EDIBLE OIL- Melaka, Malaysia Jan 1992 – May 1993
A palm oil refinery division of Devon Group
Line Leader
Reported to: Plant Supervisor
. Perform preventive maintenance
. Support production line through troubleshooting
Reason for Leaving : Career Progression
EDUCATION
Bachelor of Science in Electromechanical Engineering
Cambridge International University, USA (2004-2006)
NTC-3 Electromechanical Engineering
Institute Technical Education (ITE), Singapore (1994 -1996)
Sijil Pelajaran Malaysia (O-Levels)
Sri Kota Secondary, Melaka
TRAINING i CERTIFICATION
Safety Training, Petronas Industry Standard: BOSET
Offshore Safety Sdn Bhd – Expires 24th
Nov 2015
Certificate of Competency: PCSB Permit To Work System Assessment
Petronas Carigali Sdn Bhd – Jun 2012: Valid till 17th June 2015
Loss Prevention System with Knowledge Test
Terengganu Safety Training Centre Sdn Bhd – Feb 2012
Primevera Project Managemet Course 102: Basic
Enterprise Business Solutions (EBS) – Apr 2009
1. Endura HP ! VHP PVD Platform Maintenance & Calibration
2. Endura HP!VHP PVD Functional Description & Basic Trouble Shooting
3. Endura HP ! VHP PVD Operations & Programming
Applied Materials Incorporated – Mar 2001
Advanced Chemical Handling
National Semiconductor University – May 1998
EMPLOYMENT REFERENCES AVAILABLE UPON REQUEST

More Related Content

What's hot

What's hot (20)

Resume MAR
Resume MARResume MAR
Resume MAR
 
Rakesh
RakeshRakesh
Rakesh
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Glenn updated cv
Glenn updated cvGlenn updated cv
Glenn updated cv
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Emmanuel C-CV2
Emmanuel C-CV2Emmanuel C-CV2
Emmanuel C-CV2
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Mincore Capability and Experience Profile
Mincore Capability and Experience ProfileMincore Capability and Experience Profile
Mincore Capability and Experience Profile
 
Austin overview 2017
Austin overview 2017Austin overview 2017
Austin overview 2017
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
JULIOS CV-T
JULIOS CV-TJULIOS CV-T
JULIOS CV-T
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV
 
CV 2016
CV 2016CV 2016
CV 2016
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 

Similar to nixon cv-Jan2016 _2_

Similar to nixon cv-Jan2016 _2_ (20)

My Resume
My ResumeMy Resume
My Resume
 
CV rajesh
CV rajeshCV rajesh
CV rajesh
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Wp 241016
Wp 241016Wp 241016
Wp 241016
 
Pari Resume 2015 India
Pari Resume 2015 IndiaPari Resume 2015 India
Pari Resume 2015 India
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Resume of SSK
Resume of SSKResume of SSK
Resume of SSK
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
MURUGU SUNDARAN - CV
MURUGU SUNDARAN - CVMURUGU SUNDARAN - CV
MURUGU SUNDARAN - CV
 
Resume of Kalaiyappan Thannirmalai
Resume of Kalaiyappan ThannirmalaiResume of Kalaiyappan Thannirmalai
Resume of Kalaiyappan Thannirmalai
 
T Pearce CV PIPNG MANAGER ENGINEER 2015
T Pearce CV PIPNG MANAGER  ENGINEER 2015T Pearce CV PIPNG MANAGER  ENGINEER 2015
T Pearce CV PIPNG MANAGER ENGINEER 2015
 
