1. MIDEL C. DALANGIN
e-mail address: mdalangin13@yahoo.com
mobile # -+639353126947
Phil. tel.# - 0063632234145
RESUME
SUMMARY OF EXPERIENCE:
Engaged for more than 20 years in extensive work in the field of piping, Tie-in( cold and hot tapping),
structural supports, welding inspection, supervision of piping erection, testing, pre-commissioning,
material preparation and preservation, line checking and punch listing and killing, scheduling and
manpower distribution based on the given scope of work..
DETAILS OF WORK EXPERIENCE:
Employer: CHIYODA PHILIPPINES LIMITED
PILIPINAS SHELL PETROLIUM COMPANY (EURO 4 COMPLIANCE ) PROJECT
TABANGAO , PHILIPPINES
Client : SHELL PHILIPPINES
Duration: MARCH 2015 –NOV.2015
Position: PIPING SUPERINTENDENT/AREA OWNER
Employer: CHIYODA SINGAPORE LIMITED
SHELL CHEMICAL SERAYA ( GREASE – Grade Range Expansion And Scippy
Expansion ) PROJECT
JURONG ISLAND , SINGAPORE
2. Client : SHELL SINGAPORE
Duration: APRIL 2013 –APRIL 2014
Position: LEAD PIPING SUPERVISOR / AREA OWNER
Employer: CHIYODA SINGAPORE LIMITED
SHELL BUKOM SCOT & BUGIS PROJECT
BUKOM ISLAND , SINGAPORE
Client : SHELL SINGAPORE
Duration: JANUARY, 2011 – MARCH 2013
Position: PIPING SUPERVISOR
■ In-charge of all piping revamp works such demolition of existing lines, Tie-In activities, coordinating
with Shell PU’s personnel for windows of tie-in schedule and to ensure that all necessary factors has been
in place prior to commence work such as permits, equipments/ tools use for de-oiling and above all safety
during this activities.
■ Conduct daily coordination meeting with all discipline lead supervisors to discuss important matters that
affects the work flow as well as important matters with regards to project condition or status base on
priorities.
■ Delegate all important information discussed in coordination meeting to all contractor supervisors in my
areas of responsibilities like Test Package status to acquire smooth work flow and to avoid delays.
■ Coordinate and plan erection and installation of piping components
■ Supervise Contractors personnel in the field and fabrication as well as material preservations.
■ Ensure compliance with HSE standards and regulation.
■ Ensure compliance with project standards and specification
■ Check and ensure right sequence of work flow
■ Initiate changes if required in consultation with project engineering
■ Coordinate with other contractor to prevent interruption in workflow/ SIMOPS
■ Follow-up status of the work and compare planned and actual figures
■ recognize appearance of problems and report those items to superior
■ Compile and follow up punch list items to attain targeted date
■ Monitor and ensure that pressure testing comply with standards and specification
■ Monitor and ensure that LRP(line-up and reinstatement package) were carried on correctly prior to
steam/air blowing of its cleaning block or line cleaning.
Employer: GLOBAL CAOMPANY LTD.
SAUDI ARAMCO
MANIFA CORE HYDRO-CARBON PROJECT
MANIFA, KSA
Client : SAIPEM
Duration: JULY 2010 – JANUARY 15,2012
Position: PIPING ENGINEER
Employer: BATEMAN OIL AND GAS COMPANY
KASHAGAN FIELD DEVELOPMENT
KASHAGAN POWER GENERATION AND UTILITIES PROJECT
KARABATAN, KAZAKHSTAN
Client : AGIP KCO
Duration: SEPTEMBER, 2009 – JULY 2010
Position: PIPING ENGINEER
3. ■■ Attend daily coordination meeting with all discipline lead supervisors to discuss important matters that
affects the work flow as well as the project condition or status base on priority schedule. In charge of Test
Package preparations. Check and verify at site problems with regards to piping components before making
technical query and make recommendation base on ASNE standards and specifications, monitor and review
the billing prior to submission and provide look ahead schedule to acquire targeted production.
.