Isyak Yuzri Ahmad Resume
Isyak Yuzri Ahmad ResumeIsyak Yuzri Ahmad Resume
Isyak Yuzri Ahmad Resume
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
BBA resume_2017
BBA resume_2017BBA resume_2017
BBA resume_2017
 

nixon cv-Jan2016 _2_

  • 1. I Nixon Das + 6012 - 6400 270 I P a g e 1 I Private and Confidential NIXON DAS NRIC : 730812-04-5007 I Male I Malaysian 24, Jalan Limau Besar Bukit Bandaraya, Bangsar 59000 Kuala Lumpur, Malaysia Mobile No I +6012 – 6400 270 Email I nixon.das@gmail.com OPERATIONS ENGINEER I PROJECT ENGINEER I MARKETING I PLANNING & COSTING Igniting business with uncommon vision. Entrepreneurial experience in New Business Development and Industry Networking Initiatives in Oil and Gas. Self-motivated to achieve peak performance, penetrate competitive markets and meet aggressive business objectives. High-capacity professional with experience in Oil & Gas and Electromechanical market sectors, specializing in project engineering roles and working as part of a ‘key personnel team’ where inputs would assist with developing, planning and starting up projects, primarily supporting management with optimal schedule development options for delivering a project. Acquired a reputation for quickly grasping complicated projects and completing projects within budget and time frame. A creative thinker, problem solver and decision maker who effectively balances the needs of clients, contractors with the mission of the organization. Cited by past employers for willingness to work hard, co-operative outlook, high degree of initiative, keen and analytical mind. VALUE OFFERED • New Business Development • Lead Development & Networking • Hook-up & Commissioning • Solutions Selling • Supplier Liaison & Negotiation • Technical Knowledge • Operations Management • Costing and Budgeting • Hardworking • Project Management • Creative Thinking • Tenders & Quotations TRAINING SNAPHOT PETRONAS Offshore Safety Passport (Valid BOSET and Offshore Medical) Niosh Oil & Gas Safety Passport PETRONAS Carigali Permit To Work System Assessment (PTW) Loss Prevention System and Knowledge Test at (Terengganu Safety Training Centre) Presentation Skills Training SELECTED EMPLOYMENT HIGHLIGHTS Successfully Completed EPC TLP Malikai Project on Piping Installation total pipe spools 1200 Total Dia-Inch 12,190 ahead of schedule Successfully Completed EPCC PUMA Project (May 2013 to Aug 2014) ahead of schedule Successfully raked in revenue from Petronas Penapisan Melaka Sdn Bhd (PPMSB) for Dialog Systems Sdn Bhd amounting to RM 15,000,000 for Flare Gas Recovery Units. The project, being the first of its kind in Malaysia was awarded in April 2013. “Congratulations. Nixon, you have done a good job to finally secure this project. This will be the first installation in Malaysia using LRC system…” ~Alizan Abdul Manan - Director, Dialog Systems Asia, Apr 1 st ,2013(via email) Acquired a one-year contract from Talisman, increasing revenue for the company by up to RM 700,000 per month as rental for a Portable Mercury Removal Unit (MRU). This was a 1-year follow-up on my part. Secured new business from Petronas Methnol Labuan Sdn Bhd for RM 400,000 for the inspection work scope by our Principal Quest Integrity Crew for the Reformer Tube Inspection in PMLSB during plant shutdown.
  • 2. I Nixon Das + 6012 - 6400 270 I P a g e 2 i Private and Confidential EMPLOYMENT SUMMARY DIALOG PAC Aug 2014-Present Project Engineer DIALOG Engineering & Construction Jul 2013-Aug2014 Project Engineer DIALOG SYSTEMS SDN BHD, Malaysia Oct 2011 - May 2013 Operations Engineer c/w Project Engineer & Marketing GLOBAL PROCESS SOLUTION (GPS Pipeline LLC) Malaysia Feb 2009 – Oct 2010 Planning & Costing Support Engineer SOLUTIONS ON SILICON BV (SOS) Netherlands, Shenzhen, China May 2006 – Dec 2008 Senior Engineer Specialist & Project Engineer QUALITY ASSURANCE ANAGEMENT (QAM), Singapore May 2004 – Apr 2006 Senior Engineer Specialist & Project Engineer ST MICROELECTRONICS - Ang Mo Kio, Singapore Jun 2000 – May 2004 Technician (Etching Department) NATIONAL SEMICONDUCTOR SDN BHD- Melaka, Malaysia Jan 1998 – Dec 1999 Senior Technician SGS THOMPSON MICROELECTRONICS, Singapore Jun 1996 – Dec 1997 Technician (Etching Department) SGS THOMPSON MICROELECTRONICS, Singapore Jun 1993 – May 1994 Technical Assistant (Photolithography Department) CENTRAL EDIBLE OIL (Palm Oil Refinery)- Melaka, Malaysia Jan 1992 – May 1993 Line Leader EMPLOYMENT CHRONICLE DIALOG PAC – Malikai EPC TLP Project - SSPC Aug 2014– PRESENT Project Engineer Reporting to: Project Manager Key Responsibilities: • Attending kick-off meeting w/ Main-con (MMHE Management) • Monitoring Pre-Fabrication of Pipe Spools at Nilai yard • Erection of pipe spools at site • Follow up Engineering and Procurement w/ regards to design and material expediting. • Follow up with QA/QC document for all the test pack, weld summary and final documentations. • Attending weekly safety walkabout w/ MMHE PMT and SSPC Clients • Dialog KPI have achieve ZERO Lost Time Incident (LTI) • Attending Weekly and daily Progress meeting w/ MMHE PMT,PM and Clients • Follow-up SI’s And VO’s for piping activities • Coordinate w/ PMT’s for the scaffolding, painting and installation of pipe supports activities • Preparing weekly and monthly progress reports • Preparing MTO • Control Manpower budget within the cost limit for client
  • 3. I Nixon Das + 6012 - 6400 270 I P a g e 3 i Private and Confidential EMPLOYMENT CHRONICLE Continued • Coordinate w/ logistics for material delivery @ Site • Coordinate w/ inter discipline PMT in order to conduct piping activities • Liaise with the clients (SHELL to resolved major issues w/ regards on piping fabrication and erection activities • Conducting Hydro testing Activity • Conducting Re-instatement and Flange Management • Clear Punch list to achieve ITR • Managing all activities @ Site and resources (Manpower, Equip,Consumables,and facilities w/ regards to Fabrication/Erection of Pipe spools, Pipe supports, valves and hydro testing • Attending Permit to Work (PTW) Meeting and managing • Total Pipe Spools 1,200 and Total Dia-inch is 12,190 • Prepare COC’s to our main- con MMHE EMPLOYMENT CHRONICLE DIALOG E&C May 2013 – Aug 2014 Dialog has been awarded as EPCC Contractor for Puma Bitumen Terminal At Tanjung Langsat Johor Baharu is a fast track project and completion within 1 year Project Engineer Reporting to: Project Manager and Project Director i Key Responsibilities: • Assist Project Manager to strengthen the site office, Operation and Project Execution. • Follow up Engineering and Procurement w/ regards to design and material expediting. • Attending Kick off meeting with all the sub-con • Member of HSE Committee Member achieved 1 Million Man-hours (Dialog’s KPI) without Lost Time Incident (LTI) with maximum manpower 600 Work Forces during Peak Period. Actively involved in Weekly Safety Walk about with the HSE Committee and the Client PIPING • Coordinate On Piping Activity - Manage Project Material (Piping, Shall Plate &Pipe Support) receiving Activity - Manage, Control and accelerate Jetty Piping and Terminal Piping - Monitoring of Pre-Fabrication of pipe spools @ yard - Erection of Piping Spools at Jetty 2.2Km and Terminal Piping Finish On Time - Establishment for Client & DOSH approval for Pressure Test at Jetty - Conducting Re-instatement and Flange Management - Cost Saving 570,000 for not using barge and Road Transportation - Monitoring pipe support fabrication with our sub-con - Provide daily and weekly report for piping - Monitoring Electrical Heat Tracing for Jetty Piping and thermo hot oil piping for terminals - Evaluation of design changes and initiates the change orders - Submitting documents and attending meeting w/ DOSH for approval of jetty piping - Total piping Dia-inch is 65,000 - Prepare SI and Progress Claims Blasting & Painting • Coordinate On Blasting and Panting at Blasting Yard,for all the materials • Follow up on Touch up Painting at Terminal and Jetty