Employer: CHIYODA-TECHNIP JOINT VENTURE
QATAR GAS II EXPANSION PROJECT
TRAIN 4 AND 5 LNG PLANT
RAS LAFFAN, QATAR
Client : EXXON MOBIL
Duration: MARCH 29, 2007 – MARCH 31, 2009
Position: PIPING SUPERVISOR
Employer: LINDE ARABIA COMPANY
SABIC LINEAR ALPHA OLEFINS PROJECT
Duration: JUNE 1, 2005 – OCTOBER 15, 2006
Position: PIPING SUPERVISOR
Employer: RAYMOND SAUDI ARABIA LIMITED
SAFCO – AMMONIA AND UREA EXPANSION PLANT
Duration: JANUARY 2005 – MAY 2005
Position: PIPING INSPECTOR
Employer: SAUDI TOYO ENG’G COMPANY
JUPC PROJECT
EO/EG PLANT
Duration: 15 JUNE 2004 – 10 OCTOBER 2004
Position: PIPING INSPECTOR
Employer: ARABIAN CBI LTD.
ARAMCO GOSP-2 PROJECT
QATIF,SAUDI ARABIA
Duration: MARCH 10,2003 –13 JUNE 2004
Position: PIPING INSPECTOR
Employer: WARGA HIKMAT KEJURUTERAAN SDN. BHD.
MLNG –TIGA PROJECT
KBR-JGC CONSORTIUM
SARAWAK,MALAYSIA
Duration: APRIL 2001 – DECEMBER 2002
Position: QC INSPECTOR ( PIPING / WELDING )
Employer: MITSUBISHI HEAVY INDUSTRIES CO. LTD.
SABIYA POWER STATION
8 X 300 MW PROJECT
SABIYA, STATE OF KUWAIT
Duration: JUNE 1998 – FEBRUARY 2000
Position: PIPING INSPECTOR
4. ■ Job description:
■ perform inspection in piping spool fabrication(orientation, materials, consumables etc.) , material
preservations, also includes visual inspection of welding joints in accordance to ASME codes and standards.
■ Request necessary NDT requirements according to its line class requirements.
■ Review test package necessary documents before submission to client for approval.
■ Conduct punch listing before and after testing.
■ Witness hydrostatic and pneumatic testing in accordance to approved testing procedure
■ Witness cold and hot tapping to ensure correct procedure during the process.
Employer: FLUOR INTERNATIONAL LTD.
EQUATE PETRO-CHEMICAL PROJECT
SHUAIBA INDUSTRIAL AREA
STATE OF KUWAIT
Position: PIPING SUPERVISOR
Duration: MARCH 1996 – MARCH 1997
Job Description:
Responsible in supervision of all piping and structural work activities such as fabricaton, erection and
installation of piping and structural supports. material requisition shall be based on construction drawing
and specifications, also manpower/ equipments distribution shall be in proper/priorities to avoid delays.
Ensure that hydrostatic/pneumatic testing shall be in accordance to project procedure and specifications.
Punch clearing shall be in accordance to priority system to achieve project schedule.
Employer: MASTER IRON WORKS INCORPORATED
ASIA STEEL ROLLING MILL PROJECT
BULACAN, PHILIPPINES
Duration: JANUARY 1995 – JANUARY 1996
Positioin: PIPING FOREMAN
Job description:
Responsible in piping erection and installation of different piping and structural components with the
given plan specification, materials and preservations. Work also includes spool fabrication and testing of
different line systems with approved testing procedure as well as restoration of these lines after testing. Line
checking/punch listing of these lines were cleared before submission for final completion check. Manpower
distribution were done properly to acquire smooth work and schedules were met at given schedule.
Employer: EEI CORPORATION
PAGBILAO POWER STATION
2 X 380 MW POWER PLANT POROJECT
PAGBILAO,QUEZON, PHILIPPINES
Duration: 19 NOVEMBER 1994 – 10 JANUUARY 1995
Position: PIPEFITTER
Employer: EEI CORPPORATION
SHELL PHILIPPINES INC.
STAR PROJECT( OIL REFINERY )
Duration: 22 FEBRUARY 1994 – 05 NOVEMBER 1994
Position: PIPEFITTER
5. Employer: EEI CORPORATION
NATIONAL STEEL CORPORATION
FIVE YEAR EXPANSION PROGRAM
ILIGAN CITY, PHILIPPINES
Duration: 21 JANUARY 1991 – 20DECEMBER 1993
Postion: PIPEFITTER - A
Job Description:
Engaged in spool fabrication and installation and testing different piping lines as well as line
checking before and after testing. Also engaged in punch clearing before submission for final checking with
the client.