  • 4. I Nixon Das + 6012 - 6400 270 I P a g e 4 i Private and Confidential EMPLOYMENT CHRONICLE Continued Tanks Fabrication • Monitoring for the pre-fabrication and delivery at site • Erection of annular plates and bottom plates for 16 nos of tanks. And Shell plates erection by conventional and jacking method • Monitoring of resources deployed in daily basis • Develop and maintain project plans to achieve the project objectives • Evaluation of design changes and initiates the change orders • Hydro Testing Tanks • Prepare SI and Progress Claims Scaffolding • Coordinates with Scaffolding team erection and dismantling • Verification of claims TELECOM • Submitting documents to TELECOM and to lay TELECOM cables to the terminal • Coordinate with TELECOM vendors to conduct internal wiring including w/servers QA/QC • Coordinating with QA/QC document’s ready for Inspection • Coordinating Hydro testing, Flushing & Blowing test packages and final documentations. Commissioning • Conducting commissioning works for all pumps • Coordinate on commissioning of Fire Water line with Fire brigade team & Client’s for approval • Pursue for final punch Items clearing and Test Packages hand over to achieve Mechanical Completion ( MC)and Ready For Start Up (RFSU) • Receive first oil without any complication EMPLOYMENT CHRONICLE DIALOG SYSTEMS SDN BHD, Malaysia Oct 2011 – May 2013 Principally involved in the marketing of specialty chemicals, catalysts and absorbents, petroleum additives, drilling base oil and specialty equipment and provision of specialist technical services. Operations Engineer c/w Project Engineer & Marketing Reporting to: Department Head (Sr. Sales Manager) and Director Key Responsibilities: • To provide technical support for the sales & marketing of the specialty products marketed by the company. • To develop sales & marketing opportunities for the products by making frequent sales I marketing visits to the various clients. • To coordinate and prepare all quotations and tenders by liaising with the clients, principals, logistics and finance support to ensure that all submissions are done in a timely manner and to monitor the status of all quotations and tenders. • To maintain a close relationship with all clients and principals. • To keep abreast of developments in the petroleum and petrochemical industries that may impact on the sales of the range of products such as organizational changes, product obsolescence, statutory changes and production process.
  • 5. I Nixon Das + 6012 - 6400 270 I P a g e 5 i Private and Confidential EMPLOYMENT CHRONICLE c o n t i n u e d • To review, identify and develop opportunities for the development of additional sales for the products. • Finding the best solution for the customer needs by fitting the appropriate application to the needs • Making the necessary procurement through creating relations with the sub-suppliers and providers • Making the necessary evaluation, costing and pricing till presenting the final offer or quotation to the end user or for a tender. • After the purchase order is received, as Project Engineer I was responsible for accomplishing the contracted project according to the contract with the highest possible quality standards and customer satisfaction. Achievements (Project Based): April 2013: Personally responsible for acquiring! winning a tender project from Petronas Penapisan Melaka Sdn Bhd (PPMSB) for Dialog Systems Sdn Bhd amounting to RM 15,000,000 for Flare Gas Recovery Units. This project has been identified to be the first of its kind in Malaysia. • Coordinate with our Principal in Australia for all the technical requirements • Involved in Technical Commercial meeting with Petronas Melaka and with our principal • Kick off Meeting with Petronas Melaka • Responsible for negotiation and contract administration for this project • Attended the Kick off Meeting with our principal in Melbourne, Australia so that all the technical requirements comply with PETRONAS Melaka • Responsible for planning and scheduling. • Responsible for cost control and monitoring. • Responsible for technical execution of work. • Responsible for design, fabrication & construction from our Principal in Australia to Petronas Melaka and oversee the projects undertaken by the company • Participate actively in Hazop • Responsible for submitting weekly meeting & progress report Jan 2012 – present: Portable Mercury Removal Unit for Talisman at Bunga Orkid A (BOA) – FSO Offshore Platform. Acted in the capacity of a Project Engineer having secured a 1-year contract with Talisman for a rental fee or RM 700,000 per month. • Kick off Meeting with Talisman • Coordinated with our Dialog yard to refurbish the MRU skid • Responsible for the improvement and technology application on the skid. • Responsible for the client to visit at site for FAT • Advised and support team on health, safety & environment matters • Responsible for mob-demob • Responsible for commissioning and testing • Responsible for the operation • Responsible for invoicing to our client Talisman • Responsible for receiving payment monthly from our client Talisman April 2012: Secured business from Petronas Methnol Labuan Sdn Bhd bringing revenue for the company amounting to RM 400,000 for the inspection work scope by our Principal Quest Integrity Crew. This was for the Reformer Tube Inspection in PMLSB to be used during the plant shutdown. • Kick off Meeting with Petronas Methnol Labuan Sdn Bhd • Coordinated with PMLSB and our Principal Quest Integrity • MANTIS Inspection of 336 Installed Reformer Tubes located in PMLSB.
  • 6. I Nixon Das + 6012 - 6400 270 I P a g e 6 i Private and Confidential EMPLOYMENT CHRONICLE c o n t i n u e d • Detected creep growth rate of the tubes and performed a Level 1 assessment on the tubes. • Communicated with clients and reported the inspection finding to PMLSB within 48 hours upon completing the inspection. • Performed a Level 3 Remaining Life Assessment of the reformer tubes. • Responsible for invoicing our client PMLSB • Responsible for receiving payment from our client PMLSB • Responsible for releasing payment to our principal’s & sub-contractor May 2012: Coordinated with our Principal Johnson Matthey to our client BASF with all the jobs on site and prepared reports for our client BASF. The objectives of the service carried out on the accessible furnace tubes in the H-1201 reformer for BASF Petronas Chemicals Sdn Bhd at Kuantan is: • To compare GC pyrometer readings to the plant IR pyrometer and new purchase thermal imaging equipment, hence to use the GC pyrometer reading to calibrate both instruments or as a benchmark for future reference. • To detect actual tubes wall temperature as confirmation that plant is operating within the tube • Design temperature after catalysts and new tubes change out to different materials (micro alloy). This is critical due to current plant load had been increased to 105% • The temperatures of the tubes were measured via the lower and top elevation peepholes. • Numbers of tubes measured depended on site and peep hole accessibility. However, only • Selected tubes had been measured at the top elevation due to the direct flames from the burners at the top elevation. This will restrict and alter accuracy of IR pyrometer reading. Hence all this values measured by gold cup are to act as reference to ensure low tube wall temperature for the top part of reformer tubes. • Responsible for invoicing our client BASF • Responsible for receiving payment from our client BASF • Responsible for releasing payment to our principal’s & sub-contractor PERSONAL ! PROFESSIONAL HIATUS Sep 2010 – Sep 2011 Upon leaving GPS, focused entirely on getting re-employed within an Oil & Gas industry where my passion lies. I sacrificed a huge earning potential as I regarded the move into Dialog as a necessary stepping stone. GLOBAL PROCESS SOLUTION (GPS Pipeline LLC), Malaysia Feb 2009 – Oct 2010 A global provider of technology-based “design and build“ process facilities solutions for the upstream oil & gas industry with core business in an integrated package of services engineered towards a traditional “lump-sum“ of Engineering, Procurement and Construction (EPC). Planning & Costing Support Engineer Reporting to: Project Manager Key Responsibilities: Responsible for EPC project as part of the Project Management Team for the ‘Bouri FSO, replacement’ offshore Project for Mellitah Oil & Gas ;ENI , Libya based at the PMT’s head quarters, Kuala Lumpur, Malaysia. The main sub-contractor base was in Dalian, China where the new build of an Ultra Large FSO c!w turret moored vessel was designed and constructed. The Subsea pipeline was designed and constructed in UK. Total value of the project USD 465 million