EDUCATIONAL ATTAINMENT:
COLLEGE : MINDANAO STATE UNIVERSITY
2 YEARS- MECHANICAL ENGINEERING
BSBA- ECONOMICS 1982 – 1987 – GRADUATE
UNIVERSITY SCHOLAR
MARAWI CITY
SECONDARY: MSU-ILIGAN INSTITUTE OF TECHNOLOGY
1978 - 1982
ILIGAN CITY
GOVERNMENT SCHOLAR
PRIMARY : SUAREZ ELEMENTARY SCHOOL
1972 – 1978
ILIGAN CITY
COMPUTER KNOWLEDGE: MICROSOFT WORD, MICROSOFT EXCEL, INTERNET AND SMART
PLAN REVIEW OPERATION(SPR-3D PIPING MODEL)
REFERENCES:
ENG’R DANILO MAGLINES PIPING SURENTINDENT
AGIP/KCO
KASHAGAN DVELOPMENT PROJECT
KARABATAN,KAZAKHSTAN
TEL. NUMBER – (8701)221-5411
Y. TAJIRI: LEAD PIPING ENGINEER
QATAR GAS-2 EXPANSION PROJECT
RAS LAFFAN,QATAR
MOBILE: +9745547366
E-MAIL AD: ytajiri@ctjv.com
ENGR.VICENTE JUNILLER : EEI PROJECT MANAGER / AGIP-KCO
SUPERINTENDENT
KASHAGAN DVELOPMENT PROJECT
KARABATAN,KAZAKHSTAN
6. MOBILE NO. +7701535654
E-MAIL AD. vicente.juniller@agipkco.com
BIO-DATA
NAME: MIDEL C. DALANGIN
SPOUSE: SUZANNE P. DALANGIN
DEPENDENTS: JEREMIAH DALE DALANGIN
JYDEL ANNE DALANGIN
JANNA DALANGIN
FATHER: MAGDALENO DALANGIN
MOTHER: VIRGINIA DALANGIN
CERTIFICATIONS/TRAINING:
SINGAPORE MINISTRY OF MANPOWER9MOM)
1. OIL/ PETROCHEMICAL INDUSTRY SAFETY COURSE FOR SUPERVISOR- SINGAPORE (AKC-
12-0819)
2. CONFINE SPACE
3. WORKING AT HEIGHT
BOLT TORQUING AND TENSIONING TRAINING- EEI SHELL STAR PROJECT PHILIPPINES
CPR/BLS/FIRST AID COURSE-KSA, MINISTRY OF HEALTH
FIELD SUPERVISOR ORIENTATION-JMSB-KMSB JOINT VENTURE, MALAYSIA
SAFETY AWARD EXCELLENCE- QATARGAS II LNG PROJECT, QATAR
SAFETY LEADERSHIP SKILL-PATH TRAINING- FLOUR ARABIA LIMITED, KSA
SUPERVISOR ROLES AND RESPONSIBILITIES-SAFETY- JMSB-KMSB JOINT VENTURE,
MALAYSIA
CHIYODA-TECHNIP JOINT VENTURE MANDATORY COURSES:
LOCK OUT/ TAG OUT
ACCIDENT/INCIDENT INVESTIGATION& REPORTING
CONFINED SPACE ENTRY
PERMIT TO WORK ( PTW )
METHOD STATEMENT & JSA
HAZARD IDENTIFICATION
WASTE MANAGEMENT
HEIGHT SAFETY
S.A.F.E. WORKSHOP
DEFENSIVE DRIVING
H2S TRAINING
QUALIFIED PERMIT RECIEVER LIVE AREAS QATARGAS PLANT
AGIP/KCO MANDATORY TRAINING COURSES:
HSE INDUCTION
MANAGER & SUPERVISOR ROLES & RESPONSIBILITIES
PERMIT TO WORK, REV.6
EXCAVATIONSAFETY AND BARRICADING
7. WORKING AT HEIGHTS
HEAVY LIFTING
COFINED SPACEFIRE SAFETY TRAINING
FISRT AID (RESCUE BREATHING CARDIO PULMONARY RESUSCITATION)
OIL SPILL TRAINING
SAFE DRIVING