  • 7. I Nixon Das + 6012 - 6400 270 I P a g e 7 i Private and Confidential EMPLOYMENT CHRONICLE c o n t i n u e d • Project Management – provided support to both engineering and planning/cost managers with primavera planning including cost models and diagrams. • Planning and schedule development. • Managing main sub-contractors across Libya, Malaysia, China and the US. • Develop what if scenarios to identify potential cost and schedule risk and potential impacts. • Develop recovery plans to manage risk areas. • Prepare weekly and monthly progress reports, S-Curve, resource allocations analysis etc. Reason for Leaving : Company affected by financial crisis-made to sign Deed of Indemnity & Release SOLUTIONS ON SILICON BV (SOS) Netherlands, Shenzhen, China May 2006 – Dec 2008 A company of highly experienced engineers and technicians in the high -tech world of semiconductors and related fields that provide turnkey Semiconductor/MEMS Equipment for Dry-Etch, Ion Implant, Epitaxy, RTP, PVD and SACVD technologies. Senior Engineer Specialist & Project Engineer Reporting to: Company Director; Direct reports: 6 Engineers Key Responsibilities: . Initiated the Semiconductor equipment setup in China, Singapore and Shenzhen. In China – was part of the key personnel team involved with the start-up and commissioning of a new production facility. . Programmed automated machinery and power up systems inclusive of hardware set-up and calibration optimization work. . Preventive maintenance, Refurbishment of equipment and troubleshooting on LAM 9600, LAM 9400, LAM Rainbow 4520, Axcelis, Fusion, Etcher Applied Material 8300, Tegal 903, Danippon, Gasonic, Gasonic PEP, Semitool, Rf generator and Microwave generator. . Conducted user training on site to ensure that every user knew how to maintain the system to prevent it from breaking down due to improper operation. . Further support work included regular daily on-site visits. . Attended to all emergency service calls where engineering solutions were required in order to diagnose and bring back on-line production operation. . Assisted the APAC Sales Director in prospecting for new clients in Asia, including attending client sales presentations to offer electrical and mechanical production automated production services to Malaysia, China & Singapore. Achievements: . Programmed automated machinery and power up systems including hardware setup and calibration optimization work. . Initiated semi-conductor equipment setup in China, Singapore and Shenzhen and commissioned a new production facility. . Delivered the project on time to the client . Secured business and revenue for company amounting to USD 20,000,000 – Siltera Kulim Project in Malaysia and SSMC Pasir Ris, Singapore through own initiatives, personal sourcing and networking. Reason for Leaving : Contract Assignment – Completed Project
  • 8. I Nixon Das + 6012 - 6400 270 I P a g e 8 i Private and Confidential EMPLOYMENT CHRONICLE c o n t I n u e d QUALITY ASSURANCE MANAGEMENT (QAM), Singapore May 2004 – Apr 2006 Leading technical service provider to the Semiconductor, Biotechnology, Pharmaceutical, Solar and Electronics Industry Senior Engineer Specialist & Project Engineer Reported to: Company Director Key Responsibilities: . Was based in Shanghai from May 13 – June 13th 2004 . Set-up the machines, hook up the power cables and power up the systems. . Hard ware set-up and calibration. . Conducted preventive maintenance and troubleshooting on the equipment P5000 and SACVD. Achievements: . Consistently delivered equipments on time in excellent working order. . Upgrade of equipment to standard spec according to client specification. . Implemented equipment improvement to achieve best possible equipment reliability and performance. . Reduced downtime, allowing equipment to run optimally at 95-97%. . Yield improvement from 89% to 96%. . Managed, guided and trained several engineers on the team. Reason for Leaving : Contract Assignment – Completed Project ST MICROELECTRONICS - Ang Mo Kio, Singapore Jun 2000 – May 2004 A world leader in providing the semiconductor solutions. Technician (Etching Department) Reported to: Section Manager and Department GM Key Responsibilities: . Responsible for carrying out corrective and preventive maintenance in order to ensure that the equipments operate within specifications. . Provided technical support throughout equipment installation and relocation stages to improve equipment capacities and efficiencies. . Implemented equipment reliability, efficiency improvement and cost reduction projects. . Carried out corrective and preventive action, based on the technical analysis done to improve fab yields. . Implemented projects to standardize equipment hardware. Achievements: . Implemented operating procedures to improve ease of use and cost of ownership. . Assisted in start up equipment for a New Plant. . Was able to hook up new machines and completed all assignments on time. Worked on the following tools: LAM 9600, LAM 9400, LAM Rainbow 4520, Axcelis, Fusion, Etcher, Applied Material 8300, Tegal 903, Danippon, Gasonic, Gasonic PEP, Semitool, Rf generator and Microwave generator. Reason for Leaving : Better career prospect, exposure and travel opportunity.
  • 9. I Nixon Das + 6012 - 6400 270 I P a g e 9 i Private and Confidential EMPLOYMENT CHRONICLE c o n t i n u e d NATIONAL SEMICONDUCTOR SDN BHD- Melaka, Malaysia Jan 1998 – Dec 1999 Subsidiary of National Semiconductor Corporation specializing in analog devices and subsystems Senior Technician Reported to : Section Manager and Department Head; Direct reports: 10 Technicians Key Responsibilities: . Headed the engineering department . Performed preventive maintenance and troubleshooting of equipments . Planned and upgraded equipments to achieve optimum and production output with lower down time . Co-ordinated TPM activities to ensure 24 hours support is available. Achievements: . TPM activities successfully achieved with team efficiencies Reason for Leaving : No career and role progression sighted. SGS THOMPSON MICROELECTRONICS, Singapore Jun 1996 – Dec 1997 A global independent semiconductor company that designs, develops, manufactures and market s a broad range of semiconductor integrated circuits (ICs) and discrete devices used in a wide variety of microelectronic applications, including telecommunications systems, computer systems, consumer products, automotive products and industrial automation and control systems. Technician (Etching Department) Reported to: Coordinator Key Responsibilities: . Performed corrective and preventive maintenance for wet and dry etch . Assisted Maintenance Engineer in performing daily line activities, troubleshooting PCB, Tegal, RF generator, semi tool and Alcatel vacuum mechanical pump. . Provided technical skill training to new technicians and PM technicians Achievements: . Implemented equipment improvement to achieve best possible equipment reliability and performance. Technical Assistant (Photolithography Department) Jun 1993 – May 1994 Reported to : Production Supervisor and Coordinator . Performed preventive maintenance on electrical chemical bench, canon tools, SVG Resist Coating tools and performed troubleshooting Reason for Leaving : To explore work opportunity in Malaysia.
  • 10. I Nixon Das + 6012 - 6400 270 I P a g e 1 0 i Private and Confidential EMPLOYMENT CHRONICLE c o n t i n u e d CENTRAL EDIBLE OIL- Melaka, Malaysia Jan 1992 – May 1993 A palm oil refinery division of Devon Group Line Leader Reported to: Plant Supervisor . Perform preventive maintenance . Support production line through troubleshooting Reason for Leaving : Career Progression EDUCATION Bachelor of Science in Electromechanical Engineering Cambridge International University, USA (2004-2006) NTC-3 Electromechanical Engineering Institute Technical Education (ITE), Singapore (1994 -1996) Sijil Pelajaran Malaysia (O-Levels) Sri Kota Secondary, Melaka TRAINING i CERTIFICATION Safety Training, Petronas Industry Standard: BOSET Offshore Safety Sdn Bhd – Expires 24th Nov 2015 Certificate of Competency: PCSB Permit To Work System Assessment Petronas Carigali Sdn Bhd – Jun 2012: Valid till 17th June 2015 Loss Prevention System with Knowledge Test Terengganu Safety Training Centre Sdn Bhd – Feb 2012 Primevera Project Managemet Course 102: Basic Enterprise Business Solutions (EBS) – Apr 2009 1. Endura HP ! VHP PVD Platform Maintenance & Calibration 2. Endura HP!VHP PVD Functional Description & Basic Trouble Shooting 3. Endura HP ! VHP PVD Operations & Programming Applied Materials Incorporated – Mar 2001 Advanced Chemical Handling National Semiconductor University – May 1998 EMPLOYMENT REFERENCES AVAILABLE UPON REQUEST